HomeMy WebLinkAbout20140723 Ver 1_Application_20140710
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
PAT L. MCCRORY ANTHONY J. TATA
GOVERNOR SECRETARY
July 10, 2014
Mr. Tom Steffens
U.S. Army Corps of Engineers
Regulatory Field Office
2407 West 5th St.
Washington, NC 27889
Mr. Stephen Lane
N.C. Dept. of Environment and
Natural Resources
Division of Coastal Management
400 Commerce Avenue
Morehead City, NC 28557
Dear Sirs:
Subject: Application for a Section 404 Nationwide Permit 23, Section 401 Water
Quality Certification and CAMA Major Development Permit for the proposed
replacement of Bridge No. 33 over the North River on US 70 in Carteret County,
North Carolina; TIP No. B-4722B; Federal Aid Project No. BRNHS-0070 (84);
Debit $400 from WBS No. 38496.1.1
The North Carolina Department of Transportation (NCDOT) proposes to replace the 1,028 foot,
47-span bridge over the North River, with an approximately 1,350 foot, 15-span bridge on a new
alignment north of the existing. Traffic will remain on-site during construction. Permanent
impacts to jurisdictional resources include 0.03 acre of wetland fill and 0.58 acre of fill in surface
waters.
Please see enclosed copies of the Pre-Construction Notification (PCN), Preliminary
Jurisdictional Determination Form, Cedar Point Mitigation Site debit ledger, permit drawings,
utility permit drawings, stormwater management plan, MP forms and roadway plans for the
above referenced project. The Categorical Exclusion (CE) was completed in September 2012
and distributed shortly thereafter.
This project calls for a letting date of April 21, 2015 and a review date of March 3, 2015. The
project schedule may be advanced if funding becomes available.
Regulatory Approvals
Section 404 Permit: All aspects of this project are being processed by the Federal Highway
Administration as a "Categorical Exclusion" in accordance with 23 CFR 771.115(b). The
NCDOT requests that the project be authorized by NW 23 for bridge construction.
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
1548 MAIL SERVICE CENTER
RALEIGH NC 27699-1548
TELEPHONE: 919-707-6000
FAX: 919-250-4224
WEBSITE: WWW.NCDOT.GOV/DOH/PRECONSTRUCT/PE/
LOCATION:
CENTURY CENTER, BUILDING A
1000 BIRCH RIDGE DRIVE
RALEIGH NC 27610
Section 401 Permit: We anticipate 401 General Certification number 3891 will apply to this
project. NCDOT is requesting written concurrence from the North Carolina Department of
Environmental and Natural Resources, Division of Water Resources.
CAMA Major Permit: NCDOT requests that the proposed work be authorized under a Coastal
Area Management Act Major Permit. The landowner receipts will be forwarded as soon as they
are available. Authorization to debit the $400 Permit Application Fee from WBS Element
38496.1.1 is hereby given.
A copy of this permit application will be posted on the NCDOT Website at
https://connect.ncdot.gov/resources/Environmental/Pages/default.aspx, under Quick Links >
Permit Applications. A copy of the CE is also available at the above website address under Quick
Links > Environmental Documents. Thank you for your assistance with this project. If you have
any questions or need additional information, please contact Tyler Stanton at
tstanton@ncdot.gov or (919) 707-6156.
Sincerely,
@(- Richard W. Hancock, P.E., Manager
Project Development and Environmental Analysis Unit
cc: NCDOT Permit Application Standard Distribution List
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1a. Type(s) of approval sought from the
Corps: Section 404 Permit Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: 23 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? Yes No
1d. Type(s) of approval sought from the DWQ (check all that apply):
401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit
401 Water Quality Certification – Express Riparian Buffer Authorization
1e. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification:
Yes No
For the record only for Corps Permit:
Yes No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
Yes No
1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h
below.
Yes No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No
2. Project Information
2a. Name of project: Proposed Replacement of Bridge No. 33 over the North River on US 70
2b. County: Carteret
2c. Nearest municipality / town: Beaufort
2d. Subdivision name: not applicable
2e. NCDOT only, T.I.P. or state
project no: B-4722B
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. not applicable
3c. Responsible Party (for LLC if
applicable): not applicable
3d. Street address: 1598 Mail Service Center
3e. City, state, zip: Raleigh, NC 27699-1598
3f. Telephone no.: (919) 707-6156
3g. Fax no.: (919) 250-4224
3h. Email address: tstanton@ncdot.gov
Office Use Only:
Corps action ID no. _____________
DWQ project no. _______________
Form Version 1.3 Dec 10 2008
1
4. Applicant Information (if different from owner)
4a. Applicant is: Agent Other, specify:
4b. Name: not applicable
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: not applicable
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
2
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): not applicable
1b. Site coordinates (in decimal degrees): Latitude: 34.78915 Longitude: - 76.60982
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size: 5 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project: North RIver
2b. Water Quality Classification of nearest receiving water: SA; HQW
2c. River basin: White Oak
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application: Existing conditions at the site include maintained/disturbed roadside shoulder and marsh. Land use in the
project vicinity is predominantly residential with some agriculture and forested areas.
3b. List the total estimated acreage of all existing wetlands on the property: 0.25
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0
3d. Explain the purpose of the proposed project: Replace a structurally deficient bridge that is approaching the end of its
useful life. Replacement of the bridge will result in safer traffic operations.
3e. Describe the overall project in detail, including the type of equipment to be used:
The proposed replacement of Bridge No. 33 over the North River in Carteret County will be realigned to the north of the
existing bridge. Approximately 42,000 sf of existing causeway will be removed Traffic will remain on-site during
construction. Standard road building equipment, such as trucks, dozers, and cranes will be used.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments: A preliminary JD request was sent May 27, 2010;
however, a signed form was never received.
Yes No Unknown
4b. If the Corps made the jurisdictional determination, what type
of determination was made? Preliminary Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): Tyler Stanton
Agency/Consultant Company: NCDOT
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? Yes No Unknown
5b. If yes, explain in detail according to “help file” instructions.
6. Future Project Plans
6a. Is this a phased project? Yes No
6b. If yes, explain.
3
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
Wetlands Streams - tributaries Buffers
Open Waters Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number –
Permanent (P) or
Temporary (T)
2b.
Type of impact
2c.
Type of wetland
(if known)
2d.
Forested
2e.
Type of jurisdiction
(Corps - 404, 10
DWQ – non-404, other)
2f.
Area of impact
(acres)
Site 1 P T Fill Coastal Yes
No
Corps
DWQ 0.03
Site 2 P T Yes
No
Corps
DWQ
Site 3 P T Yes
No
Corps
DWQ
Site 4 P T Yes
No
Corps
DWQ
Site 5 P T Yes
No
Corps
DWQ
2g. Total wetland impacts 0.03 Perm
0.00 Temp
2h. Comments: *There will be 0.01 ac of hand clearing in wetlands and proposed temporary impacts to wetlands of <0.01 acre
of temporary fill in wetlands in the hand clearing areas for the installation of erosion control measures, including temporary silt
fence and/or special sediment control fence.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number -
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial
(PER) or
intermittent
(INT)?
3e.
Type of
jurisdiction
(Corps - 404, 10
DWQ – non-404,
other)
3f.
Average
stream
width
(feet)
3g.
Impact length
(linear feet)
Site 1 P T PER
INT
Corps
DWQ
Site 1 P T PER
INT
Corps
DWQ
Site 2 P T PER
INT
Corps
DWQ
Site 3 P T PER
INT
Corps
DWQ
3h. Total stream and tributary impacts
3i. Comments:
4
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
Open water
impact number –
Permanent (P) or
Temporary (T)
4b.
Name of
waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody type
4e.
Area of impact (acres)
O1 P T North River Fill River 0.58
O1 P T North River Fill River 0.56
O2 P T
O3 P T
4f. Total open water impacts 0.58 Perm
0.56 Temp
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a.
Pond ID
number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded Filled Excavat
ed Flooded Filled Excavated Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
Yes No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
5
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer
impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
Project is in which protected basin?
Neuse Tar-Pamlico Other:
Catawba Randleman
6b.
Buffer impact
number –
Permanent (P) or
Temporary (T)
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1 impact
(square feet)
6g.
Zone 2 impact
(square feet)
B1 P T Yes
No
B2 P T Yes
No
B3 P T Yes
No
6h. Total buffer impacts
6i. Comments:
6
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Sheet pile is being utilized on the northern side of the causeway due to instability of bed materials which also allows for
minimization of impacts to the surrounding wetlands and jurisdictional stream impacts. Ditches have been designed to
meet grass swale criteria on the remainder of the existing causeways to treat all runoff and promote infiltration. The grade
of the proposed bridge was designed such that deck drains are not required.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Best Management Practices for the Protection of Surface Waters, as well as, Best Management Practices for
Construction and Maintenance Activities will be implemented.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
Yes No
If no, explain:
2b. If yes, mitigation is required by (check all that apply): DWQ Corps
2c. If yes, which mitigation option will be used for this
project?
Mitigation bank
Payment to in-lieu fee program
Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: not applicable
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: warm cool cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: 0.06 acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
7
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
Yes No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
8
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules?
Yes No
1b. If yes, then is a diffuse flow plan included? If not, explain why.
Comments: Yes No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? Yes No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
See attached permit drawings and stormwater management plan.
2e. Who will be responsible for the review of the Stormwater Management Plan?
Certified Local Government
DWQ Stormwater Program
DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government’s jurisdiction is this project? not applicable
3b. Which of the following locally-implemented stormwater management programs
apply (check all that apply):
Phase II
NSW
USMP
Water Supply Watershed
Other:
3c. Has the approved Stormwater Management Plan with proof of approval been
attached?
Yes No
4. DWQ Stormwater Program Review
4a. Which of the following state-implemented stormwater management programs apply
(check all that apply):
Coastal counties
HQW
ORW
Session Law 2006-246
Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? Yes No N/A
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No N/A
5b. Have all of the 401 Unit submittal requirements been met? Yes No N/A
9
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1a. Does the project involve an expenditure of public (federal/state/local) funds or the
use of public (federal/state) land? Yes No
1b. If you answered “yes” to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
Yes No
1c. If you answered “yes” to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.)
Comments:
Yes No
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
or Riparian Buffer Rules (15A NCAC 2B .0200)?
Yes No
2b. Is this an after-the-fact permit application? Yes No
2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
additional development, which could impact nearby downstream water quality?
Yes
No
3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered “no,” provide a short narrative description.
Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby
land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
not applicable
10
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
habitat?
• Yes
/1 No
5b. Have you checked with the USFWS concerning Endangered Species Act
impacts?
• Yes /1
No
5c. If yes, indicate the USFWS Field Office you have contacted.
• Raleigh
• Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
NCNHP, USFWS website, field surveys
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
■ Yes
No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
NMFS County Index
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
govemments have designated as having historic or cultural preservation
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
. Yes //
No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NEPA Documentation
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?
No
i1 Yes •
8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA
8c. What source(s) did you use to make the floodplain determination? FEMA Maps
0{ Richard W. Hancock, P.E.
7._ 0,(y-
"'
Applicant/Agent's Printed Name
Date
Applicant/Agent's Signature
(Agents signature is valid only if an authorization letter from the applicant
is provided.)
11
DCM MP-1
APPLICATION for
Major Development Permit
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name
North Carolina Department Of Transportation
Project Name (if applicable)
B-4722B (38496.1.1)
Applicant 1: First Name
Richard
MI
W
Last Name
Hancock, P.E.
Applicant 2: First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
1598 Mail Service Center
PO Box
City
Raleigh
State
NC
ZIP
Country
Phone No.
FAX No.
27699-1598
US -A
919 - 707 - 6000 ext.
- -
Street Address (if different from above)
City
State
ZIP
Email
2. Agent/Contractor Information
Business Name
N/A
Agent/ Contractor 1: First Name
MI
Last Name
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address
PO Box
City
State
ZIP
Phone No. 1
- ext.
Phone No. 2
- - ext.
FAX No.
Contractor #
Street Address (if different from above)
City
State
ZIP
Email
<Form continues on back>
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple)
Carteret
Street Address
State Rd. #
US 70
Subdivision Name
N/A
City
State
Zip
-
Phone No.
- ext.
Lot No.(s) (if many, attach additional page with list)
,
a. In which NC river basin is the project located?
White Oak
b. Name of body of water nearest to proposed project
North River
c. Is the water body identified in (b) above,
natural or manmade?
d. Name the closest major water body to the proposed project site.
North River
►ZlNatural ['Manmade •Unknown
e. Is proposed work within city limits or planning jurisdiction?
['Yes ®No
f. If applicable, list the planning jurisdiction or city limit the proposed
work falls within.
N/A
4. Site Description
a. Total length of shoreline on the tract (ft.)
—2,725'
b. Size of entire tract (sq.ft.)
53_0,700
c. Size of individual lot(s)
N/A,
(If many lot sizes, please attach additional page with a list)
d. Approximate elevation of tract above NHW (normal high water) or
NWL (normal water level)
6.8' ®NHW or IN NWL
e. Vegetation on tract
Herbacous with sparse shrubs
f. Man-made features and uses now on tract
Bridge, causeway, and road
g. Identify and describe the existing land uses adjacent to the proposed
project site.
Residential and forest land
h. How does local government zone the tract?
Residential
i.
Is the proposed project consistent with the applicable zoning?
(Attach zoning compliance certificate, if applicable)
•Yes ENo ®NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ['Yes No
k. Has a professional archaeological assessment been done for the tract?
If yes, by whom?
If yes, attach a copy. ►SYes ❑No ❑NA
NCDOT (Reference CE)
I. Is the proposed project located in a National Registered Historic District
National Register listed or eligible property?
or does it involve a •Yes No DNA
<Form continues on next page>
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? I Yes ❑No
(ii) Are there coastal wetlands on the site? ZYes • No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? Yes ■ No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
None
o. Describe existing drinking water supply source.
None
p. Describe existing storm water management or treatment systems.
None
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? • Commercial y Public/Government
❑ Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
The purpose of the project is replace the existing bridge,io improve the —level of service for the traveling public
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Typical highway and bridge construction vehicles and equipment will be used, including, but not limited to, dump trucks,
cranes, graders, and bull dozers. Storage and staging areas will be located on uplands.
d. List all development activities you propose.
Replace/Lengthen bridge; Remove portion of existing road fill/causeway to improve bridge hydraulic conveyance and offset
surface water being filled in. Addition of fill due to widening facility.
e. Are the proposed activities maintenance of an existing project, new work, or both? New work
f. What is the approximate total disturbed land area resulting from the proposed project? 6.7 ESq.Ft or ®Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes • No ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
2 GI's are located on either side of the proposed bridge that discharge on high ground into grass swales constructed on
existing causeway.
i. Will wastewater or stormwater be discharged into a wetland? MI Yes ►1 No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water? ■Yes .❑No ❑NA
j. Is there any mitigation proposed? ®Yes ❑No •NA
If yes, attach a mitigation proposal.
<Form continues on back>
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name See attached Phone No.
Address
Name Phone No.
Address
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
N/A
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
rtc'Lain( kcock, P .
Date jal /0 r 20 l(- Print Nwrie
W.
Signature
Please indicate application attachments pertaining to your proposed project.
®DCM MP-2 Excavation and Fill Information
❑DCM MP-3 Upland Development
❑DCM MP-4 Structures Information
®DCM MP-5 Bridges and Culverts
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access
Channel
(NLW or
NWL)
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
Breakwater
Other
(excluding
shoreline
stabilization)
Length
Width
Avg. Existing
Depth
NA
NA
Final Project
Depth
NA
NA
1. EXCAVATION
®This section not applicable
a. Amount of material to be excavated from below NHW or NWL in
cubic yards.
b. Type of material to be excavated.
c. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards.
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW EISAV ❑SB
OWL ❑None
(ii) Describe the purpose of the excavation in these areas:
2. DISPOSAL OF EXCAVATED MATERIAL This section not applicable
a. Location of disposal area.
c. (i) Do you claim title to disposal area?
❑Yes ❑No ❑NA
(ii) If no, attach a letter granting permission from the owner.
e. (i) Does the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ❑None
(ii) Describe the purpose of disposal in these areas:
b. Dimensions of disposal area.
d. (i) Will a disposal area be available for future maintenance?
❑Yes ❑No ❑NA
(ii) If yes, where?
f. (i) Does the disposal include any area in the water?
❑Yes ❑No ❑NA
(ii) If yes, how much water area is affected?
Fore OCIA P (Excavation and Fill, Page 2 of 3)-
3. SHORELINE STABILIZATION
(If development is a wood groin, use MP-4 — Structures)
❑This section not applicable
a. Type of shoreline stabilization:
❑Bulkhead ORiprap ❑Breakwater/Sill ®Other: Sheet
pile
c. Average distance waterward of NHW or NWL: 5 ft.
e. Type of stabilization material:
Class II Rip Rap
9
Number of square feet of fill to be placed below water level.
Bulkhead backfill Riprap 689 SF
Breakwater/Sill Other
Source of fill material.
TBD
b. Length: 1880'
Width: 15'
d. Maximum distance waterward of NHW or NWL: 5.2 ft.
f. (i) Has there been shoreline erosion during preceding 12
months?
❑Yes ❑No ®NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
h. Type of fill material.
N/A
4. OTHER FILL ACTIVITIES
(Excluding Shoreline Stabilization)
ZThis section not applicable
a. (i) Will fill material be brought to the site? ❑Yes DNo
If yes,
(ii) Amount of material to be placed in the water
(iii) Dimensions of fill area
(iv) Purpose of fill
❑ NA
b.
(i) Will fill material be placed in coastal wetlands/marsh (CW),
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ❑None
(ii) Describe the purpose of the fill in these areas:
5. GENERAL
a.
How will excavated or fill material be kept on site and erosion
controlled?
Use of Standard NCDOT Best Management Practices and
erosion control measures.
c. (i) Will navigational aids be required as a result of the project?
❑Yes No DNA
(ii) If yes, explain what type and how they will be implemented.
b.
What type of construction equipment will be used (e.g., dragline,
backhoe, or hydraulic dredge)?
Crane, bulldozer, dump truck, motor grader
d. (i) Will wetlands be crossed in transporting equipment to project
site? ❑Yes ®No DNA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
Date
J 01 t0 , 2 .o (`-F
Project Name
k c,LafJ t+e .coc,k P j.
/Applicant Name
Applicant Signature
constaim
Form DCM MP-5
BRIDGES and CULVERTS
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. BRIDGES
❑This section not applicable
a. Is the proposed bridge:
['Commercial ®Public/Government ['Private/Community
c. Type of bridge (construction material):
Prestressed Concrete Girders
e. (i) Will proposed bridge replace an existing bridge? ®Yes ❑No
If yes,
(ii) Length of existing bridge: 1,030'
(iii) Width of existing bridge: 28'
(iv) Navigation clearance underneath existing bridge: 87'
(v) Will all, or a part of, the existing bridge be removed?
(Explain) The entire existing bridgawill be removed
g. Length of proposed bridge: 1,350'
Will the proposed bridge affect existing water flow? ®Yes ❑No
If yes, explain: Proposed bridge will have fewer bents in the
river as well as approximately 12,800 CY of causeway
removal.
k. Navigation clearance underneath proposed bridge: 8.7'
m. Will the proposed bridge cross wetlands containing no navigable
waters? ['Yes No
If yes, explain:
b. Water body to be crossed by bridge:
North River
d. Water depth at the proposed crossing at NLW or NWL:
9.5'
f. (i) Will proposed bridge replace an existing culvert? ❑Yes No
If yes,
(ii) Length of existing culvert:
(iii) Width of existing culvert:
(iv) Height of the top of the existing culvert above the NHW or
NWL:
(v) Will all, or a part of, the existing culvert be removed?
(Explain)
h. Width of proposed bridge: 36'
Will the proposed bridge affect navigation by reducing or
increasing the existing navigable opening? ®Yes ['No
If yes, explain: The existing structure provides a minimum
vertical clearance of approximately 7', which is greater than
the proposed minimum vertical clearance of 3.5'. However,
the proposed structure has a deeper superstructure depth
in order to increase the span lengths to 90', is longer than
the existing structure, and is being built on a crest vertical
curve. Therefore, the proposed maximum vertical
clearance of 8.7' is the same as the existing maximum
vertical clearance near proposed Bent 8. Additonally,
horizontal clearance will increase by approx. 322'.
Have you contacted the U.S. Coast Guard concerning their
approval? ®Yes ['No
If yes, explain: An application for Preliminary Public Notice
for Navigational Purposes has been submitted.
n• Height of proposed bridge above wetlands: N/A; Bridge is only
over surface water
2. CULVERTS
®This section not applicable
a. Number of culverts proposed:
c. Type of culvert (construction material):
b. Water body in which the culvert is to be placed:
< Form continues on back>
d. (i) Will proposed culvert replace an existing bridge? e. (i) Will proposed culvert replace an existing culvert?
❑Yes ❑No
If yes,
(ii) Length of existing bridge:
(iii) Width of existing bridge:
(iv) Navigation clearance underneath existing bridge:
(v) Will all, or a part of, the existing bridge be removed?
(Explain)
❑Yes ❑No
If yes,
(ii) Length of existing culvert(s):
(iii) Width of existing culvert(s):
(iv) Height of the top of the existing culvert above the NHW or
NWL:
(v) Will all, or a part of, the existing culvert be removed?
(Explain)
Length of proposed culvert: g. Width of proposed culvert:
h. Height of the top of the proposed culvert above the NHW or NWL.
Will the proposed culvert affect navigation by reducing or
increasing the existing navigable opening? ❑Yes ❑No
If yes, explain:
Depth of culvert to be buried below existing bottom contour.
k. Will the proposed culvert affect existing water flow?
❑Yes ❑No
If yes, explain:
3. EXCAVATION and FILL
❑This section not applicable
a. (i) Will the placement of the proposed bridge or culvert require any
excavation below the NHW or NWL? ®Yes ❑No
If yes,
(ii) Avg. length of area to be excavated: 305'
(iii) Avg. width of area to be excavated: 143'
(iv) Avg. depth of area to be excavated: 10'
(v) Amount of material to be excavated in cubic yards: 12,800
b.
(i) Will the placement of the proposed bridge or culvert require any
excavation within coastal wetlands/marsh (CW), submerged
aquatic vegetation (SAV), shell bottom (SB), or other wetlands
(WL)? If any boxes are checked, provide the number of square
feet affected.
❑CW ❑SAV ❑SB
OWL ®None
(ii) Describe the purpose of the excavation in these areas:
c. (i) Will the placement of the proposed bridge or culvert require any
high -ground excavation? ®Yes ❑No
If yes,
(ii) Avg. length of area to be excavated: 83' end bent)
(iii) Avg. width of area to be excavated: 116'
(iv) Avg. depth of area to be excavated: 6'
(v) Amount of material to be excavated in cubic yards: 1250
d. If the placement of the bridge or culvert involves any excavation, please complete the following:
(i) Location of the spoil disposal area: TBD by contractor. If material is suitable, it may be used as part of the proposed roadway
fill.
(ii) Dimensions of the spoil disposal area: TBD
(iii) Do you claim title to the disposal area? ❑Yes CI No (If no, attach a letter granting permission from the owner.)
(iv) Will the disposal area be available for future maintenance? ❑Yes ❑No
(v) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAVs), other wetlands (WL), or shell
bottom (SB)?
❑CW ❑SAV OWL ❑SB ®None
If any boxes are checked, give dimensions if different from (ii) above.
(vi) Does the disposal area include any area below the NHW or NWL? ? ❑Yes No
If yes, give dimensions if different from (ii) above.
e (i) Will the_plarement of the_proposPrl bridga nr culvert result in any f
g
fill (other than excavated material described in Item d above) to
be placed below NHW or NWL? ®Yes ❑No
If yes,
(ii) Avg. length of area to be filled: 359'
(iii) Avg. width of area to be filled: 28'
(iv) Purpose of fill: Proposed Roadway.
(i) Will the placement of the proposed bridge or culvert result in any
fill (other than excavated material described in Item d above) to
be placed on high -ground? ['Yes ®No
If yes,
(ii) Avg. length of area to be filled:
(iii) Avg. width of area to be filled:
(iv) Purpose of fill:
(i) Will the placement of the_propnsed bridge or culvert resultan any
fill (other than excavated material described in Item d above) to
be placed within coastal wetlands/marsh (CW), submerged
aquatic vegetation (SAV), shell bottom (SB), or other wetlands
(WL)? If any boxes are checked, provide the number of square
feet affected.
CW 1,117 ❑SAV ❑SB
OWL ['None
(ii) Describe the purpose of the excavation in these areas:
Fill is for proposed roadway North of existing roadway.
4. GENERAL
a. Will the proposed project require the relocation of any existing b. Will the proposed project require the construction of any temporary
utility lines? ®Yes ❑No detour structures? ❑Yes No
If yes, explain: Existing telephone lines will be relocated
by directional bore on the north side. Overhead power
lines are not in confilict with the proposed bridge;
however, adjustments may become necessary prior to
If yes, explain:
construction.
If this portion of the proposed project has already received
approval from local authorities, please attach a copy of the
approval or certification.
< Form continues on back>
c. Will the proposed project require any work channels?
❑Yes No
If yes, complete Form DCM-MP-2.
e. What type of construction equipment will be used (for example,
dragline, backhoe, or hydraulic dredge)?
Typical highway construction vehicles and equipment.
d. How will excavated or fill material be kept on site and erosion
controlled?
Use of Standard NCDOT Best Management Practices and
erosion control measures.
f. Will wetlands be crossed in transporting equipment to project site?
❑Yes No
If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
g.
Will the placement of the proposed bridge or culvert require any
shoreline stabilization? ZYes ['No
If yes, complete form MP-2, Section 3 for Shoreline
Stabilization only.
Jul -(Y
Date
- -V7221
Project Name
12-k6 (p- cocC , (-.E
Applicant Name
Applicant Signature
The Cedar Point Mitigation Site is located in Carteret County adjacent to both NC 24 and the
White Oak River. The site was designed as an emergent marsh and a constructed channel within
the site promotes tidal exchange within the mitigation area. The Cedar Point site provides
mitigation to offset impacts from improvements to NC 24 as well as for future impacts in the
White Oak River basin. The Cedar Point Mitigation site was constructed in 2002 but had to be
replanted in May 2003 due to vegetation failure. After five years of monitoring and both the
vegetation and hydrologic monitoring meeting success criteria, the site was closed out in April
2008.
To offset unavoidable coastal marsh impacts associated with TIP B-4722B, the Cedar Point
Mitigation Site will be debited .03 acres of Brackish Marsh restoration. This debit is reflected in
the debit ledger below.
HUC Mitigation Type Starting Amount (Ac.) Additional Notes
3020106 Brackish Marsh Preservation 12.92 Do not debit.
3020106 Brackish Marsh Restoration 0.78
Mitigation
Type Debit Amount Status Site TIP Action ID# NOTES
Brackish
Marsh
Restoration
0.03 Close Out B-4722B Action ID# will
be entered once
the permit is
received.
