Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW4220601_Design Calculations_20220712 (2)
STORMWATER CALCULATIONS FOR HAVENBROOKE SUBDIVISION FORSYTH COUNTY, NORTH CAROLINA .. .11. . lm LATHAM-WALTERS ENGINEERING, INC. 16507-A NORTHCROSS DRIVE HUNTERSVILLE, N.C. 28078 Phone:704-895-8484 Fax:704-237-4362 N.C. Corporate License C-1815 FOR BRAXTON REAL ESTATE AND DEVELOPMENT CO. 6420 HAMPTON KNOLL RD. CLEMMONS, NC 27012 6/15/2022 �II1 �ti•� , CA S �o - . SEAL a 0 185 8584 2 Havenbrooke Subdivision Stormwater Narrative Havenbrooke Subdivision is a 71 lot single family development on a 74.97 acre parcel in Northeast Forsyth County. The subdivision is being developed as low density since the percent of impervious coverage is only 15.62% which is well below the State's requirement of being less than 24% BUA. In trying to adhere to the low -density requirement of the State it is very difficult due to the existing ground terrain for this development being steep with over 60' of vertical fall from the main connection to Bethel Church Road to the first outfall point with an average slope exceeding 10%. This would not be conducive for roadside ditch construction due to erosive velocities and the amount of runoff contributing to these areas. Therefore, the development is using curb and gutter with pipes to convey the stormwater from larger storms across the site (meeting NCDOT's requirement for allowable spread), then dissipating the velocities at the outfalls with rip rap aprons. Since the subdivision is using curb 6t gutter additional stormwater measures were added to try and meet the State's low - density requirements and are listed and described below: Curb Outlets: Due to the extreme topographic issues with the site, there were only limited areas where curb outlets could be used to take runoff from the street to treat the runoff by use of Vegetated Conveyance Ditches so that ditches would not outfall over the steeper fill slopes generally associated with the project's low points. Five areas were located on the site that could take this runoff from the street using a 2% depression from the edge of pavement past the sidewalk then to a vegetated conveyance ditch for treatment. Vegetated Conveyance Ditches: At the end of all curb outlets vegetated conveyances were designed using a 3:1 slope trapezoidal ditch with a minimum length of 100', a 2' bottom width, and slopes 5% or less. These ditches are to be lined with N.A.G. SC150 liner and sodded with tall fescue. These areas are depicted on sheets C8.0 6t 8.1 with design information and details. Treatment Swales: At the end of all pipe outfall areas, treatment swales will connect to the end of the rip rap apron that shall be installed at a 0% slope. These treatment swales have been designed in general conformance with the State's guidelines using a 3:1 slope trapezoidal ditch with a minimum length of 100', a 2' bottom width, and slopes 5% or less. Like the vegetated conveyances, these ditches are to be lined with N.A.G. SC150 liner and sodded with tall fescue. Unlike the conveyance ditches, the treatment swales shall have 1' high treated timber check dams with 3" low flow orifices installed at 50' on center to increase the treatment time for the 0.75 in/hr rainfall event to a minimum of 4 minutes. These areas are depicted on sheets C8.0 6t 8.1 with design information and details. TREATMENT SWALES CALCULATIONS Havenbrooke Subdivision 7-Jun-22 Low Density Hydraulic