Loading...
HomeMy WebLinkAbout20140701 Ver 1_401 Application_20140714C ter Le�r�a C1earWater Environmental Consultants, Inc July 7, 2014 www.cwenv.com Ms. Tasha McCormick US Army Corps of Engineers Asheville Regulatory " Field Office 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 -2638 Ms. Karen Higgins NC DWR, 401 & Buffer Permitting Unit 512 N. Salisbury Street, 9t' Floor Raleigh, North Carolina 27604 RE: Biltmore Lake — Block I ( +/- 66 AC) Biltmore Lake, LLC Buncombe County, North Carolina Dear Ms. McCormick and Ms. Higgins: The attached Pre- Construction,Notification (PCN) is being submitted on behalf of Biltmore Lake, LLC represented by Mr. Lee Thomason. The project site is located off Reeves Cove Road within the Biltmore Lake Subdivision in Asheville, Buncombe County, North Carolina The applicant is seeking a Nationwide Permit 12 and 13 for bank stabilization and utility line crossings. Please do not hesitate to contact me- at 828 - 698 -9800 if you have any questions or comments regarding the enclosed PCN. A copy of this package has been sent to Mr. Doug Besler of the NC Wildlife Resources Commission for review. A copy of this application has also been submitted to Mr. Tim Fox of the NC Division of Water Resources, Asheville Regional Office. Respectfully, Rebekah L. Newton Project Biologist Copy Furnished: NC Division of Water Resources, Asheville— Tim Fox NC Wildlife Resources Commission — Doug, Besler 224 South Grove Street, Suite F Hendersonville, NC 28792 828 - 698- 9800'Tel 828 - 698 -9003 Fax R. Clement Riddle, P.W.S Principal Corps Submittal Cover Sheet Please provide the following info: L Project Name: Biltmore Lake — Block I 2. Name of Property Owner /Applicant: Mr. Lee Thomason; Biltmore Lake, LLC 3. Name of Consultant/Agent: C1earWater Environmental Consultants, Inc. *Agent authorization needs to be attached. 4. Related/previous Action ID numbers(s): 2003 - 3'03'84 -NW12; 2003 - 30385 -NW39 200330385 -NW39; 2003- 30492 -NW42 5. Site Address: Reeves Cove Road 6. Subdivision Name: Biltmore Lake 7. City: Enka 8. County: Buncombe 9. Lat: 35.520385N Long: - 82.659938W (Decimal Degrees Please) 10. Quadrangle Name: Enka 11. Waterway: Bill Moore Creek 12. Watershed: French Broad 06010105 13. Requested Action: X Nationwide Permit # 12 and 13 General Permit # Jurisdictional Determination Request _ Pre - Application Request The following information will be completed by the Corps office: AID: Prepare File Folder Assign number in ORM Begin Date Authorization: Section 10 Section 404 Project Description/Nature,of Activity/Project Purpose: Site/Waters Name: Keywords: Cwa,rW er Department of the Army NCDENR Wilmington District, Corps of Engineers NC DWR, Webscape Unit Attn: Scott McLendon, Chief Regulatory Division Attn: Karen Higgins PO Box 1'890 512 North Salisbury Street Wilmington, NC 28402 -1890 Raleigh, North Carolina 27604 I, the current landowner /managing partner of the property identified below, hereby authorize ClearWater Environmental Consultants, Inc. (CEC) to act on my behalf as my agent daring the processing of jurisdictional determination requests and permits,to,,impact Wetlands and Water of the US subject to ,Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. CEC is authorized to provide supplemental information as needed at the request of the USACE or DWR. Additionally, I authorize representatives of the Wilmington District, US Army Corps of Engineers to enter upon the property herein described for the purposes of'conducting on- site investigations and issuing a determination associated with Wetlands and Waters of the US subject to Federal jurisdiction under Section 404 of the Clean Water Act and /or Section 10 of the Rivers and Harbors Act of 1899. Property Owner of Record: —� Property Owner of Address: A2 4 Phone Number. Property Location: Owner/Managing Partner Printed Name: Owner/Managing Partner Signature: Date: 224 South Grove Street, Suite F Hendersonville, NC 28792 Phone: 828 - 698 -9800 www cwenv.com otoF w n rF9oG 6 I 1 > y PAID 20140701 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version Pre - Construction Notification PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ®Section 404 Permit ❑Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 12 and 13 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Biltmore Lake — Block I 2b. County: Buncombe 2c. Nearest municipality / town: Asheville 2d. Subdivision name: Biltmore Lake 2e. NCDOT only, T.I.P. or state project no: n/a _ 3. Owner Information 3a. Name(s) on Recorded Deed: Biltmore Lake, LLC ; 3b. Deed Book and Page No. 3925/0177 j r ;n t !