Loading...
HomeMy WebLinkAboutNC0062278_DMR Review Record_20220705DMR REVIEW RECORD Mooresville Regional Office Facility Name: Daniel Stowe Botanical Garden WTP Permit Number: NC0088684 Report Period: February 2022 Prior Assessments: Enforcement Factor: Waterbody Outfall # Outfall Description Waterbody Name Classification 001 RO reject to UT Catawba River CATAWBA RIVER (Lake Wylie below elevation 570) WS-V,B North Carolina portion Monitoring Frequency Violations Sample Location: Outfall 001 - Effluent Violation Unit of Date Parameter Frequency Measure Action 2/28/2022 Duration of discharge 2 X month hours Other Violations/Staff Remarks: The facility become aware of the parameter issue on begging of February and worked with Central Office to address this category. Which was resolved in March — BPJ recommended Supervisor Remarks: No Action, Facility Reporting error Completed by: Assistant Regional Supervisor Sign -off: Regional Supervisor Sign -off: Ori Tuvia DocuSigned by: A14CC681AF27425... Date: Date: Date: 7/5/2022 7/5/2022 Prior 12-Month Enforcement History Permit Number: NC0088684 Report Period: February 2022 Monitoring Violation Sample Location: Outfall 001 - Effluent Violation Report Violation Date Period Parameter Type NOD NOV CPA 10/31/2021 10-2021 Duration of discharge Frequency Violation NOV-2022-MV-0016 10/31/2021 10-2021 Flow, in conduit or thru Frequency Violation NOV-2022-MV-0016 treatment plant 10/31/2021 10-2021 pH Frequency Violation NOV-2022-MV-0016 10/31/2021 10-2021 Solids, Total Dissolved Frequency Violation NOV-2022-MV-0016 11/30/2021 11-2021 Duration of discharge Frequency Violation NOV-2022-MV-0017 11/30/2021 11-2021 Flow, in conduit or thru Frequency Violation NOV-2022-MV-0017 treatment plant 11/30/2021 11-2021 pH Frequency Violation NOV-2022-MV-0017 11/30/2021 11-2021 Solids, Total Dissolved Frequency Violation NOV-2022-MV-0017 1/31/2022 1-2022 Duration of discharge Frequency Violation NOV-2022-MV-0038 12/31/2021 12-2021 Duration of discharge Frequency Violation NOV-2022-MV-0045 12/31/2021 12-2021 Flow, in conduit or thru Frequency Violation NOV-2022-MV-0045 treatment plant 12/31/2021 12-2021 Hardness, Total (as CaCO3) Frequency Violation NOV-2022-MV-0045 12/31/2021 12-2021 pH Frequency Violation NOV-2022-MV-0045 12/31/2021 12-2021 Solids, Total Dissolved Frequency Violation NOV-2022-MV-0045 Reporting Violation Sample Location: Violation Report Violation Date Period Parameter Type NOD NOV CPA 1 /31 /2022 12-2021 Late/Missing DMR NOV-2022-MV-0045 5/1/2021 3-2021 Late/Missing DMR NOD-2021-LR-0020 5/31/2021 4-2021 Late/Missing DMR NOD-2021-LR-0021 7/1/2021 5-2021 Late/Missing DMR NOD-2022-LR-0009 7/31/2021 6-2021 Late/Missing DMR NOD-2022-LR-0010 8/31/2021 7-2021 Late/Missing DMR NOD-2022-LR-0011 10/1/2021 8-2021 Late/Missing DMR NOD-2022-LR-0012 10/31/2021 9-2021 Late/Missing DMR NOD-2022-LR-0013 Other Violation Violation Report Violation Date Period Parameter Type NOD NOV CPA 3/31/2021 3-2021 Aquatic toxicity permit limit violation NOV-2021-TX-0024