Retention Calculation Location: Ditch 1A 1. Detain 0.75 in/hour storm for 4 minutes in MDC Treatment Swales 2. Calculate Volume to be retained: Q = cia, where c = 0.5 1 = 0.75 in/hr. A = 9.64 Ac. Q = 3.615 cfs Volume = Q x 60(sec/min) x 4 min. = 3. Utilize a V deep dam for low flow retention Length of Ditch Slope of Ditch Bottom Width of Ditch Side Slopes - Z:1 Design Depth Total Depth Calculate volume of ditch: Length of Storage Area: Average Area (each end) Storage Volume in Ditch for Retention: Storage Volume > Volume Required 867.6 cf volume required 150 ft. 0.035 ft/ft 3 ft. 3 1 2 150 ft. 6 sf 900 cf Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. DITCH 1A 0.75 in/hr Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 3.00 Invert Elev (ft) = 744.00 Slope (%) = 4.00 N-Value = 0.032 Calculations Compute by: Known Q Known Q (cfs) = 3.61 Elev (ft) Section 748.00 747.00 746.00 745.00 744.00 743.00 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday, Jun 14 2022 = 0.34 = 3.610 = 1.03 = 3.52 = 4.15 = 0.39 = 4.04 = 0.53 2 4 6 8 10 12 14 16 18 20 22 24 Reach (ft) Depth (ft) 4.00 3.00 2.00 1.00 ■ WIT.i Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. DITCH 1A 10 Year Storm Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 3.00 Invert Elev (ft) = 744.00 Slope (%) = 4.00 N-Value = 0.032 Calculations Compute by: Known Q Known Q (cfs) = 23.25 Elev (ft) Section 748.00 747.00 746.00 745.00 744.00 743.00 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday, Jun 14 2022 = 0.85 = 23.25 = 3.87 = 6.01 = 7.38 = 1.02 = 7.10 = 1.41 2 4 6 8 10 12 14 16 18 20 22 24 Reach (ft) Depth (ft) 4.00 3.00 2.00 1.00 ■ WIT.i Havenbrooke Subdivision 7-Jun-22 Low Density Hydraulic Retention Calculation Location: Ditch 1B 1. Detain 0.75 in/hour storm for 4 minutes in MDC Treatment Swales 2. Calculate Volume to be retained: Q = cia, where c = 0.5 1 = 0.75 in/hr. A = 4.41 Ac. Q = 1.65375 cfs Volume = Q x 60(sec/min) x 4 min. = 3. Utilize a V deep dam for low flow retention Length of Ditch Slope of Ditch Bottom Width of Ditch Side Slopes - Z:1 Design Depth Calculate volume of ditch: Length of Storage Area: Average Area (each end) Storage Volume in Ditch for Retention: Storage Volume > Volume Required 396.9 cf volume required 140 ft. 0.0415 ft/ft 2 ft. 3 1 140 ft. 5 sf 700 cf Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. DITCH 1 B 0.75 in/hr Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 744.00 Slope (%) = 4.15 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 1.65 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday, Jun 14 2022 = 0.21 = 1.650 = 0.55 = 2.99 = 3.33 = 0.25 = 3.26 = 0.35 Elev (ft) Section Depth (ft) 747.00 3.00 746.50 746.00 2.50 2.00 745.50 1.50 745.00 1.00 744.50 744.00 7d'1 tin 0.50 0.00 -0 50 2 4 6 8 10 Reach (ft) 12 14 16 18 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. DITCH 1 B 10 Year Storm Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 744.00 Slope (%) = 4.15 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 14.75 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday, Jun 14 2022 = 0.66 = 14.75 = 2.63 = 5.62 = 6.17 = 0.82 = 5.96 = 1.15 Elev (ft) Section Depth (ft) 747.00 3.00 746.50 746.00 2.50 2.00 745.50 1.50 745.00 1.00 744.50 744.00 7d'1 tin 0.50 0.00 -0 50 2 4 6 8 10 Reach (ft) 12 14 16 18 Havenbrooke Subdivision 7-Jun-22 Low Density Hydraulic Retention Calculation Location: Ditch 1C 1. Detain 0.75 in/hour storm for 4 minutes in MDC Treatment Swales 2. Calculate