_ 3c. Responsible Party (for LLC if applicabl e): Mr. Lee Thomason �QJALlr777�' �fVAT� + 3d. Street address: 1 Town Square Blvd., Suite 330 3e. City, state, zip: Asheville, North Carolina 28803 3f. Telephone no.: 828- 209 -2000 3g. Fax no.: n/a 3h. Email address: Thomason@biltmorefarms.com Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner,) 4a Applicant is. ❑,Agent ❑ Other, specify- 4b Name 4c Business name (if applicable) 4d. Street address 4e. City,, state, zip- 4f Telephone no 4g. Fax no.: 4h. Email address- 5. Agent/Consultant Information (if applicable) 5a. Name R Clement Riddle 5b Business name (if applicable)- ClearWater Environmental Consultants, Inc 5c. Street address 224 South Grove Street, Suite F 5d City, state, zip* Hendersonville, North Carolina 28792 5e Telephone no.. 828 -698 -9800 5f Fax no.. n/a 5g Email address. rebekah @cwenv.com Page 2 of 11 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a Property identification no. (tax PIN or parcel ID) 9619 -13 -8409 1b Site coordinates (in decimal degrees) Latitude. 35.520385 Longitude -82- 659938 (DD DDDDDD) ( -DD DDDDDD) 1c Property size. +/- 66, acres 2. Surface Waters 2a Name of nearest,body of water (stream, river, etc ) to Bill Moore,Creek proposed project* 2b Water Quality Classification of nearest receiving water. C - from source to Hominy Creek 2c. River basin Upper French Broad 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The proposed utility line crossings and road bridges will serve a previously undeveloped portion of the Bdtmore Lake residential development Currently, th&site is forested with residential development to the north General land use in the vicinity is residential, commercial, and forest land 3b List the total estimated acreage of all existing wetlands on the property Approximately 0 03AC 3c. List,.the total estimated linear feet of all existing streams (intermittent and perennial) on the property: Approximately 3,740LF 3d Explain the purpose of the proposed project The purpose of the proposed project is to expand the existing Biltmore Lake subdivision 3e Describe the overall project in detail, including the type of equipment to be used - The project includes the development of lots, roads, and associated infrastructure Streams crossed by roads will be bridged. Bank stabilization will be used at bridge abutments. The utility�crossings will be installed using the "trench -cut" method The stream banks will be returned to pre - existing conditions after installation The stream banks at Crossing #2 will be stabilized with matting and seed. 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ❑ Yes ® No ❑ Unknown project (including all prior phases) in the past? Comments: 4b If the Corps made the jurisdictional determination, what type ❑preliminary E] Final of determination was made 4c If yes, who delineated the 'jurisdictional areas? Agency /Consultant Company. Name (if known). Other. 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ® Yes El No El Unknown this project (including all prior phases) in the past? 5b If yes, explain in detail according to "help file" instructions Action ID 2003 -30384 and 2003 - 30384, Nationwide Permits 12 and 39, issued January 30, 2003 Action ID 2003 - 30492, Nationwide Permit 42, issued March 25, 2003 Action ID 2005 - 31655, Nationwide Permit 39, issued June 1, 2005 Page 3 of 11 PCN Form — Version 1 3 December 10, 2008 Version 6. Future Project,Plans 6a Is this a phased project? ® Yes ❑ No 6b. If yes, explain Biltmore Lake is a master planned residential community,that is being developed in phases At the beginning of the project (2003), it was expected that all phases would be complete by 2008. Due to the economic downturn, phases of this project were /have been delayed A master plan has been included for review (Attachment A). Page,4 of 11 PCN Form — Version 1 3 December 10, 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b 2c 2d. 