HomeMy WebLinkAbout20140722 Ver 1_Application_20140710(Version 1.2; Released September 2011)
B-5151 (42312.1.1)County(ies):Granville Page 1 of 1
Project Type:Date:
Phone:Phone:
Email:Email:
County(ies):
CAMA County?
Design/Future:Existing:
Supplemental:
Primary:
Little Grassy Creek
Roanoke
23-2-4
lmjohns@ncdot.gov / cjlee@ncdot.gov
10' Travel Lanes, 1' Paved Shoulder, 3' Grass Shoulders. 4:1 Side Slopes 10' Travel Lanes, 3' Grassed Shoulders, 3:1 Side Slopes
N/A
NCDWQ Stream Index No.:
Project/TIP No.:
NCDOT Contact:
Project No.:B-5151 (42312.1.1)
Contractor / Designer:
lmjohns@ncdot.gov / cjlee@ncdot.gov
General Project Information
Address:
4/8/2014
1020 Birch Ridge Dr
Raleigh, NC 27610 Raleigh, NC 27610
North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
FOR LINEAR ROADWAY PROJECTS
Linda Johns/Craig Lee
Bridge Replacement
ac.
General Project Narrative:The project consists of replacing Bridge# 215 on SR 1432 (Crawford-Currin Road) over Little Grassy Creek. The approach work will consist of raising the existing roadway
grade and providing paved and grass shoulders and guardrails.Bridge #215 existing 3 span structure (55.0' total length) will be replaced with a single span (1@85') 33" box
beam with 4' caps. Bridge #215 eliminates 1 bent which is in the water and 1 bent on natural ground.
Best Mgmt. Practices:
-Promotion of sheet flow and infiltration with grassed shoulders except where shoulder berm gutter to 2GI at bridge.
-Drainage systems outlet to rip rap pads. Systems in SW and SE quad outlets to proposed ditches.
-Elimination of direct runoff from the bridge deck into Little Grassy Creek.
-No Deck Drains required on bridge.
-Removal of existing road fill under bridges will improve bridge conveyance and reduce velocities in bridge opening.
-Rip Rap on embankments to prevent erosion.
Typical Cross Section Description:
References
87
0.38
Average Daily Traffic (veh/hr/day):
ac.
Other Stream Classification:
Linda Johns/Craig Lee
City/Town:
919-707-6728 / 919-707-6708
1020 Birch Ridge Dr Address:
Oxford
919-707-6728 / 919-707-6708
Granville
No
NCDWQ Surface Water Classification for Primary Receiving Water
303(d) Impairments:
River Basin(s):
Primary Receiving Water:
Class C
Buffer Rules in Effect
Project Description
Surrounding Land Use: Woods/Fields0.13
125
0.33Project Built-Upon Area (ac.)
Proposed Project Existing Site
Project Length (lin. Miles or feet):
S
I
T
E
1
W
E
T
L
A
N
D
A
N
D
S
U
R
F
A
C
E
W
A
T
E
R
I
M
P
A
C
T
S
P
E
R
M
I
T
R:\Hydraulics\PERM ITS_Environm ental\Drawings\B5151_hyd_tsh_1of7.dgncjlee4/29/2014
S
H
E
E
T
1
O
F
7
P
E
R
M
I
T
D
R
A
W
I
N
G
VICINITY MAP
G
R
A
N
V
I
L
L
E
C
O
U
N
T
Y
DHVDTV ======%%MPH ADTADT PROJECTBEGIN000PROFILE (HORIZONTAL)
P
R
O
J
E
C
T
L
E
N
G
T
H
R
I
G
H
T
O
F
W
A
Y
D
A
T
E
:
L
E
T
T
I
N
G
D
A
T
E
:
S
T
A
T
E
S
T
A
T
E
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
S
T
A
T
E
P
R
O
J
.
N
O
.
F.
A
.
P
R
O
J
.
N
O
.
DE
S
C
R
I
P
T
I
O
N
N
O
.
T
O
T
A
L
S
H
E
E
T
S
N
.
C
.
S
H
E
E
T
1
DESIGN DATA
P
r
e
p
a
r
e
d
i
n
t
h
e
O
f
f
i
c
e
o
f
:
S
I
G
N
A
T
U
R
E
:
S
I
G
N
A
T
U
R
E
:
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
2
0
1
2
S
T
A
N
D
A
R
D
S
P
E
C
I
F
I
C
A
T
I
O
N
S
P
R
O
J
E
C
T
E
N
G
I
N
E
E
R
P
R
O
J
E
C
T
D
E
S
I
G
N
E
N
G
I
N
E
E
R
GRAPHIC SCALES PLANSPROFILE (VERTICAL)
L
O
C
A
T
I
O
N
:
T
Y
P
E
O
F
W
O
R
K
:
09/08/99
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
000$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$
1
0
0
0
B
i
r
c
h
R
i
d
g
e
D
r
.
,
R
a
l
e
i
g
h
N
C
,
2
7
6
1
0
CON TRACT:TIP PROJECT:
ARTMEN
N
A
S
O
H
DEP
T
O
F
T
R
A
S
P
OR
T
T
IO N
T
ATE
O
F
N
R
T
C
AROLINA
E
N
D
B
R
I
D
G
E
B
E
G
I
N
B
R
I
D
G
E
LE
N
G
T
H
R
O
A
D
W
A
Y
T
I
P
P
R
O
J
E
C
T
B
-
5
1
5
1
F
E
B
R
U
A
R
Y
1
7
,
2
0
1
5
J
E
F
F
R
E
Y
L
.
T
E
A
G
U
E
,
P
E
T
O
N
Y
H
O
U
S
E
R
,
P
E
10 10603SUBREGIONAL TIER PROJECTEND
4
2
3
1
2
.
1
.
1
B
R
Z
-
1
4
3
2
(
5
)
B
-
5
1
5
1
B-5151 See Sheet 1-B For Conventional SymbolsLE
N
G
T
H
S
T
R
U
C
T
U
R
E
T
I
P
P
R
O
J
E
C
T
B
-
5
1
5
1
TO
T
A
L
L
E
N
G
T
H
T
I
P
P
R
O
J
E
C
T
B
-
5
1
5
1
P
.
E
.
5025501005010050102051040
=
0
.
1
3
3
M
I
L
E
=
0
.
1
1
6
M
I
L
E
TO SR 1430
OFF-SITE DETO
U
R
=
0
.
0
1
7
M
I
L
E
L
IT
T
L
E
GR
A
S
SY
CR
E
E
K
4
See Sheet 1-A For Index of SheetsDUAL 2%)%**FUNC. CLASS.=RURAL LOCAL (TTST 1% +125 VPD 87 VPD
B
R
I
D
G
E
N
O
.
2
1
5
O
V
E
R
L
I
T
T
L
E
G
R
A
S
S
Y
C
R
E
E
K
O
N
S
R
1
4
3
2
(
C
R
A
W
F
O
R
D
C
U
R
R
I
N
R
D
.
)
G
R
A
D
I
N
G
,
P
A
V
I
N
G
,
D
R
A
I
N
A
G
E
,
A
N
D
S
T
R
U
C
T
U
R
E
J
A
N
U
A
R
Y
1
7
,
2
0
1
4
-
L
-
S
T
A
.
1
1
+
0
0
.
0
0
B
E
G
I
N
T
I
P
P
R
O
J
E
C
T
B
-
5
1
5
1
-
L
-
S
T
A
.
1
8
+
0
0
.
0
0
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
5
1
5
1
-
L-
T
O
S
R 1433
E
N
G
I
N
E
E
R
H
Y
D
R
A
U
L
I
C
S
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
E
N
G
I
N
E
E
R
R
O
A
D
W
A
Y
D
E
S
I
G
N
20152035
-
L
-
S
T
A
.
1
3
+
7
3
.
2
6
-
L
-
S
T
A
.
1
4
+
6
0
.
7
4
CRA
WFORD CURRIN RD.
CRA
WFO
RD
CU
RRIN
RD
.
LITTLE
GRASSY
CREEK
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LI
M
I
T
S
E
S
T
A
B
L
I
S
H
E
D
B
Y
M
E
T
H
O
D
I
I
I
.
SR 1432
SR 1432
4
2
3
1
2
.
2
.
F
D
1
B
R
Z
-
1
4
3
2
(
5
)
R
/
W
&
U
T
I
L
.
RAILW AY
S
T
O
V
A
L
L
143214601430143
0
1
5
1
5
14311430152
6
1433 1431
D
e
x
te
r
R
d
.
P
e
n
n
R
d
.
Oxford
St.
Herm anWilkersonRd.CrawfordCurrinRd.Currin Rd.LittleRd.HartsCrossroads GrassyCreekRd.Mountain
RevisRd.OwensSt.
15
1
5
1432Crawford GrassySOUTHERN
E
P
K
NSRS 2007
NAD 83/
G
R
A
P
H
I
C
S
C
A
L
E
0
’
5
0
’
1
0
0
’
5
0
’
EN
G
L
I
S
H
S
S
S
U
R
F
A
C
E
W
A
T
E
R
D
E
N
O
T
E
S
I
M
P
A
C
T
S
I
N
T
S
T
S
I
M
P
A
C
T
S
I
N
S
U
R
F
A
C
E
W
A
T
E
R
D
E
N
O
T
E
S
T
E
M
P
O
R
A
R
Y
S
S
S
S
S
I
T
E
1
R:\Hydraulics\PERM ITS_Environm ental\Drawings\B5151_prm _wet_2of7.dgncjlee4/29/2014
S S
S
S
S
S
T
S
T
S
T
S
T
S
S
P
E
R
M
A
N
E
N
T
S
W
I
M
P
A
C
T
S
T
E
M
P
O
R
A
R
Y
S
W
I
M
P
A
C
T
S
T
O
P
E
L
.
=
3
4
8
.
0
’
T
E
M
P
.
R
O
C
K
C
A
U
S
E
W
A
Y
S
H
E
E
T
2
O
F
7
P
E
R
M
I
T
D
R
A
W
I
N
G
NAD 83/ NSRS 2007
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAM E$$$$8/17/99
B
-
5
1
5
1
4
P
R
O
P
.
P
A
V
E
D
S
H
O
U
L
D
E
R
F
O
R
-
L
-
P
R
O
F
I
L
E
,
S
E
E
S
H
E
E
T
N
O
.
5
L
ITTLE
GRASSY
CREEK
GRA
U
3
5
0
T
L
-
2
SKETCH SHOWING PAVEMENT/BRIDG
E
R
E
L
A
T
I
O
N
S
H
I
P
(NOT TO SCALE)BEGIN BRIDGE
E
N
D
B
R
I
D
G
E
BEGIN APPROACH SLAB
E
N
D
A
P
P
R
O
A
C
H
S
L
A
B
-L- POC STA. 11+00.00 BEGIN TIP PROJECT B-5151
-
L
-
P
O
T
S
T
A
.
1
8
+
0
0
.