Volume to be retained: Q = cia, where c = 0.5 1 = 0.75 in/hr. A = 3.49 Ac. Q = 1.30875 cfs Volume = Q x 60(sec/min) x 4 min. = 3. Utilize a V deep dam for low flow retention Length of Ditch Slope of Ditch Bottom Width of Ditch Side Slopes - Z:1 Design Depth Calculate volume of ditch: Length of Storage Area: Cross -Sectional Area: Storage Volume in Ditch for Retention: Storage Volume > Volume Required 314.1 cf volume required 130 ft. 0.05 ft/ft 2 ft. 3 1 130 ft. 5 sf 650 cf Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Ditch 1 C 0.75 in/hr Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 854.00 Slope (%) = 5.00 N-Value = 0.033 Calculations Compute by: Known Q Known Q (cfs) = 1.31 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday, Jun 14 2022 = 0.19 = 1.310 = 0.49 = 2.68 = 3.20 = 0.22 = 3.14 = 0.30 Elev (ft) Section Depth (ft) 857.00 3.00 856.50 856.00 2.50 2.00 855.50 1.50 855.00 1.00 854.50 854.00 R1;11 tin 0.50 0.00 -0 50 2 4 6 8 10 Reach (ft) 12 14 16 18 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Ditch 1 C 10 Year Storm Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 854.00 Slope (%) = 5.00 N-Value = 0.033 Calculations Compute by: Known Q Known Q (cfs) = 11.42 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday, Jun 14 2022 = 0.58 = 11.42 = 2.17 = 5.26 = 5.67 = 0.72 = 5.48 = 1.01 Elev (ft) Section Depth (ft) 857.00 3.00 856.50 856.00 2.50 2.00 855.50 1.50 855.00 1.00 854.50 854.00 R1;11 tin 0.50 0.00 -0 50 2 4 6 8 10 Reach (ft) 12 14 16 18 Havenbrooke Subdivision 7-Jun-22 Low Density Hydraulic Retention Calculation Location: Ditch 1D 1. Detain 0.75 in/hour storm for 4 minutes in MDC Treatment Swales 2. Calculate Volume to be retained: Q = cia, where c = 0.5 1 = 0.75 in/hr. A = 4.9 Ac. Q = 1.8375 cfs V= Volume = Q x 60(sec/min) x 4 min. = 441 cf volume required 3. Utilize a V deep dam for low flow retention Length of Ditch 167 ft. Slope of Ditch 0.047 ft/ft Bottom Width of Ditch 2 ft. Side Slopes - Z:1 3 Design Depth 1 Total Depth 2 Calculate volume of ditch: Length of Storage Area: 167 ft. Average Area (each end) 5 sf Storage Volume in Ditch for Retention: 835 cf Storage Volume > Volume Required Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Ditch 1 D 0.75 in/hr Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 870.00 Slope (%) = 4.75 N-Value = 0.032 Calculations Compute by: Known Q Known Q (cfs) = 1.84 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday, Jun 14 2022 = 0.23 = 1.840 = 0.62 = 2.97 = 3.45 = 0.26 = 3.38 = 0.37 Elev (ft) Section Depth (ft) 873.00 3.00 872.50 872.00 2.50 2.00 871.50 1.50 871.00 1.00 870.50 870.00 Rrla tin 0.50 0.00 -0 50 2 4 6 8 10 Reach (ft) 12 14 16 18 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Ditch 1 D 10 Year Storm Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 770.00 Slope (%) = 4.75 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 16.13 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday, Jun 14 2022 = 0.67 = 16.13 = 2.69 = 6.00 = 6.24 = 0.85 = 6.02 = 1.23 Elev (ft) Section Depth (ft) 773.00 3.00 772.50 772.00 2.50 2.00 771.50 1.50 771.00 1.00 770.50 770.00 7Aa tin 0.50 0.00 -0 50 2 4 6 8 10 Reach (ft) 12 14 16 18 Havenbrooke Subdivision 7-Jun-22 Low Density Hydraulic Retention Calculation Location: Ditch 1E 1. Detain 0.75 in/hour storm for 4 minutes in MDC Treatment Swales 2. Calculate Volume to be retained: Q = cia, where c = 0.5 1 = 0.75 in/hr. A = 3.48 Ac. Q = 1.305 cfs V= Volume = Q x 