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑No ❑DWQ_ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments - 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a. 3b 3c. 3d 3e 3f 3g Stream impact Type,of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) Bank Stabilization S1 ® P ❑ T for Bridge and Temp Utility Bill Moore Creek ® PER ❑ INT ® Corps ® DWQ 5 66 Crossing S2 ❑ P ®T Temp. Utility UT Bill Moore ® PER ® Corps 3 20 Crossing Creek ❑ INT ® DWQ Bank Stabilization S3 ®P ❑ T for Bridge and UT Bill Moore ® PER ® Corps 3 50 Temp Utility Creek ❑ INT ® DWQ Crossing S4 ❑ P ❑ T ❑ PER [],Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 136 3i Comments All utility crossings will be installed using the "trench -cut" method and the streams will be returned to pre-- Page 5 of 11 PCN Form — Version 1.3 December 10, 2008 Version existing conditions upon completion of construction Bank stabilization will be used around bridge abutments to avoid scour and erosion around the bridge 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S then individually list all open water impacts below 4a Open water impact•number — Permanent (P) or Tem ora T 4b Name of waterbody (if applicable) 4c Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 ❑P ❑T 02 ❑P 03 ❑P 04 ❑ P'❑ T 4f. Total open water. impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments 5h. Is a dam high hazard permit required ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) - 5j Size of pond watershed (acres). 5k. Method of construction Page 6 of 11 PCN Form — Version 1 3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar - Pamlico ❑ Other. Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c 6d 6e. 6f 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent,(P),or for Stream name mitigation (square feet ) (square feet) Temporary T im act required?, 61 ❑P ❑T ❑Yes ❑ No B2 ❑P ❑T El Yes ❑ No B3 ❑P ❑T El Yes ❑ No 6h Total buffer impacts 61. Comments D. Impact Justification and Mitigation 1. Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Bridges are being utilized for road crossings. Bridges and utility lines will be located at the same spot along the streams lb Specifically describe measures taken to avoid or minimize the,1proposed impacts through construction techniques Construction equipment will be operated from high ground The utility lines will be installed using the "trench -cut" method After installation, the stream bed and banks,will be returned to original contours. Crossing #2 will be stabilized with matting and seed. The impact to the streams associated with the utility lines will be temporary 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U S or Waters of the State 2b If yes, mitigation is required by (check all that apply)- ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this project? ❑ payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of'Mitigation Bank. 3b Credits Purchased (attach receipt and letter) Type Quantity Page 7 of 11 PCN Form — Version 1 3 December 10, 2008 Version 3c Comments 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b. Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e Riparian wetland mitigation requested= acres 4f Non- npanan wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h. Comments ,5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan 6. Buffer Mitigation (State Regulated Riparian Buffer Rules)— required by DWQ 6a Will the, project, result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑ No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h. Comments. Page 8 of 11 PCN Form — Version 1 3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified Riparian ❑ Yes ® No within one of the NC Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why Comments ❑ Yes No ❑ 2. Stormwater Management Plan 2a What is the overall percent imperviousness of this project7 —20% 2b_ Does this project require a Stormwater Management Plan'? ® Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan, explain