0
0
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
5
1
5
1
8
:
1
P
.
S
.
T
R
A
N
S
.
8:1 P.S. TRANS.27’-10"4’-7"2’ MIN. TO VAR.
F
O
R
S
T
R
U
C
T
U
R
E
P
L
A
N
S
,
S
E
E
S
H
E
E
T
S
S
-
1
T
H
R
U
S
-
?
GRAU 350 TL-2GRAU 350 TL-2 -L- STA. 13+73.26-L- STA. 13+61.02
-
L
-
S
T
A
.
1
4
+
6
0
.
7
4
-
L
-
S
T
A
.
1
4
+
7
2
.
2
5
-L- STA. 13+43.00 BEGIN SBG
-
L
-
S
T
A
.
1
4
+
8
6
.
0
0
E
N
D
S
B
G
B
R
I
D
G
E
A
P
P
R
O
A
C
H
S
L
A
B
P
A
V
E
M
E
N
T
R
E
M
O
V
A
L
*LONG CHORD*STRUCTURE DESIGN (SEE STRUC
T
U
R
E
P
L
A
N
S
)
.
LONG CHORD TO THE CURVE
S
E
T
B
Y
NOTE: THE BRIDGE IS DESIGNE
D
O
N
T
H
E
04 15
+
0
0
T
L
-
2
G
R
A
U
3
5
0
20’
O
T
H
E
R
W
I
S
E
O
N
P
L
A
N
S
A
L
L
D
R
I
V
E
W
A
Y
R
A
D
I
I
A
R
E
1
0
’
U
N
L
E
S
S
N
O
T
E
D
20’
2
0
’
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
S
E
E
S
T
R
U
C
T
U
R
E
P
L
A
N
S
E
N
D
B
E
N
T
E
X
C
A
V
A
T
I
O
N
-L--L-SHOP CURVED TYPE-IIISHOP CURVED TYPE-IIISHOP CURVED TYPE-IIISHOP CURVED TYPE-III5’-10"" TO 21 3’-1VAR.
T
T
15" R
CP
60.00’
60.00’
PR
O
PE
R
T
Y
LI
N
E I
S
C/
L
O
F
C
R
E
E
K
PROPERTY
L
INE
IS
C
/L
OF
CREEK
WO
O
D
S
W
O
O
D
S
WOODS
WO
O
D
S
WO
O
D
S
WO
O
D
S
15
" R
C
P
4’ WD
4’ WD
1 S EL WIRE
1
S
E
L
W
I
R
E
4’ WW
4’ WD & WW
4’ WD & WW 5’ WD & WW
5’
WD
&
W
W
MTL
G
ATE
S
O
IL
SOIL15" R
CP
SOIL
S
IL
T
F
E
N
C
E
4
’ WD
T
T
T
4
’ WW
B
R
ID
G
E
#
2
15
CR
AWF
OR
D
-
CUR
R
IN
R
D
.
S
R
14
3
2
20’ BST EXISTING R/W
E
XIS
TIN
G
R/
W
E
X
IS
T
ING
R
/
W
EXISTING R/W
1
2
3
4
5
R
I
P
R
A
P
RIP
R
A
P
M
A
T
T
H
E
W
&
V
A
L
E
R
IE
C
O
R
S
A
R
O
3
R
O
B
E
R
T
A
.
K
U
H
L
B
E
R
G
&
G
A
Y
L
E
G
.
K
U
H
L
B
E
R
G
4
L
U
C
Y
H
.
B
O
D
E
2
J
O
H
N
S
.
F
L
O
W
E
,
I
I
I
1
SR 1432CRAWFORD-CURRIN RD.
-
L-
10+00
15+00
1
5
"
C
S
P
1
5
"
C
S
P
T
B
2
G
I
T
B
2
G
I
S
E
E
D
E
T
A
I
L
D
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
S
E
E
D
E
T
A
I
L
C
R
I
P
R
A
P
A
T
E
M
B
A
N
K
M
E
N
T
w
/
2
E
L
B
O
W
S
w
/
2
E
L
B
O
W
S
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
C
L
A
S
S
I
I
R
I
P
R
A
P
(
N
o
t
t
o
S
c
a
l
e
)
R
I
P
R
A
P
A
T
E
M
B
A
N
K
M
E
N
T
-
L
-
S
T
A
.
1
4
+
3
0
R
T
-
L
-
S
T
A
.
1
3
+
9
1
R
T
D
E
T
A
I
L
C
G
r
a
d
e
D
i
t
c
h
2
.
0
’
G
E
O
T
E
X
T
I
L
E
G
e
o
t
e
x
t
i
l
e
=
7
5
S
Y
C
l
a
s
s
I
I
R
i
p
R
a
p
=
3
0
T
O
N
S
1
0
’
m
i
n
.
1
.
0
’
m
i
n
.
18"
ELB
ELB
EL
B
EL
B
d 2:1BD ( Not to Scale)SPECIAL CUT BASE DITCHFlatterX:1 or-L- STA. 13+00 TO STA. 13+90 RT (X=2)-L- STA. 11+00 TO STA. 13+00 RT (X=4)DETAIL BB=2.0 Ft.Max. d=1.5 Ft.Min. D=1.5 Ft.Type of Liner= Class I Rip-Rap Ground NaturalDitchSlopeFrontGeotextileFlatterX:1 orD2:1 ( Not to Scale)SPECIAL CUT DITCH-L- STA. 15+00 TO STA. 15+75 RT (X=4)-L- STA. 14+50 TO STA. 15+00 RT (X=2)Min. D=1.0 Ft.DETAIL DSlopeDitchFrontGroundNatural
C
C
F
F
C
C
F
F
C
C
F
C
C
F
C
C
C
F
F
S
H
E
E
T
3
O
F
7
P
E
R
M
I
T
D
R
A
W
I
N
G
-
L-
10+00
15+00
NAD 83/ NSRS 2007
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAM E$$$$8/17/99
B
-
5
1
5
1
4
P
R
O
P
.
P
A
V
E
D
S
H
O
U
L
D
E
R
F
O
R
-
L
-
P
R
O
F
I
L
E
,
S
E
E
S
H
E
E
T
N
O
.
5
L
ITTLE
GRASSY
CREEK
GRA
U
3
5
0
T
L
-
2
SKETCH SHOWING PAVEMENT/BRIDG
E
R
E
L
A
T
I
O
N
S
H
I
P
(NOT TO SCALE)BEGIN BRIDGE
E
N
D
B
R
I
D
G
E
BEGIN APPROACH SLAB
E
N
D
A
P
P
R
O
A
C
H
S
L
A
B
-L- POC STA. 11+00.00 BEGIN TIP PROJECT B-5151
-
L
-
P
O
T
S
T
A
.
1
8
+
0
0
.
0
0
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
5
1
5
1
8
:
1
P
.
S
.
T
R
A
N
S
.
8:1 P.S. TRANS.27’-10"4’-7"2’ MIN. TO VAR.
F
O
R
S
T
R
U
C
T
U
R
E
P
L
A
N
S
,
S
E
E
S
H
E
E
T
S
S
-
1
T
H
R
U
S
-
?
GRAU 350 TL-2GRAU 350 TL-2 -L- STA. 13+73.26-L- STA. 13+61.02
-
L
-
S
T
A
.
1
4
+
6
0
.
7
4
-
L
-
S
T
A
.
1
4
+
7
2
.
2
5
-L- STA. 13+43.00 BEGIN SBG
-
L
-
S
T
A
.
1
4
+
8
6
.
0
0
E
N
D
S
B
G
B
R
I
D
G
E
A
P
P
R
O
A
C
H
S
L
A
B
P
A
V
E
M
E
N
T
R
E
M
O
V
A
L
*LONG CHORD*STRUCTURE DESIGN (SEE STRUC
T
U
R
E
P
L
A
N
S
)
.
LONG CHORD TO THE CURVE
S
E
T
B
Y
NOTE: THE BRIDGE IS DESIGNE
D
O
N
T
H
E
04 15
+
0
0
T
L
-
2
G
R
A
U
3
5
0
20’
O
T
H
E
R
W
I
S
E
O
N
P
L
A
N
S
A
L
L
D
R
I
V
E
W
A
Y
R
A
D
I
I
A
R
E
1
0
’
U
N
L
E
S
S
N
O
T
E
D
20’
2
0
’
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
S
E
E
S
T
R
U
C
T
U
R
E
P
L
A
N
S
E
N
D
B
E
N
T
E
X
C
A
V
A
T
I
O
N
-L--L-SHOP CURVED TYPE-IIISHOP CURVED TYPE-IIISHOP CURVED TYPE-IIISHOP CURVED TYPE-III5’-10"" TO 21 3’-1VAR.
340341.0
3
4
1.0
341.0
3
4
1.0
341.0
341.0
341.0
341.0
3
4
2
.
0
342.0
342.0
3
4
2
.0
342.0
342.0
342.0
3
4
3
.0
3
4
3.0
343.0
3
4
3
.0
3
4
3
.0
343.0
34
4.0
344.0
344.0
344.0
345
34
5
345
345
345
3
4
5
345
345
345
345
345
345
346.0
346.0
346.0
346
.0
346.0
346.0
346.0
347.0
347.0
347.0
347.0
347
.0
347.0
347.0
347.0
347.0 348.0
348.0
348
.0
348.0
3
4
8.0
3
48.0
348.0
348
.0
349.0
349.0
3
4
9.0
349.0
349.0
349.0
349.0
3
4
9
.
0
349.0
349.0
3
5
0
3
5
0
350
3
50
3
5
0
350
350
350
35
0
3
5
0
350
350
350
3
5
0
350
350
350
350
350
350 350
350
350
350
351.0
351.0
3
5
1.
0
351.0
3
5
1.0
351.0
351.0
351.0
351.0
352.0
352.0
3
5
2.0
352.0
3
5
2.
0
352.0
352.0
3
5
3
.0
3
53.0
353.0
3
5
3
.0
353.0
353.0
3
5
3.
0
354
.0
354.0
3
5
4
.0
3
5
4
.0
354.0
354.0
354.0
355
355
3
5
5
355
355
355
355
355
3
5
5
3
5
5
3
5
5
35
5
355
3
5
5
3
5
5
355
355
3
5
6
.0
356.0
356.0
356.0
356.0
356.0
3
5
6
.0
3
5
6
.
0
356.0
356.0
356.0
356.0
357.0
357.0
3
5
7.
0
357.0
3
5
7
.
0
357.0
3
5
7
.0
358
.0
358.0
3
5
8
.0
3
5
8.0
358.0 3
5
8
.
0
359.0
359.0
359.0
359.0
359.0
3
5
9.0
359.0
360
360
360
360
360360
360
3
6
0
360 360
361.0
361.0361.0
361.0
361.0
362.0
362.0
362.0
3 6 2 .0
362.0
362.0
363.0
363.0
363.0
363.0
363.0
364.0
364.0
364.0
364.0
3
6
4.
