Loading...
HomeMy WebLinkAboutCivitan Park Wetland 2021 Inspection Form CompletedCity of Winston-Salem Stormwater Division — Stormwater Post Construction Permit Annual Compliance Report Development Name: 61 V ITP*%�k PA(A( WVEEL Permit No: tom( )ry Contact Person: - (�.G .r Phone Number: ^3-3 G_ -1 *7— 6q 6 1 Inspection Year (e.g. June 2019-May 2020): Z ) Development Address: tsFF rgLu V�Np C�r6L ot� Permit Information Stormwater Management System Addresses (circle one): Water Quality Water Quantity Both Stormwater Control Measures (SCM's) Inspected in the past year applicable to this site (insert nun ex of ea _Wet Ponds Infiltration Basins Infiltration Trenches Swales Stormwater Wellar Dry Ponds Bioretention Cells Permeable Pavement Sand filters (circle one — pe Closed Underground Cistem/Piping Detention System _Level Spreader/Filter Strip Bay Filters Contech Filters Other (specify type and number on site): File Review - Notification of Chances etc. Yes No N/A 1. Is the development still consistent with the approved set of as -built records? (Have additions been made to the site which have increased the impervious area for example but for which the City Stormwater Division was not notified 2. In the case of a HOA has the contact person for the BOA changed since the time of the recorded O&M Agreement? If so please provide the new contact for the HOA in a later section of this report t/ 3. Has the ownership of the system changed since the O&M Agreement was recorded? 4. Has the City of Winston-Salem Stormwater Division been notified of any owner changes and have the appropriate procedures been followed for such change in ownership per the O&M Agreement requirements? Built lJnen Area l6LJA1 Yes No N/A 5. Is the BUA still consistent with the permitted design or have other constmction activities occurred without the Stormwater Divisions knowledge? ✓ 6. Is the BUA aspermitted) graded such that the runoff drains to the system? ✓ 7. Is the drainage area still consistent with thepermit? i.e. no un ermitted drainage to the SCMS ✓ 8. Is the drainage area stabilized? to reduce risk of sedimentation to the SCM's) ✓ Stormwater SCM's - Cenaral Vas No N/A 9. Are the SCM(s) still located per the approved plans? r/' 10. Are [he SCM s s ecifications still matchin the ermitted Tans? 11. Have any un ermitted changes or modifications been made to the SCM(s)? 12. Are the Riparian buffers recorded during permitting if applicable) free of disturbance & built upon area? Stormwater SCMtsI - Oneration and Maintenance Yes No N/A 13. Are the recorded Stormwater Access and Maintenance Easements, or general access to the site and the system in the case of a blanket easement, clear and well maintained? 14. Are the SCM(s) been operated and maintained per thepermit/recorded O&M Agreement requirements? 15. Have all of the SCM(s) inspections carried out in the past year been carried carper the required frequency as stated in the O&M Agreement and copies of those inspections provided here with this annual report? 16. If the inspections necessitated any maintenance of the SCM(s) has all such documentation of maintenance been provided here as in what the issue was, who carried out the maintenance/repairs, when was it done along with photographic evidence of before and after repairs? Ciry of Winston-Salem Stormwater Division —Stormwater SCM(s) Annual Compliance Report Page 1 of 2 City of Winston-Salem Stormwater Division — Stormwater Post Construction Permit Annual Compliance Report SCM s Ins ectors Yes No N/A 17. Have all of the past years inspections of the SCM(s) been carried out by a suitable qualified professional such as a Registered Engineer or Landscape Architect in the State of North Carolina, or an individual who has attained certification to inspect SCM(s) through North Carolina State University's SCM Inspection course? Documentation of such credentials must be included with the annual inspection records submitted with this report and should include. the name, their contact address and phone number and proof of their qualifications to carry out such inspections such as seals attached to the inspections or photocopies of their NC State certification. Ins ection Photo ra hs — **Re ulred to be submitted with annual Ins ection re orts** Yes No NIA 18. Are ail relevant photographs [akeh during [he individual inspections and if applicable, maintenance activities, included here in with this report submittal and do all these photographs have date stam s? Comments -Please list or include below any other comments that you may see as relevant to this submittal of records. W t T l_ �r� r�iX�S 4aMP � c 'cE �.r�2tivv 1_ AG.Gk>S is I✓APotstQt_E O k� kry fc)t,%0E SPEGt,F5 ALL_ PfLaJY.sA P flli tw C«41- Ownershio Information -Provide the latest owner and/or HOA contact person name, address and