why 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan Buncombe County has been delegated authority for review and approval of SMPs in their jurisdiction The stormwater "Letter of Approval" dated,April 14, 2014 has been attached for review`(Attachment B) ® Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater'Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this, project? Buncombe County ® Phase II 3b Which of the following locally- implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply)* ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ® Yes (Attachment B) ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties 4a Which of the following state - implemented stormwater management programs apply ❑ HQW ❑ ORW (check all that apply), ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of,approval'been attached? ❑ Yes ❑ No S. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been mete ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1.3,December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the El Yes No use of public (federal /state) land? lb If you answered "yes" to the above, does the,,project require, preparation of an environmental document pursuant to the requirements ofthe National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC•2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ SurfaceMater or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b Is this an after - the -fact permit application? ❑ Yes ® No 2c If'you:answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most,recent DWQ, policy If you,answered "no," provide,a short narrativeAescnption The proposed utility lines and roads will service lots in the Bdtmore Lake residential development. Bdtmore Lake is a master planned community Any residents moving onto newly developed lots can obtain all goods and services from existing facilities along the Smoky Park Highway corridor. The proposed activities will not result in additional development that could impact nearby downstream water quality 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods,and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility Wastewater generated at the site will be treated at the local municipal facility There,is existing sanitary sewer service along Reeves Creek Road The, proposed, sewer lines will connect to the existing service. Page 10 of 11 PCN Form — Version 1 3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) ,5a Will this project�occur in or near an area with federally protected species or El Yes No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act 'impacts? ❑ Yes No ® 5c If yes, indicate the USFWS Field Office you have contacted ❑ Raleigh ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? FWS County data and the Natural Heritage Program Element Occurrence data 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential -fish habitats ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? South Atlantic Habitat and Ecosystem IMS Impact will not occur in a manne system 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area-that the state, federal or tribal governments have designated.as having historic or cultural preservation ❑ Yes ® No status (e•g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? National Register of Historic Places,recotds maintained by'the NC State Historic Preservation Office (SHPO) and available on SHPO's HPOWEB GIS Service and the National Park Service's Download Center The Enka Mill Historic District (Study List Site #BN0377) is located - approximately 1_ mile from the proposed project,site It is the opinion of CEC, that proposed activity is not likely to threaten the integrity of this site 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ® Yes ❑ No 8b If yes, explain how�project meets FEMA requirements- A Floodplain Development Permit was issued by Buncombe County on June 18, 2013 (Attachment C) 8c What source(s) did you use to make the floodplain determination? NC Floodplain Mapping Program — Digital Flood Insurance Rate Map (DFIRM) panel 9616 (effective 01/06/10). C1er�e 7-7-/Y Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature'is