(V
e
r
s
i
o
n
1
.
2
;
R
e
l
e
a
s
e
d
J
u
l
y
2
0
1
2
)
B-
4
7
2
2
B
Co
u
n
t
y
(
i
e
s
)
:
CA
R
T
E
R
E
T
Page 1of 2
Pr
o
j
e
c
t
T
y
p
e
:
D
a
t
e
:
Ph
o
n
e
:
Ph
o
n
e
:
Em
a
i
l
:
Em
a
i
l
:
Co
u
n
t
y
(
i
e
s
)
:
CA
M
A
C
o
u
n
t
y
?
De
s
i
g
n
/
F
u
t
u
r
e
:
Ex
i
s
t
i
n
g
:
Su
r
r
o
u
n
d
i
n
g
L
a
n
d
U
s
e
:
CO
M
M
E
R
C
I
A
L
S
H
E
L
L
F
I
S
H
N
U
R
S
E
R
Y
0.
6
7
2
M
I
L
E
S
14
,
6
0
0
A
D
T
2.
1
0
Pr
o
j
e
c
t
B
u
i
l
t
-
U
p
o
n
A
r
e
a
(
a
c
.
)
Pr
o
p
o
s
e
d
P
r
o
j
e
c
t
E
x
i
s
t
i
n
g
S
i
t
e
Pr
o
j
e
c
t
L
e
n
g
t
h
(
l
i
n
.
M
i
l
e
s
o
r
f
e
e
t
)
:
Bu
f
f
e
r
R
u
l
e
s
i
n
E
f
f
e
c
t
Pr
o
j
e
c
t
D
e
s
c
r
i
p
t
i
o
n
fe
c
a
l
c
o
l
i
f
o
r
m
t
u
r
b
i
d
i
t
y
Ye
s
Pr
i
m
a
r
y
N
u
r
s
e
r
y
A
r
e
a
s
De
s
i
g
n
a
t
e
d
S
h
e
l
l
f
i
s
h
H
a
r
v
e
s
t
i
n
g
A
r
e
a
s
NC
D
W
Q
S
u
r
f
a
c
e
W
a
t
e
r
C
l
a
s
s
i
f
i
c
a
t
i
o
n
f
o
r
P
r
i
m
a
r
y
R
e
c
e
i
v
i
n
g
W
a
t
e
r
30
3
(
d
)
I
m
p
a
i
r
m
e
n
t
s
:
Ri
v
e
r
B
a
s
i
n
(
s
)
:
Pr
i
m
a
r
y
R
e
c
e
i
v
i
n
g
W
a
t
e
r
:
Cl
a
s
s
S
A
Ot
h
e
r
S
t
r
e
a
m
C
l
a
s
s
i
f
i
c
a
t
i
o
n
:
CH
R
I
S
T
O
P
H
E
R
R
.
L
E
W
I
S
Ci
t
y
/
T
o
w
n
:
(9
1
9
)
7
0
7
-
6
7
1
4
10
2
0
B
I
R
C
H
R
I
D
G
E
R
D
.
Ad
d
r
e
s
s
:
BE
A
U
F
O
R
T
(9
1
9
)
7
0
7
-
6
7
0
7
CA
R
T
E
R
E
T
ac.
Ge
n
e
r
a
l
P
r
o
j
e
c
t
N
a
r
r
a
t
i
v
e
:
TH
E
P
R
O
P
O
S
E
D
R
E
P
L
A
C
E
M
E
N
T
O
F
B
R
I
D
G
E
N
O
.
3
3
O
V
E
R
T
H
E
N
O
R
T
H
R
I
V
E
R
I
N
C
A
R
T
E
R
E
T
C
O
U
N
T
Y
W
I
L
L
B
E
R
E
A
L
I
G
N
E
D
T
O
T
H
E
N
O
R
T
H
O
F
T
H
E
E
X
I
S
T
I
N
G
BR
I
D
G
E
.
A
P
P
R
O
X
I
M
A
T
E
L
Y
4
2
,
0
0
0
S
F
O
F
E
X
I
S
T
I
N
G
C
A
US
E
W
A
Y
W
I
L
L
B
E
R
E
M
O
V
E
D
A
T
T
H
E
R
E
Q
U
E
S
T
O
F
RE
G
U
L
A
T
O
R
Y
A
G
E
N
C
I
E
S
.
S
H
E
E
T
P
I
L
E
I
S
B
E
I
NG
UT
I
L
I
Z
E
D
O
N
T
H
E
N
O
R
T
H
E
R
N
S
I
D
E
O
F
T
H
E
C
A
U
S
E
W
A
Y
D
U
E
T
O
I
N
S
T
A
B
I
L
I
T
Y
O
F
B
E
D
M
A
T
E
R
A
I
L
S
W
H
I
C
H
A
L
S
O
A
L
L
O
W
S
F
O
R
M
I
N
I
M
I
Z
A
T
I
O
N
O
F
I
M
P
A
C
T
S
TO
TH
E
S
U
R
R
O
U
N
D
I
N
G
W
E
T
L
A
N
D
S
A
N
D
J
U
R
I
S
D
I
C
T
I
O
N
A
L
S
T
R
E
A
M
I
M
P
A
C
T
S
.
NO
T
E
:
A
L
T
H
O
U
G
H
G
R
A
S
S
S
W
A
L
E
S
A
R
E
N
O
T
R
E
Q
U
I
R
E
D
,
D
I
T
C
H
E
S
W
E
R
E
DE
S
I
G
N
E
D
T
O
M
E
E
T
G
R
A
S
S
S
W
A
L
E
C
R
I
T
E
R
I
A
O
N
T
H
E
R
E
M
A
I
N
D
E
R
O
F
T
H
E
EX
I
S
T
I
N
G
C
A
U
S
E
W
A
Y
S
T
O
T
R
E
A
T
A
L
L
R
U
N
O
F
F
A
N
D
P
R
O
M
O
T
E
I
N
F
I
L
T
R
A
T
I
O
N
A
T
TH
E
R
E
Q
U
E
S
T
O
F
R
E
G
U
L
A
T
O
R
Y
A
G
E
N
C
I
E
S
.
T
H
E
G
R
A
D
E
O
F
T
H
E
P
R
O
P
O
S
E
D
B
R
I
D
G
E
W
A
S
D
E
S
I
G
N
E
D
S
U
C
H
T
H
A
T
D
E
C
K
D
R
A
I
N
S
A
R
E
N
O
T
R
E
Q
U
I
R
E
D
.
Ty
p
i
c
a
l
C
r
o
s
s
S
e
c
t
i
o
n
D
e
s
c
r
i
p
t
i
o
n
:
Re
f
e
r
e
n
c
e
s
10,600 ADT
6.
7
0
Av
e
r
a
g
e
D
a
i
l
y
T
r
a
f
f
i
c
(
v
e
h
/
h
r
/
d
a
y
)
:
ac
.
No
r
t
h
C
a
r
o
l
i
n
a
D
e
p
a
r
t
m
e
n
t
o
f
T
r
a
n
s
p
o
r
t
a
t
i
o
n
Hi
g
h
w
a
y
S
t
o
r
m
w
a
t
e
r
P
r
o
g
r
a
m
S
T
O
R
M
W
A
T
E
R
M
A
N
A
G
E
M
E
N
T
P
L
A
N
FO
R
L
I
N
E
A
R
R
O
A
D
W
A
Y
P
R
O
J
E
C
T
S
PA
U
L
A
T
K
I
N
S
O
N
,
P
E
BR
I
D
G
E
R
E
P
L
A
C
E
M
E
N
T
Ge
n
e
r
a
l
P
r
o
j
e
c
t
I
n
f
o
r
m
a
t
i
o
n
Ad
d
r
e
s
s
:
10
2
0
B
I
R
C
H
R
I
D
G
E
R
D
.
RA
L
E
I
G
H
,
N
C
2
7
6
1
0
RA
L
E
I
G
H
,
N
C
2
7
6
1
0
Pr
o
j
e
c
t
/
T
I
P
N
o
.
:
NC
D
O
T
C
o
n
t
a
c
t
:
Pr
o
j
e
c
t
N
o
.
:
B-
4
7
2
2
B
Co
n
t
r
a
c
t
o
r
/
D
e
s
i
g
n
e
r
:
PA
T
K
I
N
S
O
N
@
N
C
D
O
T
.
G
O
V
WH
I
T
E
O
A
K
21
-
3
5
-
1
CR
L
E
W
I
S
2
@
N
C
D
O
T
.
G
O
V
TW
O
1
2
F
T
.
T
R
A
V
E
L
L
A
N
E
S
W
I
T
H
4
F
T
.
P
A
V
E
D
S
H
O
U
L
D
E
R
S
2
4
F
T
.
P
A
V
E
M
E
N
T
W
I
D
T
H
W
I
T
H
2
F
T
.
G
R
A
S
S
S
H
O
U
L
D
E
R
S
N/
A
NC
D
W
Q
S
t
r
e
a
m
I
n
d
e
x
N
o
.
:
Su
p
p
l
e
m
e
n
t
a
l
:
Hi
g
h
Q
u
a
l
i
t
y
W
a
t
e
r
s
(
H
Q
W
)
Pr
i
m
a
r
y
:
NO
R
T
H
R
I
V
E
R
VICINITY MAPNOT TO SCALE PROJECT BEGIN PROJECT END -L- STA. 31+00.00 BEGIN TIP PROJECT B-
4
7
2
2
B
-
L
-
S
T
A
.
6
6
+
5
0
.
0
0
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
4
7
2
2
B
TOT
A
L
L
E
N
G
T
H
O
F
T
I
P
P
R
O
J
E
C
T
B
-
4
7
2
2
B
=
0
.
6
7
2
M
I
L
E
S
LEN
G
T
H
S
T
R
U
C
T
U
R
E
T
I
P
P
R
O
J
E
C
T
B
-
4
7
2
2
B
=
0
.
2
5
6
M
I
L
E
S
LEN
G
T
H
R
O
A
D
W
A
Y
T
I
P
P
R
O
J
E
C
T
B
-
4
7
2
2
B
=
0
.
4
1
6
M
I
L
E
S
TOBEAUFORT
T
O
B
E
T
T
I
E
S
U
S
A
N
C
.
L
A
N
C
A
S
T
E
R
,
P
E
G
A
R
Y
R
.
L
O
V
E
R
I
N
G
,
P
E
C
A
R
T
E
R
E
T
C
O
U
N
T
Y
B
R
I
D
G
E
N
O
.
3
3
O
V
E
R
T
H
E
N
O
R
T
H
R
I
V
E
R
O
N
U
S
7
0
G
R
A
D
I
N
G
,
P
A
V
I
N
G
,
D
R
A
I
N
A
G
E
,
A
N
D
S
T
R
U
C
T
U
R
E
2550100502550100505102010DHVDTV======10,60014,6001055 460 %%MPH ADTADT20152035
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
*(TTST 1% + DUAL 3%)STATEWIDE TIER RURAL ARTERIAL FUNC CLASS =%*000PROFILE (HORIZONTAL)
3
8
4
9
6
.
1
.
1
P
E
B
R
N
H
S
-
0
0
7
0
(
8
4
)
P
R
O
J
E
C
T
L
E
N
G
T
H
R
I
G
H
T
O
F
W
A
Y
D
A
T
E
:
L
E
T
T
I
N
G
D
A
T
E
:
S
T
A
T
E
S
T
A
T
E
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
S
T
A
T
E
P
R
O
J
.
N
O
.
F.
A
.
P
R
O
J
.
N
O
.
DE
S
C
R
I
P
T
I
O
N
N
O
.
T
O
T
A
L
S
H
E
E
T
S
N
.
C
.
S
H
E
E
T
1
DESIGN DATA
P
r
e
p
a
r
e
d
i
n
t
h
e
O
f
f
i
c
e
o
f
:
S
I
G
N
A
T
U
R
E
:
S
I
G
N
A
T
U
R
E
:
P
.
E
.
P
.
E
.
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
2
0
1
2
S
T
A
N
D
A
R
D
S
P
E
C
I
F
I
C
A
T
I
O
N
S
P
R
O
J
E
C
T
E
N
G
I
N
E
E
R
P
R
O
J
E
C
T
D
E
S
I
G
N
E
N
G
I
N
E
E
R
GRAPHIC SCALES PLANSPROFILE (VERTICAL)
H
Y
D
R
A
U
L
I
C
S
E
N
G
I
N
E
E
R
L
O
C
A
T
I
O
N
:
T
Y
P
E
O
F
W
O
R
K
:
09/08/99
B
-
4
7
2
2
B
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
000 See Sheet 1-B For Conventional Symbols See Sheet 1-A For Index of Sheets$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$CON TRACT:TIP PROJECT:B-4722B
ARTMEN
N
A
S
O
H
DEP
T
O
F
T
R
A
S
P
OR
T
T
IO N
T
ATE
O
F
N
R
T
C
AROLINA
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
-
L
-
A
P
R
I
L
3
0
,
2
0
1
3
A
P
R
I
L
2
1
,
2
0
1
5
N
O
R
T
H
R
I
V
E
R
T
H
I
S
P
R
O
J
E
C
T
I
S
N
O
T
W
I
T
H
I
N
A
N
Y
M
U
N
I
C
I
P
A
L
B
O
U
N
D
A
R
I
E
S
.
B
R
N
H
S
-
0
0
7
0
(
8
4
)
3
8
4
9
6
.
2
.
1
R
/
W
&
U
T
I
L
.
-L- STA. 40+99.04 BEGIN BRIDGE
-
L
-
S
T
A
.
5
4
+
5
0
.
9
6
E
N
D
B
R
I
D
G
E
TO THE LIMITS ESTABLISHED BY ME
T
H
O
D
I
I
I
.
CLEARING ON THIS PROJECT SHALL B
E
P
E
R
F
O
R
M
E
D
B
R
I
D
G
E
N
O
.
3
3
U
S 7
0
US 70
1
0
0
0
B
i
r
c
h
R
i
d
g
e
D
r
.
,
R
a
l
e
i
g
h
,
N
C
2
7
6
1
0
S
H
E
E
T
1
O
F
1
1
P
E
R
M
I
T
D
R
A
W
I
N
G
W
E
T
L
A
N
D
A
N
D
S
U
R
F
A
C
E
W
A
T
E
R
I
M
P
A
C
T
S
P
E
R
M
I
T
R:\Hydraulics\PERM ITS_Environm ental\Drawings\1-B4722B_Rdy_tsh.dgncrlewis26/17/2014
5
6
4
GRAU 350 GRAU 350
GRAU
350
G
R
A
U
3
5
0
Pop. 3,888 BettieO
tw
a
y
Straits 7070
7
0
1299 130313031480147914271427142814261304 121211701170 14681464 11641167 1166116511681675167617231674167311651238144514351466
13
2
6
13
3
1
1329
13
2
8
13
2
7
13
3
1
13
3
1
1324
13
2
5
13
2
5
1462 1458143214331431 1430 1429 14491434130113021472
1
3
3
5
1335133513411471145414371436134013331339 1333 133
3
1
3
3
2
1332
13
3
4
14
4
0
13
4
3
13
4
2
14601174 1300132313221312131014121459116916311446123112301644123212461455148314841481
Gilliken
Creek
101CedarSt.Live OakSt.Beaufortand CreekCreek WardCreekNorthLeopardCreekSouthLeopardCreekTurnerCreekGibbsCreekNorthRiverNorth RiverMarsh 1489
13
3
5
7070Beaufort101
NSRS
2007
NAD
83
/
WETLAND DENOTES FILL INFFSSSURFACE WATER DENOTES IMPACTS INTSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY
S
I
T
E
1
1
"
=
1
0
0
’
0
’
1
0
0
’
1
0
0
’
D
E
T
A
I
L
C
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
(
N
O
T
T
O
S
C
A
L
E
)
2
.
0
’
2:1
C
R
O
S
S
S
E
C
T
I
O
N
V
I
E
W
P
R
O
F
I
L
E
V
I
E
W
S
H
O
W
N
F
O
R
C
L
A
R
I
T
Y
E
X
I
S
T
I
N
G
B
R
I
D
G
E
N
O
T
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
E
X
.
C
A
U
S
E
W
A
Y
(
T
O
B
E
R
E
M
O
V
E
D
)
(
T
O
B
E
R
E
T
A
I
N
E
D
)
EX
.
C
A
U
S
E
W
A
Y
-
L
-
S
T
A
.
4
0
+
8
0
T
O
4
4
+
0
5
R
T
.
RE
M
O
V
E
E
X
.
C
A
U
S
E
W
A
Y
T
O
G
E
O
T
E
X
T
I
L
E
N
A
T
U
R
A
L
B
E
D
E
L
E
V
A
T
I
O
N
W
/
3
.
5
’
K
E
Y
-
I
N
C
L
A
S
S
I
I
R
I
P
R
A
P
E
X
.
R
O
A
D
W
A
Y
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
(T
O
B
E
R
E
M
O
V
E
D
)
E
X
I
S
T
I
N
G
C
A
U
S
E
W
A
Y
S
H
E
E
T
2
O
F
1
1
P
E
R
M
I
T
D
R
A
W
I
N
G
T
E
M
P
.
W
O
R
K
B
R
I
D
G
E
SEE E
N
L
A
R
G
E
M
E
N
T
S
H
E
E
T
4
R
E
M
O
V
E
P
A
V
E
M
E
N
T
P
E
R
M
A
N
E
N
T
S
H
E
E
T
P
I
L
E
P
E
R
M
A
N
E
N
T
S
H
E
E
T
P
I
L
E
G
R
A
S
S
E
D
S
W
A
L
E
D
A
T
A
S
E
E
D
E
T
A
I
L
A
S
P
E
C
I
A
L
C
U
T
d
=
0
.
7
F
T
.
d
=
0
.
7
F
T
.
V
=
1
.
1
F
P
S
V
=
1
.
2
F
P
S
A
C
T
U
A
L
L
E
N
G
T
H
=
4
6
4
F
T
.
R
E
Q
U
I
R
E
D
L
E
N
G
T
H
=
6
1
F
T
.
L
O
N
G
I
T
U
D
N
A
L
=
0
.
3
%
S
L
O
P
E
:
F
R
O
N
T
=
4
:
1
B
A
C
K
=
4
:
1
Q
=
(
0
.
5
8
)
(
7
.
0
6
)
(
0
.
6
1
)
=
2
.
5
C
F
S
Q
=
C
I
A
=
(
0
.
5
8
)
(
5
.
4
2
)
(
0
.
6
1
)
=
1
.
9
C
F
S
D
A
=
0
.
6
1
A
C
R
E
S
C
=
0
.
5
8
-
L
-
S
T
A
.
3
3
+
8
6
T
O
3
8
+
5
0
R
T
.
2
22 1
0
1
01
0
G
R
A
S
S
E
D
S
W
A
L
E
D
A
T
A
S
E
E
D
E
T
A
I
L
B
L
A
T
E
R
A
L
’
V
’
S
E
E
D
E
T
A
I
L
A
S
P
E
C
I
A
L
C
U
T
2
22 1
0
1
0
1
0
d
=
1
.
1
F
T
.
d
=
1
.
2
F
T
.
V
=
1
.
5
F
P
S
V
=
1
.
6
F
P
S
A
C
T
U
A
L
L
E
N
G
T
H
=
2
3
6
F
T
.
R
E
Q
U
I
R
E
D
L
E
N
G
T
H
=
9
2
F
T
.
L
O
N
G
I
T
U
D
N
A
L
=
0
.
3
%
S
L
O
P
E
:
F
R
O
N
T
=
4
:
1
B
A
C
K
=
4
:
1
Q
=
(
0
.
7
9
)
(
7
.
0
6
)
(
0
.
9
2
)
+
2
.
5
=
8
.
0
C
F
S
Q
=
C
I
A
=
(
0
.
7
9
)
(
5
.
4
2
)
(
0
.
9
2
)
+
1
.
9
=
6
.
0
C
F
S
A
C
R
E
S
C
=
0
.
7
9
A
D
D
I
T
I
O
N
A
L
D
A
T
O
B
E
T
R
E
A
T
E
D
=
0
.
9
2
T
O
T
A
L
D
A
=
1
.
5
3
A
C
R
E
S
-
L
-
S
T
A
.
3
8
+
5
0
T
O
4
0
+
8
6
R
T
.
HCHCCLEARINGDENOTES HAND
W
A
T
E
R
I
M
P
A
C
T
S
P
E
R
M
A
N
E
N
T
S
U
R
F
A
C
E
R:\Hydraulics\PERM ITS_Environm ental\Drawings\2-B4722B_Hyd_prm _wet_PSH_4.dgncrlewis26/17/2014
D
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
C
U
T
G
R
A
S
S
E
D
S
W
A
L
E
4:1
G
r
o
u
n
d
N
a
t
u
r
a
l
D
E
T
A
I
L
A
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
M
i
n
.
D
=
1
F
T
.
4:1
-
L
-
S
T
A
.
3
3
+
8
6
T
O
4
0
+
5
0
R
T
.
15" RCP-IV
1
5
"
R
C
P
-
I
V
15" RCP-IV
1
5
"
R
C
P
-
I
V
15"
2
G
I
2
G
I
2
G
I
2
G
I
S
E
E
D
E
T
A
I
L
C
A
P
P
R
O
X
.
1
2
,
8
0
0
C
Y
E
X
C
A
V
A
T
I
O
N
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
S
E
E
D
E
T
A
I
L
B
G
R
A
S
S
E
D
S
W
A
L
E
LA
T
E
R
A
L
’
V
’
W
/
P
S
R
M
S
E
E
D
E
T
A
I
L
A
G
R
A
S
S
E
D
S
W
A
L
E
S
P
E
C
I
A
L
C
U
T
3:1
(
N
o
t
t
o
S
c
a
l
e
)
4:1
4:1
D
b
1
"
/
F
t
.
L
w
w
w
-
L
-
S
T
A
.
4
0
+
5
0
T
O
4
0
+
8
6
R
T
.
G
r
o
u
n
d
N
a
t
u
r
a
l
Se
e
Roa
dw
a
y p
rofile
s
Prop. d
itch
g
ra
de
P
R
O
F
I
L
E
V
I
E
W
D
E
T
A
I
L
B
G
R
A
S
S
E
D
S
W
A
L
E
w
/
P
S
R
M
P
L
A
N
V
I
E
W
S
L
O
P
E
F
I
L
L
PS
R
M
T
U
C
K
A
L
L
S
I
D
E
S
P
S
R
M
w
/
1
’
D
I
T
C
H
G
R
A
D
E
E
N
D
O
F
P
R
O
P
O
S
E
D
L
=
3
.
5
F
T
.
w
=
5
F
T
.
b
=
5
F
T
.
M
i
n
.
D
=
1
.
5
F
T
.
B
L
1
L
1
=
7
.
5
F
T
.
B
=
1
0
F
T
.
L
1
G
r
o
u
n
d
N
a
t
u
r
a
l
E
L
E
V
.
3
.
6
6
F
T
.
E
L
E
V
.
4
.
8
F
T
.
2
G
I
D
E
T
A
I
L
C
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
(
N
O
T
T
O
S
C
A
L
E
)
2
.
0
’
2:1
C
R
O
S
S
S
E
C
T
I
O
N
V
I
E
W
P
R
O
F
I
L
E
V
I
E
W
S
H
O
W
N
F
O
R
C
L
A
R
I
T
Y
E
X
I
S
T
I
N
G
B
R
I
D
G
E
N
O
T
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
E
X
.
C
A
U
S
E
W
A
Y
(
T
O
B
E
R
E
M
O
V
E
D
)
(
T
O
B
E
R
E
T
A
I
N
E
D
)
EX
.
C
A
U
S
E
W
A
Y
-
L
-
S
T
A
.
4
0
+
8
0
T
O
4
4
+
0
5
R
T
.
RE
M
O
V
E
E
X
.
C
A
U
S
E
W
A
Y
T
O
G
E
O
T
E
X
T
I
L
E
N
A
T
U
R
A
L
B
E
D
E
L
E
V
A
T
I
O
N
W
/
3
.
5
’
K
E
Y
-
I
N
C
L
A
S
S
I
I
R
I
P
R
A
P
E
X
.
R
O
A
D
W
A
Y
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
(T
O
B
E
R
E
M
O
V
E
D
)
E
X
I
S
T
I
N
G
C
A
U
S
E
W
A
Y
U
S
7
0
2
4
’
B
S
T
J
O
H
N
R
.
F
U
L
C
H
E
R
J
R
.
R
I
P
R
A
P
R
I
P
R
A
P
R
I
P
R
A
P
R
I
P
R
A
P
SCRUB SCRUB
-
B
L
-
3
-
B
L
-
4
-BL- 2 PAMCAR FARMS LLCJANET FULCHER
B
R
I
D
G
E
#
3
3
E
X
I
S
T
I
N
G
P
O
W
E
R
T
R
A
N
S
M
I
S
S
I
O
N
L
I
N
E
E
A
S
E
M
E
N
T
30+00
3
5
+
0
0
4
0
+
0
0
M ATCH LIN E SEE SHEET 5 -L- STA. 44+00.00
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
4
B
-
4
7
2
2
B
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
N
O
T
E
S
NAD
83
/ NSRS
2007
TYPE-IIITYPE-III
T
Y
P
E
-
I
I
I
T
Y
P
E
-
I
I
I
025
02
01
24’4’4’
6’24’6’
6’24’6’BEGIN BRIDG
E
BEGIN APPROACH SL
A
B
E
N
D
B
R
I
D
G
E
E
N
D
A
P
P
R
O
A
C
H
S
L
A
B
SKETCH OF PA
V
E
M
E
N
T
/
B
R
I
D
G
E
R
E
L
A
T
I
O
N
S
H
I
P
N
O
T
T
O
S
C
A
L
E
1
)
F
O
R
-
L
-
P
R
O
F
I
L
E
,
S
E
E
S
H
E
E
T
7
P
A
V
E
M
E
N
T
R
E
M
O
V
A
L
025025025025
025
24’4’4’-L- STA. 40+75.04 LT END SBG-L- STA. 40+75.04 RT END SBG-L- STA. 40+
9
9
.
0
4
-L- STA. 40+75.04
-
L
-
S
T
A
.
5
4
+
7
4
.
9
6
-
L
-
S
T
A
.
5
4
+
7
4
.
9
6
L
T
B
E
G
I
N
S
B
G
-
L
-
S
T
A
.
5
4
+
7
4
.
9
6
R
T
B
E
G
I
N
S
B
G
-
L
-
S
T
A
.
5
4
+
5
0
.
9
6
1
2
T
E
M
P
.
W
O
R
K
B
R
I
D
G
E
C
C
C
C
FFFFF
C
C
C
C
C
C
C
C
D
E
T
A
I
L
C
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
(
N
O
T
T
O
S
C
A
L
E
)
2
.