60(sec/min) x 4 min. = 313.2 cf volume required 3. Utilize a V deep dam for low flow retention Length of Ditch 103 ft. Slope of Ditch 0.01 ft/ft Bottom Width of Ditch 2 ft. Side Slopes - Z:1 3 Design Depth 1 Calculate volume of ditch: Length of Storage Area: 103 ft. Average Area (each end) 5 sf Storage Volume in Ditch for Retention: 515 cf Storage Volume > Volume Required Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Ditch 1 E 0.75 in/hr Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 870.00 Slope (%) = 1.00 N-Value = 0.032 Calculations Compute by: Known Q Known Q (cfs) = 1.31 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday, Jun 14 2022 = 0.28 = 1.305 = 0.80 = 1.64 = 3.77 = 0.22 = 3.68 = 0.32 Elev (ft) Section Depth (ft) 873.00 3.00 872.50 872.00 2.50 2.00 871.50 1.50 871.00 1.00 870.50 870.00 Rrla tin 0.50 0.00 -0 50 2 4 6 8 10 Reach (ft) 12 14 16 18 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Ditch 1 E 10 Year Storm Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 870.00 Slope (%) = 1.00 N-Value = 0.032 Calculations Compute by: Known Q Known Q (cfs) = 11.41 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday, Jun 14 2022 = 0.85 = 11.41 = 3.87 = 2.95 = 7.38 = 0.72 = 7.10 = 0.99 Elev (ft) Section Depth (ft) 873.00 3.00 872.50 872.00 2.50 2.00 871.50 1.50 871.00 1.00 870.50 870.00 Rrla tin 0.50 0.00 -0 50 2 4 6 8 10 Reach (ft) 12 14 16 18 Havenbrooke Subdivision 7-Jun-22 Low Density Hydraulic Retention Calculation Location: Ditch 1F 1. Detain 0.75 in/hour storm for 4 minutes in MDC Treatment Swales 2. Calculate Volume to be retained: Q = cia, where c = 0.5 1 = 0.75 in/hr. A = 1.12 Ac. Q = 0.42 cfs V= Volume = Q x 60(sec/min) x 4 min 100.8 cf volume required 3. Utilize a V deep dam for low flow retention Length of Ditch 103 ft. Slope of Ditch 0.006 ft/ft Bottom Width of Ditch 2 ft. Side Slopes - Z:1 3 Design Depth 1 Calculate volume of ditch: Length of Storage Area: 103 ft. Average Area (each end) 5 sf Storage Volume in Ditch for Retention: 515 cf Storage Volume > Volume Required Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Ditch 1 F 0.75 in/hr Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 854.00 Slope (%) = 0.60 N-Value = 0.033 Calculations Compute by: Known Q Known Q (cfs) = 0.42 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday, Jun 14 2022 = 0.18 = 0.420 = 0.46 = 0.92 = 3.14 = 0.11 = 3.08 = 0.19 Elev (ft) Section Depth (ft) 857.00 3.00 856.50 856.00 2.50 2.00 855.50 1.50 855.00 1.00 854.50 854.00 R1;11 tin 0.50 0.00 -0 50 2 4 6 8 10 Reach (ft) 12 14 16 18 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Ditch 1 F 10 Year Storm Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 854.00 Slope (%) = 0.60 N-Value = 0.033 Calculations Compute by: Known Q Known Q (cfs) = 3.81 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday, Jun 14 2022 = 0.57 = 3.810 = 2.11 = 1.80 = 5.60 = 0.40 = 5.42 = 0.62 Elev (ft) Section Depth (ft) 857.00 3.00 856.50 856.00 2.50 2.00 855.50 1.50 855.00 854.50 1.00 0.50 854.00 R1;11 tin 0.00 -0 50 2 4 6 8 10 Reach (ft) 12 14 16 18 Havenbrooke Subdivision 15-Jun-22 Vegetative Ditch Calculations for Curb Outlet Conveyance Vegetative Conveyance Ditch 1 1. Calculate Ditch Flows for 10 Year Storm Q = cia, where c = 0.5 1 = 6.88 in/hr. A = 0.35 Ac. Q = 1.204 cfs Vegetative Conveyance Ditch 2 1. Calculate Ditch Flows for 10 Year Storm Q = cia, where c = 0.5 1 = 6.88 in/hr. A = 0.22 Ac. Q = 0.7568 cfs Vegetative Conveyance Ditch 3 