valid only if an authonzation letter from the applicant is provided Page 11 of 11 PCN Form — Version 1 3 December 10, 2008 Version Biltmore Lake - Block 1 (+/- 66 AC) DravAty: RLN 06.05.14; CEC Project# 311 Buncombe County, North Carolina 0 0.25 0.5 1 MiIes G_earWater 224 South Grove Street, Suite F Hendersonville, North Carolina 28792 Site Vicinity Figure 1 Biltmore Lake - Block 1 ( +/- 66 AC) Buncombe County, North Carolina CLearWater 224 South Grove Street, Suite F Hendersonville, North Carolina 28792 USGS Topographic Map Enka Quad Figure 2 PROPOSED SANITARY PROPOSED UTILITY /BRIDGE SEWER MAIN (TYP) STREAM IMPACT (66 LF) PROPOSED V Preliminary ftA=1 , LOCATION MAP WATER MAIN rar m em" (TYP ) CONSULTING ENGINEERS & LAND PLANNERS i I , i III _ I 1114 r Figure 3.0 214 N ,King Street Buncombe County �l�- , L\VAAHendersonville, NC 28792 (828) 687.7177 North Carolina \ wgla com EXISTING STREAM — v� (TYP ) Is I PROPOSED UTILITY — STREAM IMPACT (20 LF) PROPOSED BRIDGE/ UTILITY STREAM IMPACT (50 LF) PROJECT - BOUNDARY EXISTING SANITARY SEWER MAIN (TYP ) �\ \' s t:'� a EXISTING WETLAND (TYP ) — BILL MOORE CREEK �A � 1w ' V Preliminary ftA=1 , LOCATION MAP Not for Construction rar m em" WILLIAM G. LAPSLEY & ASSOCIATES, P.A. CONSULTING ENGINEERS & LAND PLANNERS i I , i III _ I 1114 r Figure 3.0 214 N ,King Street Buncombe County �l�- , L\VAAHendersonville, NC 28792 (828) 687.7177 North Carolina \ wgla com EXISTING STREAM — v� (TYP ) EXISTING SANITARY SEWER MAIN (TYP ) �\ \' s t:'� a EXISTING WETLAND (TYP ) — BILL MOORE CREEK �A � 1w ' V Preliminary ftA=1 , LOCATION MAP Not for Construction rar m em" WILLIAM G. LAPSLEY & ASSOCIATES, P.A. CONSULTING ENGINEERS & LAND PLANNERS Biltmore Lake Wetland & Stream Impacts NC License No: C -0556 Block "I" Phase I Figure 3.0 214 N ,King Street Buncombe County L\VAAHendersonville, NC 28792 (828) 687.7177 North Carolina Scale. I"= 350' wgla com To be used at Utility /Bridge Stream Impact #1 & #3 Location GRASSED SLOPE II CLASS B RIP RAP I—I TYPICAL HIGH WATER DEPTH �12' - 18" I— STREAM BED -I I IiI EXTEND RIP RAP A MIN OF 6" BELOW STREAM BED DEPTH VARIES PROPOSED UTILITY PIPE LINE Preliminary Not for Construction WILLIAM G. LAPSLEY & ASSOCIATES, P.A. CONSULTING ENGINEERS & LAND PLANNERS Bilt(hore Lake STREAM BANK STABILIZATION NC License No. C -0556 Block "I" Phase I FIGURE 3.1 214 N King Street Buncombe County Asheville, INC 28792 North Carolina (828) 687 -7177 Not to Scale www wgla com To be used at Utility /Bridge Stream Impact #1 and #3 Location R F nnnnncrn Dorncr, NILLIAM G. LAPSLEY & ASSOCIATES, P.A. CONSULTING ENGINEERS & LAUD PLANNERS NC License No: C -0556 King Street Asheville, lle, NC 28792 (828) 687 -7177 www.wgia.com Biltmore Lake Block "I" Phase I Buncombe County North Carolina 0 l! L j l! Ze.14 NR -WA �� � 6 fi stn U 'ROPOSED GRADE TING GRADE PROPOSED END BENT AND FOOTING TO BE LOCATED OUTSIDE OF STREAM BED RFn Preliminary Not for Construction STREAM CROSSING DETAIL FIGURE 3.2 Not to Scale NOTE MATTING SHALL BE COIR FIBER, 750 GRAM PER SQ METER WITH NOMINAL 0 50 IN OPENING SIZE ANCHOR MATTING IN 8" TRENCH —\ 1' MIN To be used at Utility Stream Impact #2 Location MATTING PLACED FLUSH WITH BANK SURFACE, LAP OVER DOWNSTREAM /DOWN SLOPE SEAMS 12" WOOD STAKE PLACED IN 3' 0 C DIAMOND PATTERN STREAM BED 1 � SMOOTH SURFACE, REMOVE ALL _ op DEBRIS AND SEED /MULCH BEFORE I— PLACING MATTING �{ EXTEND MATTING A MIN OF MATTING ANCHOR-ED J D DEPTH VARIES BELOW STREAM BED 1' BELOW STREAM BED PROPOSED UTILITY PIPE LINE Preliminary Not for Construction WILLIAM G. LAPSLEY & ASSOCIATES, P.A Wetland & Stream Impacts CONSULTING ENGINEERS' LAND PLANNERS Bdtmore Lake F Block "I" Phase I Figure 3.3 NC License No C -0556 214 N King Street Buncombe County Hendersonville, NC 28792 North Carolina \W:16, vi_ 104, (828) 687 -7177 Not to Scale �� wgia corn Biltmore Lake - Block I ( +/- 66 AM Biltmore Lake - Block 1 (+/- 66 AC) Buncombe County, North Carolina aearWater 224 South Grove Street, Suite F Hendersonville, North Carolina 28792 Aerial Photograph (2010) NCCGIA Figure 5 Attachment A Master Plan M 900 = , OD M c m l _1� � /8 ,f „ e ITA 0, �_! {Y�• .. - Jam.,• �. �,5 0 aoa _ u a� F » RMTKORE 1.4 WILLIAM G LAPSLEY & ASSOCIATES P.A. r MASTER PLAN \ O BUNCOMBE , CONSUTING ENGINEERS & AND PLNNERS p ONT --IF HENDERSONVIUZ, NORTH CAROLINA Attachment B Buncombe County "Letter of Approval" for Stormwater (dated April 14, 2014) April 14, 2014 Buncombe County Government Planning and Development Jon E. Creighton 46 Valley Street Assistant County Manager/Planning Asheville, NC 28801 Director Telephone (828) 250 -4830 Fax (828) 250 -6086 LETTER OF APPROVAL Lee Thomason Biltmoie Lake, LLC One Town Square Blvd., Ste 330 Asheville, NC 28803 Deau Mr. Thomason, NOTICE — This is not a permit This office has reviewed the Stormwatei Plan submitted for the project listed below. We find the plan to be acceptable and hereby issue this Letter of Approval The approval of a stormwater plan is conditioned on the applicant's compliance with federal and state water quality laws, regulations, and rules. All other applicable county permits and reviews must be completed prior to issuance of the stoimwatei permit and the beginning any land disturbing activity. The approval of the stormwatei permit shall require an enforceable restriction on property usage that runs with the land, such as recorded deed restrictions ou protective,covenants, to ensure that futuue development and uedevelopment maintains the site consistent with the approved project plans. The Buncombe County Stormwater Management Ordinance is a performance oriented program requiring protection of the natural resources and adjoining properties. If, following commencement of this project, it is determined that the plan is inadequate, this office may require revisions to the plan and its implementation. You must acquire a stormwater permit from this office. Submit a surety performance bond as described in Division 5 Section 2 of the Stormwater Management Ordinance and a permit will be issued. The amount of surety required for this project is $218,210.00. This letter gives the notice required by Chapter 26, Environment, Article VII, Division 2,Section 2, H(l) of'our right of periodic inspection to insure compliance with the approved plan This approval shall become null and void if you have not made progress on the site within six months after the date of approval. A one time six month extension can be Siormwatei Management 250 -4848 Lee Thomason Page 2 of 2 granted fot good cause shown upon receiving a written request fiom you before the expiration of the approved plan Please inform this office of the construction start date. We look forward to working with you on this project. Sincerely, /� '►'L�f� �� -ate—. Mike Goodson, PE, CPESC Stormwatet Administrator Protect name. Biltmore Lake Block 1, Phase I Pioject No. STW2014 -0001 1 Location Reeves Cove Road Date received- March 20, 2014 Date approved- April 14, 2014 Pei son financially responsible Lee Thomason Cc William G. Lapsley & Associates Buncombe County Erosion Control Attachment C Floodplain Development Permit (dated June 18, 2013) June 18, 2013 Buncombe County Government Planning and Development Jon E. Creighton 46 Valley Street Assistant County Manager/Planning Director Asheville, NC 28801 Telephone (828) 250 -4830 Fox (828) 250 -6086 Will Buie, PE For Biltmore Lake, LLC One Town Square B1vd.,,Ste. 330 Asheville, NC 28803 Dear Mr. Buie: Flood Development Permit for 9616 -13 -7499 Bridge and approach fill's over Bill Moore Creek In April 2008, a flood development permit application was submitted for the proposed bridge on the above referenced parcel. A permit review'fee was paid, and a review of the No Rise study and permit application was made. The project was>on hold, and application was made for the same bridge in April of this year. Since our floodplain maps changed, the revised study needed to reference the new maps and data. A re- submittal was received and reviewed. The permit is issued with the following conditions: • The submittal of a Letter of Map Revision (LOMR) must be made upon.completion of the project. • The certification from the engineer that the as -built conditions meet the conditions that were modeled in the No Rise study, that no additional fill or development occurred within the