0
364.0
3
6
5
3 65
365365
365
365
365
365365
3
6
5
365
365
3
6
6.0
366.0
366.0
366.0
366.0
366.0
3
6
7.
0
367
.0
367.0
367.0
367
.0
367.0
368.0
368
.0
368.0
368.0
368.0
3
6
8
.0
368.0 3
6
9.0
369.0
369.0
369.0
3
6
9
.0
369.0
370
370
370
370
370
370
370
370
370
370
3
7
0
370
37
0
371.0
371.0
371.0
371.0
3
7
1.0
3
7
1.
0
3
7
1.0
372.0
3
7
2.0
3
7
2.
0
372.0
372.0
372.0
373
.0
3
7
3
.
0
373.0
373.0
373.0
374.0
374.0
374.0
374.0
374.0
375375
3
7
5
375
3
7
5
375
375
375
375
375376.0
376.0
3
7
6.
0
376.0
376.0
376.0 377.0
377.0
3
7
7.0
377.0
377.0
378.0
3 7 8 .0
378.0
378.0
379.0
379.0
3
7
9.0
379.0
379.0379.0 380380380
3
8
0
38
0
380
3 8 1.0
381.0
381.0
381.0
382.0
3
8
2
.0
3
8
2.0
382.0
383.0
383.0
383
.0
383.0
384.0384.0
384.0
384.0
385385385385
385
385
385386.0386.0
386.0
386.0
386.0387.0387.0
387
.0
388.0388.0
388.0
389.0389.0
389
.0
390390390390390391.0391.0 391.0392.0392.0 392.0393.0393.0 394.0394.0 395395395395396.0396.0 396.0397.0397.0 398.0398.0 399.0399.0 400400400400401.0401.0 402.0402.0 403.0 403.0404.0 404.0405405405406.0 406.0407.0408.0409.0410411.0
G
R
A
P
H
I
C
S
C
A
L
E
0
’
5
0
’
1
0
0
’
5
0
’
EN
G
L
I
S
H
S
S
S
U
R
F
A
C
E
W
A
T
E
R
D
E
N
O
T
E
S
I
M
P
A
C
T
S
I
N
T
S
T
S
I
M
P
A
C
T
S
I
N
S
U
R
F
A
C
E
W
A
T
E
R
D
E
N
O
T
E
S
T
E
M
P
O
R
A
R
Y
S
S
S
S
S
I
T
E
1
R:\Hydraulics\PERM ITS_Environm ental\Drawings\B5151_prm _wet_3of7.dgncjlee4/29/2014
S S
S
S
S
S
T
S
T
S
T
S
T
S
S
P
E
R
M
A
N
E
N
T
S
W
I
M
P
A
C
T
S
T
E
M
P
O
R
A
R
Y
S
W
I
M
P
A
C
T
S
T
O
P
E
L
.
=
3
4
8
.
0
’
T
E
M
P
.
R
O
C
K
C
A
U
S
E
W
A
Y
1
5
"
C
S
P
1
5
"
C
S
P
T
B
2
G
I
T
B
2
G
I
S
E
E
D
E
T
A
I
L
D
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
S
E
E
D
E
T
A
I
L
C
R
I
P
R
A
P
A
T
E
M
B
A
N
K
M
E
N
T
w
/
2
E
L
B
O
W
S
w
/
2
E
L
B
O
W
S
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
C
L
A
S
S
I
I
R
I
P
R
A
P
(
N
o
t
t
o
S
c
a
l
e
)
R
I
P
R
A
P
A
T
E
M
B
A
N
K
M
E
N
T
-
L
-
S
T
A
.
1
4
+
3
0
R
T
-
L
-
S
T
A
.
1
3
+
9
1
R
T
D
E
T
A
I
L
C
G
r
a
d
e
D
i
t
c
h
2
.
0
’
G
E
O
T
E
X
T
I
L
E
G
e
o
t
e
x
t
i
l
e
=
7
5
S
Y
C
l
a
s
s
I
I
R
i
p
R
a
p
=
3
0
T
O
N
S
1
0
’
m
i
n
.
1
.
0
’
m
i
n
.
18"
ELB
ELB
EL
B
EL
B
d 2:1BD ( Not to Scale)SPECIAL CUT BASE DITCHFlatterX:1 or-L- STA. 13+00 TO STA. 13+90 RT (X=2)-L- STA. 11+00 TO STA. 13+00 RT (X=4)DETAIL BB=2.0 Ft.Max. d=1.5 Ft.Min. D=1.5 Ft.Type of Liner= Class I Rip-Rap Ground NaturalDitchSlopeFrontGeotextileFlatterX:1 orD2:1 ( Not to Scale)SPECIAL CUT DITCH-L- STA. 15+00 TO STA. 15+75 RT (X=4)-L- STA. 14+50 TO STA. 15+00 RT (X=2)Min. D=1.0 Ft.DETAIL DSlopeDitchFrontGroundNatural
T
T
15" R
CP
60.00’
60.00’
PR
O
PE
R
T
Y
LI
N
E I
S
C/
L
O
F
C
R
E
E
K
PROPERTY
L
INE
IS
C
/L
OF
CREEK
WO
O
D
S
W
O
O
D
S
WOODS
WO
O
D
S
WO
O
D
S
WO
O
D
S
15
" R
C
P
4’ WD
4’ WD
1 S EL WIRE
1
S
E
L
W
I
R
E
4’ WW
4’ WD & WW
4’ WD & WW 5’ WD & WW
5’
WD
&
W
W
MTL
G
ATE
S
O
IL
SOIL15" R
CP
SOIL
S
IL
T
F
E
N
C
E
4
’ WD
T
T
T
4
’ WW
B
R
ID
G
E
#
2
15
CR
AWF
OR
D
-
CUR
R
IN
R
D
.
S
R
14
3
2
20’ BST EXISTING R/W
E
XIS
TIN
G
R/
W
E
X
IS
T
ING
R
/
W
EXISTING R/W
1
2
3
4
5
R
I
P
R
A
P
RIP
R
A
P
M
A
T
T
H
E
W
&
V
A
L
E
R
IE
C
O
R
S
A
R
O
3
R
O
B
E
R
T
A
.
K
U
H
L
B
E
R
G
&
G
A
Y
L
E
G
.
K
U
H
L
B
E
R
G
4
L
U
C
Y
H
.
B
O
D
E
2
J
O
H
N
S
.
F
L
O
W
E
,
I
I
I
1
SR 1432CRAWFORD-CURRIN RD.
C
C
F
F
C
C
F
F
C
C
F
C
C
F
C
C
C
F
F
SSSURFACE WATER DENOTES IMPACTS INTSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY
N
C
G
RID
N
A
D 83/
NS
RS 2007
GRAPHIC SCALE 0’20’40’60’20’R:\Hydraulics\PERM ITS_Environm ental\Drawings\B5151_hyd_prm _wet_B_4of7.dgncjlee4/29/2014
EN
G
L
I
S
H
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99
S
H
E
E
T
4
O
F
7
P
E
R
M
I
T
D
R
A
W
I
N
G
L
ITTLE
GRA
S
SY
CREEK
-L- STA. 14+86.00 END SBG
T
T
15" RCP
P
R
O
P
E
R
T
Y
LI
N
E I
S
C/
L
O
F
C
R
E
E
K
PRO
PERTY
L
INE
IS
C
/L
O
F
CREEK
W
O
O
D
S
WOODS
W
O
O
D
S
W
O
O
D
S
W
O
O
D
S
15
" R
C
P
4’ W
D
5’ WD & WW
MTL
G
ATE
S
O
IL
SOIL15" RCPSOIL
S
IL
T
F
E
N
C
E
4
’ WD
T
T
T
4
’ WW
B
R
ID
G
E
#
2
15
C
R
AWF
OR
D
-
C
U
R
R
IN
R
D
.
S
R
14
3
2 E
X
IS
T
IN
G
R
/
W
2
3
R
I
P
R
A
P
RIP
R
A
P
-
L-
T
B
2
G
I
T
B
2
G
I
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
C
L
A
S
S
I
I
R
I
P
R
A
P
18"
EL
B
EL
B
E
L
B
E
L
B
S
S
S
S
S
I
T
E
1
S S
S
S
S
S
T
S
T
S
T
S
T
S
S
P
E
R
M
A
N
E
N
T
S
W
I
M
P
A
C
T
S
TEMPOR
A
R
Y
S
W
I
M
P
A
C
T
S
TOP EL
.
=
3
4
8
.
0
’
TEMP. R
O
C
K
C
A
U
S
E
W
A
Y
C F
F
C
F
F
C
C
C
F
C
C
C
F
F
SSSURFACE WATER DENOTES IMPACTS INTSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY
N
C
G
RID
N
A
D 83/
NS
RS 2007
GRAPHIC SCALE 0’20’40’60’20’R:\Hydraulics\PERM ITS_Environm ental\Drawings\B5151_hyd_prm _wet_B_4of7.dgncjlee4/29/2014
EN
G
L
I
S
H
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99
S
H
E
E
T
5
O
F
7
P
E
R
M
I
T
D
R
A
W
I
N
G
L
ITTLE
GRA
S
SY
CREEK
-L- STA. 14+86.00 END SBG
341.0
3
4
1.
0
341.0
341.0
341.0
342.0
3
4
2
.0
342.0
3
4
3.
0
343.0
3
4
3
.0
3
4
3
.0
3
4
4.
0
344
.0
344.0
3
4
5
345
345
3
4
5
345
345
3
4
5
345
345
346.0
346.0
346.0
3
4
6
.0
346.0
346.0
346.0
347.0
347.0
347.0
3
4
7
.0
347.0
347.0
347.0
347.0
348.0
348.0
348.0
3
4
8
.
0
3
4
8
.0
348.0
34
8
.0
349.0
349.0
349
.0
349
.0
3
4
9
.
0
349.0
349.0
3
5
0
3
5
0
350
3
5
0
3
5
0
350
350
3
5
0
3
5
0
350
350
350
3
5
0
350
350
350
350
350 350
350
350
350
351.0
3
5
1
.0
3
5
1
.
0
351
.0
3
5
1.
0
351.0
351.0
351.0
351.0
352.0
352.0
3
5
2.0
352.0
3
5
2.
0
352.0
352.0
3
5
3
.0
3
5
3.
0
3
5
3
.0
3
5
3
.0
353.0
353.0
3
5
3.
0
3
5
4.0
354.0
3
5
4
.0
3
5
4
.0
354.0
354.0 354.0 355355355
355
355
355
355
3
5
5
3
5
5
3
5
5
3
5
5
3
5
5
3
5
5
355
355
356.0
356.0
356.0
356.0
356.0
356.0
3
5
6
.0
3
5
6
.
0
356.0
356.0
356.0
356.0 357.0
3
5
7.
0
357.0
357.0
3
5
7.
