HomeMy WebLinkAboutStormwater_Unfunded Request Form_Civitan Park (PARTIAL)PROJECT TITLE DEPARTMENT/DIVISION
Civitan Park Wetland Restoration Project Field Operations/Stormwater
PROJECT DESCRIPTION/JUSTIFICATION
The Civitan Park Wetland is a municipally -owned stormwater control measure (SCM) located directly adjacent to Salem Creek, which is biologically -impaired due to fecal coliforms. The wetland
allows for natural predation of fecal coliforms, thus reducing pollutant loading to Salem Creek. In addition, the wetland filters nutrients and soil particles from the upland area of Winston-Salem State
University. The reduction of fecal coliform waste loading is a requirement of the city's Stormwater NPDES permit, within the Total Maximum Daily Loading section. Since no maintenance activities
have been performed since 2008, the wetland will need to completely restored to its original engineered state. Once restored, maintenance activities will need to performed on an annual basis - funds
will be secured from the Stormwater Division's operating budget.
FINANCIAL SUMMARY:
Prior Years
Planned Appropriations
2023-2028
Total Approp
Budget Planning Planning Planning Planning Planning
To Date
FY 22-23
FY 23-24
FY 24-25
FY 25-26
FY 26-27
I FY 27-28
Grand Total
Expenditures
Planning/Design/Engineering
$0
$277,500
$0
$0
$0
$0
$0
$277,500
Land/Right-of-Way Acquisition
0
0
0
0
0
0
0
0
Construction
0
0
920,000
920,000
0
0
0
1,840,000
Equipment & Furnishings
0
0
0
0
0
0
0
0
Other (Specify) - Permits
0
10,000
0
0
0
0
0
10,000
Contingency - 20%
0
57,500
184,000
184,000
0
0
0
425,500
Total Project Expenditures
$0
$345,000
$1,104,000
$1,104,000
$0
$0
$0
$2,553,000
Funding Sources
General Fund
$0
$0
$0
$0
$0
$0
$0
$0
GO Bonds/Authorized
0
0
0
0
0
0
0
0
GO Bonds/Two-Thirds
0
0
0
0
0
GO Bonds/Unauthorized
0
60
Revenue Bonds
0
0
0
0
0
0
0
0
Special Obligation Bonds
0
0
0
0
0
0
0
0
Limited Obligation Bond (Previously COPS)
0
0
0
0
0
0
0
0
Grants (Specify Source)
0
0
0
0
0
0
0
0
Assessments
0
0
0
0
0
0
0
0
NCMLC
0
0
0
0
0
0
0
0
Other (Specify)-Stormwater Utility Fund
0
345,000
1,104,000
1,104,000
0
0
0
2,553,000
Total Project Funding Sources
$0
$345,000
$1,104,000
$1,104,000
$0
$0
$0
$2,553,000
OPERATING IMPACT:
Personnel
$0
$0
$0
SO
$0
$0
$0
Supplies and Services
0
0
0
0
0
0
0
Capital Outlay/Lease Payments
0
0
0
0
0
0
0
(Less Operating Revenues)
0
0
0
0
0
0
0
Total Net Expenditures
$0
$0
$0
$0
$0
$0
$0
28