floodway, and an as -built No Rise certification be submitted • Certification that the lowest horizontal member of the bridge is,at least two feet above the base flood elevation If you should need anything in the near1uture, please contact me at 250 -4836, or through email at cynthia.barcklow a,buncombecounty.org. Please contact me,once the bridge is constructed for a final flood inspection. Sincerely, 8 Cyn , Fox Barcklow, AICP, CFM Planner III DEVELOPMENT PERMIT IN AREA OYSPECIAL FLOOD HAZARD In compliance with the provisions of the Code of Ordinances, Buncombe County, NC, Chapter 34 as amended, other lawful.standards and regulations of the County,, the North Carolina General Statutes, and the Federal Flood Disaster Protection Act of 1973, as amended. Biltmore Lake, LLC Are hereby authorized to,encroach,in an area designated as an Area of Special Flood Hazard, Section 34 -30, located at Bridge over Bill Moore Creek 9616.13 -7499 This encroachment /development will consist of; Placing a bridge and the approach fills over Bill Moore Creek With additional information contained in the application for this permit and substantiating documents. County of Buncombe BY: &-' F �-' A /414'. 1 A;!-- a /— Cyb(hiiFox-Aaricklow, w, Planner June 18, 2013 Permit No. FH -08 -106 Buncombe County Government Planning and Development APPLICATION FOR DEVELOPMENT PERMIT IN ARE, A. OF SPECIAL FLOOD HAZARD This form Is to be completed by the applicaut'and submitted to the Floodplain Administrator. Tli 'e coiti' lete'tl b'io ®Dp1i1v AD 1fAlIST TO ,,,, `- i J Y .� elf Ap'- lieation # - -; - ;2;'; , ire- �- j- = .��'' ti�;- ; yi �t , -� �l. �J.,�l;' '� }'• ^Fo:t�"c'i + 1 1. -„- i�'(i 1A �,i5l b. K�'' 'fr` S' :,`S_' '`4i ii `7�'„'y "r •l � `• _ , -Y - _ < � .' • �lwoigll• I�siri : e$',�; jNa� '' :'Is�pe, ±bnte;�, , �` � "' £;' .,` �'; :Djcvl'eI�',gittl�c�itlt;�r1 ? , e 0 SECTION 2: Proposed Development (To be completed by APPLICANT!) The applicant'musrsubutit'the following documents before the application can be processed: A site development plan, drawn to scale, showing rho location of all existing structures, topography, water bodies, adjacent roads, lot dimensions, and proposed development, showing (where applicable) attchoritig systettts, proposed elevation of lowest floor (including basement), types of water - resistant matc+ials used:below the first floor, details of flood proofing of utilities located below the first floor, details of enclosures below the firs t floor, proposed location of fill, and proposed amount of fill Telephone Number(s): cR?,.8) M--7w 0 Name of Qontracto+: T. be MerininlP_ff Telephone Nuntber(s)' Matting Address- APPLICATION FOR DEVELOPMENT PIsRI\1IT IN AREA OF SPECIAL FLOOD HAZARD Page I of 2 Name of Designer/ Engineer. Wt '&+G toPS � ` rf550C�k.YP� Telephone Number(s): 482e) Co�%1l� Mail ittg,Addtess: "iroto`�c�i�i Jr_�, , 5. �$ � she. ✓il�� N(' ZRBaO SECTION 2 (Continued): SECTION 2A: Structural Developnrent'(Checic all applicable boxes) Activity XNew Structure ❑ Addition ❑ Alteration ❑ Relocation • Demolition • Replacement Estimated Cost of Project 5 Structure Type: • Residential (I — 4 Family) • Residential (More than 4 Family) '❑ Non- residentiali(Floodproofing ❑ Yes) • Combined Use (Residential and Commercial) • Manufactured (Mobile) Home (In'Manufacttued Home Park? ❑ Yes) SECTION 211: Other DevelojpInt Activilles,(Check all applicable boxes) )( Cleanng g0radin Fill ❑ Mining ❑ Drilling • Excavation (Except for Structural Development Checked Above) • Watercourse Alteration (Including Dredgm& and Channel Modifications) • Drainage,lmprovements (Including,Cnlvert Work) Road; Street, or Bridge Construction Subdivision (New or Expansion) • Individual Water or Sewer System • Other (Please Specify) After completing SECTION 2, APPLICANT should submit form along with site °development plan and permit application fee'lo the Floodplain Administrator for review. To be c pleted bye FLOODPLAIN'ADMINISTRATOR A�rh]Ieatiou iR eiv )ice 01 P'.$50.00 S' 1r Faoiily Residenga :1;150Ad Commercial �'es O'NQ \vnte = ` Permit Officer Signature _ Date APPLICATION FOR DEVELOPMENT PERMIT IN AREA OF SPECIAL FLOOD HAZARD Pagc 2 of 2