0
’
2:1
C
R
O
S
S
S
E
C
T
I
O
N
V
I
E
W
P
R
O
F
I
L
E
V
I
E
W
S
H
O
W
N
F
O
R
C
L
A
R
I
T
Y
E
X
I
S
T
I
N
G
B
R
I
D
G
E
N
O
T
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
E
X
.
C
A
U
S
E
W
A
Y
(
T
O
B
E
R
E
M
O
V
E
D
)
(
T
O
B
E
R
E
T
A
I
N
E
D
)
EX
.
C
A
U
S
E
W
A
Y
-
L
-
S
T
A
.
4
0
+
8
0
T
O
4
4
+
0
5
R
T
.
RE
M
O
V
E
E
X
.
C
A
U
S
E
W
A
Y
T
O
G
E
O
T
E
X
T
I
L
E
N
A
T
U
R
A
L
B
E
D
E
L
E
V
A
T
I
O
N
W
/
3
.
5
’
K
E
Y
-
I
N
C
L
A
S
S
I
I
R
I
P
R
A
P
E
X
.
R
O
A
D
W
A
Y
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
(T
O
B
E
R
E
M
O
V
E
D
)
E
X
I
S
T
I
N
G
C
A
U
S
E
W
A
Y
T
E
M
P
.
W
O
R
K
B
R
I
D
G
E
WETLAND DENOTES FILL INFFSSSURFACE WATER DENOTES IMPACTS INTSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY
S
I
T
E
1
1
"
=
1
0
0
’
0
’
1
0
0
’
1
0
0
’
S
H
E
E
T
3
O
F
1
1
P
E
R
M
I
T
D
R
A
W
I
N
G
SEE E
N
L
A
R
G
E
M
E
N
T
S
H
E
E
T
4
R
E
M
O
V
E
P
A
V
E
M
E
N
T
P
E
R
M
A
N
E
N
T
S
H
E
E
T
P
I
L
E
P
E
R
M
A
N
E
N
T
S
H
E
E
T
P
I
L
E
G
R
A
S
S
E
D
S
W
A
L
E
D
A
T
A
S
E
E
D
E
T
A
I
L
A
S
P
E
C
I
A
L
C
U
T
d
=
0
.
7
F
T
.
d
=
0
.
7
F
T
.
V
=
1
.
1
F
P
S
V
=
1
.
2
F
P
S
A
C
T
U
A
L
L
E
N
G
T
H
=
4
6
4
F
T
.
R
E
Q
U
I
R
E
D
L
E
N
G
T
H
=
6
1
F
T
.
L
O
N
G
I
T
U
D
N
A
L
=
0
.
3
%
S
L
O
P
E
:
F
R
O
N
T
=
4
:
1
B
A
C
K
=
4
:
1
Q
=
(
0
.
5
8
)
(
7
.
0
6
)
(
0
.
6
1
)
=
2
.
5
C
F
S
Q
=
C
I
A
=
(
0
.
5
8
)
(
5
.
4
2
)
(
0
.
6
1
)
=
1
.
9
C
F
S
D
A
=
0
.
6
1
A
C
R
E
S
C
=
0
.
5
8
-
L
-
S
T
A
.
3
3
+
8
6
T
O
3
8
+
5
0
R
T
.
2
22 1
0
1
01
0
G
R
A
S
S
E
D
S
W
A
L
E
D
A
T
A
S
E
E
D
E
T
A
I
L
B
L
A
T
E
R
A
L
’
V
’
S
E
E
D
E
T
A
I
L
A
S
P
E
C
I
A
L
C
U
T
2
22 1
0
1
0
1
0
d
=
1
.
1
F
T
.
d
=
1
.
2
F
T
.
V
=
1
.
5
F
P
S
V
=
1
.
6
F
P
S
A
C
T
U
A
L
L
E
N
G
T
H
=
2
3
6
F
T
.
R
E
Q
U
I
R
E
D
L
E
N
G
T
H
=
9
2
F
T
.
L
O
N
G
I
T
U
D
N
A
L
=
0
.
3
%
S
L
O
P
E
:
F
R
O
N
T
=
4
:
1
B
A
C
K
=
4
:
1
Q
=
(
0
.
7
9
)
(
7
.
0
6
)
(
0
.
9
2
)
+
2
.
5
=
8
.
0
C
F
S
Q
=
C
I
A
=
(
0
.
7
9
)
(
5
.
4
2
)
(
0
.
9
2
)
+
1
.
9
=
6
.
0
C
F
S
A
C
R
E
S
C
=
0
.
7
9
A
D
D
I
T
I
O
N
A
L
D
A
T
O
B
E
T
R
E
A
T
E
D
=
0
.
9
2
T
O
T
A
L
D
A
=
1
.
5
3
A
C
R
E
S
-
L
-
S
T
A
.
3
8
+
5
0
T
O
4
0
+
8
6
R
T
.
HCHCCLEARINGDENOTES HAND
W
A
T
E
R
I
M
P
A
C
T
S
P
E
R
M
A
N
E
N
T
S
U
R
F
A
C
E
R:\Hydraulics\PERM ITS_Environm ental\Drawings\3-B4722B_Hyd_prm _wet_PSH_4_CO NTO URS.dgncrlewis26/17/2014
D
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
C
U
T
G
R
A
S
S
E
D
S
W
A
L
E
4:1
G
r
o
u
n
d
N
a
t
u
r
a
l
D
E
T
A
I
L
A
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
M
i
n
.
D
=
1
F
T
.
4:1
-
L
-
S
T
A
.
3
3
+
8
6
T
O
4
0
+
5
0
R
T
.
15" RCP-IV
1
5
"
R
C
P
-
I
V
15" RCP-IV
1
5
"
R
C
P
-
I
V
15"
2
G
I
2
G
I
2
G
I
2
G
I
S
E
E
D
E
T
A
I
L
C
A
P
P
R
O
X
.
1
2
,
8
0
0
C
Y
E
X
C
A
V
A
T
I
O
N
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
S
E
E
D
E
T
A
I
L
B
G
R
A
S
S
E
D
S
W
A
L
E
LA
T
E
R
A
L
’
V
’
W
/
P
S
R
M
S
E
E
D
E
T
A
I
L
A
G
R
A
S
S
E
D
S
W
A
L
E
S
P
E
C
I
A
L
C
U
T
3:1
(
N
o
t
t
o
S
c
a
l
e
)
4:1
4:1
D
b
1
"
/
F
t
.
L
w
w
w
-
L
-
S
T
A
.
4
0
+
5
0
T
O
4
0
+
8
6
R
T
.
G
r
o
u
n
d
N
a
t
u
r
a
l
Se
e
Roa
dw
a
y p
rofile
s
Prop. d
itch
g
ra
de
P
R
O
F
I
L
E
V
I
E
W
D
E
T
A
I
L
B
G
R
A
S
S
E
D
S
W
A
L
E
w
/
P
S
R
M
P
L
A
N
V
I
E
W
S
L
O
P
E
F
I
L
L
PS
R
M
T
U
C
K
A
L
L
S
I
D
E
S
P
S
R
M
w
/
1
’
D
I
T
C
H
G
R
A
D
E
E
N
D
O
F
P
R
O
P
O
S
E
D
L
=
3
.
5
F
T
.
w
=
5
F
T
.
b
=
5
F
T
.
M
i
n
.
D
=
1
.
5
F
T
.
B
L
1
L
1
=
7
.
5
F
T
.
B
=
1
0
F
T
.
L
1
G
r
o
u
n
d
N
a
t
u
r
a
l
E
L
E
V
.
3
.
6
6
F
T
.
E
L
E
V
.
4
.
8
F
T
.
2
G
I
D
E
T
A
I
L
C
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
(
N
O
T
T
O
S
C
A
L
E
)
2
.
0
’
2:1
C
R
O
S
S
S
E
C
T
I
O
N
V
I
E
W
P
R
O
F
I
L
E
V
I
E
W
S
H
O
W
N
F
O
R
C
L
A
R
I
T
Y
E
X
I
S
T
I
N
G
B
R
I
D
G
E
N
O
T
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
E
X
.
C
A
U
S
E
W
A
Y
(
T
O
B
E
R
E
M
O
V
E
D
)
(
T
O
B
E
R
E
T
A
I
N
E
D
)
EX
.
C
A
U
S
E
W
A
Y
-
L
-
S
T
A
.
4
0
+
8
0
T
O
4
4
+
0
5
R
T
.
RE
M
O
V
E
E
X
.
C
A
U
S
E
W
A
Y
T
O
G
E
O
T
E
X
T
I
L
E
N
A
T
U
R
A
L
B
E
D
E
L
E
V
A
T
I
O
N
W
/
3
.
5
’
K
E
Y
-
I
N
C
L
A
S
S
I
I
R
I
P
R
A
P
E
X
.
R
O
A
D
W
A
Y
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
(T
O
B
E
R
E
M
O
V
E
D
)
E
X
I
S
T
I
N
G
C
A
U
S
E
W
A
Y
U
S
7
0
2
4
’
B
S
T
J
O
H
N
R
.
F
U
L
C
H
E
R
J
R
.
R
I
P
R
A
P
R
I
P
R
A
P
R
I
P
R
A
P
R
I
P
R
A
P
SCRUB SCRUB
-
B
L
-
3
-
B
L
-
4
-BL- 2 PAMCAR FARMS LLCJANET FULCHER
B
R
I
D
G
E
#
3
3
E
X
I
S
T
I
N
G
P
O
W
E
R
T
R
A
N
S
M
I
S
S
I
O
N
L
I
N
E
E
A
S
E
M
E
N
T
-
5.
0
-5.0
-4
.5
-4.5
-4.0
-
4
.0
-
4
.
0
-
4
.
0
-4
.0
-3.5
-3.5
-
3.
5
-
3
.
5
-
3
.
5
-
3
.
5
-
3
.
5
-
3
.5
-
3.
5
-
3.5
-3.5
-
3
.5
-3.5
-3
.5
-3
.5
-
3
.
0
-
3
.0
-
3.
0
-3
.0
-
3
.0
-
3
.0
-3
.0
-3.0
-
3
.
0
-
3
.
0
-
3
.
0
-
3
.
0
-3.0-3.0-3.0
-
3.
0
-3.0
-2.5
-
2
.5
-
2
.5
-
2.5
-
2
.5
-
2
.
5
-
2
.
5
-
2
.
5
-
2
.5
-
2
.
5
-2.5-2.5-2.5 -2.5 -2.5 -2.0-2.0
-
2.0
-2.0
-
2
.0
-
2
.
0
-
2
.
0
-2.0
-
2
.
0
-
2
.
0
-
2
.
0
-
2
.
0
-
2
.
0
-2.0-2.0-2.0 -2.0 -2.0-2.0 -1.5-1.5-1.5
-1.5
-1.5
-
1
.
5
-
1
.
5
-
1
.
5
-1.5
-
1
.
5
-1.5
-
1
.
5
-
1.5
-
1.5
-1.5-1.5-1.5 -1.5 -1.0-1.0-1.0-1.0
-
1
.0
-
1
.
0
-
1
.
0
-
1
.
0
-1.0
-
1
.
0
-
1
.
0
-
1
.
0
-
1.0
-1.
0
-1.0-1.0
-
1.0
-
1.0
-
1.0
-0.5-0.5-0.5-0.5
-0
.5
-
0
.
5
-
0
.
5
-
0
.5
-
0
.
5
-
0
.
5
-
0
.
5
-
0
.5
-
0
.5
-
0
.
5
-0.5-0.5 0.00.00.00.00.00.0
0
.0
0
.0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0
.
0
0.0
0.0
0
.
0
0
.
0
0
.
0
0
.0
0
.
0
0
.0
0
.
0
0
.
0
0.00.00.00.0 0.0 0.50.50.50.5
0
.5
0
.
5
0
.
5
0
.
5
0
.
5
0.5
0
.
5
0
.
5
0
.
5
0
.
5
0.50.5 1.0
1
.
0
1.0
1
.
0
1
.
0
1
.
0
1.0
1
.
0
1
.
0
1
.
0
1
.
0
1.0 1.0 1.0
1.0
1.5
1
.
5
1
.
5
1
.
5
1
.
5
1.51.5 1.51.51.51.5
1
.
5
1
.
5
1
.
5
1
.
5
1
.
5
1.5
1.5 1.5
2
.0
2
.
0
2
.
0
2
.
0
2
.
0
2.02.0 2.0 2.0
2
.
0
2
.
0
2
.
0
2
.
0
2
.
0
2.0 2.02.0 2.0
2
.0
2
.5
2
.
5
2
.
5
2
.
5
2
.
5
2.52.5 2.5 2.5
2
.
5
2
.
5
2
.
5
2
.
5
2
.
5
2.52.5
3
.
0
3
.
0
3
.
0
3
.
0
3
.
0
3.03.0 3.0
3
.
0
3
.
0
3
.
0
3
.
0
3
.
0
3.0
3
.5
3
.
5
3
.
5
3
.
5
3
.
5
3.53.5 3.5 3.5
3
.
5
3
.
5
3
.
5
3
.
5
3
.
5
3.5 3.5
4
.
0
4
.
0
4.04.0 4.0 4.0
4
.
0
4
.
0
4
.
0
4
.
0
4
.0 4
.
0
4
.
0
4
.
0
4
.
5
4
.
5
4.54.54.5
4
.
5
4
.
5
4
.5
4
.
5
4.5
4
.
5
4
.
5
4.5
5
.
0
5
.
0
5
.
0
5.05.05.05.05.0 5.05.05.0
5
.
0
5
.0
5
.
0
5
.
0
5
.
0
5.0
5
.0
5.0
5
.
0
5.0
5
.
0
5
.
0
5
.
0
5
.
0
5.05.0
5
.
5
5
.
5
5.55.55.5
5
.
5
5
.
5
5
.
5
5
.5
5
.
5
5.5
5
.
5
5
.
5
6
.
0
6
.
0
6.06.06.0
6
.
0
6
.
0
6
.
0
6
.
0
6
.0 6
.
0
6
.
0
6
.
0
6
.0
6
.
5
6
.
5
6.56.56.5
6
.
5
6.5
6
.
5
6
.5
6
.
5
6
.5
6
.
5
6
.
5
6
.
5
6
.5
7
.
0
7
.0
7
.
0
7
.0
7
.
0
7.07.07.07.0
7
.
0
7
.
0
7.
0
7
.
0
7
.
0
7
.
0
7
.0
7.0
7.
0
7
.0
7
.0
7
.
0
7
.0
7
.0
7.0
7
.0
7.57.5
7
.
5
7
.
5
7
.5
7
.
5
7
.
5
7
.
5
7.57.5
7
.5
7
.5
7
.5
7.
5
7
.5
7
.5
7
.
5
8.0
8
.
0
8
.
0
8
.
0
8
.
0
8
.
0
8
.
0
8.0
8
.08
.0
8
.0
8
.0
8
.0
8
.5
8.58.58.5
8.5 9
.0
9
.0
9.0
9
.0
9.0
9
.5
30+00
3
5
+
0
0
4
0
+
0
0
M ATCH LIN E SEE SHEET 5 -L- STA. 44+00.00
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
4
B
-
4
7
2
2
B
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
N
O
T
E
S
NAD
83
/ NSRS
2007
TYPE-IIITYPE-III
T
Y
P
E
-
I
I
I
T
Y
P
E
-
I
I
I
025
02
01
24’4’4’
6’24’6’
6’24’6’BEGIN BRIDG
E
BEGIN APPROACH SL
A
B
E
N
D
B
R
I
D
G
E
E
N
D
A
P
P
R
O
A
C
H
S
L
A
B
SKETCH OF PA
V
E
M
E
N
T
/
B
R
I
D
G
E
R
E
L
A
T
I
O
N
S
H
I
P
N
O
T
T
O
S
C
A
L
E
1
)
F
O
R
-
L
-
P
R
O
F
I
L
E
,
S
E
E
S
H
E
E
T
7
P
A
V
E
M
E
N
T
R
E
M
O
V
A
L
025025025025
025
24’4’4’-L- STA. 40+75.04 LT END SBG-L- STA. 40+75.04 RT END SBG-L- STA. 40+
9
9
.
0
4
-L- STA. 40+75.04
-
L
-
S
T
A
.
5
4
+
7
4
.
9
6
-
L
-
S
T
A
.
5
4
+
7
4
.
9
6
L
T
B
E
G
I
N
S
B
G
-
L
-
S
T
A
.
5
4
+
7
4
.
9
6
R
T
B
E
G
I
N
S
B
G
-
L
-
S
T
A
.
5
4
+
5
0
.
9
6
1
2
T
E
M
P
.
W
O
R
K
B
R
I
D
G
E
C
C
C
C
FFFFF
C
C
C
C
C
C
C
C
WETLA
N
D
DENOTES F
I
L
L
I
N
FFSSSURFACE W
A
T
E
R
DENOTES I
M
P
A
C
T
S
I
N
T
S
T
S
I
M
P
A
C
T
S
I
N
S
U
R
F
A
C
E
W
A
T
E
R
D
E
N
O
T
E
S
T
E
M
P
O
R
A
R
Y
S
I
T
E
1
0
’
5
0
’
5
0
’
1
"
=
5
0
’
H
C
H
C
C
L
E
A
R
I
N
G
D
E
N
O
T
E
S
H
A
N
D
P
L
A
N
V
I
E
W
N
C
D
O
T
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
C
A
R
T
E
R
E
T
C
O
U
N
T
Y
P
R
O
J
E
C
T
:
3
8
4
9
6
.
1
.
1
(
B
-
4
7
2
2
B
)
N
O
R
T
H
R
I
V
E
R
O
N
U
S
7
0
B
R
I
D
G
E
N
O
.
3
3
O
V
E
R
B
E
A
U
F
O
R
T
-
B
E
T
T
I
E
S
H
E
E
T
4
O
F
1
1
6
/
1
7
/
1
4
103
1
0
4
U
S
7
0
2
4
’
B
S
T
PAMCAR FARMS LLC1
C
FF
F
C
MHW=1.2’MLW=-1.9’M
T
L
=
-
0
.
4
’
S
H
E
E
T
5
O
F
1
1
P
E
R
M
I
T
D
R
A
W
I
N
G
S
H
E
E
T
P
I
L
E
T
Y
P
I
C
A
L
3
.
5
’
K
E
Y
-
I
N
S
E
E
D
E
T
A
I
L
C
E
X
.
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
BASE DISCHARGEOHW ELEVATION= 2.4 = 4/18/2012 = 3.1 = 21,000= = 8.0 = 100 = = 7.3 = 50
S
E
E
D
E
T
A
I
L
E
E
L
E
V
.
O
F
2
’
E
X
C
A
V
A
T
E
T
O
T
Y
P
I
C
A
L
3
.
5
’
K
E
Y
-
I
N
2:
1
S
H
E
E
T
P
I
L
E
2:1
T
E
M
P
O
R
A
R
Y
W
O
R
K
B
R
I
D
G
E
T
E
M
P
O
R
A
R
Y
W
O
R
K
B
R
I
D
G
E
M
A
X
.
W
O
R
K
B
R
I
D
G
E
G
R
A
D
E
=
6
%
A
B
O
V
E
M
E
A
N
H
I
G
H
W
A
T
E
R
)
.
C
O
N
T
R
A
C
T
O
R
.
M
I
N
.
L
O
W
C
H
O
R
D
=
3
.
2
’
(
2
’
F
I
N
A
L
W
O
R
K
B
R
I
D
G
E
G
R
A
D
E
T
O
B
E
S
E
T
B
Y
BRIDGE HYDRAULIC DATADESIGN DISCHARGEDESIGN FREQUENCYDESIGN HW ELEVATIONBASE FREQUENCYBASE HW ELEVATIONOVERTOPPING DISCHARGEOVERTOPPING FREQUENCYOVERTOPPING ELEVATIONDATE OF SURVEYAT DATE OF SURVEY = CFSYRSFTCFSYRSFTCFSYRSFTFTFT
E
X
C
A
V
A
T
I
O
N
R
E
M
O
V
A
L
E
X
I
S
T
I
N
G
C
A
U
S
E
W
A
Y
R:\Hydraulics\PERM ITS_Environm ental\Drawings\5-B4722B_Hyd_prm _wet_NO RTH_RIVER_PRO FILE_1.dgncrlewis26/17/2014 31323334
3
5
3
6
3
7
3
8
3
9
4
0
4
1
4
2
4
3
4
4
-40 -30 -20 -10 0 1045464748
4
9
5
0
5
1
5
2
5
3
5
4
5
5
5
6
5
7
5
8
-40 -30 -20 -10 0 10 ELEV. = 8.01’-L- STA. 31+00.00 BEGIN GRADE
-
L
-
20 30 5040
-
4
0
-
3
0
-
2
0
-
1
0
0 1
0
2
0
3
0
-
4
0
-
3
0
-
2
0
-
1
0
0 1
0
2
0
3
0
5
0
4
0
N
O
T
E
S
-
L
-
1
)
F
O
R
-
L
-
P
L
A
N
V
I
E
W
,
S
E
E
S
H
E
E
T
S
4
,
5
A
N
D
6
V
=
6
0
M
P
H
V = 60 M
P
H
V
=
6
0
M
P
H
V = 60 MPH PI = 33+18.00EL = 9.38’(+)0.6284%(-)0.1735%VC = 240’K = 299
P
I
=
3
9
+
0
0
.
0
0
E
L
=
8
.
3
7
’
(
-
)
0
.
1
7
3
5
%
(
+
)
1
.
2
0
0
7
%
V
C
=
3
0
0
’
K
=
2
1
8
14.63
PI = 47+
8
2
.
0
0
EL = 18.9
6
’
(+)1.2007%(-)1.200
0
%
VC = 1,0
0
0
’
K = 41714.63
P
I
=
5
7
+
4
2
.
0
0
E
L
=
7
.
4
4
’
(-
)1.2
0
0
0
%
(
+
)
0
.
0
9
5
5
%
V
C
=
3
0
0
’
K
=
2
3
2
7.58
(
+
)
0
.
6
0
0
0
%
(
+
)
0
.3
0
0
0
%
(-) 1.407
8
%
(
-
)
0
.3
0
0
0
%
(
+
)
0
.3
0
0
0
%
ELEV. 6.43-L- STA. 33+86.07 (RT)BEGIN SPECIAL CUT DITCH
ELEV. 5.53
-L- STA. 34+50.00 (RT)
SPECIAL CUT DITCH
ELEV. 3.52
-L- STA. 58+50.00 (RT)
SPECIAL CUT DITCH
ELEV. 3.66
-L- STA. 40+75.00 (RT)
END LATERAL ’V’ DITCH
ELEV. 3.73
-L- STA. 40+50.00 (RT)
BEGIN LATERAL ’V’ DITCH
END SPECIAL CUT DITCH
ELEV. 2.32
-L- STA. 54+75.00 (RT)
BEGIN LATERAL ’V’ DITCH
ELEV. 2.47
-L- STA. 55+00.00 (RT)
LATERAL ’V’ DITCH
ELEV. 2.62
-L- STA. 55+50.00 (RT)
BEGIN SPECIAL CUT DITCH
END LATERAL ’V’ DITCH
2:1
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
7
B
-
4
7
2
2
B
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAM E$$$$
-
L
-
S
T
A
.
4
0
+
9
9
.
0
4
B
E
G
I
N
B
R
I
D
G
E
-
L
-
S
T
A
.
5
4
+
5
0
.
9
6
E
N
D
B
R
I
D
G
E
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
7
.
8
0
3.
9
5
:
1
4
:1
0
.
0
2
0
0
.
0
2
0
6
.
2
3
7
.
0
8
4:
1
4
:1
0
.
0
2
0
0
.
0
0
3
5
.
5
3
7
.
2
2
4:
1
4
:1
0
.
0
2
0
0
.
0
1
6
5
.
3
8
6
.
4
8
4
:
1
4
:1
0
.
0
3
4
0
.
0
3
4
5
.
2
3
4
.
0
0
4:
1
4
:1
0
.0
5
0
0
.0
5
0
5
.
0
8
1
.
2
3
4:
1
4
:1
0
.0
5
0
0
.0
5
0
4
.
9
3
W
L
B
L
I
M
I
T
S
C
L
E
A
R
I
N
G
J
S &W
L
B
S
H
E
E
T
6
O
F
1
1
P
E
R
M
I
T
D
R
A
W
I
N
G
WETLAND IMPACTS SITE 1
00
1
0
1
0
2
0
2
0
3
0
3
0
4
0
4
0
5
0
5
0
6
0
60
7
0
70
8
0
80
9
0
90
1
0
0
100
1
1
0
110
1
2
0
120
1
3
0
130
1
4
0
140
1
5
0
150
1
0
2
00 1
0
2
00 1
0
2
00 1
0
2
00 1
0
2
00 1
0
2
00
00
1
0
1
0
2
0
2
0
3
0
3
0
4
0
4
0
5
0
5
0
6
0
60
7
0
70
8
0
80
9
0
90
1
0
0
100
1
1
0
110
1
2
0
120
1
3
0
130
1
4
0
140
1
5
0
150
5
1
0
X
-
2
B
-
4
7
2
2
B
10 200 10 200 10 200 10 200 10 200 10 200
3
4
+
0
0
.
0
0
3
4
+
5
0
.
0
0
3
5
+
0
0
.
0
0
3
5
+
5
0
.
0
0
3
6
+
0
0
.
0
0
3
6
+
5
0
.
0
0
-
L
-
R:\Hydraulics\PERM ITS_Environm ental\Drawings\6-B4722B_Hyd_prm _wet_XSC_SITE_1.dgncrlewis26/17/2014
T
E
M
P
.
W
O
R
K
B
R
I
D
G
E
T
E
M
P
.
W
O
R
K
B
R
I
D
G
E
D
E
T
A
I
L
E
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
(
N
O
T
T
O
S
C
A
L
E
)
2
.
0
’
2:1
C
R
O
S
S
S
E
C
T
I
O
N
V
I
E
W
P
R
O
F
I
L
E
V
I
E
W
S
H
O
W
N
F
O
R
C
L
A
R
I
T
Y
E
X
I
S
T
I
N
G
B
R
I
D
G
E
N
O
T
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
E
X
.
C
A
U
S
E
W
A
Y
(
T
O
B
E
R
E
M
O
V
E
D
)
(T
O
B
E
R
E
T
A
I
N
E
D
)
E
X
.
C
A
U
S
E
W
A
Y
-
L
-
S
T
A
.
5
3
+
6
2
T
O
5
4
+
6
4
R
T
.
E
L
E
V
A
T
I
O
N
O
F
2
F
T
.
G
E
O
T
E
X
T
I
L
E
E
X
.
R
O
A
D
W
A
Y
RE
M
O
V
E
E
X
.
C
A
U
S
E
W
A
Y
T
O
W
/
3
.
