Loading...
HomeMy WebLinkAbout20220934 Ver 1_Shoreline Stabilization_20220708 .ri tOf� 1. ROY COOPER ' ,o Governor d te • MICHAEL S.REGAN av ; Serrrtary S.DANIEL SMITH NORTH CAROLINA State of North Carolina Director Environmental Quality Department of Environment Quality Division of Water Resources 15A NCAC 02H.0500—Water Quality Certification,Shoreline Stabilization FORM: SSGP 09-2020 Shoreline Stabilization Application Form Three copies of the application (including attachments)and the application fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.) Paul Wojoski Paul Wojoski DWR—401 & Buffer Permitting Branch DWR—401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre-Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre-Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre-filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre-filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre- °ling Meeting R uest to this application. Date of Pre-filing Meeting Request: _/ (required) RECEIVED DWR ID# ersion (if applicable) JUN - 8 2022 DEQ-WATER RESOURCES 401 &BUFFER PERMIT' " A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Michael Thomas Waid Mailing Address: '1)40 414G Tolley Ridge Lane Winston Salem, NC 27102 Telephone Number: 336/399-9643 Fax Number: E-mail Address: mwaid@wakehealth.edu -A North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617 919.707.9000 i 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: N/A Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Davidson Nearest Town: Lexington Lake/ river/ ocean adjacent to property: High Rock Lake Property size (acres): 0.48 acres Subdivision name or site address (include phase/lot number): Lot 17, Tarawood, 365 Marigold Lane, Lexington Directions to site - please include road names and numbers, landmarks, etc.: 1-85 to Lexington exit for NC Hwy 8, go south on NC Hwy 8, L on Briggs Rd., L on Shoreline Dr., R on Marigold Ln., property is on the L at end of road. Latitude (in decimal degrees) 35.40.1115 Longitude (decimal degrees) 80.14.0820 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Single-family residential community FORM: SSGP 09-2020 Page 2 of 6 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): To stabilize an eroding shoreline and protect it from further erosion. 7. Will work be conducted from land? From water? ❑ 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 344 Sq. Ft. Temporary impacts in square feet: None 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 1420 Sq. Ft. Temporary impacts (temporary clearing, construction corridor) in square feet: 860 Sq. Ft. 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): Many small trees will be removed in order to complete the stabilization project. 11. Signature By signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time Owner/Agent's Signature` [15A NCAC 02H .05020)] Date `Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation FORM: SSGP 09-2020 Page 3 of 6 d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation La ke (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level ami Shoreline Plan View Lake (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level iatA• . a "fShoref'ine .:L' r i..4rx�r�usgsfi•r Rlprap 2h x150ft. additional clearing • If necessary b�r Plan View 1 4 ' Existing Dock -30ftx7ft ' men pwri efr 3 ft x150ft Below fug pond/ NWL r xxs~,a tams f 4 hx15o50ft Above full pond/ NWL FORM: SSGP 09-2020 Page 4 of 6 Lake (At Full Pond/ Normal Water Level) Side View Tu. >a) 463 = E 0 z 0 fl- LL FORM: SSGP 09-2020 Page 5 of 6 3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing I if necessary I 10 ft. bank height Side Vi FORM: SSGP 09-2020 Page 6 of 6 VEGETATION AND EROSION CONTROL FABRIC EXISTING GRADE CLASS 2 RIP RAP 1 2 EROSION CONTROL FABRIC — LAKE BOTTOM TYPICAL CONDITIONS • 36" TO 72" ERODED CUT • WAVE EXPOSURE Varies 3to5ft. Assume 1 ft. FOR: LOCATION: RESERVOIR: MICHAEL THOMAS WAID LOT 17, TARAWOOD HIGH ROCK LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: MODERATE RIP RAP STABILIZATION DETAIL 3 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: Michael Thomas Waid Lot 17, Tarawood, 365 Marigold Lane STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 172 LF of proposed shoreline stabilization measures. Detail X indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 8 on NCDEQ Form SSGP 09-2020) Area of Impact = Shoreline Length x Depth* x Slope = (172') x (1') x (2) = 344 sq. ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 — Impact Area Above the Normal Pool Level (Item 9 on NCDEQ Form SSGP 09-2020) Permanent Impact From Shoreline Stabilization Measures Height of Bank Above Normal Pool Varies Across the Shoreline Estimate 60 LF of Shoreline = 3 ft. Above Normal Pool Estimate 30 LF of Shoreline = 4 ft. Above Normal Pool Estimate 82 LF of Shoreline = 5 ft. Above Normal Pool Area of Impact = Length x Height x Slope = (60' x 3' x 2) + (30' x 4' x 2) + (82' x 5' x 2) = 360 + 240 + 820 = 1420 sq. ft. Impact From Construction Above Shoreline Stabilization Assume 5 ft. Wide Zone Area of Impact = 172' x 5 ft. = 860 sq. ft. Total Area of Impact Above Normal Pool Level = 2280 sq. ft. ji SCALE 1" = 40" s LAKE SITE MAP MICHAEL THOMAS WAID 7/6/22, 1:19 PM 365 Marigold Ln - Google Maps G Ave finer Re - Fdsing St es & Supply aps 365 Marigold Ln Marina ao Camp; .: Hnkrn Rd Nature Soyz Tree Service 9 Ave 1 r Church Ave L Ave M Budd Beach !22921 Buddle Creek Swim Area rs1 _;onstruction Angie 5 POMar Dr Go4gle utcw.orks 1 22991 The Bran Welborn Podcast 99 Map data ©2022 1000 ft s• Ra httos://www.aooale.com/mans/place/365+Marigold+Ln,+Lexington,+NC+27292/(a�35.6717594,-802308913,15z/data=!4m5!3m4! 1 s0x8853851 f872f8453:0x9f526bc357e11 d7fl8m2!3d35.6700384!4d-80.... 1/1