HomeMy WebLinkAbout20140673 Ver 1_More Info Received_20140709070)40 (07 3
HOMEQUEST
B U I L D E R S
JULY 5, 2014
NCDENR
401 & Buffer Permitting Unit,
1617 Mail Service Cntr
Raleigh, NC 27699 -1617
Subject: REGUEST FOR ADDITIONAL INFO
HOMEQUEST BUILDERS INC. 847 Madison Ave. property
To Whom it May Concern,
On July 3, 2014 our office received a request for additional information regarding
our application requesting a Buffer Authorization from the Division for subject
property at 847 Madison Ave. Cary NC. As requested, HOMEQUEST BUILDERS INC is
providing three (3) signed copies of page 5 of 5 of the application. 1, Steve F. Smalto,
as the applicant am the President and Owner of HOMEQUEST BUILDERS INC.
Thank you in advance for your assistance in this matter.
Regards,
Steve F Smalto
Owner
HOMEQUEST BUILDERS INC
303 Grand Ave
Raleigh, NC 27606
steve @homequestnc.com
0 9 2014 }
3
n NR
!�1�4i Z St�tmwr:u}r fSraurre� !
303 Grand Avcmie . Raleigh, NC 27606 www.homcqucstnc.arm
919.859 6208 Office 919 , 559.6207 Fax 1 50 *26 *26449 Nextel
20140613
E. Diffuse Flow Plan
All buffer impacts and high ground impacts require diffuse flow or other form of
❑ Diffuse flow
stormwater treatment. Include a plan that fully documents how diffuse flow will be
Other BMP
maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form.
1 a.
If due to site constraints, a BMP other than a level spreader is proposed, please provide
❑ Yes ® No
a plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP
public (federal /state) land?
Manual and attach a BMP Supplement Form.
1 b.
F.
Supplementary Information
1.
Environmental Documentation
1 a.
Does the project involve an expenditure of public (federal /state /local) funds or the use of
❑ Yes ® No
public (federal /state) land?
1 b.
If you answered "yes" to the above, does the project require preparation of an
❑ Yes ❑ No
environmental document pursuant to the requirements of the National or State (North
Carolina) Environmental Policy Act (NEPA/SEPA)?
1c.
If you answered "yes" to the above, has the document been finalized by the State
❑ Yes ❑ No
Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.)
Comments:
2.
Violations
2a.
Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated
❑ Yes ® No
Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or
Riparian Buffer Rules (15A NCAC 02B.0200)?
2b.
Is this an after - the -fact permit application?
❑ Yes ® No
2c.
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
OW��
r S'�4 L.N v1M�r. �s J, -� -III
Applicant/Agent's Printed Name Applicant/Agent's Sigrfature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Send this completed form and accompanying documents to the following:
For government transportation projects send For government transportation projects send
by First Class Mail via the US Postal Service: by delivery service (UPS, FedEx, etc.):
NC DWR, Transportation Permitting Unit OR NC DWR, Transportation Permitting Unit
1650 Mail Service Center 512 N. Salisbury Street
Raleigh, NC 27699 - 1650 Raleigh, NC 27604
For all other projects send by First Class Mail
via the US Postal Service
Karen Higgins OR
NCDWR — 401 & Buffer Permitting Unit
1650 Mail Service Center
Raleigh, NC 27699 - 1650
FORM: BA 10 -2013
For all other projects send by delivery service
(UPS, FedEx, etc.):
Karen Higgins
qt
NCDWR — 401 & Buffer Permi
512 N. Salisbury Street Q �a
Raleigh, NC 27604
t 261
d Page 5 of 5
171tf „i1rp,, QUALITY
lN�Ilar $ Starm r Branch