5
’
K
E
Y
-
I
N
C
L
A
S
S
I
I
R
I
P
R
A
P
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
(T
O
B
E
R
E
M
O
V
E
D
)
E
X
I
S
T
I
N
G
C
A
U
S
E
W
A
Y
S
H
E
E
T
7
O
F
1
1
P
E
R
M
I
T
D
R
A
W
I
N
G
S
I
T
E
1
1"=100’0’100’100’SSSURFACE WATER DENOTES IMPACTS INTSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY
P
E
R
M
A
N
E
N
T
S
H
E
E
T
P
I
L
E
G
R
A
S
S
E
D
S
W
A
L
E
D
A
T
A
S
E
E
D
E
T
A
I
L
D
L
A
T
E
R
A
L
’
V
’
S
E
E
D
E
T
A
I
L
F
S
P
E
C
I
A
L
C
U
T
2
22 1
0
1
0
1
0
d
=
1
.
1
0
F
T
.
d
=
1
.
2
0
F
T
.
V
=
1
.
5
0
F
P
S
V
=
1
.
6
0
F
P
S
A
C
T
U
A
L
L
E
N
G
T
H
=
7
5
F
T
.
R
E
Q
U
I
R
E
D
L
E
N
G
T
H
=
6
7
F
T
.
L
O
N
G
I
T
U
D
N
A
L
=
0
.
3
%
S
L
O
P
E
:
F
R
O
N
T
=
4
:
1
B
A
C
K
=
3
:
1
Q
=
(
0
.
8
5
)
(
7
.
0
6
)
(
0
.
6
7
)
+
3
.
9
=
8
.
0
C
F
S
Q
=
C
I
A
=
(
0
.
8
5
)
(
5
.
4
2
)
(
0
.
6
7
)
+
3
.
0
=
6
.
1
C
F
S
A
C
R
E
S
C
=
0
.
8
5
A
D
D
I
T
I
O
N
A
L
D
A
T
O
B
E
T
R
E
A
T
E
D
=
0
.
6
7
T
O
T
A
L
D
A
=
1
.
6
9
A
C
R
E
S
-
L
-
S
T
A
.
5
5
+
0
0
T
O
5
5
+
7
5
R
T
.
G
R
A
S
S
E
D
S
W
A
L
E
D
A
T
A
S
E
E
D
E
T
A
I
L
D
L
A
T
E
R
A
L
’
V
’
2
22 1
0
1
0
1
0
d
=
1
.
0
0
F
T
.
d
=
1
.
1
0
F
T
.
V
=
2
.
0
0
F
P
S
V
=
2
.
1
0
F
P
S
A
C
T
U
A
L
L
E
N
G
T
H
=
5
8
F
T
.
R
E
Q
U
I
R
E
D
L
E
N
G
T
H
=
3
F
T
.
L
O
N
G
I
T
U
D
N
A
L
=
0
.
6
%
S
L
O
P
E
:
F
R
O
N
T
=
4
:
1
B
A
C
K
=
3
:
1
Q
=
(
0
.
3
)
(
7
.
0
6
)
(
0
.
0
3
)
+
8
.
0
=
8
.
0
C
F
S
Q
=
C
I
A
=
(
0
.
3
)
(
5
.
4
2
)
(
0
.
0
3
)
+
6
.
1
=
6
.
1
C
F
S
A
C
R
E
S
C
=
0
.
3
A
D
D
I
T
I
O
N
A
L
D
A
T
O
B
E
T
R
E
A
T
E
D
=
0
.
0
3
T
O
T
A
L
D
A
=
1
.
7
2
A
C
R
E
S
-
L
-
S
T
A
.
5
4
+
5
7
T
O
5
5
+
0
0
R
T
.
R:\Hydraulics\PERM ITS_Environm ental\Drawings\7-B4722B_Hyd_prm _wet_PSH_5.dgncrlewis26/17/2014
D
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
C
U
T
G
R
A
S
S
E
D
S
W
A
L
E
4:1
G
r
o
u
n
d
N
a
t
u
r
a
l
D
E
T
A
I
L
F
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
M
i
n
.
D
=
1
F
T
.
3:1
-
L
-
S
T
A
.
5
5
+
5
0
T
O
6
4
+
5
0
R
T
.
2
G
I
2
G
I
2
G
I
2
G
I
1
5
"
R
C
P
-
I
V
R
C
P
-
I
V
1
5
"
S
E
E
D
E
T
A
I
L
E
A
P
P
R
O
X
.
1
,
2
5
0
C
Y
E
X
C
A
V
A
T
I
O
N
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
S
E
E
D
E
T
A
I
L
D
G
R
A
S
S
E
D
S
W
A
L
E
L
A
T
E
R
A
L
’
V
’
S
E
E
D
E
T
A
I
L
F
G
R
A
S
S
E
D
S
W
A
L
E
S
P
E
C
I
A
L
C
U
T
3:1
(
N
o
t
t
o
S
c
a
l
e
)
4:1
3:1
D
b
1
"
/
F
t
.
L
w
w
w
-L- S
T
A
.
5
4
+
5
7
T
O
5
5
+
5
0
R
T
.
Ground NaturalSee Roadway p
ro
files
Prop. ditch
g
ra
d
e
PROFILE VIEW
D
E
T
A
I
L
D
GR
A
S
S
E
D
S
W
A
L
E
w
/
P
S
R
M
PLAN VIEW
S
L
O
P
E
F
I
L
L
PS
R
M
T
U
C
K
A
L
L
S
I
D
E
S
P
S
R
M
w
/
1
’
DITCH GRADE END OF PROPO
S
E
D
L=7.5FT.w=5FT.b=5FT.Min. D=1.5FT.
B
L
1
L
1
=
1
0
F
T
.
B
=
1
2
F
T
.
L
1
G
r
o
u
n
d
N
a
t
u
r
a
l
ELEV. 2.32
F
T
.
E
L
E
V
.
4
.
8
F
T
.
EL
BELB
RCP-IV
15"
D
E
T
A
I
L
E
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
(
N
O
T
T
O
S
C
A
L
E
)
2
.
0
’
2:1
C
R
O
S
S
S
E
C
T
I
O
N
V
I
E
W
P
R
O
F
I
L
E
V
I
E
W
S
H
O
W
N
F
O
R
C
L
A
R
I
T
Y
E
X
I
S
T
I
N
G
B
R
I
D
G
E
N
O
T
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
E
X
.
C
A
U
S
E
W
A
Y
(
T
O
B
E
R
E
M
O
V
E
D
)
(T
O
B
E
R
E
T
A
I
N
E
D
)
E
X
.
C
A
U
S
E
W
A
Y
-
L
-
S
T
A
.
5
3
+
6
2
T
O
5
4
+
6
4
R
T
.
E
L
E
V
A
T
I
O
N
O
F
2
F
T
.
G
E
O
T
E
X
T
I
L
E
E
X
.
R
O
A
D
W
A
Y
RE
M
O
V
E
E
X
.
C
A
U
S
E
W
A
Y
T
O
W
/
3
.
5
’
K
E
Y
-
I
N
C
L
A
S
S
I
I
R
I
P
R
A
P
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
(T
O
B
E
R
E
M
O
V
E
D
)
E
X
I
S
T
I
N
G
C
A
U
S
E
W
A
Y
ELBO W S
W / 2
15"
1
5
"
B
R
I
D
G
E
#
3
3
11
0
G
R
.
G
R
.
(
T
I
D
A
L
F
L
O
W
)
N
O
R
T
H
R
I
V
E
R
R
I
P
R
A
P
R
I
P
R
A
P
R
I
P
R
A
P
R
I
P
R
A
P
S
I
G
N
L
E
A
S
E
S
I
G
N
L
E
A
S
E
S
I
G
N
L
E
A
S
E
S
I
G
N
L
E
A
S
E
FO & TELE IN CONDUIT ALONG BOTH SIDES OF BRIDGE
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
O
F
-
B
L
-
5
U
S
7
0
2
4
’
B
S
T
45+00
5
0
+
0
0
5
5
+
0
0
M ATCH LIN E SEE SHEET 4 -L- STA. 44+00.00
M ATCH LINE SEE SHEET 6 -L- STA. 58+00.00
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
5
B
-
4
7
2
2
B
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
N
O
T
E
S
NAD
83
/ NSRS
2007
1
)
F
O
R
-
L
-
P
R
O
F
I
L
E
,
S
E
E
S
H
E
E
T
7
P
A
V
E
M
E
N
T
R
E
M
O
V
A
L
3
4
5
T
E
M
P
.
W
O
R
K
B
R
I
D
G
E
T
E
M
P
.
W
O
R
K
B
R
I
D
G
E
F
C
C
C
C
C
C
C
D
E
T
A
I
L
E
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
(
N
O
T
T
O
S
C
A
L
E
)
2
.
0
’
2:1
C
R
O
S
S
S
E
C
T
I
O
N
V
I
E
W
P
R
O
F
I
L
E
V
I
E
W
S
H
O
W
N
F
O
R
C
L
A
R
I
T
Y
E
X
I
S
T
I
N
G
B
R
I
D
G
E
N
O
T
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
E
X
.
C
A
U
S
E
W
A
Y
(
T
O
B
E
R
E
M
O
V
E
D
)
(T
O
B
E
R
E
T
A
I
N
E
D
)
E
X
.
C
A
U
S
E
W
A
Y
-
L
-
S
T
A
.
5
3
+
6
2
T
O
5
4
+
6
4
R
T
.
E
L
E
V
A
T
I
O
N
O
F
2
F
T
.
G
E
O
T
E
X
T
I
L
E
E
X
.
R
O
A
D
W
A
Y
RE
M
O
V
E
E
X
.
C
A
U
S
E
W
A
Y
T
O
W
/
3
.
5
’
K
E
Y
-
I
N
C
L
A
S
S
I
I
R
I
P
R
A
P
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
(T
O
B
E
R
E
M
O
V
E
D
)
E
X
I
S
T
I
N
G
C
A
U
S
E
W
A
Y
S
I
T
E
1
S
H
E
E
T
8
O
F
1
1
P
E
R
M
I
T
D
R
A
W
I
N
G
SSSURFACE WATER DENOTES IMPACTS INTSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY 1"=100’0’100’100’
T
E
M
P
.
W
O
R
K
B
R
I
D
G
E
T
E
M
P
.
W
O
R
K
B
R
I
D
G
E
P
E
R
M
A
N
E
N
T
S
H
E
E
T
P
I
L
E
G
R
A
S
S
E
D
S
W
A
L
E
D
A
T
A
S
E
E
D
E
T
A
I
L
D
L
A
T
E
R
A
L
’
V
’
S
E
E
D
E
T
A
I
L
F
S
P
E
C
I
A
L
C
U
T
2
22 1
0
1
0
1
0
d
=
1
.
1
0
F
T
.
d
=
1
.
2
0
F
T
.
V
=
1
.
5
0
F
P
S
V
=
1
.
6
0
F
P
S
A
C
T
U
A
L
L
E
N
G
T
H
=
7
5
F
T
.
R
E
Q
U
I
R
E
D
L
E
N
G
T
H
=
6
7
F
T
.
L
O
N
G
I
T
U
D
N
A
L
=
0
.
3
%
S
L
O
P
E
:
F
R
O
N
T
=
4
:
1
B
A
C
K
=
3
:
1
Q
=
(
0
.
8
5
)
(
7
.
0
6
)
(
0
.
6
7
)
+
3
.
9
=
8
.
0
C
F
S
Q
=
C
I
A
=
(
0
.
8
5
)
(
5
.
4
2
)
(
0
.
6
7
)
+
3
.
0
=
6
.
1
C
F
S
A
C
R
E
S
C
=
0
.
8
5
A
D
D
I
T
I
O
N
A
L
D
A
T
O
B
E
T
R
E
A
T
E
D
=
0
.
6
7
T
O
T
A
L
D
A
=
1
.
6
9
A
C
R
E
S
-
L
-
S
T
A
.
5
5
+
0
0
T
O
5
5
+
7
5
R
T
.
G
R
A
S
S
E
D
S
W
A
L
E
D
A
T
A
S
E
E
D
E
T
A
I
L
D
L
A
T
E
R
A
L
’
V
’
2
22 1
0
1
0
1
0
d
=
1
.
0
0
F
T
.
d
=
1
.
1
0
F
T
.
V
=
2
.
0
0
F
P
S
V
=
2
.
1
0
F
P
S
A
C
T
U
A
L
L
E
N
G
T
H
=
5
8
F
T
.
R
E
Q
U
I
R
E
D
L
E
N
G
T
H
=
3
F
T
.
L
O
N
G
I
T
U
D
N
A
L
=
0
.
6
%
S
L
O
P
E
:
F
R
O
N
T
=
4
:
1
B
A
C
K
=
3
:
1
Q
=
(
0
.
3
)
(
7
.
0
6
)
(
0
.
0
3
)
+
8
.
0
=
8
.
0
C
F
S
Q
=
C
I
A
=
(
0
.
3
)
(
5
.
4
2
)
(
0
.
0
3
)
+
6
.
1
=
6
.
1
C
F
S
A
C
R
E
S
C
=
0
.
3
A
D
D
I
T
I
O
N
A
L
D
A
T
O
B
E
T
R
E
A
T
E
D
=
0
.
0
3
T
O
T
A
L
D
A
=
1
.
7
2
A
C
R
E
S
-
L
-
S
T
A
.
5
4
+
5
7
T
O
5
5
+
0
0
R
T
.
R:\Hydraulics\PERM ITS_Environm ental\Drawings\8-B4722B_Hyd_prm _wet_PSH_5_CO NTO URS.dgncrlewis26/17/2014
D
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
C
U
T
G
R
A
S
S
E
D
S
W
A
L
E
4:1
G
r
o
u
n
d
N
a
t
u
r
a
l
D
E
T
A
I
L
F
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
M
i
n
.
D
=
1
F
T
.
3:1
-
L
-
S
T
A
.
5
5
+
5
0
T
O
6
4
+
5
0
R
T
.
2
G
I
2
G
I
2
G
I
2
G
I
1
5
"
R
C
P
-
I
V
R
C
P
-
I
V
1
5
"
S
E
E
D
E
T
A
I
L
E
A
P
P
R
O
X
.
1
,
2
5
0
C
Y
E
X
C
A
V
A
T
I
O
N
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
S
E
E
D
E
T
A
I
L
D
G
R
A
S
S
E
D
S
W
A
L
E
L
A
T
E
R
A
L
’
V
’
S
E
E
D
E
T
A
I
L
F
G
R
A
S
S
E
D
S
W
A
L
E
S
P
E
C
I
A
L
C
U
T
3:1
(
N
o
t
t
o
S
c
a
l
e
)
4:1
3:1
D
b
1
"
/
F
t
.
L
w
w
w
-L- S
T
A
.
5
4
+
5
7
T
O
5
5
+
5
0
R
T
.
Ground NaturalSee Roadway p
ro
files
Prop. ditch
g
ra
d
e
PROFILE VIEW
D
E
T
A
I
L
D
GR
A
S
S
E
D
S
W
A
L
E
w
/
P
S
R
M
PLAN VIEW
S
L
O
P
E
F
I
L
L
PS
R
M
T
U
C
K
A
L
L
S
I
D
E
S
P
S
R
M
w
/
1
’
DITCH GRADE END OF PROPO
S
E
D
L=7.5FT.w=5FT.b=5FT.Min. D=1.5FT.
B
L
1
L
1
=
1
0
F
T
.
B
=
1
2
F
T
.
L
1
G
r
o
u
n
d
N
a
t
u
r
a
l
ELEV. 2.32
F
T
.
E
L
E
V
.
4
.
8
F
T
.
EL
BELB
RCP-IV
15"
D
E
T
A
I
L
E
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
(
N
O
T
T
O
S
C
A
L
E
)
2
.
0
’
2:1
C
R
O
S
S
S
E
C
T
I
O
N
V
I
E
W
P
R
O
F
I
L
E
V
I
E
W
S
H
O
W
N
F
O
R
C
L
A
R
I
T
Y
E
X
I
S
T
I
N
G
B
R
I
D
G
E
N
O
T
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
E
X
.
C
A
U
S
E
W
A
Y
(
T
O
B
E
R
E
M
O
V
E
D
)
(T
O
B
E
R
E
T
A
I
N
E
D
)
E
X
.
C
A
U
S
E
W
A
Y
-
L
-
S
T
A
.
5
3
+
6
2
T
O
5
4
+
6
4
R
T
.
E
L
E
V
A
T
I
O
N
O
F
2
F
T
.
G
E
O
T
E
X
T
I
L
E
E
X
.
R
O
A
D
W
A
Y
RE
M
O
V
E
E
X
.
C
A
U
S
E
W
A
Y
T
O
W
/
3
.
5
’
K
E
Y
-
I
N
C
L
A
S
S
I
I
R
I
P
R
A
P
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
(T
O
B
E
R
E
M
O
V
E
D
)
E
X
I
S
T
I
N
G
C
A
U
S
E
W
A
Y
ELBO W S
W / 2
15"
1
5
"
B
R
I
D
G
E
#
3
3
11
0
G
R
.
G
R
.
(
T
I
D
A
L
F
L
O
W
)
N
O
R
T
H
R
I
V
E
R
R
I
P
R
A
P
R
I
P
R
A
P
R
I
P
R
A
P
R
I
P
R
A
P
220.01’
N1333’58"W
S
I
G
N
L
E
A
S
E
S
I
G
N
L
E
A
S
E
S
I
G
N
L
E
A
S
E
S
I
G
N
L
E
A
S
E
A
L
O
N
G
H
I
G
H
T
I
D
E
L
I
N
E
FO & TELE IN CONDUIT ALONG BOTH SIDES OF BRIDGE
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
O
F
-
B
L
-
5
U
S
7
0
2
4
’
B
S
T
E
X
I
S
T
I
N
G
P
O
W
E
R
T
R
A
N
S
M
I
S
S
I
O
N
L
I
N
E
E
A
S
E
M
E
N
T
-11.5
-
11.5 -
11.5
-11.0
-11.0
-11.0
-11.0
-11.0 -
1
0.
5
-10.5
-10.5
-
10
.5
-10.5
-
10
.0 -10.0
-10.0
-10.0-1
0
.
0-10.0
-10.0
-
1
0
.
0
-10.0
-10.0 -10.0
-9.5 -9.5
-9.5
-
9.
5
-9.5
-9.5
-9.0
-9
.0
-9.0
-9
.0
-
9.
0
-9.0
-9.0
-
8
.5
-8.5
-8.5
-8.5
-8
.5
-8.5-8.5
-8.5
-8
.5
-8.0
-
8
.
0
-8.0
-8.0
-8.0
-8.0
-8
.0
-8
.0
-8.0
-8.0
-8
.0
-7.5
-7.5
-7.5
-
7
.
5
-7.5
-7.5
-7
.5
-7.5-7.5
-7.5
-7.5
-7.0
-7.0 -7.0
-
7.
0
-7.0
-7.0
-7
.0
-7.0-7.0
-7.0
-7 .0
-7.0
-6
.5
-6.5
-6.5
-
6
.5
-6.5
-6.5
-6
.5
-6.5-6.5-6.5
-6.5
-6.5
-6.5-6.5
-
6
.
0
-6.0
-6.0
-6.0
-6.0
-6.0
-6
.0
-6.0-6.0-6.0-6.0-6.0
-6.0
-6.0
-6.0
-5.5
-5
.5
-5.5
-5.5
-5.5
-5.5
-5.5-5.5-5.5-5.5-5.5-5.5-5.5-5.5
-5.5
-5
.0
-5
.0
-5
.0
-5.0
-5.0
-
5
.
0
-5.0
-5.0
-
5
.
0
-5.0 -5.0 -
5
.0
-5
.0
-5.0
-5.0
-5.0
-5.0
-5.0-5.0-5.0-5.0-5.0-5.0-5.0-5.0-5.0-5.0-5.0-5.0-5.0
-5.0
-5.0
-4
.5
-
4.5
-4
.5
-4.5
-4.5
-
4.
5
-4
.5
-
4.
5
-4
.5
-4.5
-4.5
-4.5-4.5-4.5-4.5-4.5-4.5
-4.5
-4
.0
-
4
.0
-4.0
-
4.
0
-4.0
-4
.0
-4.0
-
4
.
0
-4
.0
-
4
.0
-4
.0
-4
.0
-4.0
-4.0-4.0-4.0-4.0-4.0
-4
.0
-4
.0
-3
.
5
-3.5
-3.5
-3
.5
-3
.5
-3.5
-
3.
5
-
3
.
5
-3.5
-3
.5
-
3
.5
-3.5-3.5-3.5
-3
.5
-3.0
-3.0
-3.0
-
3
.0
-3.0
-
3.
0
-
3
.0
-3
.0
-3.0-3.0-3.0-3.0
-
3
.
0
-2.5
-
2.
5
-
2.
5
-2
.5
-2.5 -2.5
-2.5
-
2
.
5
-2.5
-2.5
-
2
.5
-2.5
-
2
.
0
-
2
.0
-
2.
0
-2.0
-
2
.
0
-
1.
5
-1.5
-1.5
-1.5
-
1.5
-
1
.
5
-1.5
-
1
.
0
-1.0
-
1.0
-
1.0
-
1
.
0
-1.0
-
0
.
5
-
0
.5
-
0
.
5
-
0.5
-
0
.
5
0
.
0
0
.
0
0
.0
0
.
0
0
.0
0.
0
0.0
0
.
0
0
.
0
0
.
5
0
.
5
0
.
5
0
.
5
0
.
5
1
.
0
1
.
0
1.0
1.0
1
.
0
1
.
5
1.5
1
.
5
1.5
1
.
5
2
.
0
2.0
2
.
0
2.0
2
.
0
2
.
5
2
.
5
2.5
2
.5
2
.
5
3
.
0
3.0
3
.
0
3.0
3
.
0
3
.
5
3.5
3.5
3
.
5
3
.
5
4
.
0
4.0
4.0
4
.
0
4
.
0
4
.
5
4
.
5
4.5
4
.5
4
.
5
4
.5
5
.
0
5
.
0
5.
0
5
.
0
5.0
5.0
5.0
5
.
0
5
.
0
5
.0
5
.0
5.5
5
.
5
5.
5
5
.
5
5
.5
5
.5
5
.56
.
0
6
.
0
6
.
0
6
.
0
6.0
6
.0
6
.0
6
.5
6
.5
6
.
5
6
.
5
6
.5
6
.5
6
.
5
7
.
0
7
.
0
7
.
0
7
.
0
7
.
0
7
.
5
7
.
5
7
.
5
8.0 8
.08.5
9
.0
9.
0
9
.0
9
.5
9
.5
45+00
5
0
+
0
0
5
5
+
0
0
M ATCH LIN E SEE SHEET 4 -L- STA. 44+00.00
M ATCH LINE SEE SHEET 6 -L- STA. 58+00.00
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
5
B
-
4
7
2
2
B
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
N
O
T
E
S
NAD
83
/ NSRS
2007
1
)
F
O
R
-
L
-
P
R
O
F
I
L
E
,
S
E
E
S
H
E
E
T
7
P
A
V
E
M
E
N
T
R
E
M
O
V
A
L
3
4
5
F
C
C
C
C
C
C
C
S
H
E
E
T
9
O
F
1
1
P
E
R
M
I
T
D
R
A
W
I
N
G
S
I
T
E
1
SSSURFACE WATER DENOTES IMPACTS INTSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY 1"=100’0’100’100’
P
E
R
M
A
N
E
N
T
S
H
E
E
T
P
I
L
E
2
22 1
0
1
01
0
d
=
0
.
8
0
F
T
.
d
=
0
.
9
0
F
T
.
V
=
1
.
3
0
F
P
S
V
=
1
.
3
0
F
P
S
A
C
T
U
A
L
L
E
N
G
T
H
=
8
7
5
F
T
.
R
E
Q
U
I
R
E
D
L
E
N
G
T
H
=
1
0
2
F
T
.
L
O
N
G
I
T
U
D
N
A
L
=
0
.
3
%
S
L
O
P
E
:
F
R
O
N
T
=
4
:
1
B
A
C
K
=
3
:
1
Q
=
(
0
.
5
4
)
(
7
.
0
6
)
(
1
.
0
2
)
=
3
.
9
C
F
S
Q
=
C
I
A
=
(
0
.
5
4
)
(
5
.
4
2
)
(
1
.
0
2
)
=
3
.
0
C
F
S
D
A
=
1
.
0
2
A
C
R
E
S
C
=
0
.
5
4
-
L
-
S
T
A
.
5
5
+
7
5
T
O
6
4
+
5
0
R
T
.
G
R
A
S
S
E
D
S
W
A
L
E
D
A
T
A
S
E
E
D
E
T
A
I
L
F
S
P
E
C
I
A
L
C
U
T
R:\Hydraulics\PERM ITS_Environm ental\Drawings\9-B4722B_Hyd_prm _wet_PSH_6.dgncrlewis26/17/2014 D ( Not to Scale)SPECIAL CUT GRASSED SW
A
L
E
4:1GroundNatural DETAIL F
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
Min. D
=
1
F
T
.
3:1-L- STA. 55+50 TO 64+50
R
T
.
S
E
E
D
E
T
A
I
L
F
G
R
A
S
S
E
D
S
W
A
L
E
S
P
E
C
I
A
L
C
U
T
15" RCP
15
" R
CP
15
" RCP
15
" RCP
1
5
"
R
C
P
R
E
T
A
I
N
RETAIN
RETA
IN
RETAIN
RETAIN
T
US 70 24’ BST
G
R
.
S
OI
L
12’ CONC
12
’ CONC
9
’ G
R.
9’ GR.
1
2
’ GR
.
2
4
" WD
R
A
IL
2
4
" WD
R
A
IL
2
4
" WD
R
A
IL
2
4
" WD
P
R
IV
A
C
Y
4
8
" CH
L
1S
B
KD
1S
F
D
1S
F
D
1S
B
L
KD
1S
F
D
8
’ SO
IL
WD
DO
C
K
2
S
B
KD
S
M
E
L
V
IN
R
A
Y
S
U
G
G
N
A
S
IR
K
HA
N
, E
T
U
X
E
IP
E
IP
E
IP
E
IP
E
I
P
E
IP
T
H
E
O
D
O
R
E
L
A
W
R
E
N
C
E
RIP RAP RIP RAP
S
I
G
N
L
E
A
S
E
S
I
G
N
L
E
A
S
E
S
I
G
N
L
E
A
S
E
B
L
E
D
S
O
E
M
IC
H
A
E
L
A
.
13’ BST OLD ROAD BED
S
C
R
UB
E
T
U
X
F
E
R
R
E
L
L
,
D
A
N
IE
L
B
.
E
T
U
X
F
E
R
R
E
L
L
,
D
A
N
IE
L
B
.
POSTS
D
O
C
K
P
I
L
I
N
G
S
WD
S
E
A
WA
L
L
S
OIL
-BL- 6
-
B
L
-
7
N
A
N
C
Y
D
U
R
A
N
T
P
A
U
L
A
S
T
A
P
L
E
T
O
N
L
A
U
R
E
N
S
T
R
U
S
T
J
A
R
V
IS
E
. WE
E
K
S
, E
T
U
X
F
R
A
N
K
Y
A
R
B
O
R
O
U
G
H
,
E
T
A
L
E
U
L
A
F
.