0
3
5
7
.0
358.0
35
8
.0
3
5
8
.0
358.0358.0 358.0359.0
359.0
359.0
359.0
359.0
359.0 360360360
360
360360
360
3
6
0
361.0
361.0361.0
361.0362.0
362.0
363.0
363.0
364.0 365365365
365
3
6
5
365 366.0366.0369.0 370
370
371.0
T
T
15" RCP
P
R
O
P
E
R
T
Y
LI
N
E I
S
C/
L
O
F
C
R
E
E
K
PRO
PERTY
L
INE
IS
C
/L
O
F
CREEK
W
O
O
D
S
WOODS
W
O
O
D
S
W
O
O
D
S
W
O
O
D
S
15
" R
C
P
4’ W
D
5’ WD & WW
MTL
G
ATE
S
O
IL
SOIL15" RCPSOIL
S
IL
T
F
E
N
C
E
4
’ WD
T
T
T
4
’ WW
B
R
ID
G
E
#
2
15
C
R
AWF
OR
D
-
C
U
R
R
IN
R
D
.
S
R
14
3
2 E
X
IS
T
IN
G
R
/
W
2
3
R
I
P
R
A
P
RIP
R
A
P
-
L-
T
B
2
G
I
T
B
2
G
I
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
C
L
A
S
S
I
I
R
I
P
R
A
P
18"
EL
B
EL
B
E
L
B
E
L
B
S
S
S
S
S
I
T
E
1
S S
S
S
S
S
T
S
T
S
T
S
T
S
S
P
E
R
M
A
N
E
N
T
S
W
I
M
P
A
C
T
S
TEMPOR
A
R
Y
S
W
I
M
P
A
C
T
S
TOP EL
.
=
3
4
8
.
0
’
TEMP. R
O
C
K
C
A
U
S
E
W
A
Y
C F
F
C
F
F
C
C
C
F
C
C
C
F
F
R:\Hydraulics\PERM ITS_Environm ental\Drawings\B5151_hyd_psh_pfl_6of7.dgncjlee4/29/2014
w
/
1
’
O
F
C
L
A
S
S
B
R
I
P
R
A
P
O
N
T
O
P
C
L
A
S
S
I
I
R
I
P
R
A
P
T
O
P
E
L
.
=
3
4
8
.
0
’
T
E
M
P
.
C
A
U
S
E
W
A
Y
S
H
E
E
T
6
O
F
7
P
E
R
M
I
T
D
R
A
W
I
N
G
1
.
5
:
1
(
T
Y
P
.
)
340 350 360 370 380
P
I
=
1
3
+
1
4
.
0
0
E
L
=
3
5
6
.
0
7
’
V
C
=
1
1
5
’
K
=
1
7
P
I
=
1
5
+
9
4
.
0
0
E
L
=
3
5
4
.
6
6
’
V
C
=
2
2
7
’
K
=
4
9
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
5
B
-
5
1
5
1
$$$$$$SYSTIM E$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAM E$$$$10+0011+00
1
2
+
0
0
1
3
+
0
0
1
4
+
0
0
1
5
+
0
0
1
6
+
0
0
1
7
+
0
0
1
8
+
0
0
-
L
-
-
L
-
S
T
A
.
1
4
+
6
0
.
7
4
E
N
D
B
R
I
D
G
E
V
=
2
0
M
P
H
V
=
3
5
M
P
H
d
d
3
4
0
3
5
0
3
6
0
3
7
0
3
8
0
E
L
.
=
3
7
2
.
0
0
’
-
L
-
S
T
A
.
1
1
+
0
0
.
0
0
B
E
G
I
N
G
R
A
D
E
E
L
.
=
3
6
3
.
1
7
’
-
L
-
S
T
A
.
1
8
+
0
0
.
0
0
E
N
D
G
R
A
D
E
-
L
-
S
T
A
.
1
3
+
7
3
.
2
6
B
E
G
I
N
B
R
I
D
G
E
El = 349.00’
(
+
)
1.
2
0
%
PI =13+50.00
EL = 369.75’-L- STA. 11+00.00BEGIN RT DITCH GRADE
EL = 346.60’
-L- STA. 13+90.00
END RT DITCH GRADE
EL = 348.50’
-L- STA. 14+50.00
BEGIN RT DITCH GRADE
EL = 350.00’
-L- STA. 15+75.00
END RT DITCH GRADE
D
I
T
C
H
L
E
G
E
N
D
R
I
G
H
T
D
I
T
C
H
D
E
S
I
G
N
D
I
S
C
H
A
R
G
E
D
E
S
I
G
N
F
R
E
Q
U
E
N
C
Y
B
A
S
E
D
I
S
C
H
A
R
G
E
C
F
S
Y
R
S
Y
R
S
B
A
S
E
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
E
L
E
V
A
T
I
O
N
O
V
E
R
T
O
P
P
I
N
G
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
D
I
S
C
H
A
R
G
E
C
F
S
C
F
S
Y
R
S
F
T
F
T
F
T
D
E
S
I
G
N
H
W
E
L
E
V
A
T
I
O
N
B
A
S
E
H
W
E
L
E
V
A
T
I
O
N
B
R
I
D
G
E
H
Y
D
R
A
U
L
I
C
D
A
T
A
D
A
T
E
O
F
S
U
R
V
E
Y
W
.
S
.
E
L
E
V
A
T
I
O
N
A
T
D
A
T
E
O
F
S
U
R
V
E
Y
F
T
=
3
2
0
0
=
2
5
=
3
5
4
.
5
=
4
7
4
3
=
1
0
0
=
3
5
6
.
8
7
=
3
9
0
0
=
5
0
=
3
5
5
.
6
=
1
0
/
1
5
/
2
0
1
3
=
3
4
4
.
0
EL = 352.53’-L- STA. 13+59.00 18’ RT.BM#1 RR SPIKE IN 18" BIRCHEL = 366.56’-L- STA. 12+11.00 32’ RT.BM#2 RR SPIKE IN 16" PINE
E
L
=
3
5
5
.
5
5
’
S
K
E
W
=
1
0
5
S
P
A
N
=
1
@
8
5
’
3
3
"
B
O
X
B
E
A
M
C
-
L
-
S
T
A
.
1
4
+
1
7
.
0
0
L
O
E
L
E
V
A
T
I
O
N
E
S
T
I
M
A
T
E
D
N
.
W
.
S
.
=
3
4
6
.
0
F
T
F
O
R
S
T
R
U
C
T
U
R
E
P
L
A
N
S
,
S
E
E
S
H
E
E
T
S
S
-
1
T
H
R
U
S
-
?
F
O
R
-
L
-
P
L
A
N
V
I
E
W
,
S
E
E
S
H
E
E
T
4
L
E
F
T
D
I
T
C
H
(-)7
.4
4
3
8
%
(-
)0
.5
0
3
6
%
(-
)0
.5
0
3
6
%
(
+
)
4
.
1
2
9
3
%
EL = 357.40’
-L- STA. 17+00.00
BEGIN LT DITCH GRADE
EL = 361.40’
-L- STA. 18+00.00
END LT DITCH GRADE
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
S
E
E
S
T
R
U
C
T
U
R
E
P
L
A
N
S
C
L
A
S
S
I
I
R
I
P
R
A
P
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
S
E
E
S
T
R
U
C
T
U
R
E
P
L
A
N
S
E
N
D
B
E
N
T
E
X
C
A
V
A
T
I
O
N
(
+
)
4
.
0
0
%
El = 357.00’
(-) 8
.5
0
%
(-) 8
.0
0
%
(-
) 6
.0
0
%
PI =12+50.00
EL = 357.40’
-L- STA. 17+00.00
BEGIN LT DITCH GRADE
EL = 361.40’
-L- STA. 18+00.00
END LT DITCH GRADE
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
S
E
E
S
T
R
U
C
T
U
R
E
P
L
A
N
S
C
L
A
S
S
I
I
R
I
P
R
A
P
(
+
)
4
.
0
0
%
T
O
A
P
P
R
O
X
I
M
A
T
E
E
L
=
3
4
8
.
0
’
A
B
U
T
M
E
N
T
E
X
C
A
V
A
T
I
O
N
5
’
W
I
D
E
,
3
.
5
’
D
E
E
P
C
L
A
S
S
I
I
R
I
P
R
A
P
1
.
5
:
1
N
O
R
M
A
L
N
O
K
E
Y
-
I
N
C
L
A
S
S
I
I
R
I
P
R
A
P
T
O
A
P
P
R
O
X
I
M
A
T
E
E
L
E
V
.
=
3
4
8
.
5
’
A
B
U
T
M
E
N
T
E
X
C
A
V
A
T
I
O
N
5
’
W
I
D
E
,
3
.
5
’
D
E
E
P
C
L
A
S
S
I
I
R
I
P
R
A
P
N
.
W
.
S
.
=
3
4
6
.
0
’
(
1
0
/
1
5
/
2
0
1
3
)
W
.
S
.
=
3
4
4
.
0
’
N
O
K
E
Y
-
I
N
C
L
A
S
S
I
I
R
I
P
R
A
P
CAMA 404 Hand Existing Existing
Permanent Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No.(From/To)Size / Type Wetlands Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design
(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft)
1 14+00 to 14+35 -L-Bank Stabilization <0.01 77
1 14+10 to 14+30 -L-Rock Causeway 0.02
TOTALS:0.00 0.00 0.00 0.00 0.00 0.00 <0.01 0.02 77 0.00 0.00
ATN Revised 3/31/05 SHEET 7 of 7 (04/24/2014)
SR 1432 (Crawford-Currin Rd)
WETLAND PERMIT IMPACT SUMMARY
SURFACE WATER IMPACTSWETLAND IMPACTS
over Little Grassy Creek
PROJECT: 42312.1.1 (B-5151)
BRIDGE #215 on
N.C.D.O.T.
DIVISION OF HIGHWAYS
GRANVILLE COUNTY
VICINITY MAP
G
R
A
N
V
I
L
L
E
C
O
U
N
T
Y
DHVDTV ======%%MPH ADTADT
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
PROJECTBEGIN000PROFILE (HORIZONTAL)
P
R
O
J
E
C
T
L
E
N
G
T
H
R
I
G
H
T
O
F
W
A
Y
D
A
T
E
:
L
E
T
T
I
N
G
D
A
T
E
:
S
T
A
T
E
S
T
A
T
E
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
S
T
A
T
E
P
R
O
J
.
N
O
.
F.
A
.
P
R
O
J
.
N
O
.
DE
S
C
R
I
P
T
I
O
N
N
O
.
T
O
T
A
L
S
H
E
E
T
S
N
.
C
.
