Loading...
HomeMy WebLinkAboutStormwater_Unfunded Request Form_Civitan Park (PARTIAL)PROJECT TITLE DEPARTMENT/DIVISION Civitan Park Wetland Restoration Project Field Operations/Stormwater PROJECT DESCRIPTION/JUSTIFICATION The Civitan Park Wetland is a municipally -owned stormwater control measure (SCM) located directly adjacent to Salem Creek, which is biologically -impaired due to fecal coliforms. The wetland allows for natural predation of fecal coliforms, thus reducing pollutant loading to Salem Creek. In addition, the wetland filters nutrients and soil particles from the upland area of Winston-Salem State University. The reduction of fecal coliform waste loading is a requirement of the city's Stormwater NPDES permit, within the Total Maximum Daily Loading section. Since no maintenance activities have been performed since 2008, the wetland will need to completely restored to its original engineered state. Once restored, maintenance activities will need to performed on an annual basis - funds will be secured from the Stormwater Division's operating budget. FINANCIAL SUMMARY: Prior Years Planned Appropriations 2023-2028 Total Approp Budget Planning Planning Planning Planning Planning To Date FY 22-23 FY 23-24 FY 24-25 FY 25-26 FY 26-27 I FY 27-28 Grand Total Expenditures Planning/Design/Engineering $0 $277,500 $0 $0 $0 $0 $0 $277,500 Land/Right-of-Way Acquisition 0 0 0 0 0 0 0 0 Construction 0 0 920,000 920,000 0 0 0 1,840,000 Equipment & Furnishings 0 0 0 0 0 0 0 0 Other (Specify) - Permits 0 10,000 0 0 0 0 0 10,000 Contingency - 20% 0 57,500 184,000 184,000 0 0 0 425,500 Total Project Expenditures $0 $345,000 $1,104,000 $1,104,000 $0 $0 $0 $2,553,000 Funding Sources General Fund $0 $0 $0 $0 $0 $0 $0 $0 GO Bonds/Authorized 0 0 0 0 0 0 0 0 GO Bonds/Two-Thirds 0 0 0 0 0 GO Bonds/Unauthorized 0 60 Revenue Bonds 0 0 0 0 0 0 0 0 Special Obligation Bonds 0 0 0 0 0 0 0 0 Limited Obligation Bond (Previously COPS) 0 0 0 0 0 0 0 0 Grants (Specify Source) 0 0 0 0 0 0 0 0 Assessments 0 0 0 0 0 0 0 0 NCMLC 0 0 0 0 0 0 0 0 Other (Specify)-Stormwater Utility Fund 0 345,000 1,104,000 1,104,000 0 0 0 2,553,000 Total Project Funding Sources $0 $345,000 $1,104,000 $1,104,000 $0 $0 $0 $2,553,000 OPERATING IMPACT: Personnel $0 $0 $0 SO $0 $0 $0 Supplies and Services 0 0 0 0 0 0 0 Capital Outlay/Lease Payments 0 0 0 0 0 0 0 (Less Operating Revenues) 0 0 0 0 0 0 0 Total Net Expenditures $0 $0 $0 $0 $0 $0 $0 28