P
IN
N
O
, E
T
A
L
60+00
6
5
+
0
0
7
0
+
00
M ATCH LINE SEE SHEET 5 -L- STA. 58+00.00REVISIONS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
6
B
-
4
7
2
2
B
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
N
O
T
E
S
1
)
F
O
R
-
L
-
P
R
O
F
I
L
E
,
S
E
E
S
H
E
E
T
S
7
A
N
D
8
NAD
83
/ NSRS
2007
P
A
V
E
M
E
N
T
R
E
M
O
V
A
L
6
45
C
C
C
F
F
F
FF
F
C
S
I
T
E
1
SSSURFACE WATER DENOTES IMPACTS INTSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY
S
H
E
E
T
1
0
O
F
1
1
P
E
R
M
I
T
D
R
A
W
I
N
G
1"=100’0’100’100’
P
E
R
M
A
N
E
N
T
S
H
E
E
T
P
I
L
E
2
22 1
0
1
01
0
d
=
0
.
8
0
F
T
.
d
=
0
.
9
0
F
T
.
V
=
1
.
3
0
F
P
S
V
=
1
.
3
0
F
P
S
A
C
T
U
A
L
L
E
N
G
T
H
=
8
7
5
F
T
.
R
E
Q
U
I
R
E
D
L
E
N
G
T
H
=
1
0
2
F
T
.
L
O
N
G
I
T
U
D
N
A
L
=
0
.
3
%
S
L
O
P
E
:
F
R
O
N
T
=
4
:
1
B
A
C
K
=
3
:
1
Q
=
(
0
.
5
4
)
(
7
.
0
6
)
(
1
.
0
2
)
=
3
.
9
C
F
S
Q
=
C
I
A
=
(
0
.
5
4
)
(
5
.
4
2
)
(
1
.
0
2
)
=
3
.
0
C
F
S
D
A
=
1
.
0
2
A
C
R
E
S
C
=
0
.
5
4
-
L
-
S
T
A
.
5
5
+
7
5
T
O
6
4
+
5
0
R
T
.
G
R
A
S
S
E
D
S
W
A
L
E
D
A
T
A
S
E
E
D
E
T
A
I
L
F
S
P
E
C
I
A
L
C
U
T
R:\Hydraulics\PERM ITS_Environm ental\Drawings\10-B4722B_Hyd_prm _wet_PSH_6_CO NTO URS.dgncrlewis26/17/2014 D ( Not to Scale)SPECIAL CUT GRASSED SW
A
L
E
4:1GroundNatural DETAIL F
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
Min. D
=
1
F
T
.
3:1-L- STA. 55+50 TO 64+50
R
T
.
S
E
E
D
E
T
A
I
L
F
G
R
A
S
S
E
D
S
W
A
L
E
S
P
E
C
I
A
L
C
U
T
15" RCP
15
" R
CP
15
" RCP
15
" RCP
1
5
"
R
C
P
R
E
T
A
I
N
RETAIN
RETA
IN
RETAIN
RETAIN
T
112113 114
1
1
5
11
6
11
7
11
8
119
12
0
12
1
12
2
12
3
12
4
US 70 24’ BST
G
R
.
S
OI
L
12’ CONC
12
’ CONC
9
’ G
R.
9’ GR.
1
2
’ GR
.
2
4
" WD
R
A
IL
2
4
" WD
R
A
IL
2
4
" WD
R
A
IL
2
4
" WD
P
R
IV
A
C
Y
4
8
" CH
L
1S
B
KD
1S
F
D
1S
F
D
1S
B
L
KD
1S
F
D
8
’ SO
IL
WD
DO
C
K
2
S
B
KD
S
M
E
L
V
IN
R
A
Y
S
U
G
G
N
A
S
IR
K
HA
N
, E
T
U
X
E
IP
E
IP
E
IP
E
IP
E
I
P
E
IP
T
H
E
O
D
O
R
E
L
A
W
R
E
N
C
E
RIP RAP RIP RAP
S
I
G
N
L
E
A
S
E
S
I
G
N
L
E
A
S
E
S
I
G
N
L
E
A
S
E
B
L
E
D
S
O
E
M
IC
H
A
E
L
A
.
13’ BST OLD ROAD BED
S
C
R
UB
E
T
U
X
F
E
R
R
E
L
L
,
D
A
N
IE
L
B
.
E
T
U
X
F
E
R
R
E
L
L
,
D
A
N
IE
L
B
.
POSTS
D
O
C
K
P
I
L
I
N
G
S
WD
S
E
A
WA
L
L
S
OIL
-BL- 6
-
B
L
-
7
N
A
N
C
Y
D
U
R
A
N
T
P
A
U
L
A
S
T
A
P
L
E
T
O
N
L
A
U
R
E
N
S
T
R
U
S
T
J
A
R
V
IS
E
. WE
E
K
S
, E
T
U
X
F
R
A
N
K
Y
A
R
B
O
R
O
U
G
H
,
E
T
A
L
E
U
L
A
F
.
P
IN
N
O
, E
T
A
L
-
6
.0
-5.5
-5.0
-5.0
-4.5
-4.0
-4.0
-3.5
-3.5
-3.5
-3.0 -3.0
-3.0
-3.0
-2.5 -2.5 -2.5 -2.5 -2.5
-2.5
-2.5
-2.5 -2.5
-2.5
-2.5
-2.5
-
2.5
-2.5
-
2
.5
-2.0
-
2.
0
-2.0
-2.0
-2
.0
-2.0
-
2
.
0
-
2
.0
-2.0-2.0 -2.0-2.0
-
2.
0
-2 .0
-2.0
-
2
.
0 -2.0
-
2.
0
-2.0
-
2
.
0
-
2
.0
-
2.
0
-
2
.0
-
2
.0
-
2.0
-2.0
-
2.
0
-
2
.0
-
2
.0
-1.5
-1.5
-1.5
-1.5
-1.5
-
1
.
5
-1.5 -1.5-1.5
-
1.5
-
1.5
-
1.
5
-
1
.
5
-
1
.
5
-
1.
5
-1.5
-
1
.
5
-1.5
-
1.
5
-
1.
5
-1.5
-1.5
-
1.5
-1.0
-1.0
-
1.
0
-1.0
-1.0
-
1
.
0
-1.0 -1.0-1.0
-
1
.
0
-
1
.
0
-
1.
0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0 -1.0
-1.0
-1.0
-
1.0
-
1
.
0
-0.5
-0.5
-0.5
-0.5
-0
.5
-
0
.
5
-0.5-0.5 -0.5-0.5
-
0
.
5
-
0.
5
-
0
.
5
-
0
.
5
-0.5
-0.5
-0.5
-0
.5
-
0.
5
-0.5
-0.5
-0.5
-0
.5
-
0
.
5
-0.5
-0.5
0.
0
0.0
0.0
0.0
0.0
0.0
0.0
0
.0
0
.0
0
.0
0
.0
0
.
0
0
.
0
0.00.00.0 0.00.00.0
0
.
0
0
.
0
0.0
0
.
0
0
.
0
0.0
0
.
0
0.0
0
.0
0.0
0
.0 0.0
0
.
0
0
.
0
0.0
0.0
0.0
0.0
0
.
0
0.0
0.
0
0
.0
0
.0
0.0
0.5
0.5
0
.5
0
.5
0
.
5
0.50.5 0.50.5
0
.
5
0.5
0.5
0
.5
0.
5
0.5
0.5
0.5
0
.5
0.
5
0.5
0.5
1.0
1.0
1.0
1.
0
1.0
1.
0
1
.
0
1.0
1
.
0
1.01.01.0
1
.
0
1.0
1.0
1.0
1
.
0
1.0
1.0
1.0
1.5
1.5
1.5
1.5
1.5
1.5
1.51.5 1.51.5
1
.
5
1
.
5
1
.
5
1.5
1.5
1.5
1.5
1.5
1
.5
1.5
1.5
1.5
1.5
2.0
2.0
2.0
2.0
2.0
2.0
2
.
0
2.0 2.02.0
2
.
0
2.0
2.0
2
.
0
2.0
2.
0
2.0
2.0
2
.
0
2.0
2
.
0
2
.
0
2.0
2.0
2.0
2.0
2
.0
2.5
2.5
2.5
2.5
2.5
2
.5
2
.
5
2.52.5 2.5
2
.
5
2.
5
2.5
2
.
5
2
.
5
2
.5
2.
5
2
.
5
2
.
5
2.5
2
.5
2.5
2
.5
2.5
2
.5
3.0
3.0
3
.0
3.0
3
.
0
3
.0
3
.
0
3.03.03.03.0
3
.
0
3.0
3
.0
3.0
3
.0
3
.
0
3.0
3.0
3
.0
3
.0
3.0
3
.0
3
.5
3.5
3.53.5
3
.5
3.
5
3
.5
3
.
5
3.5 3.53.5
3
.
5
3
.
5
3
.5
3
.5
3.
5
3.5
3
.5
3.5
3.
5
4.0
4
.
0
4.0
4
.
0
4.
0
4
.
0
4.0
4
.0
4 .04.0
4.0
4.0
4.
0
4.0
4
.0
4
.
0
4.0
4
.
0
4.0
4
.0
4
.0
4
.0
4.5
4
.
5
4
.5
4
.
5
4
.
5
4
.
5
4
.5
4
.5
4.5
4
.5
4.5
4.5
4.5
4.5
4
.5
4.54.5
4
.5
4
.
5
5.05.05.0
5
.
0
5
.
0
5
.
0
5.0
5
.0
5
.0
5
.
0
5.0
5.0
5
.0
5.0
5.0
5.0
5.0
5
.0
5
.
0
5.0
5
.0
5
.
0
5.0
5
.0
5.
0
5
.
0
5
.
0
5
.
0
5.05.05.05.0
5.0
5
.0
5.0
5.
0
5.55.5
5
.
5
5
.
5
5
.5
5
.5
5
.5
5
.
5
5.5
5.5
5
.
5
5
.5
5
.5
5
.
5
5
.
5
5.55.5
5
.5
5.5
5
.5
6.06.0
6
.
0
6
.0
6
.0
6
.0
6
.0
6
.0
6
.0
6
.
0
6.06.0
6
.0
6.56.5
6
.
5
6
.
5
6
.5
6.5
6
.5
6
.
5
6
.
5
6
.
5
6.56.5
6
.5
7
.
0
7
.0
7
.0
7
.
0
7
.
0
7.0 7.07.0
7
.
0
7.
0
7
.0
7.0
7
.
5
7
.5
7
.
5
7
.
5
7
.
5
7.5
7.57.57.5
7
.
5
8.0
8
.
0
8
.0
8
.0
8
.
5
60+00
6
5
+
0
0
7
0
+
00
M ATCH LINE SEE SHEET 5 -L- STA. 58+00.00REVISIONS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
6
B
-
4
7
2
2
B
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
N
O
T
E
S
1
)
F
O
R
-
L
-
P
R
O
F
I
L
E
,
S
E
E
S
H
E
E
T
S
7
A
N
D
8
NAD
83
/ NSRS
2007
P
A
V
E
M
E
N
T
R
E
M
O
V
A
L
6
45
C
C
C
F
F
F
FF
F
C
Ha
n
d
Existing Existing
Pe
r
m
a
n
e
n
t
T
e
m
p
.
E
x
c
a
v
a
t
i
o
n
M
e
c
h
a
n
i
z
e
d
C
l
e
a
r
i
n
g
P
e
r
m
a
n
e
n
t
T
e
m
p
.
C
h
a
n
n
e
l
C
h
a
n
n
e
l
N
a
t
u
r
a
l
Si
t
e
S
t
a
t
i
o
n
S
t
r
u
c
t
u
r
e
F
i
l
l
I
n
F
i
l
l
I
n
i
n
C
l
e
a
r
i
n
g
i
n
S
W
S
W
I
m
p
a
c
t
s
I
m
p
a
c
t
s
S
t
r
e
a
m
No
.
(
F
r
o
m
/
T
o
)
S
i
z
e
/
T
y
p
e
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
i
n
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
i
m
p
a
c
t
s
i
m
p
a
c
t
s
P
e
r
m
a
n
e
n
t
T
e
m
p
.
D
e
s
i
g
n
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
f
t
)
(
f
t
)
(
f
t
)
1
3
2
+
2
1
T
O
6
3
+
4
5
L
T
1
3
5
0
F
T
.
B
R
I
D
G
E
0
.
0
3
0
.
0
4
0
.
5
8
0
.
5
6
TO
T
A
L
S
*
:
0
.
0
3
0
.
0
4
0
.
5
8
0
.
5
6
0
0
0
*R
o
u
n
d
e
d
t
o
t
a
l
s
a
r
e
s
u
m
o
f
a
c
t
u
a
l
i
m
p
a
c
t
s
NO
T
E
S
:
Re
v
i
s
e
d
2
0
1
3
1
0
2
4
W
E
T
L
A
N
D
P
E
R
M
I
T
I
M
P
A
C
T
S
U
M
M
A
R
Y
WE
T
L
A
N
D
I
M
P
A
C
T
S
S
U
R
F
A
C
E
W
A
T
E
R
I
M
P
A
C
T
S
CARTERET COUNTY BRIDGE 33 ON US 70 OVER NORTH RIVER SHEET 11 OF 11
Al
l
w
e
t
l
a
n
d
s
a
s
s
o
c
i
a
t
e
d
w
i
t
h
t
h
i
s
p
r
o
j
e
c
t
a
r
e
C
A
M
A
w
e
t
l
a
n
d
s
.
NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS B-4722B
3/17/14
B-4722B NEU Narrative
Utility Owners:
• Telephone: Century Link (contact: Mitch Averitte 252-247-4493)
• Power: Duke Energy Progress Distribution (contact: Eddie Watkins 919-518-5248)
General Utility Relocations:
All utility lines inside the project limits will be adjusted as necessary to avoid conflict with the proposed
bridge.
Existing Utilities:
• Telephone: Existing telephone located on both the north and south sides of US 70; both of these
lines are in conflict with the proposed bridge and will need to be relocated.
• Power: Existing distribution located on the south side of US 70; currently these lines are not in
conflict with the proposed bridge, however we are having the poles scanned to make sure that
they meet minimum height -clearances. We will reassess -the power and determine if it needs t
be relocated once the poles have been scanned.
Proposed Utilities:
• Telephone: Existing telephone lines on both the north and south side of US 70 will be removed
and relocated 5' inside the right-of-way line on the north side on US 70 by method of directional
bore. At the bridge the telephone Tine will be attached to the bridge via the railing.
See Steet 1-A For Index of Sleets
See Sleet 1-8 For Conventional Symbols
T.I.P. NO.
SHEET NO.
ind Narrative \B-9722B Ut_tah_UEI_psh.dgn
PROJECT: B-4722B
ATE OF NORTI-1 CAROLINA
DIVISION OF HIGHWAYS
NEU PERMIT PLANS
CARTERET COUNTY
LOCATION: BRIDGE NO. 33 OVER THE NORTH
RIVER ON US 70
TYPE OF WORK: RELOCATION OF FIBER OPTIC CABL ' •
�o
N
B-4722B
1
REVISION 7/10/14
Utility Permit Drawing
Sheet 1 oL.
- B LWO R7
BEGIN BRIDGE
-L- STA. 40 + 99.04
NORTH RIVER
BEGIN TIP PROJECT B-4722B
-L- STA. 31 + 00.00
BRIDGE NO. 33
END BRIDGE
-L- STA. 54 + 50.96
CLEARING ON THIS PROJECT SHALL BE PERFORMED
TO THE LIMITS ESTABLISHED BY METHOD III.
• •
GRAPHIC SCALES
50 25 i0 50 100
PLANS
5,01111125 1 0
PROFILE (HORIZONTAL)
10 5 0 10 20
PROFILE (VERTICAL)
� !1
/j
END TIP PROJECT B-4722B
-L- STA. 66 + 50.00
TO�;�
BETTIE �1.
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
INCOMPLETE PLANS
DO NOT USR FOR R/IV ACQUISITION
PRELIMINARY PLANS
PO NOT OW FOR CONITRCCTION -_....
SHEET NO.
1
4 THRU 6
7 THRU 16
INDEX OF SHEETS
DESCRIPTION
TITLE SHEET
PLAN SHEETS
PROFILES
UTILITY OWNERS ON PROJECT
(A) DUKE PROGRESS
(B) CENTURY LINK
PREPARED IN THE OFFICE OF
DIVISION OF HIGHWAYS
UTILITIES UNIT
UTILITIES ENGINEERING
MSS MAIL SERVICES CENTER
RALEIGH NC 17699-15SS
PHONE (919) 707.6690
FAX (919) 210-4111
Roger Worthington, P.E.
Corey Bousquer, P.E.
Mariko Hafeez
UTILITIES SECTION ENGINEER
UTILITIES SQUAD LEADER PROJECT ENGINEER
UTILITIES PROJECT DESIGNER
PROP. 4" FIBER OPTIC CABLE (1)
35+00
BEGIN SHEET PILE WALL
-L- STA. 3A+00.00
T.f.r.0 Ra 17 r .,.p INC a 0:1 PS TAPCR 7R'
S IIs_�u4..,P oGl'.10401yE..
ill♦rl==rim--weril ili��
�rE'Eil:ti — ra do
-. C.L'11�ISI,.'•'�� • ��ii �E- -
z'SO�.a,,,+••+L����,�-'g�!.�'o�t `r1iE•E�+Eiiu;TadP� �R11�dA.C6-+
tmema{���� E► i - vL�r •���C�ri�=mil. -"
'.�11%� 1II �AS=�••�4►� v`♦� • I AS
:'�� ��!�ii►�A�ifiv�.►. ► _ -a..+ . � �_� �N����
..=r:�:::: Pa o REMOVE 1 -�: .... �__:�<_ _ ::
DETAIL C
CAUSEWAY REMOVAL
(NOT To SCALD
CROSS SECTION VIEW
PROFILE VIEW
-L- STA. 40+80 TO 44+05 RT.
ATTACH FO TEL. CABLE TO THE BRIDGE
40+00
BEGIN SBG
-L- STA. 39+50 LT.
PROJECT REFERENCE NO.
SHEET NO.
B-4722B
4
OW SHEET NO
ROADWAY DESIGN
ENGINEER
HYDRAULICS
ENGINEER
PRELTMThTARY PLANS
DO NOT B5H POR: ( ', (C-EIOS
Utility Permit Drawing
Sheet L of
END SBG
-L- STA. 40+75.04 LT
SKETCH OF PAVEMENT/BRIDGE RELATIONSHIP
BEGIN APPROACH SLAB
-L- STA. 40+75,04
TYPE -III
m
TYPE -III
END SBG
-L- STA, 40-75.04 RT
BEGIN BRIDGE
-L- STA. 40+99.04
END APPROACH SLAB
-L- STA. 54+74.96
BEGIN SBG
-L- STA 54+74.96 L
TYPE -III
END BRIDGE
-L- STA. 54+50.96
I//Ar
WarAjWINg
%IMRIiY
A%//4
TYPE -III
BEGIN SBG
-L- STA. 54-74.96 RT
NOT TO SCALE
BEGIN TIP PROJECT B-4722B
—L— POC Sta. 31 + 00.00
30+00
"w n pa50
i
JANET FULCMF3! ,UGH WITF.R Mn,
06 249 PG 362
/PROPS-0 • `\NE
15/E
Js-
-L- PT Sta. 31+39.00
PI Ste 291-3923
= 16' 07' 567' (PT)
0 = 4 30' 00.5-
L = 402.93'
T = 20316'
R = 127320'
PI Sto 36+79.6/
A = 6' 02' 00.0' (PT)
0 = 2' 17' 30.6-
L = 26325'
T = 13175'
R = 2,500D0'
1_J
15
PROPERTY LINE
SPECIAL CUT
GRASSED SWALE
SEE DETAIL A
RIP RAP
`\ 130.09' .
_BL_3
-L- PC Sra. 35+47.86
STA sB+4� RAT. 0 _/
�
JOIN R. FULCIEeR JR.
D8 407 PG 205
J8 --JS
EXISTING POWER TRANSMISSION LINE EASEMENT
-I PT Sta, 38+11.11
LATERAL 'V' W/PSRM
GRASSED SWALE
SEE DETAIL II
99.79J RT
158.00'RT
END SHEET PILE WALL
-1- STA. 41403,29
, '' ,:. ''''''' _ .
1.:„„._ __
li ► O
E
4/10
HIGHGNA TER I6AR! ���''
CAUSEWAY REMOVAL
APPROX.12,800 CY EXCAVATION
SEE DETAIL C
PROP. 40' RADIUS OF RIP RAP
AROUND EXISTING POWER POLE
-L- STA 33+86 TO 40+50 RT.
DETAIL B
GRASSED SWALE wPSRM
INaro Sla.l
I b 1
I:1N
3.10PT.
L1.7.5Pi.
Natural
Ground
Mln. D-1.5FT.
b-SFT.
w•SFT.
L-].SET.
PLAN VIEW
PROFILE MEW
!ND OP PROPOSED
DITCH OMDE
BLCV. 3.66PT.
FILL
SLOP'
PSRM
5*5,5l
Oraund
!LEY. 4.8PT.
PSSM NI'
TUCK ALL SIDES
-L- STA.40+50 TO 40-86 RT.
158.OQJRTI
5 -1
U
I -
NOTES
1) FOR -L- PROFILE, SEE SHEET 7
PROJECT REFERENCE NO. SHEET NO.
B-4722B 5
MY SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
STA. 44 + 00.00
Narrative\B-4722B_Ut_(rdy sht5_UE(nes permit Sht5)_psh.dgr
0
c
0
a
E
0
G
Z
0,
0
m,A
'T
r�LL
-mz
rV �U
45 + 00
E E E
FO F. TELE IN CONDUIT ALONG BOTH SIDES OF BRIDGE
-L-
PI Sto 57+24.59
A = 3'15' 00.0' (RT)
0 = r 25' 56.6'
L = 226.89'
T = 113.48'
R = 4.000.00'
DETAIL D
GRASSED SWALE w?SRM
Not to Sao)
I.
S-ISTT.
LI .10PT.
LI
RIVER
EVISTUK PONER TRANSMISSION LINE EASEMENT
Neural
Gw.nd
Mtn. D-1.5ET.
b-SET.
w- ITT.
L-7.IFT.
PLAN VIEW
PROFILE VIEW
ENO OF PROPOSED
DITCH OWE
Pm
ILEV. S.SSFT.
ALL
SLOPE
PSRM
N.Wrn1
Groond
ILIV. 4.IFT.
PSRM w'1'
TUCK All SIDES
-L- STA.54+57 TO 55+50 RT.
ATTACH FO TEL. CABLE TO THE BRIDGE
50+00
E E
BM2
99.80' RT
115.00' RT.
CAUSEWAY REMOVAL
_APPROX.1,259 CY EXCAVATION
SEE DETAIL E
PROP. 40' RADIUS OF RIP RAP
AROUND EXISTING POWER POLE
SPECIAL CUT GRASSED SWALE
( No110 Soap)
roun
D-1 T.
Front
Di1ch
Slope
-L- STA. 55+50 TO 64+50 RT.
PETAIL E
CAUSEWAY REMOVAL
NOT TO SCALE)
CROSS SECTION VIEW
PROFILE VIEW
u1'..I T
wovenaroe
-L- STA 53+62 TO 54+64 RT.
LEASE G
SIGN
r�
LEASE O
. SIGN
Utility Permit Drawing
Sheet 3 of I IP
55+00
BEGIN SHEET P
-L- STA 54+4
-BL- 5
END SBG
-L- STA. 555p+10 LT.
8:1 PS TAPER
E 115.00' RT.
LATERAL 'V' —
GRASSED SWALE JS
SEE DETAIL D
END CONSTRUCTION
-DR- POT Sra 11 + 00.00
0
PRELIMflJAR'Y' PLANS )
T}GLIQT USH P,UR;:(ANS'FILUC[iON �:-
PROP. 4" FIBER OPTIC CABLE (2)
PERRY BAYER SHELLFISH LEASE "877
-L- POC Sta. 57+59.94
SPECIAL CUT --
GR. GRASSED SWALE
\ SEE DETAIL F
RIP RAP
WILBERT BRADLEY LAWERENCE
SHELLFISH LEASE ^877
-DR- PC Sra,10+28,42
-DR-
PI Sto /0+49.78
= 81' 0r /7.0' (RT)
D = 229' 10' 592
L = 35.35'
T = 2/.36'
1= 25.00'
0 S 9' /8' 32.0' E
s 7r 42' 45.0' W
DENOTES IMPACTS IN
SURFACE WATER
PAVEMENT REMOVAL
NOTES
1) FOR -L- PROFILE, SEE SHEET 7
0
Ing\NEU`.Permit P1
N i¢'40'03' E
6 0.00'
PERRY SAYER SHELLFISH LEASE 4877
PROP. 411 FIBER OPTIC CABLE (2)
60+00
-L- PT Sta. 58+38.01
13' 557- OLD ROAD BED —
ALONG HON TIDE LINE
JS
RIP RAP
JS 1S
E EoSTu1G PO8:R TRANSNISSON LINE EASENDR
e50.4
578114
WILBERT BRADLEY LAWERENCE
SHELLFISH LEASE 4877
c
POSTS
-U
O S
LEIGNASE
/ni
/
JEASE
SIGN
DETAIL F
SPECIAL CUT GRASSED SWALE
(Not to Scala(
7oun
From
Ditch
Slop.
Min. D-1 FT.
-1- STA. 55-50 TO 64-50 RT.
PI Sta 57+24.59
= 3' /5' COA' (RTJ
0=t25'56.6"
L = 226.89'
T = 113.48'
R = 4,000.00
PI Sto 68+22.94
A = 16' 24' 03.3" (RT)
0 = 4 30' Ode
L = 364.45'
T 183.48'
R = 127320'
END TIP PROJECT B-4722B
—L— POC Sta. 66 + 50.00
THEODORE LAWREFJCE
OB 212 PG 458
0B 232 PG 151
65 +00
END SHEET PILE WALL
-L- STA. 64+00,00o R MARK
oNG ettlitMAttON
n O + O
24. YID RAIL
) PAU.A STAPLETON LAURENS TRUS,T v
DB 1221 PG 471
20 PG
1S DOCN PILINGS MB
•
60 /
CUT E 975j w wD /
SEE EED TAILSWAL! JSO\ 198.6gf4p4<C /
S8EAI /
Sta. 66 9.46
6q,
B3 2j5
66., `•e
JARVIS E. WEEKS, ET ux
OB 493 PG 10
MB 20 PG 60
PROJECT REFERENCE NO.
8-47228
kW SHEET NO
ROADWAY DESIGN
ENGINEER
SHEET NO
6
HYDRAULICS
ENGINEER
PRET IMINARY PLANS: -
Utility Permit Drawing
Sheet�_of-
Fl
FRANK yoteoaoucri., ET AL
OB 918 PG 766
M8 20 PG 60
/ .3508i 9p 37
Y� p'0p'� � d
Wm.
o0
F
t/
NOTES
1) FOR -L- PROFILE, SEE SHEETS 7 AND 8
m
mom• uiuiimum• 1 PROJECT REFERENCE N0. SHEET N0.