S
H
E
E
T
1
DESIGN DATA
P
r
e
p
a
r
e
d
i
n
t
h
e
O
f
f
i
c
e
o
f
:
S
I
G
N
A
T
U
R
E
:
S
I
G
N
A
T
U
R
E
:
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
2
0
1
2
S
T
A
N
D
A
R
D
S
P
E
C
I
F
I
C
A
T
I
O
N
S
P
R
O
J
E
C
T
E
N
G
I
N
E
E
R
P
R
O
J
E
C
T
D
E
S
I
G
N
E
N
G
I
N
E
E
R
GRAPHIC SCALES PLANSPROFILE (VERTICAL)
L
O
C
A
T
I
O
N
:
T
Y
P
E
O
F
W
O
R
K
:
09/08/99
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
00025-M AR-2014 12:55R:\Roadw ay\Proj\B5151_Rdy_tsh.dgn$$$$USERNAME$$$$
1
0
0
0
B
i
r
c
h
R
i
d
g
e
D
r
.
,
R
a
l
e
i
g
h
N
C
,
2
7
6
1
0
CON TRACT:TIP PROJECT:
ARTMEN
N
A
S
O
H
DEP
T
O
F
T
R
A
S
P
OR
T
T
IO N
T
ATE
O
F
N
R
T
C
AROLINA
E
N
D
B
R
I
D
G
E
B
E
G
I
N
B
R
I
D
G
E
LE
N
G
T
H
R
O
A
D
W
A
Y
T
I
P
P
R
O
J
E
C
T
B
-
5
1
5
1
F
E
B
R
U
A
R
Y
1
7
,
2
0
1
5
J
E
F
F
R
E
Y
L
.
T
E
A
G
U
E
,
P
E
T
O
N
Y
H
O
U
S
E
R
,
P
E
10 10603SUBREGIONAL TIER PROJECTEND
4
2
3
1
2
.
1
.
1
B
R
Z
-
1
4
3
2
(
5
)
B
-
5
1
5
1
B-5151 See Sheet 1-B For Conventional SymbolsLE
N
G
T
H
S
T
R
U
C
T
U
R
E
T
I
P
P
R
O
J
E
C
T
B
-
5
1
5
1
TO
T
A
L
L
E
N
G
T
H
T
I
P
P
R
O
J
E
C
T
B
-
5
1
5
1
P
.
E
.
5025501005010050102051040
=
0
.
1
3
3
M
I
L
E
=
0
.
1
1
6
M
I
L
E
TO SR 1430
OFF-SITE DETO
U
R
=
0
.
0
1
7
M
I
L
E
L
IT
T
L
E
GR
A
S
SY
CR
E
E
K
4
See Sheet 1-A For Index of SheetsDUAL 2%)%**FUNC. CLASS.=RURAL LOCAL (TTST 1% +125 VPD 87 VPD
B
R
I
D
G
E
N
O
.
2
1
5
O
V
E
R
L
I
T
T
L
E
G
R
A
S
S
Y
C
R
E
E
K
O
N
S
R
1
4
3
2
(
C
R
A
W
F
O
R
D
C
U
R
R
I
N
R
D
.
)
G
R
A
D
I
N
G
,
P
A
V
I
N
G
,
D
R
A
I
N
A
G
E
,
A
N
D
S
T
R
U
C
T
U
R
E
J
A
N
U
A
R
Y
1
7
,
2
0
1
4
-
L
-
S
T
A
.
1
1
+
0
0
.
0
0
B
E
G
I
N
T
I
P
P
R
O
J
E
C
T
B
-
5
1
5
1
-
L
-
S
T
A
.
1
8
+
0
0
.
0
0
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
5
1
5
1
-
L-
T
O
S
R 1433
E
N
G
I
N
E
E
R
H
Y
D
R
A
U
L
I
C
S
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
E
N
G
I
N
E
E
R
R
O
A
D
W
A
Y
D
E
S
I
G
N
20152035
-
L
-
S
T
A
.
1
3
+
7
3
.
2
6
-
L
-
S
T
A
.
1
4
+
6
0
.
7
4
CRA
WFORD CURRIN RD.
CRA
WFO
RD
CU
RRIN
RD
.
LITTLE
GRASSY
CREEK
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LI
M
I
T
S
E
S
T
A
B
L
I
S
H
E
D
B
Y
M
E
T
H
O
D
I
I
I
.
SR 1432
SR 1432
4
2
3
1
2
.
2
.
F
D
1
B
R
Z
-
1
4
3
2
(
5
)
R
/
W
&
U
T
I
L
.
RAILW AY
S
T
O
V
A
L
L
15
1
5
SOUTHERN
NSRS 2007
NAD 83/
143214601430143
0
1
5
1
5
14311430152
6
1433 1431
D
e
x
te
r
R
d
.
P
e
n
n
R
d
.
Oxford
St.
Herm anWilkersonRd.CrawfordCurrinRd.Currin Rd.LittleRd.HartsCrossroads GrassyCreekRd.Mountain
RevisRd.OwensSt.
1432Crawford Grassy
Existin
g
E
d
g
e
o
f
P
a
v
e
m
e
n
t
Existin
g
C
u
r
b
Propos
e
d
S
l
o
p
e
S
t
a
k
e
s
C
u
t
Propos
e
d
S
l
o
p
e
S
t
a
k
e
s
F
i
l
l
Existin
g
M
e
t
a
l
G
u
a
r
d
r
a
i
l
Existin
g
C
a
b
l
e
G
u
i
d
e
r
a
i
l
Propos
e
d
G
u
a
r
d
r
a
i
l
Equalit
y
S
y
m
b
o
l
Pavem
e
n
t
R
e
m
o
v
a
l
Baselin
e
C
o
n
t
r
o
l
P
o
i
n
t
RIGH
T
O
F
W
A
Y
:
Existin
g
R
i
g
h
t
o
f
W
a
y
M
a
r
k
e
r
Existin
g
R
i
g
h
t
o
f
W
a
y
L
i
n
e
h
Existin
g
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
Propos
e
d
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
Propos
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
CF
Existin
g
E
a
s
e
m
e
n
t
L
i
n
e
Propos
e
d
T
e
m
p
o
r
a
r
y
C
o
n
s
t
r
u
c
t
i
o
n
E
a
s
e
m
e
n
t
Propos
e
d
T
e
m
p
o
r
a
r
y
D
r
a
i
n
a
g
e
E
a
s
e
m
e
n
t
Propos
e
d
P
e
r
m
a
n
e
n
t
D
r
a
i
n
a
g
e
E
a
s
e
m
e
n
t
Propos
e
d
P
e
r
m
a
n
e
n
t
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
HYDROLOGY:Stream or Body of WaterHydro, Pool or ReservoirFlow ArrowDisappearing StreamSpring
;
zvWKProposed Lateral, Tail, Head DitchFalse Sump Propos
e
d
C
a
b
l
e
G
u
i
d
e
r
a
i
l
M
A
J
O
R
:
B
r
i
d
g
e
,
T
u
n
n
e
l
o
r
B
o
x
C
u
l
v
e
r
t
B
r
i
d
g
e
W
i
n
g
W
a
l
l
,
H
e
a
d
W
a
l
l
a
n
d
E
n
d
W
a
l
l
M
I
N
O
R
:
H
e
a
d
a
n
d
E
n
d
W
a
l
l
P
i
p
e
C
u
l
v
e
r
t
F
o
o
t
b
r
i
d
g
e
P
a
v
e
d
D
i
t
c
h
G
u
t
t
e
r
U
T
I
L
I
T
I
E
S
:
ROA
D
S
A
N
D
R
E
L
A
T
E
D
F
E
A
T
U
R
E
S
:
E
x
i
s
t
i
n
g
P
o
w
e
r
P
o
l
e
P
r
o
p
o
s
e
d
P
o
w
e
r
P
o
l
e
P
U
/
G
P
o
w
e
r
C
a
b
l
e
H
a
n
d
H
o
l
e
P
o
w
e
r
M
a
n
h
o
l
e
P
o
w
e
r
L
i
n
e
T
o
w
e
r
P
o
w
e
r
T
r
a
n
s
f
o
r
m
e
r
E
x
i
s
t
i
n
g
J
o
i
n
t
U
s
e
P
o
l
e
P
r
o
p
o
s
e
d
J
o
i
n
t
U
s
e
P
o
l
e
E
x
i
s
t
i
n
g
T
e
l
e
p
h
o
n
e
P
o
l
e
P
r
o
p
o
s
e
d
T
e
l
e
p
h
o
n
e
P
o
l
e
T
e
l
e
p
h
o
n
e
M
a
n
h
o
l
e
T
e
l
e
p
h
o
n
e
B
o
o
t
h
T
e
l
e
p
h
o
n
e
P
e
d
e
s
t
a
l
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
H
a
n
d
H
o
l
e
R}T pQle]/b
H
-
F
r
a
m
e
P
o
l
e
O
O
P
O
W
E
R
:
T
E
L
E
P
H
O
N
E
:
T
e
l
e
p
h
o
n
e
C
e
l
l
T
o
w
e
r
R
e
c
o
r
d
e
d
U
/
G
P
o
w
e
r
L
i
n
e
R
e
c
o
r
d
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
D
e
s
i
g
n
a
t
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
(
S
.
U
.
E
.
*
)
R
e
c
o
r
d
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
o
n
d
u
i
t
D
e
s
i
g
n
a
t
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
o
n
d
u
i
t
(
S
.
U
.
E
.
*
)
R
e
c
o
r
d
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
s
C
a
b
l
e
W
A
T
E
R
:
W
a
t
e
r
M
a
n
h
o
l
e
W
a
t
e
r
M
e
t
e
r
W
a
t
e
r
V
a
l
v
e
W
a
t
e
r
H
y
d
r
a
n
t
R
e
c
o
r
d
e
d
U
/
G
W
a
t
e
r
L
i
n
e
4IHa
T
V
:
T
V
S
a
t
e
l
l
i
t
e
D
i
s
h
T
V
P
e
d
e
s
t
a
l
T
V
T
o
w
e
r
U
/
G
T
V
C
a
b
l
e
H
a
n
d
H
o
l
e
R
e
c
o
r
d
e
d
U
/
G
T
V
C
a
b
l
e
R
e
c
o
r
d
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
C
a
b
l
e
D
e
s
i
g
n
a
t
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
C
a
b
l
e
(
S
.
U
.
E
.
*
)
r|I]
G
A
S
:
G
a
s
V
a
l
v
e
G
a
s
M
e
t
e
r
R
e
c
o
r
d
e
d
U
/
G
G
a
s
L
i
n
e
n c
S
A
N
I
T
A
R
Y
S
E
W
E
R
:
S
a
n
i
t
a
r
y
S
e
w
e
r
M
a
n
h
o
l
e
S
a
n
i
t
a
r
y
S
e
w
e
r
C
l
e
a
n
o
u
t
U
/
G
S
a
n
i
t
a
r
y
S
e
w
e
r
L
i
n
e
R
e
c
o
r
d
e
d
S
S
F
o
r
c
e
d
M
a
i
n
L
i
n
e
D
e
s
i
g
n
a
t
e
d
S
S
F
o
r
c
e
d
M
a
i
n
L
i
n
e
(
S
.
U
.
E
.