phone number below. Please note that if changes to ownership were made without the City Stormwater Division been made aware of it, then the original owner and the new owner must immediately address and comply with the O&M Agreement item that details transfer of ownership and request that the Stormwater Division reissue the permit to the new owner. Please state if this is the case Financial Statement of Escrowed Funds - If a HOA is involved in the ownership of this Stormwater management system then this means there was an escrow account established at the time of permitting. The HOA is obliged to add funds to this account per the Post Construction Stormwater Management ordinance and O&M Agreement/Escrow Agreement requirements and to maintain such funds in this account. A most recent financial statement of escrowed funds should be attached here to this report Financial Statement Attach d ❑ Yes ❑ No (If no explain why not and when this statement will be provided) iJ rA Compliance Status ❑ Compliant � Non -Compliant If non -compliant with any aspect of the permit and its O&M Agreement please provide additional documentation, plan of action etc. of how and when the non -compliant issues will be addressed. '% tS t5 saMErNt"'`I TKt DePf ZT(AeNT vMpintwsc�ncrvr wwst ApP( -55 �3Pv�•� 2�eEtPT �F t NSPt.C�fte'� Inspector Name and Signature:T scDK �o(n+lLTy/� 'cam- -ram'*, pate: Inspector Qualifications: (State NC License Number to this report or include a copy of NC State SCM Inspector Qualifications) City of Wius[on-Salem Stormwater Division — Stormwater SCM(s) Auuual Compliance Aeport Page 2 of 2 STORMWATER WETLANDS: O & M Inspection Checklist _ i cv�) of_ 1. vvzo ur-c qLl V�L�IJavO "TbT91l j u 2vwY� —Npr V)Cc(Si�IL YES NO NIA fLVZ,n4 INLETS and FOREBAY 1. Inlets are located per the approved plans: = r\( Jq , N 7 i S ❑ ❑ cn er�rU S�- 2. Inlet device (swale or pipe) is free of erosion, damage or clogs: ❑ ❑ L�' 3. Forebay berm is in place and without erosion: ❑ ❑ j 4. Energy dissipaters such as rip -rap aprons and plunge pools are in place and functioning: ❑ ❑ il:l� 5. Forebay is free of excessive sediment: L e7u L,p 6Vv1A �i ZVL ❑ �/ 6. Forebay is free of trash: ",,tea „,vykq , t ryD ❑ 14� ❑ SIDE SLOPES AND BANKS 7. Vegetated side slopes are no steeper than 3:1: (LOA" T TL &L(_ ❑ ❑ LJ2 8. Banks are stable and free of erosion or bare soil: r ' " ❑ ❑ LLk 9. Slopes or berms are free of woody vegetation: ❑ ❑ 10. Free of muskrat or beaver activity: 1 K,-wdl0 .Sovne GRiTT l:� ``S lYNl'(NL ❑ LP� ❑ 11. Plants are healthy and being maintained: -Tw ❑ i U� ❑ 12. Shallow land is free of flooding at 5 days after rain event (should draw down in 2-5 days): ❑ ❑ G�hv7 TL�u 13. Main treatment area is free of excess sediment accumulation: cva ti"-c -rLa.L _ Exiqe4T nra ❑ Ljz� ❑ 14. Main treatment area is free of trash and other debris: rr-w r i Lqq . - e� xa %&T nso ❑ D� ❑ 15. Algal growth covers less than 25% of the basin surface area: cr&r T Ttp7 . - t c ST ❑ ❑ J:le 16. Cattails, phragmites or other invasive plants cover ss than 25% of the basin surface area: ❑ ❑ 17. Access easement Is being maintained: ❑ f� ❑ OUTLETS AND OUTLET DEVICE 18. Swale or emergency outlet bypass (spillway) is in the correct place and in good condition: ❑ ❑ L� GA4�T 7�u 19. Spillway has correct ground cover as per approved deviceje.g. vegetated or rip -rap): ❑ ❑ Lp' G✓aN z � l.%�-L 20. Deep pool near outlet is free of vegetation: GAT ❑ ❑ -Er 21. Drawdown device is correctly sized free of damage or clogging: GA'�T Ac c s5 ❑ ❑ 22. Drawdown valve (if applicable) is closed and not leaking: GMvr ac�e,056 ❑ ❑ 23. Orifice size matches the approved plans and is not dogged: 6AVi T Ac.�L SS ❑ ❑ kfr 24. Outlet riser (if applicable) is structurally sound and not leaking: e44Irvr Acr E% ❑ ❑ QJ 25. Weir size matches the approved plans and is not clogged or damaged: crvVT AccE5S ❑ ❑ e 26. Area at outlet is free of erosion, clogs or other signs of damage: Gv'"T A c ecE, SS ❑ ❑ 4?f 27. Energy dissipater at outlet is in place and functioning: (zv.r C Ikwc ❑ ❑ 0' 28. Trash rack is provided: G/}NZ AcZ�GSS 0 ❑ 0 29. The vegetated filter and level spreader is in place (if applicable): ❑ ❑ kL2' 30. Vegetated filter strip and level spreader inspection form completed (if applicable): ❑ ❑ LD- 31. Relative elevations match the approved plans: C. M T Try Lam' ❑ ❑ i37 eAm5-3sl6�5 .SW-( 50 Note: If there is more than 1 wetland on the property then a separate inspection checklist must be completed for each wetland. The Inspector should note on each checklist which wetland the inspection form refers to and describe its location on the property (t) Date of Inspection Name of Inspector (Please type) Sigature of Inspector Qualification of Inspector (Please describe your credentials/qualifications to carry out this inspection below)