�I� �Iu�IIIWNII���IIIIIIv I�WnI�NIIIIIn�IIIIII�CDB
.,"n9V�IIII��IIM�„7�nISI���IIII ,p� ""�°y CDB
�"
100
u�
,o90 ���y ��VY WAU�V�Ind1II70 �i�I,IIIe,.,� �����i oiin � ..m..a1111111
APPROVED BY:
1111111
60
111
1
11
1
60
50
50
40
.1
11 11
11
11
40
30
20
1`
11"p'
11
30
20
cn
-13
0
0-
0
CO
`o
o..
c.
�C•
1.4.0,
NY
DY
70'
OK .;
10 IIIIIIiIII,IIIIIIIIIII!I II ...u.H...■ ■..u.■...i......
0
■
ill
i
I
- 10
-20
-30
-40
- 50
- 60
- 70
u
N
V
i
ni
it
i
i
111111111111111111111111
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
11111111
.III .....i .. III MIME! I.I i...... , -....per
HIV
111
111111111111111111111111111111111111111111111111111111111111
-00 1111111'1111111uu1111111111iii11111ti111iiu111iVW11111IIi111111111M1111:::;Ili111111liillilfi/11ili111V11MIMfi1YI1111111IIdVIIII11111V11111nlIIIIIIIIII
nIIIII11BnWYYYINI■
0000
111
-20
- 30
-40
- 50
IHIIIIIII IIIIIIIIII IIIIIIIIII IIIIIIIIII 6°
1111111111111111111111111111111111111111
- 70
-•0
i
111
111
000
11
N
i
0
IN
111111111111111111111111111111111111111111
i
i
!!!!!!!!IiiIIIIIII!!!!!!!!!!!!!!! N... ,,
IV���Il�l�l�lll�l��llnl �i�u�ni 1
111
u
i
i
111111111111111111111111111111111111111
111
111
i
i
111
111
111
111
A
111
111
u
111111111111111i Illllllllilllllllll 111111111111111111lI1Il .... ---- "1111' 111111111111111 Illf g" 11 1""' 11111111 ill. 11 illy '11 1f 4" .1 11 1111 1111 1111111111111111111111■...1111111111111111111111111111111111111111111111111111111111111
1111111111111111 11111111111111111111i 1111111.111111111111111111:1 """ 'w�' ./1111111:1111111 1111 'ar��l 1111.:. '�111P11 'Il` 11 '11' ,11 11 yr I1.:.111 '1111 1111 f111111111111111111111111::1111111111111111111111111111111111111111111111111111111111111
IIIIIIIIIIIIIIIIII'•'•Illlllllllllllllllll iff'.Illilllllllllllfl it filllll ffllllllll t t 11 iill"""''�• ii!IIII [Illllllllll i itlllliiilll i�lll iitl �i�i�ll ii�iiiiffli��ll �illl iulllliiillll►�Il sill !';Illlllllllllllllllllllll fllllllllllllllllllllllllllllllllllllllllllll iflllllllllllllllll
-100 "' ... ' ■ -100
10
•
0
1 + 00
2+00
100
n
1111111111111111111111111
1►IIIIIlIIll1111 111lllml
PROJECT REFERENCE NO.
B.-4722B
DESIGNED BY:
■C11IC In :1 - -•
111111,1,.Gd.iiil11. 1r. L .ill111
APPROVED BY: CDB
DRAWN BY:
11 •
11
■
CHECKED BY: CDB
SHEET NO. I
8
nC
01 „I
'V
ar
80
70
60
50
40
30
20
10
0
- 10
-20
-30
- 40
- 60
-70
- 80
- 0
I11..1.-J.■.IOI. I.11.
REVISED:
NORTH CAROLINA
DEPARTAENT OF
TRANSPORTATION
UTILITIES ENGINEERING SEC
PHONE:1919)7O7-6690
FAX:019125O-4151
UTILITY CONSTRUCTION
PLANS ONLY
VVV
I I.,1il■1■ 1111.1\ 11NI. II1111i1 1
•'11 . ■ 9• 1111. 111IM `VL'4Ilk 1- 1111111 1 •♦•1
70
60
50
40
v .l. I:IOHI iID- -
I..•J■ 1■ qb .. 1■, I.JLJ1111.I.11 .,,', 1.1, 11..
J1 .r.•... 11\. 111 ■■ I■ I11.. 111 IL 1..Il Ill. ■ 11, 111
-_,.,'r •.: '..I.r •. 11 rtu.:-.11rl-n-Ju1
30
20
■
..Ill_.n1.11 I.I.' .I..1 '..11.1111.
11=J1:=11,1= 11111 1- 711..J1111...1 NI .1 INN. •111_1117.
11. 1.•• . 1.. I.... • •..... - ...■ ■.L • J...I ■ I -1. •-1 --. .... `• ,,.1'I' -. •-. -
10
0
10
-20
- 40
-50
- 60
70
.... .
UP'...
1
1 n1.-
1---�1r Iuu.
1 1 u11r n N 1
...1II ..
1 •11111111111. 1111 ■EM 1
■■ r ..1 ..r-..1.11..11 ■111 ■.11 I
I ---J1 1 1 , ..., 4" 11 Inn"'
■■ 1 all
1.1 ■r I"\ 1.1....1.1 ...■ 1111 1
1 1 / 1 1111 11 1 1111 ■■ ■111 ■I ■I 1 1 I.111 ■111 1
1 • 1 ..11- q.. 11 1 ••/•- 1. '..' 11 `.■ .11 .\ �.1 7111.1.111 ■111 ■111 1
11 1
JUL . ■■ .NEI 11\ 1 NNE, 1
- 80
-•0
3+00
4+00
5+00
90
80
70
60
50
40
30
20
10
- 10
- 20
-30
VIIIIIIIV �II�YIIII 11111111111111111111111 lllll111w11111
nsll
IIllllHIIF" '�
IIIIIIIIBiAlllll YIIIIIIIIIIIIIIIIIIIUIIIIIIIIIIIIIIIpINIIIIIIIIIIIIINII�
IIIIIIIII�IIIIIII 1111111111111111111111111111111111111111111111111111111111111
NIIIYII��IIII IIIIIIIIIIIIIIIII�I�IIIIIIIIIIIIIIIIII
IIII!!!l�mdm JINIp111IInIIIIIIgIIYIiIBI111111Nllllllllllllllllll
��ili�l�i„��,a, iiiiiiniinniii�i�ii�iii8l�lll�iiiiiiiiiiiiiiiini�,,,a„
i
a
i
i
i
s
PROJECT REFERENCE NO.
SHEET NO.
B-4722B
9
DESIGNED BY:
DRAWN BY:
MEH
MEN
CHECKED BY: COB
APPROVED
REVISED:
BY: COB
NORTH CAROLINA
DEPARTMENT OF
TRANSPORTATION
UTILITIES ENCIIEERING SEC
PHONE:1919)707-6690
FAX:1919)250-4151
1111
UTILITY CONSTRUCTION
PLANS ONLY
" "1
IIIIIIIII
1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111
IIIIll1111IIII11I1111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIl11111111111111I1111Ii111llliii
IIIIIIIIIIIIIIIIIIIIIIIIIIII1IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII11111
11111111111111111111111111111111111111111111111
40
- 50
-60
-70
-80
0
-90
—100
„pI
4
1
11.1
111111
u�
i
•
Ileiil 1111111II�II1:11111111i111III�I111II111111I�II1P1111IIIIIII II!11IIIIIIIIIIIIIIIII111111111111111111111111I111111111111111
llllllllllllllllllllllllllllllllillllllllli::111111n1111111111111111uu1:111hu111111111111II�1 IIIII
11111111111111111111111111111111111111111111 111111111111111111111111111111 I MIS ,rllll�,'1111 ? 11111111111 111111' 411111i111u11,11 PI�IM IIIIIg1111111111 Ili! 11:,111111111111111111111111111111011111111111111111111111111111111111111111111111111111111
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIlIII1 IllllllIIIIlllllllllllllllllll 1 udll 'llllll IIIPP:::l1:::11 :Ili '" 11 111111 11111111 111) '11 /Ill '11 If �" 1111111111 i117i um illllll111111111111111111111111i;;u.11111I....11111111111111111illlllllllllllllllllllll
IIIIIIIIIIIIIIli11111111111111111111111111111::::1:::111111111111111111111111111111111::I 111111. ` u" ,/11:1111:1111:11 Illl 71r•i1 111111L'III9i III 11 '11' :11 It �Ir^ylllllllll 'Ilil 111� �1111111111111111111111111111111:1:11111111111111111111111111111111111111111111111111111
11111111111111111111111111111111111111111111Ii1111111111111111111111I:11Ii11111111iiilii11111111111111111111111111ii1111111111111111I11111111111111111111111111111111111111111111111110111111!;1111111111111111111111111111111111111111111I11111111111111111111111111111111111111111111
60
50
40
30
20
10
-10
- 20
-30
- 40
- 50
- 60
-70
- 80
- 90
- 100
- 110
ar
6+00
7+00 8+00
90
PROJECT REFERENCE NO.
B-4722B
DESIGNED BY:
DRAWN BY:
11
CHECKED BY: CDB
S
HEET NO.
10
0
mEsmomm
80
70
60
50
40
30
20
10
- 10
- 20
-30
- 40
- 50
- 60
- 70
- 80
-90
100
- 110
Hmixmaal •):f7C.maHlrrTfnT7
DFI U I 1C.11..1111111111.1 IP.1 1 1117 '
APPROVED BY: CDB
EM..VSEM. C1 aoH..
•.111 L.1.1 .
REvISED:
NORTH CAROLINA
DEPARTMENT OF
TRANSPORTATION
UTILITIES ENGINEERING SEC
PHONE:I919)707-6690
FAX:(919)250-4151
UT LITY CONSTRUCTION
PLANS ONLY
•H..[' 119 .I ITEM �VL SI I\ I• A.I11 ►'•. �'
I..AJ., 1. 1... M.1 I.I, / al n Oak I. 1 CU U •
J..A.1.\.I I....I M.11.11.14L 1 .. I .I 1 I• I I,11 •I
-VI r[ f. 7I..•.'7H.1::■..L LIIIII A •J.[
.............................
-.JL.. JL...L L.Ld...JL..1L...L-.....I...JL..JL...L..4.J4.JL.dL...1..
TION
60
50
40
30
20
10
iF
--.C-7E7[__a[__[[_-_7.7.--7E=_[CA-■G-7...JL..7L..■6....7..-7[--7E...G.M.C.7M--7[-AaE..A.C.__7.-.J...7E...G...C-7■--
OMINO
L 1.11►111.. II.I.1/AH..■../A.1.....11r1..1i. /..1I,1..111..11m
7. - ■' 11 .I 11 I1. /.JI ['I... "�1.1 71..1 I IU , •'[; it ..I
•U �111..11 L`•11,.►.I.1... 1.. •',.... I•1-1-11�=-111•.11-
1 LP'.AIM►" 1 1 1
1---1.1 1 1 1 1 "EN 1,
1 1 I / ...1 d'h--- 1. .
I �•�• 1 III\ ... i. I..... -.M. a. `.
1 ► . I ...M. .. 1 . J.L
-.r--
1 IMIMI II\ \III
■■ r •EMI ..I 1 MEMO MI MI 1
■■ I... 1.1 ■/ .. 1 1 I.../ .EMI 1
.. EM.1 .1 .1 ---' 1 1 :II
...I
■■ 'EM) MI M. ■ 1 I.M.I MI I
■■ EM /MI M► �1■. 'M..I ..MI 1
II
-10
20
- 30
- 40
50
-60
- 70
- 80
- 90
—100
L 1
I
—110
9+00
10+00
11 + 00
100
PROJECT REFERENCE NO.
B-4722B
DESIGNED BY: MEH
DRAWN BY:
MEH
CHECKED BY: C.B
SHEET N0.
11
EiN31111111/93
90
80
70
60
50
40
INAIr 171 u1^rrT,t 71 u'
'Pk IL. 111.A1I III■I1.11 :L•YI11111
1
:NI. 1CV2[:.■.4r■l.l^l2.1P1;
II.1-Il.11lu.ulil i
APPROVED BY:
REVISED:
NORTH CAROLINA
DEPARTMENT OF
TRANSPORTATION
UTILITIES ENGINEERING SEC
PHONE:(919)7O7-6690
FAX:(919)25O-4151
MM
UT LITY
PLAT
:
m
m
ONSTRUCT)ON
S ONLY
1T I ON
70
:
:
60
50
40
30
I.l....J1M.AVAki..ME
.Iu 11..1'..11111111.
JI I■ 1■.11 :-11. r ■111`I 111■ 1
30
20
10
- 10
- 20
BEBE BBB
:
...Gil....i=..=i..iiii....i..Mimi.i.i..ii.i..ii.i■../i.i...■■■..■..i...ii..i. - =ii
: ■ :
1.1
n.■..
ommns
::::■■
:■■..■■r,�
:i
�m.i::ME " : : ::::■:I :
MM
:
:
..J. o..u.L...:.d:.AIM ...L...L- •L /' .C=7• 2111--Zi-
■ ■
�L__■c_.■c_�■__J.i_ac_■c__._a._a.__ac__.c__mean __.._ac_■c__■c_J■ao.
:..■■.■
•
::::: :::::
:
:
1
■.
:
- 30
:
20
10
-10
- 20
.` ..■; ..I Il.•116111 ■.I I■11 URA a f.11I ■ 111..1
Ip'.1■1 .1►.1.■11■11111.. ■■.I Il 1 ..l OII ■ I L .O
. � __L 11:L_l►:..L.L_ _JJL.�JL=1JLl_
- 30
-40
1
.■nu...•.■J Ior.r.LulI■.uru..1 • ..In.1.
11■N.I ..■Id1■I■nII■I. .I.1. .1i..11.1.
I :■I I..--...■. I...L-,....'....1 ■■\'-•aU U.I I.1 1'-■ -,. I■■..--. N■\11'-■ --1-
- 50
- 60
- 70
- 80
- 90
:::
:
S
1U•l
:
: ::
:
40
x::
:
: :
:
:■■I 1
- 50
:
- 60
:
- 70
-80
•
1l 1
MENEM
.m. '
.o-
1
1
■ IR '1■1 1 y 1 1 V `■■
■■I' .a•. '.I 1 1 1■1 .■. I.
..f ■. 1 I ■■. 1■1 .■. 1■
.■. • 1 moo am .■. 1■
.■.1 'B/, '.I ■L \/► Ill ,.I AM
■.■L. AEI 11. n 1.1 n A ll
IF All, IEL
1111 1
In- 1 I..1 1
I 1I...V AIM1.1 . I 1■.V I
1.\ • OWE
10- I■■.■
L 1.. I■./ 1
- 90
-100
0
:
1 + 00
2+00
-100
90
PROJECT REFERENCE NO.
B=-4722 B
DESIGNED BY: MEH
DRAWN BY: MEH
CHECKED BY:
SI
EET NO.
12
NaMMff=
80
70
60
50
40
30
20
10
- 10
- 20
- 30
- 40
- 50
- 60
- 70
- 80
- 90
- 100
- 110
1 / N I ONI .T.,17:: 0'.7I ■ T7717t171�
"VALE II .P'1 ■11II 1I.7P 1'11111/
APPROVED BY:
REVISED:
NORTH CAROLINA
DEPARTMENT OF
TRANSPORTATION
UTILITIES ENGIHRERIRG SEC
PHONE:19191707-6690
FAX:19191250-4151
UTILITY CONSTRUCTION
PLANS ONLY
--.en.-N-..-
I I
.nr-n.. I.11 - I;ILIL-i1■1 :,II.T.
-'I...' 41.9 I I\..."IV 411E L• lI MI II L.A.
i
=■■■i i ii
TION
60
50
40
30
]I Z. VI ■■I MI L1 I I _ ■■.I ICI M 1 ■1 11■ 1 IA ■ ■I
•-. Al ■.' 711E L`•.Mk ►.I 1l. •VC-, IL ■ - .
20
iii
■
IMO EMI
.■■■I
..i-m.Gmm■Gmm■Gm76 m7\mm.Gm.\Lm.■Lm.I■mm.\mm.L.m■Lmm■LmJ■mmJ\mm.L..■L..tLm.l■m-.I\...i..tL..tI...It.dL.dL..tL.d..JtmmJ\...L..tLmmtl.dt.mJL...L.dLm.tLw.lt.df.dL-.tL..t..7tmmaf.-aL..tLmmtL-J\.d\mmiL..tL..tLd4.J\..aL...L-.tLdt-..1\oMLo\Y..tY...ib.i■
.■M
.....
i
In
•
■■■■■
■....
i
i
■■i
i
i i
i .1J1N.V..' ..' I■■./ am, .\■■\. El.rl.. t/\1i. 111■■• ■
7\=I-■1■I: IICl■■
■I.■7■■I=711■II■■■1.1-]II■■- I..�11� 111■■- ■■ ■
1
1
1
1
i 1
i 1
1
1 11 1
i
i
Tiii 1 1 iiii i
i
i
i
i
i
i
i
i
i
1■ 1
iii, •..• i1
■■■►. ABI
--• I I I -
I I I V I.L..■. 1■■I I
1 • I■I I• `■ I I..- 1 I 1■■I I
1 I ...Ani iii •1• IUI --- I iuu•'.iIUUI 1
•1 .I■1 I.I ...' IN I. ' I I■..I L..■I 1
•...- III NO, IMI Ur IN I■k V• I I I I
.O. . 1■1 i. ANN I. 1 INF IMr /
10
- 10
- 20
- 30
-40
-50
- 60
-70
- 80
- 90
-100
i
ii
-110
3+00
4+00
5+00
90
PROJECT REFERENCE NO.
B -4722 B
DESIGNED BY: MEH
DRAWN BY: MEH
SHEET NO.
13
Cr,
N
O
80
70
60
50
40
30
20
10
- 10
-20
- 30
- 40
-50
- 60
-70
- 80
- 90
- 110
11111i11r,..I Ct II :1 II mar] IV; I', 1111I
.A.Iit1WI - ...r
..l ..1.\np..l I I 1I, 1v
.11 t tl _I I...Il ...1.I O...IIL'0
r 111i\iLL.. sac
CHECKED BY: DB
APPROVED BY:
REVISED:
NORTH CAROLINA
DEPARTMENT OF
TRANSPORTATION
UTILITIES ENGINEERING SEC
PHONE:(9191707-6690
FAX:(9191250-4151
UTILITY CONSTRUCTION
PLANS ONLY
TWT
I(UI Iiirlli��r, v01Lu 1.1 1J1[1E
I
i
I
TION
60
50
40
30
PPPPP
I.I11IIIPi,l.III II \IL ILI..I..II aIIIIII A\ II■
'-L\.=]\!7I111._7L.J\_J..L:ILI.IL AL!II1.J_
20
1.oeesae? eeoe.===MM.u..e11e..................lueee eee eeeoeeeoaeee..
I 2
I'
■[...1...lm•.p4.MMM.Mgl••.!•_.m•1[mm7. 7r■r [rL_7r••1l••mi. .....1._ 7■ •.P..!••./•M[•M7P9r.m...[!.....[P'1M 7[ 7r [C__[_77[7[1[_7[[7.G77[777[771[[C=_[C_7.__][__7[CC[C--[C-7[_C7[CC7[CC[[__IC_7[CC7l=_1[=_.C__.C_7.C77[771[7[[[[I
I o"'.
Im
■
I
MEMMMMMMMI
CI
I
I....I
I'IIII I I
...I
1 I I/Ii I 'I
I I I I L.I I
....
i
i....I.I I I� ::il IIT.i
.:._.�/._...En MI [.'lr_.......r..Y..._.1_JIMI.�ALI,...T1.... II II
I I
T 1
C 11 =I
I....I I
I
II
i
I
I
I
1
I
II I
I
IIIIIIIIII��
Mel
10
-10
— 20
— 30
40
— 50
— 60
— 70
I
I
i....I 1 1
I
I.[► .....`' I I 1 •'..... 11
---,: I 1 I .O.' 'VI1
1 i v MI II r ...
___.l. 1 I I ...r ,�.s '.1 I.I L\ ..
1 1 ... A — Ms 1 f ... 1.1 ... I.
_.vI ... . I 1 ...I 1. ...' 1.
...1 '\.r 7I \ ,..." IL \.r I.I \.r ■■
I ...L. I[I .... . 1.1 i. ..■
1 • 1V - ';.I
I.. I 1 L.... 'EMI 1
1. lour..I I ■1
i
I.� --- . I..[.I a.IOI
Ill AP' IM ""'I
1... 11.I I..I I I I
I iB
—80
—90
—100
—110
6+00
7+00
8+00
90
PROJECT REFERENCE NO.
B-4722B
DESIGNED BY: MEH
DRAWN BY: MEH
S
HEET NO.
14
31NOMM
0
CP
80
70
60
50
40
30
20
10
- 10
- 20
- 30
- 40
- 50
-60
- 70
-80
-90
—100
Cat
LL
0,1
•r NZ
Y�
CHECKED BY:
I i I irl1•r17c^re111■rr„7H-.-
/1.11Iii.I d11111111.1I31YIIII,
APPROVED BY:
IG
JI.r..P.Sa.I ■I f]..nl.
tII PL•i �•Vi�....Iit IIL.IP
REVISED:
NORTH CAROLINA
DEPARTMENT OF
TRANSPORTATION
UTILITIES ENGINEERING SEC
PHONE:(919)707-6690
FAX:(919)250-4151
UT LITY CONSTRUCTION
PLANS ONLY
III•.•Iuuu..I..'.'IIlI,11...amI••II.1n
•,l..r•.-, III• 'I 1•11. A..I11
e
I im'v.u.14J.u.21 \1III I .1'IN.I l.\IIII
uv..r.1.1MINol.I.I.1.TIILI..I L.II..■ I. I NI MIIll
l''-TI.1" IL J...L7u.I►-un-:RI.1i'..''.1I. 1C=
TION
60
50
40
30
20
10
MM
..W
-.-..--,.--.r--.r--.r-n.-_].__J...
...&
■
1
Z
■
■
10
ISOM
20
1
o l..1r.,11 •. I1. I.11..•1...1 .. ACM ..... . , ME i. \r.l■ y�...l i.
I.I II 11...11.1...1...1....1.7...1.- I1�./ �.- 1..1.
-'III L••,...•'.I...I1:..•',.... I.:.. -,I'=-/1
9
- 30
40
1
Z p
7
momm
I..► ...1 ! 1 ' " ..... 1!Bully A
IBA
I ME
1
-_J. 1 I I ■..1 .•�k '.■ I i 1.1 ... 1.
1 I 1 I ... ' ■I 1 1 ...l 1.1 ■... 1.
1 •U• 1 1 ...I ul ■R' 1.
•.•• I I ...• '\.• '.. �.v' p ,.I !MI VI i•
All EL. INI INE
I -.
1 I 1.1..... I..I 1
1..� 1 1 I..1 I
fir '--' I 1....' A•••i 1
I.i • I I...I J11..I I
u1 'O• I 111111, 1 I
1... 11.► I../ I
50
- 60
70
- 80
90
100
0,1
-110
-110
9+00
10+00
11+00
100
■■
■.■
■11U
PROJECT REFERENCE NO.
SHEET NO.
B-4722B
DESIGNED BY: MEH
DRAWN BY: MEH
15
90
Ut'hty Permit Drawing
Sh
CHECKED BY: CDB
APPROVED BY: CDB
REVISED:
80
70
60
NORTH CAROLINA
DEPARTMENT OF
TRANSPORTATION
UTILITIES ENGINEERING SEC.
PHONE:19191707-6690 UT LITY CONSTRUCTION
FAX:19191250-4151 PLANS ONLY
•
ION
70
60
50
40
30
20
i
EX
I
.� _. ....�-..... V
1-
50
40
30
20
NNE
10
0
r-�
ANIMm
mplma
10
.r. ammo- ...�
0
1 I'
t
-10
- 10
-20
-30
-40
T
1-.
EC
TE
_r
CALF
J
- 20
- 30
-40
- 50
60
- 70
- 80
- 90
F
0
e
C
a
e
- 50
-60
-70
- 80
- 90
- 100
-100
11+00
12 + 00
13+00
100
PROJECT REFERENCE NO.
B-4722B
DESIGNED BY: MEH
DRAWN BY: MEH
I1 I111. r. '7.I Aa:.l i . III :SPnTU1
C71LUil..acl11111'lI. U1•\1.1N1.1 .:
CHECKED BY:
S
EET NO.
16
90
80
70
60
50
40
30
20
311121WEE2
10
- 10
- 20
- 30
- 40
-50
- 60
-70
- 80
-90
- 100
1I
cr . T- ►.ti f..r.r.a.rc I11 r>1
APPROVED BY:
REVISED:
NORTH CAROLINA
DEPARTMENT OF
TRANSPORTATION
UTILITIES ENGINEERING SEC
PHONE:(9191707-6690
FAX:(9191250-4151
UTILITY CONSTRUCTION
PLANS ONLY
��r-r7■-r_---�r�n.i
II.ErI'E■.I..LL'....'I AIM R/IMI I U.1■
••i..r� �. -r• ru.l n..ovo�A I►.. n n n .•.a.'
"T I ON
70
.....h Jub Mill ,■:...1..W-du V m.,..... 1M I.11...1
A arm, ;bail
60
50
40
30
20
..i..........i.i
10
•
10
■
-20
.17 �1/�■lp E.r.r..l.....r..l.....E..I..0 7/ rl All l... ■■..
_ '�i■�iii(�i ii■ro■..!ti 1\�1111r�►!I%EEEEO:;I•1= ,•%■\\M.11!!1➢.
1
p
- 30
- 40
- 50
- 60
E
1
1
- 70
I,.■.- 'NMI
1 ..r MAMA 11
mowI 1 iii mr,. iiI MIL AEI
AMEN.
1.
E.. 11 :::. 11
.■■.- 1 Ei.l U.1 ... 1.
1
1
..� .1
1 IL.... 1..1
�....••:::.I
I I...r L...1
111►r INMI
- 80
- 90
100
14+00
B
hASI- 0
SC\
Utility Permit Drawing
Sheet
0 4
444 e e r \tr. -4 4 k k4
_44 • V L I E
Nei*
"rre
747
A, ; 06"
+ 64.00
99.80' RT
•._.•
`,"DENOTES IMPACTS IN
SURFACE WATER
WETLAND IMPACTS
SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
L Sta. 53+50.55 to L Sta. 54+22.71
Rip Rap
0.13
TOTALS:
0.13
Note:
Utility Permit Drawing
Sheet hi of /t,
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
Revised 8/1/13
ATN Revised 3/31/05
CARTERET COUNTY
WBS - 38496.1.1 (B-4722B)
SHEET 1 OF 1 3/19/2014
VICINITY MAPNOT TO SCALE PROJECT BEGIN PROJECT END -L- STA. 31+00.00 BEGIN TIP PROJECT B-
4
7
2
2
B
-
L
-
S
T
A
.
