Loading...
HomeMy WebLinkAbout20140605 Ver 1_Riparian Buffer Authorization_20140626DWR State of North Carolina Department of Environment and Natural Resources Division of Water Resources Division of Water Resources 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization FORM: BA 10 -2013 Riparian Buffer Authorization Form _____�_._.�.__.___ �nr� ;�r�nnnrz A. A Applicant Information PP 1 1. Project Information 20 14 la. Name of project: Logan Residence "_W,0� 1b. County: Wake QUALITY 1 c . Nearest municipality: Raleigh 9wmw!%r Branch I 1d. Subdivision name: 1e. Is the project located in any of North Carolina's twenty coastal counties. If yes, answer 1f below. ❑ Yes ® No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Owner Information 2a. Name on Recorded Deed: David and Molly Logan 2b. Deed Book and Page No. BKO15294 PG02636 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): BKBM2005 PG01736 2d. Responsible Party (for Corporations): 2e. Street address: 3517 Turnbridge Drive 2f. City, state, zip: Raleigh NC 27609 2g. Telephone no.: 919 - 413 -1980 2h. Fax no.: 2i. Email address: Molly.logan @natpow.com 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ❑ Other, specify: 3b. Name: 3c. Business name (if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: 4. Agent/Consultant Information (if applicable) 4a. Name: Hunter C. Freeman 4b. Business name (if applicable): Withers & Ravenel, Inc. 4c. Street address: 115 Mackenan Drive 4d. City, state, zip: Cary NC 27511 4e. Telephone no.: 919 - 469 -3340 4f. Fax no.: 919 - 467 -6008 4g. Email address: hfreeman(a.withersravenel.com FORM: BA 10 -2013 Page 1 of 5 B. Project,lnformation and Prior Project History 1 Property Identification 1a Property identification no (tax,PIN or parcel ID) 1705666885 lb Site coordinates (in decimal degrees) Latitude 35 85 N Longitude 78 64 W 1c Property size 2957 acres 2. Surface Waters 2a Name of nearest body of water to proposed project UT to Crabtree Creek 2b Water Quality Classification of nearest receiving water C,,NSU 2c River basin Neuse 3 Project Description 3a Describe the existing,conditions on the site and the general land use in the vicinity of the project at the time of this application Wooded narrow lot in quarter acre residential area House has been constructed 3b Attach an 8'/2 x 11 excerpt from the most recent version of the USGS topographic map indicating,the location of the „site 3c Attach an 8'/2 x 11 excerpt =from the most recent version of'the published County NRCS Soil Survey Map depicting the project site 3d List the total estimated linear feet of all existing streams,(intermittent and perennial) on the property 68 If 3e Explain the purpose of the proposed project, Install pedestrian bridge over stream in backyard 3f Describe the overall project in detail, including the type of equipment to be used - Construction of a small footbridge and re- vegetation of buffer area Small equipment such as bobcats may be used 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/ project (including all pnor pfiases)'in the past? ® Yes ❑ No ❑ Unknown Comments 4b If yes, who delineated the jurisdictional areas? Name (if known) James Graham Agency/ Consultant Company NCDENR Other 4c If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation April 2014 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ® Yes ❑ No ❑ Unknown 5b If yes, explain and detail according to "help file” instructions Building Permit for house, No buffer disturbance previously approved 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes, explain FORM BA 10 -2013 Page 2 of 5 C. Proposed Impacts Inventory Impact Justification and Mitigation 1 Buffer Impacts Avoidance and Minimization 1 a Project is in which protected basin? Specifically describe measures taken to avoid or minimize the proposed Impacts In designing project There Is no clearing needed to Install the bridge Bridge foundations will be placed outside the top of the existing stream bank ® Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Jordan ❑ Goose Creek lb Individually list all buffer Impacts below form If any impacts require mitigation, then you MUST fill out Section D of this Buffer Impact number — Permanent (P) or Temporary T Reason for Impact Type of Impact (exempt, allowable, allowable w/ mitigation) Stream name Buffer mitigation required? Zone 1 impact (sq ft) Zone,2 Impact (sq ft) B1 ® P ❑ T Bridge Multiplier UT Crabtree, Crk ❑ Yes ® No 96 _ B2 ❑ P ❑ T Zone 2 ❑ Yes ❑ No 1 5 B3 ❑ P ❑ T Total buffer mitigation required ❑ Yes ❑ No If buffer mitigation is required, is payment to a mitigation bank or NC,EEP proposed? ❑ Yes ❑ No B4 ❑ P ❑ T If yes, attach the