Loading...
HomeMy WebLinkAboutGW1-2022-06264_Well Construction - GW1_20220628 WELL CONSTRUCTION RECORD (GW 1 Pr, Fol- y 2 For Internal Use Only: 1.Well Contractor Information: CHRISTOPHER WATCHER ;14wArElzoNEs Well Contractor Name FROM TO DESCRIPTION 4448A `$Lo ft. b$ ft. (D 0""1 NC Well Contractor Certification Number f1 ft. 15 O,UTERLC*ASiNG<for muttrcesediivellsiOR L1NERi iI-a- `Iiealile .;. CUMMINGS DEVELOPMENTS , INC FROM TO DIAMETER THICKNESS MATERIAL Company Name ^^ +1 ft. fL 6 5/8 In. .188 G.STEEL 2.Well Construction Permit#: �G^r�l 1 a /(� 16.;INNER'GASINGOR TUBING 'eornermal elosed5loo FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction perm is C.e.UIC,County,State,_etc) ft ft. in. 3.Well Use(check well use): ft. ft. in. r ply Well: !'3.7CSCREEN"pl TO DIAMETER SLOT SIZE THICKNESS MATERIAL �Municipal/Public ft. ft. in. al(Heating/Cooling Supply) Residential Water Supply(single) ft. ft. in. Commercial Residential Water Supply(shared)IrriIrrigation ROi3T_ _FROM TOMATERIAL EMPLACEMENT METHOD&AMOUNT Supply Well: 0 ft- 20 ft. PORT.CEMENT POURg Recovery ft. ft. Injection Well: Aquifer Recharge 13Groundwatcr Remediation ft. ft. Aquifer Storage and Recovery49':SAND/GRA1VEL'PACK,if a"'licatile't Salinity Barrier FROM TO MATERIAL EMPLACEMENT DiETHOD Aquifer Test �Storntwater Drainage ft. ft. Experimental Technology Subsidence Control ft. tI. Geothermal(Closed Loop) Tracer 20:'DRILL''iNGI OG atfacli:additiorialSheets if.oecessa ;',:' Geothermal(Heating/Cooling Return) rjbther(explain under#21 Remarks) F OM TO DESCRIPTION(color,hardness,so Wrack e, min size,etc.) rt. 41 ft. J r _?_Z2 d i l 4.Date Well(s)Completed: Well ID# [.i!F ft. TO ft. 61 5a.a.'Well (Location: �1 ft. ft. _ _ It(�n 1 1C1 S`n l DAII (��L LC ft. ft. 4.�. ..,.s r .r %,—V Facility/Owner Name FacillityID#(if/alppl1U,C_liicaable)) ft• ft. 2022 I D 3 l P 0,01j1�� [�1f.A..r l-1 V rL 11. Physical Address,City,andygl 1114Ci 21.'REIVIARIf5 County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one hit/long is sufficient) 22.Certification. 6.Is(are)the well(s)oPermanent or oTemporary Si ire ofCcrtif ell Contractor Date By si i dos form,I hereby certify that the svell(s)was(were)constructed in accordance 7.is this a repair to an existing well: ®Yes or JMNo pill,15A NCAC 02C.0100 or 15A NCAC 03C.0200 Well Construction Standauds and that e Phis is a repair,fill out known well constriction information and explain the nature of the copy of this record has been provided to the well owner.repair under#21 remarks section or on the back of Unis form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only I GW-1 is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessary. drilled: SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: ou (ft.) For nmltiple wells list all depths ifdifferent(kran,ple-3 a 200'and 2 a 100') 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: 10.Static water level below top of casing: If w _ater level is above casing,ruse '+,, � (ft.) Division of Water Resources,Information Processing Unit, 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 6 (in.) 24b.For Iniection Wells: In addition to sending the form to the address in 24a 12.Well construction method: ROTARY above,also submit one copy of this form within 30 days of completion of well (i.e.auger,rotary,cable,direct push,etc.) construction to the following: FOR WATER SUPPLY ELLS ONLY: Division of Water Resources,Underground Injection Control Program, 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) Method of test: AIR ROTARY 24c.For Water Supply&Iniection Wells: In addition to sending the form to 13b.Disinfection type: HTH nn the address(es) above, also submit one copy of this form within 30 days of Amount: ad? completion of well construction to the county health department of the county where constructed. Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 2-22-2016