6
6
+
5
0
.
0
0
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
4
7
2
2
B
TOTA
L
L
E
N
G
T
H
O
F
T
I
P
P
R
O
J
E
C
T
B
-
4
7
2
2
B
=
0
.
6
7
2
M
I
L
E
S
LENG
T
H
S
T
R
U
C
T
U
R
E
T
I
P
P
R
O
J
E
C
T
B
-
4
7
2
2
B
=
0
.
2
5
6
M
I
L
E
S
LENG
T
H
R
O
A
D
W
A
Y
T
I
P
P
R
O
J
E
C
T
B
-
4
7
2
2
B
=
0
.
4
1
6
M
I
L
E
S
TOBEAUFORT
T
O
B
E
T
T
I
E
S
U
S
A
N
C
.
L
A
N
C
A
S
T
E
R
,
P
E
G
A
R
Y
R
.
L
O
V
E
R
I
N
G
,
P
E
C
A
R
T
E
R
E
T
C
O
U
N
T
Y
B
R
I
D
G
E
N
O
.
3
3
O
V
E
R
T
H
E
N
O
R
T
H
R
I
V
E
R
O
N
U
S
7
0
G
R
A
D
I
N
G
,
P
A
V
I
N
G
,
D
R
A
I
N
A
G
E
,
A
N
D
S
T
R
U
C
T
U
R
E
2550100502550100505102010DHVDTV======10,60014,6001055 460 %%MPH ADTADT20152035
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
*(TTST 1% + DUAL 3%)STATEWIDE TIER RURAL ARTERIAL FUNC CLASS =%*000PROFILE (HORIZONTAL)
3
8
4
9
6
.
1
.
1
P
E
B
R
N
H
S
-
0
0
7
0
(
8
4
)
P
R
O
J
E
C
T
L
E
N
G
T
H
R
I
G
H
T
O
F
W
A
Y
D
A
T
E
:
L
E
T
T
I
N
G
D
A
T
E
:
S
T
A
T
E
S
T
A
T
E
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
S
T
A
T
E
P
R
O
J
.
N
O
.
F.
A
.
P
R
O
J
.
N
O
.
D
E
S
C
R
I
P
T
I
O
N
N
O
.
T
O
T
A
L
SH
E
E
T
S
N
.
C
.
S
H
E
E
T
1
DESIGN DATA
P
r
e
p
a
r
e
d
i
n
t
h
e
O
f
f
i
c
e
o
f
:
S
I
G
N
A
T
U
R
E
:
S
I
G
N
A
T
U
R
E
:
P
.
E
.
P
.
E
.
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
2
0
1
2
S
T
A
N
D
A
R
D
S
P
E
C
I
F
I
C
A
T
I
O
N
S
P
R
O
J
E
C
T
E
N
G
I
N
E
E
R
P
R
O
J
E
C
T
D
E
S
I
G
N
E
N
G
I
N
E
E
R
GRAPHIC SCALES PLANSPROFILE (VERTICAL)
H
Y
D
R
A
U
L
I
C
S
E
N
G
I
N
E
E
R
L
O
C
A
T
I
O
N
:
T
Y
P
E
O
F
W
O
R
K
:
09/08/99
B
-
4
7
2
2
B
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
000 See Sheet 1-B For Conventional Symbols See Sheet 1-A For Index of Sheets30-APR-2013 15:45R:\Roadw ay\Proj\B4722B_Rdy_tsh.dgn$$$$USERNAM E$$$$CONTRACT:TIP PROJECT:B-4722B
ARTMEN
N
A
S
O
H
DEP
T
O
F
T
R
A
S
P
OR
T
T
IO N
T
ATE
O
F
N
R
T
C
AROLINA
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
-
L
-
A
P
R
I
L
3
0
,
2
0
1
3
A
P
R
I
L
2
1
,
2
0
1
5
N
O
R
T
H
R
I
V
E
R
T
H
I
S
P
R
O
J
E
C
T
I
S
N
O
T
W
I
T
H
I
N
A
N
Y
M
U
N
I
C
I
P
A
L
B
O
U
N
D
A
R
I
E
S
.
B
R
N
H
S
-
0
0
7
0
(
8
4
)
3
8
4
9
6
.
2
.
1
R
/
W
&
U
T
I
L
.
-L- STA. 40+99.04 BEGIN BRIDGE
-
L
-
S
T
A
.
5
4
+
5
0
.
9
6
E
N
D
B
R
I
D
G
E
TO THE LIMITS ESTABLISHED BY MET
H
O
D
I
I
I
.
CLEARING ON THIS PROJECT SHALL BE
P
E
R
F
O
R
M
E
D
B
R
I
D
G
E
N
O
.
3
3
U
S
7
0
US 70
1
0
0
0
B
i
r
c
h
R
i
d
g
e
D
r
.
,
R
a
l
e
i
g
h
,
N
C
2
7
6
1
0
5
6
4
GRAU 350 GRAU 350
G
RAU
350
G
R
A
U
3
5
0
Pop. 3,888 BettieO
tw
a
y
Straits 7070
7
0
Gilliken
Creek
101CedarSt.Live OakSt.Beaufortand CreekCreek WardCreekNorthLeopardCreekSouthLeopardCreekTurnerCreekGibbsCreekNorthRiverNorth RiverMarsh 7070Beaufort101
NSRS
2007
NAD
83
/
1299 130313031480147914271427142814261304 121211701170 14681464 11641167 1166116511681675167617231674167311651238144514351466
13
2
6
13
3
1
1329
13
2
8
13
2
7
13
3
1
13
3
1
1324
13
2
5
13
2
5
1462 1458143214331431 1430 1429 14491434130113021472
1
3
3
5
1335133513411471145414371436134013331339 1333 1333
1
3
3
2
133213
3
4
14
4
0
13
4
3
13
4
2
14601174 13001323132213121310141214591169163114461231123016441232124614551483148414811489
13
3
5
Existing
E
d
g
e
o
f
P
a
v
e
m
e
n
t
Existing
C
u
r
b
Propose
d
S
l
o
p
e
S
t
a
k
e
s
C
u
t
Propose
d
S
l
o
p
e
S
t
a
k
e
s
F
i
l
l
Existing
M
e
t
a
l
G
u
a
r
d
r
a
i
l
Existing
C
a
b
l
e
G
u
i
d
e
r
a
i
l
Propose
d
G
u
a
r
d
r
a
i
l
Equality
S
y
m
b
o
l
Paveme
n
t
R
e
m
o
v
a
l
Baseline
C
o
n
t
r
o
l
P
o
i
n
t
RIGH
T
O
F
W
A
Y
:
Existing
R
i
g
h
t
o
f
W
a
y
M
a
r
k
e
r
Existing
R
i
g
h
t
o
f
W
a
y
L
i
n
e
h
Existing
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
Propose
d
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
Propose
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
CF
Existing
E
a
s
e
m
e
n
t
L
i
n
e
Propose
d
T
e
m
p
o
r
a
r
y
C
o
n
s
t
r
u
c
t
i
o
n
E
a
s
e
m
e
n
t
Propose
d
T
e
m
p
o
r
a
r
y
D
r
a
i
n
a
g
e
E
a
s
e
m
e
n
t
Propose
d
P
e
r
m
a
n
e
n
t
D
r
a
i
n
a
g
e
E
a
s
e
m
e
n
t
Propose
d
P
e
r
m
a
n
e
n
t
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
HYDROLOGY:Stream or Body of WaterHydro, Pool or ReservoirFlow ArrowDisappearing StreamSpring
;
zvWKProposed Lateral, Tail, Head DitchFalse Sump Propose
d
C
a
b
l
e
G
u
i
d
e
r
a
i
l
M
A
J
O
R
:
B
r
i
d
g
e
,
T
u
n
n
e
l
o
r
B
o
x
C
u
l
v
e
r
t
B
r
i
d
g
e
W
i
n
g
W
a
l
l
,
H
e
a
d
W
a
l
l
a
n
d
E
n
d
W
a
l
l
M
I
N
O
R
:
H
e
a
d
a
n
d
E
n
d
W
a
l
l
P
i
p
e
C
u
l
v
e
r
t
F
o
o
t
b
r
i
d
g
e
P
a
v
e
d
D
i
t
c
h
G
u
t
t
e
r
U
T
I
L
I
T
I
E
S
:
ROAD
S
A
N
D
R
E
L
A
T
E
D
F
E
A
T
U
R
E
S
:
E
x
i
s
t
i
n
g
P
o
w
e
r
P
o
l
e
P
r
o
p
o
s
e
d
P
o
w
e
r
P
o
l
e
P
U
/
G
P
o
w
e
r
C
a
b
l
e
H
a
n
d
H
o
l
e
P
o
w
e
r
M
a
n
h
o
l
e
P
o
w
e
r
L
i
n
e
T
o
w
e
r
P
o
w
e
r
T
r
a
n
s
f
o
r
m
e
r
E
x
i
s
t
i
n
g
J
o
i
n
t
U
s
e
P
o
l
e
P
r
o
p
o
s
e
d
J
o
i
n
t
U
s
e
P
o
l
e
E
x
i
s
t
i
n
g
T
e
l
e
p
h
o
n
e
P
o
l
e
P
r
o
p
o
s
e
d
T
e
l
e
p
h
o
n
e
P
o
l
e
T
e
l
e
p
h
o
n
e
M
a
n
h
o
l
e
T
e
l
e
p
h
o
n
e
B
o
o
t
h
T
e
l
e
p
h
o
n
e
P
e
d
e
s
t
a
l
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
H
a
n
d
H
o
l
e
R}T pQle]/b
H
-
F
r
a
m
e
P
o
l
e
O
O
P
O
W
E
R
:
T
E
L
E
P
H
O
N
E
:
T
e
l
e
p
h
o
n
e
C
e
l
l
T
o
w
e
r
R
e
c
o
r
d
e
d
U
/
G
P
o
w
e
r
L
i
n
e
R
e
c
o
r
d
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
D
e
s
i
g
n
a
t
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
(
S
.
U
.
E
.
*
)
R
e
c
o
r
d
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
o
n
d
u
i
t
D
e
s
i
g
n
a
t
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
o
n
d
u
i
t
(
S
.
U
.
E
.
*
)
R
e
c
o
r
d
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
s
C
a
b
l
e
W
A
T
E
R
:
W
a
t
e
r
M
a
n
h
o
l
e
W
a
t
e
r
M
e
t
e
r
W
a
t
e
r
V
a
l
v
e
W
a
t
e
r
H
y
d
r
a
n
t
R
e
c
o
r
d
e
d
U
/
G
W
a
t
e
r
L
i
n
e
4IHa
T
V
:
T
V
S
a
t
e
l
l
i
t
e
D
i
s
h
T
V
P
e
d
e
s
t
a
l
T
V
T
o
w
e
r
U
/
G
T
V
C
a
b
l
e
H
a
n
d
H
o
l
e
R
e
c
o
r
d
e
d
U
/
G
T
V
C
a
b
l
e
R
e
c
o
r
d
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
C
a
b
l
e
D
e
s
i
g
n
a
t
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
C
a
b
l
e
(
S
.
U
.
E
.
*
)
r|I]
G
A
S
:
G
a
s
V
a
l
v
e
G
a
s
M
e
t
e
r
R
e
c
o
r
d
e
d
U
/
G
G
a
s
L
i
n
e
n c
S
A
N
I
T
A
R
Y
S
E
W
E
R
:
S
a
n
i
t
a
r
y
S
e
w
e
r
M
a
n
h
o
l
e
S
a
n
i
t
a
r
y
S
e
w
e
r
C
l
e
a
n
o
u
t
U
/
G
S
a
n
i
t
a
r
y
S
e
w
e
r
L
i
n
e
R
e
c
o
r
d
e
d
S
S
F
o
r
c
e
d
M
a
i
n
L
i
n
e
D
e
s
i
g
n
a
t
e
d
S
S
F
o
r
c
e
d
M
a
i
n
L
i
n
e
(
S
.
U
.
E
.
*
)
do
A
/
G
W
a
t
e
r
A
b
o
v
e
G
r
o
u
n
d
G
a
s
L
i
n
e
A
/
G
G
a
s
A
b
o
v
e
G
r
o
u
n
d
W
a
t
e
r
L
i
n
e
A
b
o
v
e
G
r
o
u
n
d
S
a
n
i
t
a
r
y
S
e
w
e
r
A
/
G
S
a
n
i
t
a
r
y
S
e
w
e
r
M
I
S
C
E
L
L
A
N
E
O
U
S
:
U
t
i
l
i
t
y
P
o
l
e
OFS3
U
t
i
l
i
t
y
P
o
l
e
w
i
t
h
B
a
s
e
U
t
i
l
i
t
y
L
o
c
a
t
e
d
O
b
j
e
c
t
U
t
i
l
i
t
y
T
r
a
f
f
i
c
S
i
g
n
a
l
B
o
x
U
t
i
l
i
t
y
U
n
k
n
o
w
n
U
/
G
L
i
n
e
?
C
O
N
C
C
O
N
C
W
W
v
v
D
r
a
i
n
a
g
e
B
o
x
:
C
a
t
c
h
B
a
s
i
n
,
D
I
o
r
J
B
S
t
o
r
m
S
e
w
e
r
S
t
o
r
m
S
e
w
e
r
M
a
n
h
o
l
e
m
U
/
G
T
a
n
k
;
W
a
t
e
r
,
G
a
s
,
O
i
l
A
/
G
T
a
n
k
;
W
a
t
e
r
,
G
a
s
,
O
i
l
BOUNDARIES AND PROPERTY:State LineCounty LineTownship LineCity LineReservation LineProperty LineExisting Iron PinProperty CornerProperty MonumentExisting Fence LineProposed Woven Wire FenceProposed Chain Link FenceProposed Barbed Wire Fence gF123Existing Wetland BoundaryProposed Wetland BoundaryExisting Endangered Animal BoundaryExisting Endangered Plant BoundaryBUILDINGS AND OTHER CULTURE:Area Outline Gas Pump Vent or U/G Tank CapChurchSchoolDamSignSmall Mine Well VMWWSxFoundationSBuildingyyVEGE
T
A
T
I
O
N
:
Single T
r
e
e
XY
V
i
n
e
y
a
r
d
Single S
h
r
u
b
HedgeWoods L
i
n
e
O
r
c
h
a
r
d
V
i
n
e
y
a
r
d
RAILR
O
A
D
S
:
Standar
d
G
a
u
g
e
RR Sign
a
l
M
i
l
e
p
o
s
t
SwitchRR Aba
n
d
o
n
e
d
RR Dism
a
n
t
l
e
d
S
FLOW
D
e
s
i
g
n
a
t
e
d
U
/
G
P
o
w
e
r
L
i
n
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
s
C
a
b
l
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
W
a
t
e
r
L
i
n
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
T
V
C
a
b
l
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
G
a
s
L
i
n
e
(
S
.
U
.
E
.
*
)
U
/
G
T
e
s
t
H
o
l
e
(
S
.
U
.
E
.
*
)
*S.U.E. = Subsurface Utility EngineeringWLBEIPBECM
C
O
N
C
H
W
C
B
C
S
X
T
R
A
N
S
P
O
R
T
A
T
I
O
N
M
I
L
E
P
O
S
T
3
5
S
W
I
T
C
H
Cemetery
E
X
I
S
T
I
N
G
S
T
R
U
C
T
U
R
E
S
:
Parcel / Sequence Number
E
A
A
T
U
R
E
n
d
o
f
I
n
f
o
r
m
a
t
i
o
n
E
.
O
.
I
.
Note: Not to Scale
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
1
-
B
B
-
4
7
2
2
B
A
b
a
n
d
o
n
e
d
A
c
c
o
r
d
i
n
g
t
o
U
t
i
l
i
t
y
R
e
c
o
r
d
s
WLBEABEPB
RW
RW
RW
CAET
D
E
P
D
E
P
U
E
SPPTTT
C
T
C
T
F
O
T
F
O
WWT
V
T
V
T
V
F
O
T
V
F
O
GG
S
S
F
S
S
F
S
S
?
U
T
L
Jurisdictional StreamJS 04/16/11Buffer Zone 1Buffer Zone 2 BZ 1BZ 2Wetland Propose
d
P
e
r
m
a
n
e
n
t
E
a
s
e
m
e
n
t
w
i
t
h
Iron
P
i
n
a
n
d
C
a
p
M
a
r
k
e
r
Propose
d
T
e
m
p
o
r
a
r
y
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
T
U
E
Iron P
i
n
a
n
d
C
a
p
M
a
r
k
e
r
Propose
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
w
i
t
h
D
U
E
Propose
d
P
e
r
m
a
n
e
n
t
D
r
a
i
n
a
g
e
/
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
A
U
E
Propose
d
A
e
r
i
a
l
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
C
R
Propose
d
C
u
r
b
R
a
m
p
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
CO
N
V
E
N
T
I
O
N
A
L
P
L
A
N
S
H
E
E
T
S
Y
M
B
O
L
S
U
n
d
e
r
g
r
o
u
n
d
S
t
o
r
a
g
e
T
a
n
k
,
A
p
p
r
o
x
.
L
o
c
.
G
e
o
e
n
v
i
r
o
n
m
e
n
t
a
l
B
o
r
i
n
g
U
S
T
Known Soil Contamination: Area or SitePotential Soil Contamination: Area or Site Concr
e
t
e
o
r
G
r
a
n
i
t
e
R
/
W
M
a
r
k
e
r
Propose
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
w
i
t
h
CA
Concr
e
t
e
C
/
A
M
a
r
k
e
r
Propose
d
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
L
i
n
e
w
i
t
h
1
2
’
1
2
’
F
D
P
S
4
’
F
D
P
S
4
’
1
2
’
1
2
’
F
D
P
S
4
’
F
D
P
S
4
’
1
2
’
1
2
’
1
2
’
1
3
’
W
/
G
R
1
0
’
1
3
’
W
/
G
R
1
0
’
1
3
’
W
/
G
R
1
0
’
1
3
’
W
/
G
R
1
0
’
1
2
’
6
’
6
’
3
6
’
3
8
’
-
7
"
F
D
P
S
4
’
"
21
1
’
-
3
D
D
"
21
1
’
-
3
D
D
6
:
1
6
:1
G
R
A
D
E
CL
-
L
-
CL
-
L
-
G
R
A
D
E
P
O
I
N
T
-
L
-
S
T
A
.
3
1
+
0
0
.
0
0
T
O
-
L
-
S
T
A
.
3
3
+
1
7
.
8
4
6
:
1
6
:1
CL
-
L
-
G
R
A
D
E
P
O
I
N
T
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
-
L
-
S
T
A
.
6
3
+
9
4
.
3
0
T
O
-
L
-
S
T
A
.
6
6
+
5
0
.
0
0
3:
1
3:
1
0
2
0
8
0
2
0
8
0
8
0
2
0
8
P
O
I
N
T
G
R
O
U
N
D
O
R
I
G
I
N
A
L
G
R
O
U
N
D
O
R
I
G
I
N
A
L
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
2
B
-
4
7
2
2
B
P
A
V
E
M
E
N
T
D
E
S
I
G
N
6/2/9930-APR-2013 15:45R:\Roadway\Proj\b4722b_rdy_typ.dgn$$$$USERNAME$$$$
0
2
5
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
4
A
T
T
H
E
F
O
L
L
O
W
I
N
G
L
O
C
A
T
I
O
N
S
:
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
2
A
T
T
H
E
F
O
L
L
O
W
I
N
G
L
O
C
A
T
I
O
N
:
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
4
A
T
T
H
E
F
O
L
L
O
W
I
N
G
L
O
C
A
T
I
O
N
S
:
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
G
R
O
U
N
D
O
R
I
G
I
N
A
L
V
A
R
.
S
E
E
X
-
S
E
C
T
I
O
N
S
V
A
R
.
S
E
E
X
-
S
E
C
T
I
O
N
S
V
A
R
.
S
E
E
X
-
S
E
C
T
I
O
N
S
6
:
1
3:
1
V
A
R
.
S
E
E
X
-
S
E
C
T
I
O
N
S
6
:
1
3:
1
G
R
O
U
N
D
O
R
I
G
I
N
A
L
T
T
E
1
E
1
D
1
D
1
U
U
W
W
C
1
C
1
T
T
E
1
E
1
D
1
D
1
C
1
C
1
/// /// /// /// MIN.U E23"MIN.MIN.MIN.3"Detail Showing Method of Wedging C SURVEY LC2D2D1C1E2 FINAL PAVEMENT DESIGN
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
2
GRADE TO THIS LINEGUTTER ON TOP OF SUBGRADE DETAIL SHOWING SHOULDER BERM C1D1E1 -L- STA. 54+74 TO -L- STA. 55+80 (RT)-L- STA. 54+74 TO -L- STA. 55+10 (LT)-L- STA. 38+47 TO -L- STA. 40+76 (RT)-L- STA. 39+50 TO -L- STA. 40+76 (LT)
V
A
R
.
1
0
’
T
E
1
6
’
SHEET PILE W ALL
PRO P.
A
T
T
H
E
F
O
L
L
O
W
I
N
G
L
O
C
A
T
I
O
N
S
:
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
2
A
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
2
A
MATCH LINE ’A’MATCH LINE ’A’
0
2
5
-
L
-
S
T
A
.
3
3
+
1
7
.
8
4
T
O
-
L
-
S
T
A
.
4
0
+
9
9
.
0
4
(
B
E
G
I
N
B
R
I
D
G
E
)
-
L
-
S
T
A
.
5
4
+
5
0
.
9
6
(
E
N
D
B
R
I
D
G
E
)
T
O
-
L
-
S
T
A
.
6
3
+
9
4
.
3
0
-
L
-
S
T
A
.
3
4
+
0
0
.
0
0
T
O
-
L
-
S
T
A
.
4
0
+
9
9
.
0
4
(
B
E
G
I
N
B
R
I
D
G
E
)
-
L
-
S
T
A
.
5
4
+
5
0
.
9
6
(
E
N
D
B
R
I
D
G
E
)
T
O
-
L
-
S
T
A
.
6
4
+
0
0
.
0
0
-
L
-
S
T
A
.
4
0
+
9
9
.
0
4
(
B
E
G
.
B
R
I
D
G
E
)
T
O
-
L
-
S
T
A
.
5
4
+
5
0
.
9
6
(
E
N
D
B
R
I
D
G
E
)
6
:
1
6
:1
CL
G
R
A
D
E
P
O
I
N
T
3:
1
0
2
0
2
0
8
G
R
O
U
N
D
O
R
I
G
I
N
A
L
V
A
R
.
S
E
E
X
-
S
E
C
T
I
O
N
S
V
A
R
.
S
E
E
X
-
S
E
C
T
I
O
N
S
6
:
1
3:
1
T
T
J
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
3
G
R
O
U
N
D
O
R
I
G
I
N
A
L
1
5
’
2
’
2
’
0
8
-
D
R
-
S
T
A
.
1
0
+
1
2
.
0
0
T
O
1
1
+
0
0
.
0
0
-
D
R
-
A
T
T
H
E
F
O
L
L
O
W
I
N
G
L
O
C
A
T
I
O
N
:
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
3
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
"
21
9
"
21
9
6
"
"219
"
21
9
"212"212 PAVEMENT SCHEDULEEARTH MATERIAL.NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE.PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO LAYERS.C1PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,AT AN AVERAGE RATE OF 112 LBS. PER SQ. YD. PER 1" DEPTH. TOBE PLACED IN LAYERS NOT TO EXCEED 2" IN DEPTH.C2D1PROP. APPROX. 2" ASPHALT CONCRETE INTERMEDIATE COURSE,TYPE I19.0B, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD.PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE,D2GREATER THAN 4" IN DEPTH.TYPE I19.0B, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH, TO BE PLACED IN LAYERS NOT LESS THAN 2" IN DEPTH ORAT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.0B,E1PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0B,AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TOTHAN 5" IN DEPTH.BE PLACED IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATERE2SHOWING METHOD OF WEDGING)VARIABLE DEPTH ASPHALT PAVEMENT (SEE DETAIL TWEXISTING PAVEMENT.U J6" AGGREGRATE BASE COURSE.
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
S
E
E
D
E
T
A
I
L
C
A
P
P
R
O
X
.
1
2
,
8
0
0
C
Y
E
X
C
A
V
A
T
I
O
N
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
S
E
E
D
E
T
A
I
L
B
G
R
A
S
S
E
D
S
W
A
L
E
LA
T
E
R
A
L
’
V
’
W
/
P
S
R
M
S
E
E
D
E
T
A
I
L
A
G
R
A
S
S
E
D
S
W
A
L
E
S
P
E
C
I
A
L
C
U
T
S
L
O
P
E
F
I
L
L
PS
R
M
T
U
C
K
A
L
L
S
I
D
E
S
P
S
R
M
w
/
1
’
D
I
T
C
H
G
R
A
D
E
E
N
D
O
F
P
R
O
P
O
S
E
D
G
r
o
u
n
d
N
a
t
u
r
a
l
E
L
E
V
.
3
.
6
6
F
T
.
E
L
E
V
.
4
.
8
F
T
.
R
E
M
O
V
E
E
X
.
C
A
U
S
E
W
A
Y
T
O
G
E
O
T
E
X
T
I
L
E
N
A
T
U
R
A
L
B
E
D
E
L
E
V
A
T
I
O
N
W
/
3
.
5
’
K
E
Y
-
I
N
C
L
A
S
S
I
I
R
I
P
R
A
P
E
X
.
R
O
A
D
W
A
Y
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
(T
O
B
E
R
E
M
O
V
E
D
)
E
X
I
S
T
I
N
G
C
A
U
S
E
W
A
Y
M ATCH LIN E SEE SHEET 5 -L- STA. 44+00.00
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
4
B
-
4
7
2
2
B
30-APR-2013 16:14R:\Roadway\Proj\B4722B_Rdy_psh4.dgn$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
N
O
T
E
S
TYPE-IIITYPE-III
T
Y
P
E
-
I
I
I
T
Y
P
E
-
I
I
I
025
02
01
24’4’4’
6’24’6’
6’24’6’BEGIN BRIDG
E
BEGIN APPROACH SL
A
B
E
N
D
B
R
I
D
G
E
E
N
D
A
P
P
R
O
A
C
H
S
L
A
B
SKETCH OF PA
V
E
M
E
N
T
/
B
R
I
D
G
E
R
E
L
A
T
I
O
N
S
H
I
P
N
O
T
T
O
S
C
A
L
E
1
)
F
O
R
-
L
-
P
R
O
F
I
L
E
,
S
E
E
S
H
E
E
T
7
P
A
V
E
M
E
N
T
R
E
M
O
V
A
L
025025025025
025
24’4’4’-L- STA. 40+75.04 LT END SBG-L- STA. 40+75.04 RT END SBG-L- STA. 40+
9
9
.