*
)
do
A
/
G
W
a
t
e
r
A
b
o
v
e
G
r
o
u
n
d
G
a
s
L
i
n
e
A
/
G
G
a
s
A
b
o
v
e
G
r
o
u
n
d
W
a
t
e
r
L
i
n
e
A
b
o
v
e
G
r
o
u
n
d
S
a
n
i
t
a
r
y
S
e
w
e
r
A
/
G
S
a
n
i
t
a
r
y
S
e
w
e
r
M
I
S
C
E
L
L
A
N
E
O
U
S
:
U
t
i
l
i
t
y
P
o
l
e
OFS3
U
t
i
l
i
t
y
P
o
l
e
w
i
t
h
B
a
s
e
U
t
i
l
i
t
y
L
o
c
a
t
e
d
O
b
j
e
c
t
U
t
i
l
i
t
y
T
r
a
f
f
i
c
S
i
g
n
a
l
B
o
x
U
t
i
l
i
t
y
U
n
k
n
o
w
n
U
/
G
L
i
n
e
?
C
O
N
C
C
O
N
C
W
W
v
v
D
r
a
i
n
a
g
e
B
o
x
:
C
a
t
c
h
B
a
s
i
n
,
D
I
o
r
J
B
S
t
o
r
m
S
e
w
e
r
S
t
o
r
m
S
e
w
e
r
M
a
n
h
o
l
e
m
U
/
G
T
a
n
k
;
W
a
t
e
r
,
G
a
s
,
O
i
l
A
/
G
T
a
n
k
;
W
a
t
e
r
,
G
a
s
,
O
i
l
BOUNDARIES AND PROPERTY:State LineCounty LineTownship LineCity LineReservation LineProperty LineExisting Iron PinProperty CornerProperty MonumentExisting Fence LineProposed Woven Wire FenceProposed Chain Link FenceProposed Barbed Wire Fence gF123Existing Wetland BoundaryProposed Wetland BoundaryExisting Endangered Animal BoundaryExisting Endangered Plant BoundaryBUILDINGS AND OTHER CULTURE:Area Outline Gas Pump Vent or U/G Tank CapChurchSchoolDamSignSmall Mine Well VMWWSxFoundationSBuildingyyVEGE
T
A
T
I
O
N
:
Single
T
r
e
e
XY
V
i
n
e
y
a
r
d
Single
S
h
r
u
b
HedgeWoods
L
i
n
e
O
r
c
h
a
r
d
V
i
n
e
y
a
r
d
RAIL
R
O
A
D
S
:
Standa
r
d
G
a
u
g
e
RR Sig
n
a
l
M
i
l
e
p
o
s
t
SwitchRR Ab
a
n
d
o
n
e
d
RR Dis
m
a
n
t
l
e
d
S
FLOW
D
e
s
i
g
n
a
t
e
d
U
/
G
P
o
w
e
r
L
i
n
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
s
C
a
b
l
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
W
a
t
e
r
L
i
n
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
T
V
C
a
b
l
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
G
a
s
L
i
n
e
(
S
.
U
.
E
.
*
)
U
/
G
T
e
s
t
H
o
l
e
(
S
.
U
.
E
.
*
)
*S.U.E. = Subsurface Utility EngineeringWLBEIPBECM
C
O
N
C
H
W
C
B
C
S
X
T
R
A
N
S
P
O
R
T
A
T
I
O
N
M
I
L
E
P
O
S
T
3
5
S
W
I
T
C
H
Cemetery
E
X
I
S
T
I
N
G
S
T
R
U
C
T
U
R
E
S
:
Parcel / Sequence Number
E
A
A
T
U
R
E
n
d
o
f
I
n
f
o
r
m
a
t
i
o
n
E
.
O
.
I
.
Note: Not to Scale
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
1
-
B
B
-
5
1
5
1
A
b
a
n
d
o
n
e
d
A
c
c
o
r
d
i
n
g
t
o
U
t
i
l
i
t
y
R
e
c
o
r
d
s
WLBEABEPB
RW
RW
RW
CAET
D
E
P
D
E
P
U
E
SPPTTT
C
T
C
T
F
O
T
F
O
WWT
V
T
V
T
V
F
O
T
V
F
O
GG
S
S
F
S
S
F
S
S
?
U
T
L
Jurisdictional StreamJS 12/05/11Buffer Zone 1Buffer Zone 2 BZ 1BZ 2Wetland Propos
e
d
P
e
r
m
a
n
e
n
t
E
a
s
e
m
e
n
t
w
i
t
h
Iron
P
i
n
a
n
d
C
a
p
M
a
r
k
e
r
Propos
e
d
T
e
m
p
o
r
a
r
y
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
T
U
E
Iron
P
i
n
a
n
d
C
a
p
M
a
r
k
e
r
Propos
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
w
i
t
h
D
U
E
Propos
e
d
P
e
r
m
a
n
e
n
t
D
r
a
i
n
a
g
e
/
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
A
U
E
Propos
e
d
A
e
r
i
a
l
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
C
R
Propos
e
d
C
u
r
b
R
a
m
p
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
CO
N
V
E
N
T
I
O
N
A
L
P
L
A
N
S
H
E
E
T
S
Y
M
B
O
L
S
U
n
d
e
r
g
r
o
u
n
d
S
t
o
r
a
g
e
T
a
n
k
,
A
p
p
r
o
x
.
L
o
c
.
G
e
o
e
n
v
i
r
o
n
m
e
n
t
a
l
B
o
r
i
n
g
U
S
T
Known Soil Contamination: Area or SitePotential Soil Contamination: Area or Site Conc
r
e
t
e
o
r
G
r
a
n
i
t
e
R
/
W
M
a
r
k
e
r
Propos
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
w
i
t
h
CA
Conc
r
e
t
e
C
/
A
M
a
r
k
e
r
Propos
e
d
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
L
i
n
e
w
i
t
h
D
A
T
U
M
D
E
S
C
R
I
P
T
I
O
N
T
H
E
L
O
C
A
L
I
Z
E
D
C
O
O
R
D
I
N
A
T
E
S
Y
S
T
E
M
D
E
V
E
L
O
P
E
D
F
O
R
T
H
I
S
P
R
O
J
E
C
T
I
S
B
A
S
E
D
O
N
T
H
E
S
T
A
T
E
P
L
A
N
E
C
O
O
R
D
I
N
A
T
E
S
E
S
T
A
B
L
I
S
H
E
D
B
Y
N
C
D
O
T
F
O
R
M
O
N
U
M
E
N
T
"
B
5
1
5
1
-
1
"
W
I
T
H
N
A
D
8
3
/
N
S
R
S
2
0
0
7
S
T
A
T
E
P
L
A
N
E
G
R
I
D
C
O
O
R
D
I
N
A
T
E
S
O
F
N
O
R
T
H
I
N
G
:
9
8
4
5
8
4
.
4
3
7
(
f
t
)
E
A
S
T
I
N
G
:
2
1
1
7
0
7
8
.
9
5
7
(
f
t
)
E
L
E
V
A
T
I
O
N
:
4
1
9
.
9
5
(
f
t
)
T
H
E
A
V
E
R
A
G
E
C
O
M
B
I
N
E
D
G
R
I
D
F
A
C
T
O
R
U
S
E
D
O
N
T
H
I
S
P
R
O
J
E
C
T
(
G
R
O
U
N
D
T
O
G
R
I
D
)
I
S
:
1
.
0
0
0
0
7
6
5
7
T
H
E
N
.
C
.
L
A
M
B
E
R
T
G
R
I
D
B
E
A
R
I
N
G
A
N
D
L
O
C
A
L
I
Z
E
D
H
O
R
I
Z
O
N
T
A
L
G
R
O
U
N
D
D
I
S
T
A
N
C
E
F
R
O
M
"
B
5
1
5
1
-
1
"
T
O
-
L
-
S
T
A
T
I
O
N
1
1
+
0
0
.
0
0
I
S
N
4
4
3
7
’
2
2
.
5
0
"
W
2
4
3
5
.
9
4
’
A
L
L
L
I
N
E
A
R
D
I
M
E
N
S
I
O
N
S
A
R
E
L
O
C
A
L
I
Z
E
D
H
O
R
I
Z
O
N
T
A
L
D
I
S
T
A
N
C
E
S
V
E
R
T
I
C
A
L
D
A
T
U
M
U
S
E
D
I
S
N
A
V
D
8
8
NC GRIDNAD 83/NSRS 2007-L- POC STA. 11+00.00 BEGIN TIP PROJECT B-5151
-
L
-
P
O
C
S
T
A
.
1
8
+
0
0
.
0
0
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
5
1
5
1
BL-106BL-107
-
L-
B
M
-
2
B
L
-
1
0
5
B
M
-
1
B
L
-
1
0
4
B
L
-
1
0
3
CRAWFORD-CURRIN RD.SR 1432
WO
O
D
S
WO
O
D
S
WO
O
D
S
WO
O
D
S
WO
O
D
S
WOODS
N
C
D
O
T
G
P
S
S
T
A
T
I
O
N
B
5
1
5
1
-
1
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
N
=
9
8
4
5
8
4
.
4
3
7
E
=
2
1
1
7
0
7
8
.
9
5
7
N
C
D
O
T
G
P
S
S
T
A
T
I
O
N
B
5
1
5
1
-
2
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
N
=
9
8
3
6
2
1
.
4
5
6
E
=
2
1
1
7
5
4
6
.
0
4
8
L
ITTLE
GRASSY
CREEK
TO HERMAN WILKERSON ROAD
TO
LITTLE M
OUNTAIN CREEK ROAD
L
O
C
A
T
I
O
N
:
B
R
I
D
G
E
N
O
.
2
1
5
O
V
E
R
L
I
T
T
L
E
G
R
A
S
S
Y
C
R
E
E
K
O
N
S
R
1
4
3
2
(
C
R
A
W
F
O
R
D
C
U
R
R
I
N
R
D
.
)
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
6/2/9925-M AR-2014 12:55R:\Roadway\Proj\B5151_LS_1c.dgn$$$$USERNAM E$$$$
L
o
c
a
t
i
o
n
a
n
d
S
u
r
v
e
y
s
N
O
T
E
:
D
R
A
W
I
N
G
N
O
T
T
O
S
C
A
L
E
S
U
R
V
E
Y
C
O
N
T
R
O
L
S
H
E
E
T
B
-
5
1
5
1
1
-
C
B
-
5
1
5
1
I
N
D
I
C
A
T
E
S
G
E
O
D
E
T
I
C
C
O
N
T
R
O
L
M
O
N
U
M
E
N
T
S
U
S
E
D
O
R
S
E
T
F
O
R
H
O
R
I
Z
O
N
T
A
L
P
R
O
J
E
C
T
C
O
N
T
R
O
L
B
Y
T
H
E
N
C
D
O
T
L
O
C
A
T
I
O
N
A
N
D
S
U
R
V
E
Y
S
U
N
I
T
.