1. Calculate Ditch Flows for 10 Year Storm Q = cia, where c = 0.5 1 = 6.88 in/hr. A = 0.44 Ac. Q = 1.5136 cfs Vegetative Conveyance Ditch 4 1. Calculate Ditch Flows for 10 Year Storm Q = cia, where c = 0.5 1 = 6.88 in/hr. A = 1.17 Ac. Q = 4.0248 cfs Vegetative Conveyance Ditch 5 1. Calculate Ditch Flows for 10 Year Storm Q = cia, where c = 0.5 1 = 6.88 in/hr. A = 0.36 Ac. Q = 1.2384 cfs Vegetative Conveyance Ditch 6 1. Calculate Ditch Flows for 10 Year Storm Q = cia, where c = 0.5 1 = 6.88 in/hr. A = 3.86 Ac. Q = 13.2784 cfs Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. VCD 1 Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 884.00 Slope (%) = 3.00 N-Value = 0.032 Calculations Compute by: Known Q Known Q (cfs) = 1.20 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 15 2022 = 0.20 = 1.200 = 0.52 = 2.31 = 3.26 = 0.21 = 3.20 = 0.28 Elev (ft) Section Depth (ft) 887.00 3.00 886.50 886.00 2.50 2.00 885.50 1.50 885.00 1.00 884.50 884.00 RR11 tin 0.50 0.00 -0 50 2 4 6 8 10 Reach (ft) 12 14 16 18 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. VCD 2 Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 884.00 Slope (%) = 2.76 N-Value = 0.032 Calculations Compute by: Known Q Known Q (cfs) = 0.76 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 15 2022 = 0.16 = 0.760 = 0.40 = 1.92 = 3.01 = 0.16 = 2.96 = 0.22 Elev (ft) Section Depth (ft) 887.00 3.00 886.50 886.00 2.50 2.00 885.50 1.50 885.00 1.00 884.50 884.00 RR11 tin 0.50 0.00 -0 50 2 4 6 8 10 Reach (ft) 12 14 16 18 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. VCD 3 Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 884.00 Slope (%) = 4.57 N-Value = 0.032 Calculations Compute by: Known Q Known Q (cfs) = 1.51 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 15 2022 = 0.20 = 1.510 = 0.52 = 2.90 = 3.26 = 0.24 = 3.20 = 0.33 Elev (ft) Section Depth (ft) 887.00 3.00 886.50 886.00 2.50 2.00 885.50 1.50 885.00 1.00 884.50 884.00 RR11 tin 0.50 0.00 -0 50 2 4 6 8 10 Reach (ft) 12 14 16 18 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. VCD 4 Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 870.00 Slope (%) = 4.64 N-Value = 0.032 Calculations Compute by: Known Q Known Q (cfs) = 4.02 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 15 2022 = 0.34 = 4.020 = 1.03 = 3.92 = 4.15 = 0.41 = 4.04 = 0.58 Elev (ft) Section Depth (ft) 873.00 3.00 872.50 872.00 2.50 2.00 871.50 1.50 871.00 1.00 870.50 870.00 Rrla tin 0.50 0.00 -0 50 2 4 6 8 10 Reach (ft) 12 14 16 18 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. VCD 5 Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 884.00 Slope (%) = 1.77 N-Value = 0.032 Calculations Compute by: Known Q Known Q (cfs) = 1.24 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 15 2022 = 0.24 = 1.240 = 0.65 = 1.90 = 3.52 = 0.21 = 3.44 = 0.30 Elev (ft) Section Depth (ft) 887.00 3.00 886.50 886.00 2.50 2.00 885.50 1.50 885.00 1.00 884.50 884.00 RR11 tin 0.50 0.00 -0 50 2 4 6 8 10 Reach (ft) 12 14 16 18 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. VCD 6 Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 828.00 Slope (%) = 5.00 N-Value = 0.032 Calculations Compute by: Known Q Known Q (cfs) = 13.28 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Jun 15 2022 = 0.62 = 13.28 = 2.39 = 5.55 = 5.92 = 0.77 = 5.72 = 1.10 Elev (ft) Section Depth (ft) 831.00 3.00 830.50 830.00 2.50 2.00 829.50 1.50 829.00 1.00 — 828.50 828.00 R77 tin 0.50 0.00 -0 50 2 4 6 8 10 Reach (ft) 12 14 16 18