0
4
-L- STA. 40+75.04
-
L
-
S
T
A
.
5
4
+
7
4
.
9
6
-
L
-
S
T
A
.
5
4
+
7
4
.
9
6
L
T
B
E
G
I
N
S
B
G
-
L
-
S
T
A
.
5
4
+
7
4
.
9
6
R
T
B
E
G
I
N
S
B
G
-
L
-
S
T
A
.
5
4
+
5
0
.
9
6
U
S
7
0
2
4
’
B
S
T
J
O
H
N
R
.
F
U
L
C
H
E
R
J
R
.
D
B
4
0
7
P
G
2
0
5
R
I
P
R
A
P
R
I
P
R
A
P
R
I
P
R
A
P
R
I
P
R
A
P
P
R
O
P
E
R
T
Y
L
I
N
E
A
L
O
N
G
H
I
G
H
W
A
T
E
R
M
A
R
K
P
R
O
P
E
R
T
Y
L
I
N
E
A
L
O
N
G
H
I
G
H
W
A
T
E
R
M
A
R
K
PROPERTY LINE ALONG HIGH WATER MARK PROPERTY LINE ALONG HIGH WATER MA
R
K
PROPERTY LINE ALONG HIGH WATER MARK
45.00’
SCRUB SCRUB
-
B
L
-
3
-
B
L
-
4
-BL- 2 PAMCAR FARMS LLCDB 860 PG 566JANET FULCHERDB 249 PG 362
13
0
.
0
9
’
+
7
6
.
17
B
R
I
D
G
E
#
3
3
30+00
3
5
+
0
0
4
0
+
0
0
PI Sta 29+39.23DL = 402.93’T = 203.16’R = 1,273.20’PI Sta 36+79.61DL = 263.25’T = 131.75’R = 2,500.00’
02
01
00
01
02
03
04
05
05
04
03
02
01
00
01
02
0605040302 0001020304080607050102EXIST. -L- PT Sta. 31+39.00
-
L
-
P
C
S
t
a
.
3
5
+
4
7
.
8
6
-
L
-
P
T
S
t
a
.
3
8
+
1
1
.
1
1
BEGIN TIP PROJECT B-4722B-L- POC Sta. 31+00.0027’INC.
2
7
’
I
N
C
.
2
7
’
I
N
C
.
+66.11
+92.86
+16.0024’4’4’50’ TAPERLT. & RT. -L-
-
L
-
24’4’4’
24’6’6’
G
R
A
U
3
5
0
GRAU
3
5
0
+92.79
+55.29
025
025
100’ EXIST. R/W
B
E
G
I
N
S
H
E
E
T
P
I
L
E
W
A
L
L
-
L
-
S
T
A
.
3
4
+
0
0
.
0
0
-
L
-
S
T
A
.
3
9
+
5
0
L
T
.
B
E
G
I
N
S
B
G
-
L
-
S
T
A
.
3
8
+
4
7
R
T
.
B
E
G
I
N
S
B
G
8
:
1
P
S
T
A
P
E
R
8
:
1
P
S
T
A
P
E
R
-
L
-
S
T
A
.
4
1
+
0
3
.
2
9
E
N
D
S
H
E
E
T
P
I
L
E
W
A
L
L
D
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
C
U
T
G
R
A
S
S
E
D
S
W
A
L
E
4:1
G
r
o
u
n
d
N
a
t
u
r
a
l
D
E
T
A
I
L
A
M
i
n
.
D
=
1
F
T
.
4:1
-
L
-
S
T
A
.
3
3
+
8
6
T
O
4
0
+
5
0
R
T
.
0
4
0
1
0
4
0
2
0
4
0
3
0
4
0
4
0
4
0
5
0
4
0
6
15" RCP-IV
1
5
"
R
C
P
-
I
V
15" RCP-IV
1
5
"
R
C
P
-
I
V
15"
2
G
I
2
G
I
2
G
I
2
G
I
2
G
I
3:1
(
N
o
t
t
o
S
c
a
l
e
)
4:1
4:1
D
b
1
"
/
F
t
.
L
w
w
w
-
L
-
S
T
A
.
4
0
+
5
0
T
O
4
0
+
8
6
R
T
.
G
r
o
u
n
d
N
a
t
u
r
a
l
Se
e
Roa
dw
a
y p
ro
file
s
Prop. d
itch
g
ra
d
e
P
R
O
F
I
L
E
V
I
E
W
D
E
T
A
I
L
B
G
R
A
S
S
E
D
S
W
A
L
E
w
/
P
S
R
M
P
L
A
N
V
I
E
W
L
=
3
.
5
F
T
.
w
=
5
F
T
.
b
=
5
F
T
.
M
i
n
.
D
=
1
.
5
F
T
.
B
L
1
L
1
=
7
.
5
F
T
.
B
=
1
0
F
T
.
L
1
2
G
I
G
E
O
T
E
X
T
I
L
E
E
S
T
7
S
Y
C
L
A
S
S
B
R
I
P
R
A
P
E
S
T
2
T
O
N
D
E
T
A
I
L
C
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
(
N
O
T
T
O
S
C
A
L
E
)
2
.
0
’
2:1
C
R
O
S
S
S
E
C
T
I
O
N
V
I
E
W
P
R
O
F
I
L
E
V
I
E
W
S
H
O
W
N
F
O
R
C
L
A
R
I
T
Y
E
X
I
S
T
I
N
G
B
R
I
D
G
E
N
O
T
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
E
X
.
C
A
U
S
E
W
A
Y
(
T
O
B
E
R
E
M
O
V
E
D
)
(
T
O
B
E
R
E
T
A
I
N
E
D
)
EX
.
C
A
U
S
E
W
A
Y
-
L
-
S
T
A
.
4
0
+
8
0
T
O
4
4
+
0
5
R
T
.
56.00’ LT
.
40.00’ LT
.
+00.001
2
1
5
8
.
0
0
’
R
T
+
8
2
.
0
0
4
0
.
0
0
’
L
T
.
+
4
7
.
8
6
40.00’ LT +3.34 EXIST. R/W56.00’ LT.46.87’ LT +30.00
1
5
8
.
0
0
’
R
T
9
9
.
7
8
’
R
T
+
7
5
.
0
0
6
0
.
0
0
’
L
T
.
4
0
.
0
0
’
L
T
.
+
1
1
.
1
1
C
C
C
C
FFFFF
C
C
C
C
C
C
C
C
NAD
83
/ NSRS
2007
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
S
E
E
D
E
T
A
I
L
E
A
P
P
R
O
X
.
1
,
2
5
0
C
Y
E
X
C
A
V
A
T
I
O
N
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
S
E
E
D
E
T
A
I
L
D
G
R
A
S
S
E
D
S
W
A
L
E
L
A
T
E
R
A
L
’
V
’
S
E
E
D
E
T
A
I
L
F
G
R
A
S
S
E
D
S
W
A
L
E
S
P
E
C
I
A
L
C
U
T
S
L
O
P
E
F
I
L
L
PS
R
M
T
U
C
K
A
L
L
S
I
D
E
S
P
S
R
M
w
/
1
’
DITCH GRADE END OF PROP
O
S
E
D
G
r
o
u
n
d
N
a
t
u
r
a
l
ELEV. 2.3
2
F
T
.
E
L
E
V
.
4
.
8
F
T
.
E
L
E
V
A
T
I
O
N
O
F
2
F
T
.
G
E
O
T
E
X
T
I
L
E
E
X
.
R
O
A
D
W
A
Y
RE
M
O
V
E
E
X
.
C
A
U
S
E
W
A
Y
T
O
W
/
3
.
5
’
K
E
Y
-
I
N
C
L
A
S
S
I
I
R
I
P
R
A
P
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
(T
O
B
E
R
E
M
O
V
E
D
)
E
X
I
S
T
I
N
G
C
A
U
S
E
W
A
Y
M ATCH LIN E SEE SHEET 4 -L- STA. 44+00.00
M ATCH LINE SEE SHEET 6 -L- STA. 58+00.00
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
5
B
-
4
7
2
2
B
30-APR-2013 15:26R:\Roadway\Proj\B4722B_Rdy_psh5.dgn$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
N
O
T
E
S
1
)
F
O
R
-
L
-
P
R
O
F
I
L
E
,
S
E
E
S
H
E
E
T
7
P
A
V
E
M
E
N
T
R
E
M
O
V
A
L
B
R
I
D
G
E
#
3
3
G
R
.
G
R
.
(
T
I
D
A
L
F
L
O
W
)
N
O
R
T
H
R
I
V
E
R
R
I
P
R
A
P
R
I
P
R
A
P
R
I
P
R
A
P
R
I
P
R
A
P
220.01’
N1333’58"W
450.00’
S
I
G
N
L
E
A
S
E
S
I
G
N
L
E
A
S
E
S
I
G
N
L
E
A
S
E
S
I
G
N
L
E
A
S
E
A
L
O
N
G
H
I
G
H
T
I
D
E
L
I
N
E
FO & TELE IN CONDUIT ALONG BOTH SIDES OF BRIDGE
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
S
T
A
T
E
O
F
-
B
L
-
5
U
S
7
0
2
4
’
B
S
T
B
M
1
B
M
2
P
E
R
R
Y
B
A
Y
E
R
S
H
E
L
L
F
IS
H
L
E
A
S
E
#
8
7
7
S
H
E
L
L
F
IS
H
L
E
A
S
E
#
8
7
7
W
IL
B
E
R
T
B
R
A
D
L
E
Y
L
A
W
E
R
E
N
C
E
45+00
5
0
+
0
0
5
5
+
0
0
PI Sta 57+24.59DL = 226.89’T = 113.48’R = 4,000.00’
04
03
01
00
01
02
2
7
’
I
N
C
.
+60.50
025
025
-
L
-
-L-24’6’6’
24’4’4’
G
R
A
U
3
5
0
+32.21
02
8
:
1
P
S
T
A
P
E
R
8
:
1
P
S
T
A
P
E
R
-
L
-
S
T
A
.
5
5
+
1
0
L
T
.
E
N
D
S
B
G
R
1
5
’
R
1
5
’
P
I
S
t
a
1
0
+
4
9
.
7
8
L
=
3
5
.
3
5
’
T
=
2
1
.
3
6
’
R
=
2
5
.
0
0
’
D
-
D
R
-
2 1
2
1
-
D
R
-
P
O
T
S
t
a
.
1
0
+
0
0
.
0
0
-
L
-
P
O
C
S
t
a
.
5
7
+
5
9
.
9
4
=
-
D
R
-
P
C
S
t
a
.
1
0
+
2
8
.
4
2
-
D
R
-
P
T
S
t
a
.
1
0
+
6
3
.
7
7
-
L
-
S
T
A
.
5
5
+
8
0
R
T
.
E
N
D
S
B
G
15’
-
D
R
-
P
O
T
S
t
a
.
1
1
+
0
0
.
0
0
E
N
D
C
O
N
S
T
R
U
C
T
I
O
N
-
L
-
P
C
S
t
a
.
5
6
+
1
1
.
1
1
-
L-
S
TA
.
5
4
+
4
6
.
7
1
B
EG
IN
S
H
E
ET
P
ILE
W
A
LL
D
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
C
U
T
G
R
A
S
S
E
D
S
W
A
L
E
4:1
G
r
o
u
n
d
N
a
t
u
r
a
l
D
E
T
A
I
L
F
M
i
n
.
D
=
1
F
T
.
3:1
-
L
-
S
T
A
.
5
5
+
5
0
T
O
6
4
+
5
0
R
T
.
0
5
0
1
0
5
0
2
0
5
0
3
0
5
0
4
0
5
0
5
2
G
I
2
G
I
2
G
I
2
G
I
1
5
"
R
C
P
-
I
V
R
C
P
-
I
V
1
5
"
3:1
(
N
o
t
t
o
S
c
a
l
e
)
4:1
3:1
D
b
1
"
/
F
t
.
L
w
w
w
-L- S
T
A
.
5
4
+
5
7
T
O
5
5
+
5
0
R
T
.
Ground NaturalSee Roadway p
ro
files
Prop. ditch
g
ra
d
e
PROFILE VIEW
D
E
T
A
I
L
D
G
R
A
S
S
E
D
S
W
A
L
E
w
/
P
S
R
M
PLAN VIEW L=7.5FT.w=5FT.b=5FT.Min. D=1.5FT.
B
L
1
L
1
=
1
0
F
T
.
B
=
1
2
F
T
.
L
1
EL
BELB
RCP-IV
15"
D
E
T
A
I
L
E
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
(
N
O
T
T
O
S
C
A
L
E
)
2
.
0
’
2:1
C
R
O
S
S
S
E
C
T
I
O
N
V
I
E
W
P
R
O
F
I
L
E
V
I
E
W
S
H
O
W
N
F
O
R
C
L
A
R
I
T
Y
E
X
I
S
T
I
N
G
B
R
I
D
G
E
N
O
T
S
E
E
P
L
A
N
S
F
O
R
L
I
M
I
T
S
E
X
.
C
A
U
S
E
W
A
Y
(
T
O
B
E
R
E
M
O
V
E
D
)
(T
O
B
E
R
E
T
A
I
N
E
D
)
E
X
.
C
A
U
S
E
W
A
Y
-
L
-
S
T
A
.
5
3
+
6
2
T
O
5
4
+
6
4
R
T
.
E
T
S
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
2
T
O
N
R
I
P
R
A
P
C
L
A
S
S
B
ELBO W S
W / 2
15"
0
5
0
6
1
5
"
3
EXIST. R/W +12.00
4
5
1
1
5
.
0
0
’
R
T
.
9
9
.
8
0
’
R
T
+
5
2
.
0
0
1
1
5
.
0
0
’
R
T
.
9
9
.
8
0
’
R
T
+
6
4
.
0
0
6
0
.
0
0
’
L
T
.
4
0
.
0
0
’
L
T
.
+
5
0
.
0
0
6
0
.
0
0
’
L
T
.
4
0
.
0
0
’
L
T
.
+
1
1
.
1
1
F
C
C
C
C
C
C
C
NAD
83
/ NSRS
2007
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
S
E
E
D
E
T
A
I
L
F
G
R
A
S
S
E
D
S
W
A
L
E
S
P
E
C
I
A
L
C
U
T
M ATCH LINE SEE SHEET 5 -L- STA. 58+00.00REVISIONS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
6
B
-
4
7
2
2
B
30-APR-2013 15:26R:\Roadway\Proj\B4722B_Rdy_psh6.dgn$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
N
O
T
E
S
1
)
F
O
R
-
L
-
P
R
O
F
I
L
E
,
S
E
E
S
H
E
E
T
S
7
A
N
D
8
P
A
V
E
M
E
N
T
R
E
M
O
V
A
L
T
US 70 24’ BST
G
R
.
S
OI
L
12’ CONC
12
’ CONC
9
’ G
R.
9’ GR.
1
2
’ GR
.
2
4
" WD
R
A
IL
2
4
" WD
R
A
IL
2
4
" WD
R
A
IL
2
4
" WD
P
R
IV
A
C
Y
4
8
" CH
L
1S
B
KD
1S
F
D
1S
F
D
1S
B
L
KD
1S
F
D
8
’ SO
IL
WD
DO
C
K
2
S
B
KD
S
D
B
5
3
7
P
G
4
4
6
D
B
11
18
P
G
3
0
0
M
E
L
V
IN
R
A
Y
S
U
G
G
D
B
9
3
6
P
G
14
3
N
A
S
IR
K
HA
N
, E
T
U
X
D
B
10
9
9
P
G
3
13
MB
15
P
G
10
0
E
IP
E
IP
E
IP
E
IP
E
I
P
E
IP
D
B
2
3
2
P
G
15
1
T
H
E
O
D
O
R
E
L
A
W
R
E
N
C
E
D
B
2
12
P
G
4
5
8
RIP RAP RIP RAP850.48’S7813’42"W
222.42’
N118’2"E
600.00’
450.00’
S
I
G
N
L
E
A
S
E
S
I
G
N
L
E
A
S
E
S
I
G
N
L
E
A
S
E
P
R
O
P
E
R
T
Y
L
I
N
E
A
L
O
N
G
HI
G
H
W
A
T
E
R
M
A
R
K
P
R
O
P
E
R
T
Y
L
I
N
E
A
L
O
N
G
123.96’
150
.00
’
17
9
.13
’
14
9.
9
3
’
5
0
.0
0
’
7
4
.
9
3
’
1
4
9
.
9
3
’
4
3
.5
0
’
4
0
.0
0
’
7
4
.
9
3
’
119
.
9
3
’
B
L
E
D
S
O
E
M
IC
H
A
E
L
A
.
14
0
.
0
0
’
110
.0
0
’
2
0
3
.
0
0
’
1
0
2.
4
6
’
30.31’
2
4
9.
2
4
’
69.69’
90.34’
83.66’
41.23’
19
3
.6
6
’
143
.96’
174.77’
19
8
.8
5
’
13’ BST OLD ROAD BED
S
C
R
UB
79.20’
104.09’
132.20’
HIGH
WA
T
E
R
MA
R
K
90.29’
E
T
U
X
F
E
R
R
E
L
L
,
D
A
N
IE
L
B
.
E
T
U
X
F
E
R
R
E
L
L
,
D
A
N
IE
L
B
.
PG
2
5
4
D
B
5
2
3
7
4.
9
3
’
POSTS
D
O
C
K
P
I
L
I
N
G
S
ALONG HIGH TIDE LINE
WD
S
E
A
WA
L
L
S
OIL
-BL- 6
-
B
L
-
7
PERRY BAYER SHELLFISH LEASE #877SHELLFISH LEASE #877 WILBERT BRADLEY LAWERENCE
D
B
3
6
7
P
G
4
2
6
N
A
N
C
Y
D
U
R
A
N
T
M
B
2
0
P
G
6
0
D
B
12
2
1 P
G
4
7
1
P
A
U
L
A
S
T
A
P
L
E
T
O
N
L
A
U
R
E
N
S
T
R
U
S
T
J
A
R
V
IS
E
. WE
E
K
S
, E
T
U
X
D
B
4
9
3
P
G
10
M
B
2
0
P
G
6
0
F
R
A
N
K
Y
A
R
B
O
R
O
U
G
H
,
E
T
A
L
D
B
9
18
P
G
7
6
6
M
B
2
0
P
G
6
0
E
U
L
A
F
.
P
IN
N
O
, E
T
A
L
D
B
3
6
7
P
G
4
2
5
50
.16’
+41.41
5
0
.
0
0
’
+
4
1
.
4
7
4
9
.
5
4
’
+
0
5
.
1
9
2
0
3
.4
1’
+
6
8
.2
6
60+00
6
5
+
0
0
7
0
+
00
PI Sta 68+22.94DL = 364.45’T = 183.48’R = 1,273.20’04030201000102
04
03
02
01
06
05
04
03
02
01
0002
EXIST.
-L- PT Sta. 58+38.01
-
L
-
P
C
S
t
a
.
6
6
+
3
9
.
4
6
-
L
-
P
T
S
t
a
.
7
0
+
0
3
.
9
2
-
L
-
P
O
C
S
t
a
.
6
6
+
5
0
.
0
0
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
4
7
2
2
B
27’INC.
2
7
’
IN
C
.
+61.00
+16.00
24’
4’4’
LT. &
RT.
5
0
’ TA
PER
-L- PI Sta 57+24.59DL = 226.89’T = 113.48’R = 4,000.00’ -L-24’4’4’
G
RAU
3
5
0
+94.71
100’ EXIST. R/W
100’ EXIST. R/W
-
L
-
S
T
A
.
6
4
+
0
0
.
0
0
E
N
D
S
H
E
E
T
P
I
L
E
W
A
L
L
D ( Not to Scale)SPECIAL CUT GRASSED SW
A
L
E
4:1GroundNatural DETAIL FMin. D
=
1
F
T
.
3:1-L- STA. 55+50 TO 64+50
R
T
.
15" RCP
15
" RCP
15
" RCP
15
" RCP
1
5
"
R
C
P
R
E
T
A
I
N
RETAIN
RETA
IN
RETAIN
RETAIN
6
4540.00’ LT.+38.01
4
0
.
0
0
’
L
T
.
+
2
5
.
7
8
C
C
C
F
F
F
FF
F
C
NAD
83
/ NSRS
2007
S
E
E
D
E
T
A
I
L
C
E
X
.
C
A
U
S
E
W
A
Y
R
E
M
O
V
A
L
R
E
M
O
V
A
L
F
O
R
C
A
U
S
E
W
A
Y
C
L
.
I
I
R
I
P
R
A
P
S
H
E
E
T
P
I
L
E
R
E
M
O
V
A
L
F
O
R
C
A
U
S
E
W
A
Y
C
L
.
I
I
R
I
P
R
A
P
S
H
E
E
T
P
I
L
E
S
E
E
D
E
T
A
I
L
E
E
L
E
V
.
O
F
2
’
E
X
C
A
V
A
T
E
T
O
31323334
3
5
3
6
3
7
3
8
3
9
4
0
4
1
4
2
4
3
4
4
-40 -30 -20 -10 0 1045464748
4
9
5
0
5
1
5
2
5
3
5
4
5
5
5
6
5
7
5
8
-40 -30 -20 -10 0 10 ELEV. = 8.01’-L- STA. 31+00.00 BEGIN GRADE
-
L
-
20 30 5040
-
4
0
-
3
0
-
2
0
-
1
0
0 1
0
2
0
3
0
-
4
0
-
3
0
-
2
0
-
1
0
0 1
0
2
0
3
0
5
0
4
0
N
O
T
E
S
-
L
-
1
)
F
O
R
-
L
-
P
L
A
N
V
I
E
W
,
S
E
E
S
H
E
E
T
S
4
,
5
A
N
D
6
V
=
6
0
M
P
H
V = 60 M
P
H
V
=
6
0
M
P
H
V = 60 MPH PI = 33+18.00EL = 9.38’(+)0.6284%(-)0.1735%VC = 240’K = 299
P
I
=
3
9
+
0
0
.
0
0
E
L
=
8
.
3
7
’
(
-
)
0
.
1
7
3
5
%
(
+
)
1
.
2
0
0
7
%
V
C
=
3
0
0
’
K
=
2
1
8
14.63
PI = 47+8
2
.
0
0
EL = 18.9
6
’
(+)1.2007%(-)1.2000
%
VC = 1,00
0
’
K = 41714.63
P
I
=
5
7
+
4
2
.
0
0
E
L
=
7
.
4
4
’
(-
)1.2
0
0
0
%
(
+
)
0
.
0
9
5
5
%
V
C
=
3
0
0
’
K
=
2
3
2
7.58
(
+
)
0
.
6
0
0
0
%
(
+
)
0
.
3
0
0
0
%
(-) 1.4078
%
(
-
)
0
.3
0
0
0
%
(
+
)
0
.
3
0
0
0
%
ELEV. 6.43-L- STA. 33+86.07 (RT)BEGIN SPECIAL CUT DITCH
ELEV. 5.53
-L- STA. 34+50.00 (RT)
SPECIAL CUT DITCH
ELEV. 3.52
-L- STA. 58+50.00 (RT)
SPECIAL CUT DITCH
ELEV. 3.66
-L- STA. 40+75.00 (RT)
END LATERAL ’V’ DITCH
ELEV. 3.73
-L- STA. 40+50.00 (RT)
BEGIN LATERAL ’V’ DITCH
END SPECIAL CUT DITCH
ELEV. 2.32
-L- STA. 54+75.00 (RT)
BEGIN LATERAL ’V’ DITCH
ELEV. 2.47
-L- STA. 55+00.00 (RT)
LATERAL ’V’ DITCH
ELEV. 2.62
-L- STA. 55+50.00 (RT)
BEGIN SPECIAL CUT DITCH
END LATERAL ’V’ DITCH
T
Y
P
I
C
A
L
3
.
5
’
K
E
Y
-
I
N
R
I
G
H
T
D
I
T
C
H
R
I
G
H
T
D
I
T
C
H
ELEV. = 9.30’ N 386940 E 2717976 -L- STA. 34+14.65 25.06’ RT BM# 1 NOS TIDAL BENCHMARK NO 1 1973
E
X
C
A
V
A
T
I
O
N
S
K
E
W
=
9
0
C
L
E
L
E
V
.
=
1
5
.
9
6
’
C
L
=
-
L
-
S
T
A
.
4
7
+
7
5
.
0
0
1
5
@
9
0
’
5
4
"
P
R
E
S
T
R
E
S
S
E
D
C
O
N
C
R
E
T
E
G
I
R
D
E
R
DESIGN DISCHARGEDESIGN FREQUENCY CFSYRSYRSBASE FREQUENCYOVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGECFS CFS YRSFTFTFTDESIGN HW ELEVATIONBASE HW ELEVATION BRIDGE HYDRAULIC DATAFTDATE OF SURVEYAT DATE OF SURVEYFT = = 50= 100= 21,000= 2.4 = 4/18/2012 = 3.1 = 8.0 = 7.3OHW ELEVATION = = BASE DISCHARGE
2:1
T
Y
P
I
C
A
L
3
.
5
’
K
E
Y
-
I
N
2:
1
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
7
B
-
4
7
2
2
B
30-APR-2013 15:27R:\Roadway\Proj\B4722B_Rdy_pfl.dgn$$$$USERNAME$$$$
E
X
C
A
V
A
T
I
O
N
-
L
-
S
T
A
.
4
0
+
9
9
.
0
4
B
E
G
I
N
B
R
I
D
G
E
-
L
-
S
T
A
.
5
4
+
5
0
.
9
6
E
N
D
B
R
I
D
G
E
59606162
6
3
6
4
6
5
6
6
6
7
6
8
6
9
7
0
-40 -30 -20 -10 0 10 20 30 5040
-
4
0
-
3
0
-
2
0
-
1
0
0 1
0
2
0
3
0
N
O
T
E
S
-
L
-
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
8
B
-
4
7
2
2
B
30-APR-2013 15:27R:\Roadway\Proj\B4722B_Rdy_pfl.dgn$$$$USERNAME$$$$
E
L
E
V
.
=
8
.
1
5
’
-
L
-
S
T
A
.
6
6
+
5
0
.
0
0
E
N
D
G
R
A
D
E
V
=
6
0
M
P
H
7.58
P
I
=
6
5
+
9
0
.
0
0
E
L
=
8
.
2
5
’
(
+
)
0
.
0
9
5
5
%
(
-
)
0
.
1
6
6
7
%
V
C
=
1
2
0
’
K
=
4
5
8
1
)
F
O
R
-
L
-
P
L
A
N
V
I
E
W
,
S
E
E
S
H
E
E
T
6
(+) 0.3000%
ELEV. 5.32
-L- STA. 64+50.00 (RT)
END SPECIAL CUT DITCH
R
I
G
H
T
D
I
T
C
H
ELEV. = 7.35’-DR- STA. 10+12.00 BEGIN GRADEELEV. 7.20’-DR- STA. 11+00.00 END GRADE(-)0.1749%1011 -20 -10 0 10 -DR--30-401213 20 30 40 50