P
R
O
J
E
C
T
C
O
N
T
R
O
L
E
S
T
A
B
L
I
S
H
E
D
U
S
I
N
G
G
L
O
B
A
L
P
O
S
I
T
I
O
N
I
N
G
S
Y
S
T
E
M
.
N
O
T
E
S
:
1
.
T
H
E
C
O
N
T
R
O
L
D
A
T
A
F
O
R
T
H
I
S
P
R
O
J
E
C
T
C
A
N
B
E
F
O
U
N
D
E
L
E
C
T
R
O
N
I
C
A
L
L
Y
B
Y
S
E
L
E
C
T
I
N
G
T
H
E
F
I
L
E
S
T
O
B
E
F
O
U
N
D
A
R
E
A
S
F
O
L
L
O
W
S
:
S
I
T
E
C
A
L
I
B
R
A
T
I
O
N
I
N
F
O
R
M
A
T
I
O
N
H
A
S
N
O
T
B
E
E
N
P
R
O
V
I
D
E
D
F
O
R
T
H
I
S
P
R
O
J
E
C
T
.
I
F
F
U
R
T
H
E
R
I
N
F
O
R
M
A
T
I
O
N
I
S
N
E
E
D
E
D
,
P
L
E
A
S
E
C
O
N
T
A
C
T
T
H
E
L
O
C
A
T
I
O
N
A
N
D
S
U
R
V
E
Y
S
U
N
I
T
.
H
T
T
P
S
:
/
/
C
O
N
N
E
C
T
.
N
C
D
O
T
.
G
O
V
/
R
E
S
O
U
R
C
E
S
/
L
O
C
A
T
I
O
N
/
B
5
1
5
1
_
L
S
_
C
O
N
T
R
O
L
.
T
X
T
N
C
D
O
T
P
R
O
J
E
C
T
C
O
N
T
R
O
L
D
A
T
A
A
T
:
CONTROL DATA107 BL-107 986463.53 2114951.25 403.72 OUTSIDE PRO
J
E
C
T
L
I
M
I
T
S
106 BL-106 986321.51 2115279.47 378.29 10+13.82 1
3
.
7
2
R
T
105 BL-105 986313.79 2115653.31 354.50 13+76.81 3
4
.
3
9
L
T
104 BL-104 986169.23 2115818.95 355.13 15+85.53 1
8
.
7
5
L
T
103 BL-103 985558.41 2116105.15 395.59 OUTSIDE PRO
J
E
C
T
L
I
M
I
T
S
----------------------------------------------------------------
-
-
-
-
-
-
-
-
POINT DESC. NORTH EAST ELEVATION L STATION
O
F
F
S
E
T
BASELINE****************************************RRS IN 18" BIRCH L STATION 13+59.00 18 RIGHT N 986272 E 2115617 BM-1 ELEVATION = 352.53 ********************************************************************************RRS IN 16" PINE L STATION 12+11.00 32 RIGHT N 986287 E 2115478 BM-2 ELEVATION = 366.56 ****************************************BENCHMARK DATA
R
O
W
M
a
r
k
e
r
C
o
n
c
r
e
t
e
o
r
G
r
a
n
i
t
e
-
E
A
L
I
G
N
S
T
A
T
I
O
N
O
F
F
S
E
T
N
O
R
T
H
E
A
S
T
L
1
1
+
0
0
.
0
0
3
0
.
0
0
9
8
6
2
8
8
.
3
3
7
0
2
1
1
5
3
6
5
.
0
5
8
3
L
1
1
+
0
0
.
0
0
-
3
0
.
0
0
9
8
6
3
4
8
.
0
7
4
8
2
1
1
5
3
7
0
.
6
6
2
3
L
1
1
+
0
0
.
0
0
4
0
.
0
0
9
8
6
2
7
8
.
3
8
0
7
2
1
1
5
3
6
4
.
1
2
4
3
L
1
1
+
6
3
.
3
3
-
3
0
.
0
0
9
8
6
3
4
6
.
8
4
2
5
2
1
1
5
4
2
9
.
5
7
4
7
L
1
1
+
6
9
.
6
3
4
0
.
0
0
9
8
6
2
7
7
.
3
4
1
0
2
1
1
5
4
4
0
.
0
5
6
3
L
1
2
+
1
1
.
2
6
-
3
2
.
2
0
9
8
6
3
5
0
.
2
0
9
4
2
1
1
5
4
7
9
.
9
6
0
4
L
1
2
+
4
8
.
0
4
-
3
8
.
3
5
9
8
6
3
5
3
.
4
9
3
2
2
1
1
5
5
2
0
.
0
4
6
0
L
1
3
+
0
4
.
3
5
-
4
9
.
1
0
9
8
6
3
5
3
.
0
7
4
2
2
1
1
5
5
8
2
.
8
7
3
3
L
1
3
+
1
7
.
8
0
-
5
1
.
5
7
9
8
6
3
5
1
.
6
3
2
4
2
1
1
5
5
9
8
.
0
0
9
3
L
1
3
+
5
1
.
0
3
-
5
2
.
2
4
9
8
6
3
4
0
.
8
6
3
3
2
1
1
5
6
3
3
.
6
0
3
8
L
1
3
+
8
0
.
0
0
-
5
0
.
0
0
9
8
6
3
2
6
.
6
9
0
2
2
1
1
5
6
6
2
.
7
8
0
6
L
1
4
+
5
0
.
0
0
-
4
0
.
0
0
9
8
6
2
8
1
.
1
7
2
0
2
1
1
5
7
2
5
.
8
5
4
5
L
1
7
+
6
8
.
7
2
-
4
0
.
0
0
9
8
6
0
0
5
.
9
1
2
8
2
1
1
5
9
2
5
.
8
7
7
8
L
1
7
+
6
8
.
7
2
4
0
.
0
0
9
8
5
9
8
5
.
1
2
1
9
2
1
1
5
8
4
8
.
6
2
6
6
L
1
8
+
0
0
.
0
0
4
0
.
0
0
9
8
5
9
5
4
.
9
1
2
7
2
1
1
5
8
5
6
.
7
5
7
0
L
1
8
+
0
0
.
0
0
3
0
.
0
0
9
8
5
9
5
7
.
5
1
1
5
2
1
1
5
8
6
6
.
4
1
3
3
L
1
8
+
0
0
.
0
0
-
3
0
.
0
0
9
8
5
9
7
3
.
1
0
4
7
2
1
1
5
9
2
4
.
3
5
1
7
L
1
8
+
0
0
.
0
0
-
4
0
.
0
0
9
8
5
9
7
5
.
7
0
3
5
2
1
1
5
9
3
4
.
0
0
8
1
R
O
W
M
a
r
k
e
r
P
e
r
m
a
n
e
n
t
E
a
s
e
m
e
n
t
-
E
A
L
I
G
N
S
T
A
T
I
O
N
O
F
F
S
E
T
N
O
R
T
H
E
A
S
T
L
1
3
+
2
0
.
0
0
4
0
.
0
0
9
8
6
2
6
2
.
9
2
4
0
2
1
1
5
5
7
5
.
1
8
6
0
L
1
3
+
2
0
.
0
0
5
0
.
0
0
9
8
6
2
5
3
.
3
1
0
0
2
1
1
5
5
7
2
.
4
3
4
7
L
1
3
+
8
0
.
0
0
-
6
0
.
0
0
9
8
6
3
3
5
.
8
3
6
0
2
1
1
5
6
6
6
.
8
2
4
8
L
1
4
+
5
0
.
0
0
-
6
0
.
0
0
9
8
6
2
9
7
.
9
3
5
2
2
1
1
5
7
3
6
.
7
6
2
9
L
1
5
+
7
0
.
0
0
5
0
.
0
0
9
8
6
1
3
6
.
3
4
4
6
2
1
1
5
7
5
6
.
7
6
7
7
L
1
5
+
7
0
.
0
0
4
0
.
0
0
9
8
6
1
4
2
.
9
2
8
5
2
1
1
5
7
6
4
.
2
9
4
5
L
T
Y
P
E
S
T
A
T
I
O
N
N
O
R
T
H
E
A
S
T
P
C
1
0
+
0
0
.
0
0
9
8
6
3
3
8
.
8
3
0
7
2
1
1
5
2
7
0
.
2
3
4
1
P
R
C
1
1
+
6
9
.
6
3
9
8
6
3
1
7
.
2
5
3
5
2
1
1
5
4
3
7
.
4
1
2
2
P
T
1
7
+
6
8
.
7
2
9
8
5
9
9
5
.
5
1
7
4
2
1
1
5
8
8
7
.
2
5
2
2
P
O
T
1
8
+
8
8
.
4
5
9
8
5
8
7
9
.
8
9
9
0
2
1
1
5
9
1
8
.
3
6
9
0
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
(FINAL PAVEMENT DESIGN)
0
.
0
8
0
.0
8
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
S
E
E
X
S
C
’
S
V
A
R
.
4
:
1
G
R
A
D
E
P
O
I
N
T
2:1
0
.
0
2
0
.
0
2
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
2:1
4
:1
C
1
C
1
E
1
E
1
T
T
O
R
I
G
I
N
A
L
G
R
O
U
N
D
O
R
I
G
I
N
A
L
G
R
O
U
N
D
A
T
T
H
E
F
O
L
L
O
W
I
N
G
L
O
C
A
T
I
O
N
S
:
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
A
T
T
H
E
F
O
L
L
O
W
I
N
G
L
O
C
A
T
I
O
N
:
U
S
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
2
ORIGINAL GROUND
C
1
C
1
G
R
A
D
E
P
O
I
N
T
CL
-
L
-
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
2
0
.
0
4
0
.
0
4
CL
-
L
-
-
L
-
S
T
A
.
1
4
+
6
0
.
7
4
(
E
N
D
B
R
I
D
G
E
)
T
O
1
8
+
0
0
.
0
0
-
L
-
S
T
A
.
1
1
+
0
0
.
0
0
T
O
1
3
+
7
3
.
2
6
(
B
E
G
I
N
B
R
I
D
G
E
)
1
4
+
6
0
.
7
4
(
E
N
D
B
R
I
D
G
E
)
-
L
-
S
T
A
.
1
3
+
7
3
.
2
6
(
B
E
G
I
N
B
R
I
D
G
E
)
T
O
ORIGINALGROUND C1R1USE SHOULDER BERM GUTTER AT THE FOLLOWING LOCATIO
N
S
:
E1GRADE TO THIS LINEON TOP OF SUBGRADE DETAIL SHOWING SHOULDER BERM GUTTER (SBG)
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
2
B
-
5
1
5
1
P
A
V
E
M
E
N
T
D
E
S
I
G
N
6/2/9925-MAR-2014 12:55R:\Roadway\Proj\B5151_Rdy_typ.dgn$$$$USERNAM E$$$$P A V E M E N T S C H E D U L E-L- STA. 13+43.00 TO 13+56.80 RT.-L- STA. 14+70.22 TO 14+86.00 RT.7"
7
"
C
L
B
R
I
D
G
E
"
@
21
4
NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE
.
