Loading...
HomeMy WebLinkAboutSWA000149_Response To Comments_20220712Quible Quible & Associates, P.C. ENGINEERING • ENVIRONMENTAL SCIENCES • PLANNING • RESTORATION SINCE 1959 July 11, 2022 Jim Farkas Environmental Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources Stormwater Program Via USPS RE: SWA000149 Goode Preserve Jim: Attached are the documents required. Documents include (2x): • Pages for the revised application • Revised Signed and sealed site plan with revised coverages 90 Church St., Suite B Black Mountain, NC 28711 Phone: 828-357-5149 Web: quible.com Regarding the requirement to have an E/SC permit. This development is in the town of Mills River in Henderson County. They do not participate with the Henderson County SESC or PH2. The Town's subdivision administrator requires a PH2 stormwater permit for all major subdivisions. The developer for this project will not be building the houses; they are only selling lots and constructing the roads The Town of Mills River's ordinance requires an erosion control plan and permit if land disturbance is over 1 acre, per state standards. Since the developer is only selling lots and not constructing the homes, the road will be the only disturbance they will have, and that is around 35,000 square feet. They do not know enough information regarding home site location, driveways, etc., to adequately provide an erosion control plan for individual homeowners. Each individual homeowner will be required to obtain all necessary permits, including providing measures to control erosion. Also, it was a practice until recently in the area to obtain the stormwater permit before erosion control permit to ensure stormwater quality and volume match was considered before any grading began. If you require more information, please contact me at (828) 393-5820, or tariswoldCaD-guible.com. Sincerely, Quible & Associates, PC C: y Griswold, P.E. Project Engineer