acceptance letter from the mitigation bank or NC EEP 2e If no, then discuss what type of mitigation is proposed ❑ Yes ❑ No Comments B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 96 1c Comments All Impacts are directly related to Installation of bridge, no additional clearing needed to get to construction site, therefore no temporary impacts are called out D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed Impacts In designing project There Is no clearing needed to Install the bridge Bridge foundations will be placed outside the top of the existing stream bank lb- Specifically describe measures taken to avoid or minimize the proposed Impacts through construction techniques Construction will Include no heavy equipment All construction will be done by hand or small equipment similar to a bobcat The project Is In the owner's back yard, therefore all Work will be, done to minimize Impacts 2 Buffer Mitigation 2a WIII the project result In an impact-within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 2b If yes, then identify the square feet of impact to each zone,of the riparian buffer'that requires mitigation and calculate the amount of mitigation required in the table below Zone Reason for impact Total impact (square-feet) Multiplier Required mitigation (square feet Zone 1 3 (2 for Catawba) Zone 2 1 5 Total buffer mitigation required 2c If buffer mitigation is required, is payment to a mitigation bank or NC,EEP proposed? ❑ Yes ❑ No 2d If yes, attach the acceptance letter from the mitigation bank or NC EEP 2e If no, then discuss what type of mitigation is proposed 2f Comments FORM BA 10 -2013 Page 3 of 5 C. Impact Justification and Mitigation, continued FORM SSGP3080 8 -13 Page 4 of 5 E Diffuse Flow Plan All buffer Impacts and high ground Impacts require diffuse flow or other form of ❑ Diffuse flow stormwater treatment Include a plan that fully documents how diffuse flow`wlll be ❑ Other BMP maintained If a Level Spreader Is proposed, attach a Level Spreader Supplement Form la If due to site constraints, a BMP other than a level spreader is proposed, please provide a ❑ Yes ® No plan for stormwater treatment as outlined In Chapter 8 of the NC Stormwater BMP public (federal /state) land9 Manual and attach a BMP Supplement Form lb F. Supplementary Information by First Class Mail via the US Postal Service 1 Environmental Documentation OR NCDDWR, Transportation Permitting Unit la DoesIthe project Involve an expenditure of public (federal /state /local) funds or the use =of ❑ Yes ® No Raleigh, NC 27604, public (federal /state) land9 For all other projects send by delivery service lb If you answered "yes" to the above, does the project require preparation of an ❑ Yes ® No OR Karen Higgins environmental document pursuant to the requirements of the National or State (North NCDWR — 401 & Buffer Permitting Unit 1650 Mail Service Center Carolina) Environmental Policy Act (NEPA/SEPA)? Raleigh, NC 27699 - 1650 1c If you answered "yes" to the,above, has the,document been finalized by the State ❑ Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter) Comments 2 Violations 2a Is the site in violation of DWR Wetland Rules (15A NCAC 02H 0500), Isolated Wetland ❑ Yes ® No Rules (,15A NCAC 02H 1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B 0200)? 2b Is this an after - the -fact permit application? ❑ Yes ® No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s)- ApplicanliAgeds Printed Name App ant/Ag n 's Signature Dat (Agent's signature is valid o ly f an autho iz ion letter from the applicant is provided ) Send this completed form and accompanying documents to the following For government,transportation projects send For government transportation projects send by First Class Mail via the US Postal Service by delivery service (UPS, FedEx, etc) NC DWR, Transportation Permitting Unit OR NCDDWR, Transportation Permitting Unit 1650 Mail Service Center 512 N Salisbury Street Raleigh, NC 27699 - 1650 Raleigh, NC 27604, For all other projects send.by First Class Mail For all other projects send by delivery service via the US PostahService (UPS, FedEx, etc) Karen Higgins OR Karen Higgins NCDWR ,— 401 & Buffer Permitting Unit NCDWR — 401 & Buffer Permitting Unit 1650 Mail Service Center 512 N Salisbury Street Raleigh, NC 27699 - 1650 Raleigh, NC 27604 FORM BA 10 -2013, Page 5 of 5 _ t (D a o � C CD O (CD �D 5' i n c s SS n 0 O INn IN jj NI 1 p • w s A T 3 n �fn � o N Q •o Q b � Z g�D >T< a�Z r CL n M 'O fD a 0 a A- Yl 1 a t �1 1 I i 1 r I1 c I l 6 ,1 f - v eA a rl a I a � oNLaegg; A8 L _ __ 2}BQ SNOA3A?jns I SH,3NNVld I S833NIDN3 I -- _ loefgnS' , 3 N 3 "H,'5) S H 3 I- JL I M ON'13afad !Oafadl .I