4
’
4
’
8
’
F
D
P
S
1
’
F
D
P
S
1
’
w
/
G
R
7
’
w
/
G
R
7
’
1
’
1
’
1
"
1
"
5
’
-
1
0
"
T
O
3
’
-
1
"
V
A
R
.
3
0
’
(
O
U
T
T
O
O
U
T
)
2
7
’
-
1
0
"
(
C
L
E
A
R
R
O
A
D
W
A
Y
)
1
0
’
1
0
’
1
0
’
1
0
’
C
H
O
R
D
L
O
N
G
1
4
’
-
3
"
1
3
’
-
7
"
4
’
-
7
"
T
O
2
’
M
I
N
.
V
A
R
.
EARTH MATERIAL.T AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.
0
B
,
E1
S
E
E
S
T
R
U
C
T
U
R
E
P
L
A
N
S
B
O
X
B
E
A
M
B
R
I
D
G
E
EOL(SEE X-SECTIONS)VAR.FDPS 2’-4"MATCH LINE A
MATCH LINE A
VAR.VAR.0.04 R1SHOULDER BERM GUTTER.AT AN AVERAGE RATE OF 165 LBS. PER SQ. YD. IN EACH OF TW
O
LAYERS.C1 PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE
S
F
9
.
5
A
,
Ground NaturalPSRM
G
r
a
d
e
D
i
t
c
h
2
.
0
’
G
E
O
T
E
X
T
I
L
E
Slope Ditch FrontGeotextile Ditch Slope FrontGeotextileSlopeDitchFront
NAD 83/ NSRS 2007
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
02-M AY-2014 15:30R:\Roadway\Proj\B5151_Rdy_psh.dgn$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
B
-
5
1
5
1
4
P
R
O
P
.
P
A
V
E
D
S
H
O
U
L
D
E
R
F
O
R
-
L
-
P
R
O
F
I
L
E
,
S
E
E
S
H
E
E
T
N
O
.
5
L
ITTLE
GRASSY
CREEK
GRA
U
3
5
0
T
L
-
2
SKETCH SHOWING PAVEMENT/BRIDG
E
R
E
L
A
T
I
O
N
S
H
I
P
(NOT TO SCALE)BEGIN BRIDGE
E
N
D
B
R
I
D
G
E
BEGIN APPROACH SLAB
E
N
D
A
P
P
R
O
A
C
H
S
L
A
B
-L- POC STA. 11+00.00 BEGIN TIP PROJECT B-5151
-
L
-
P
O
T
S
T
A
.
1
8
+
0
0
.
0
0
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
5
1
5
1
8
:
1
P
.
S
.
T
R
A
N
S
.
8:1 P.S. TRANS.27’-10"4’-7"2’ MIN. TO VAR.
F
O
R
S
T
R
U
C
T
U
R
E
P
L
A
N
S
,
S
E
E
S
H
E
E
T
S
S
-
1
T
H
R
U
S
-
?
GRAU 350 TL-2GRAU 350 TL-2 -L- STA. 13+73.26-L- STA. 13+61.02
-
L
-
S
T
A
.
1
4
+
6
0
.
7
4
-
L
-
S
T
A
.
1
4
+
7
2
.
2
5
-L- STA. 13+43.00 BEGIN SBG
-
L
-
S
T
A
.
1
4
+
8
6
.
0
0
E
N
D
S
B
G
B
R
I
D
G
E
A
P
P
R
O
A
C
H
S
L
A
B
P
A
V
E
M
E
N
T
R
E
M
O
V
A
L
*LONG CHORD*STRUCTURE DESIGN (SEE STRUC
T
U
R
E
P
L
A
N
S
)
.
LONG CHORD TO THE CURVE
S
E
T
B
Y
NOTE: THE BRIDGE IS DESIGNE
D
O
N
T
H
E
04
15
+
0
0
T
L
-
2
G
R
A
U
3
5
0
20’
O
T
H
E
R
W
I
S
E
O
N
P
L
A
N
S
A
L
L
D
R
I
V
E
W
A
Y
R
A
D
I
I
A
R
E
1
0
’
U
N
L
E
S
S
N
O
T
E
D
20’
2
0
’
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
S
E
E
S
T
R
U
C
T
U
R
E
P
L
A
N
S
E
N
D
B
E
N
T
E
X
C
A
V
A
T
I
O
N
-L--L-SHOP CURVED TYPE-IIISHOP CURVED TYPE-IIISHOP CURVED TYPE-IIISHOP CURVED TYPE-III5’-10"" TO 21 3’-1VAR.
+27.63
P
I
S
t
a
1
0
+
8
5
.
9
0
DL
=
1
6
9
.
6
3
’
T
=
8
5
.
9
0
’
R
=
4
3
6
.
0
5
’
P
I
S
t
a
1
5
+
2
7
.
3
0
DL
=
5
9
9
.
0
8
’
T
=
3
5
7
.
6
7
’
R
=
4
3
6
.
0
0
’
PC Sta. 10+00.00
PRC Sta. 11+69.63
PT Sta. 17+68.72
P
OT Sta. 18+88.45
-
L
-
S
E
=
0
.
0
4
R
O
=
8
4
’
T
YP.21’
+
3
7.0
0
-
L-
TYP.21’
LT. & RT.
TRANS.50’
T
YP.21’
LT. &
RT.
T
R
A
NS.50’
10+00
15+00
01
02
+53.63
B
M
#
2
B
M
#
1
20’
1’ P.S.
1’ P.S.
1’
P.S.
1’ P.S.
03
0201
00 01 02
03
04
04
0
4
0302
20’
20’
20’
27.63’
M
E
T
A
L
G
A
T
E
D
O
N
O
T
D
I
S
T
U
R
B
FENCE DO NOT DISTURB
T
T
15" R
CP
60.00’
60.00’
E
P
K
PR
O
PE
R
T
Y
LI
N
E I
S
C/
L
O
F
C
R
E
E
K
PROPERTY
L
INE
IS
C
/L
OF
CREEK
WO
O
D
S
W
O
O
D
S
WOODS
WO
O
D
S
WO
O
D
S
WO
O
D
S
15
" R
C
P
4’ WD
4’ WD
1 S EL WIRE
1
S
E
L
W
I
R
E
4’ WW
4’ WD & WW
4’ WD & WW 5’ WD & WW
5’
WD
&
W
W
MTL
G
ATE
S
O
IL
SOIL15" R
CP
SOIL
S
IL
T
F
E
N
C
E
4
’ WD
T
T
T
4
’ WW
B
R
ID
G
E
#
2
15
CR
AWF
OR
D
-
CUR
R
IN
R
D
.
S
R
14
3
2
20’ BST EXISTING R/W
E
XIS
TIN
G
R/
W
E
X
IS
T
ING
R
/
W
EXISTING R/W
BL-107
CONC WW
R
I
P
R
A
P
RIP
R
A
P
CONC WW
B
L
-10
4
BL-105
BL-106
D
B
9
7
7
P
G
7
7
7
P
B
2
8
P
G
1
1
8
M
A
T
T
H
E
W
&
V
A
L
E
R
IE
C
O
R
S
A
R
O
D
B
12
0
8
P
G
7
0
7
P
B
0
7
P
G
1
2
2
R
O
B
E
R
T
A
.
K
U
H
L
B
E
R
G
&
G
A
Y
L
E
G
.
K
U
H
L
B
E
R
G
D
B
7
6
8
P
G
5
4
0
D
B
12
0
6
P
G
10
9
L
U
C
Y
H
.
B
O
D
E
P
B
3
0
P
G
1
3
9
D
B
1
2
0
1
P
G
9
6
D
B
1
2
4
6
P
G
5
4
1
D
B
1
0
9
4
P
G
3
5
5
P
B
3
0
P
G
1
5
8
J
O
H
N
S
.
F
L
O
W
E
,
I
I
I
D
B
1
2
0
1
P
G
9
6
SR 1432CRAWFORD-CURRIN RD.
4
0
.
0
0
’
4
0
.
0
0
’
4
0
.
0
0
’
5
0
.
0
0
’
-
L
-
+
0
0
.
0
0
&
4
0
.
0
0
’
EX
.
R
/
W
-
L
-
+
6
9
.
6
3
-
L
-
+
6
8
.
7
2
-
L
-
+
0
0
.
0
0
&
4
0
.
0
0
’
EX
.
R
/
W
-
L
-
+
0
0
.
0
0
&
4
0
.
0
0
’
EX
.
R
/
W
-
L
-
+
6
8
.
7
2
-
L
-
+
2
5
.
0
0
-
L
-
+
2
0
.
0
0
&
5
0
.
0
0
’
4
0
.
0
0
’
-
L
-
+
7
0
.
0
0
&
5
0
.
0
0
’
4
0
.
0
0
’
-L- +00.00& 35.00’ EX. R/W
-
L
-
+
1
1
.
2
6
EX
.
R
/
W
-
L
-
+
8
0
.
0
0
-
L
-
+
5
0
.
0
0
4
3
1
2
5
0
.
0
0
’
-
L
-
+
5
0
.
0
0
-L- +63.33EX. R/W
-
L
-
+
4
8
.
0
4
EX
.
R
/
W
-
L
-
+
0
4
.
3
5
EX
.
R
/
W
-
L
-
+
1
7
.
8
0
EX
.
R
/
W
-
L
-
+
5
1
.
0
3
EX
.
R
/
W
-
L
-
+
7
0
.
0
0
&
7
3
.
0
0
’
5
0
.
0
0
’
&
6
0
.
0
0
’
4
0
.
0
0
’
&
6
0
.
0
0
’
5
0
.
0
0
’
C
H
O
R
D
C
H
O
R
D
R
E
T
A
I
N
R
O
C
K
C
H
E
C
K
D
A
M
R
E
T
A
I
N
R
E
M
O
V
E
R
E
T
A
I
N
1
5
"
C
S
P
1
5
"
C
S
P
T
B
2
G
I
T
B
2
G
I
0
4
0
1
0
4
0
2
0
4
0
4
0
4
0
3
R
E
T
A
I
N
R
O
C
K
C
H
E
C
K
D
A
M
ROCK CHECK
D
A
M
RETAIN EXIST
I
N
G
ROCK CHECK DAM RETAIN EXISTING ROCK CHECK DAM RETAIN EXISTING
R
O
C
K
C
H
E
C
K
D
A
M
R
E
T
A
I
N
E
X
I
S
T
I
N
G
G
R
A
D
E
T
O
D
R
A
I
N
0
4
0
5
S
E
E
D
E
T
A
I
L
D
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
S
E
E
D
E
T
A
I
L
C
R
I
P
R
A
P
A
T
E
M
B
A
N
K
M
E
N
T
T
I
E
T
O
E
X
I
S
T
I
N
G
D
I
T
C
H
L
I
N
E
E
S
T
.
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
2
T
O
N
S
C
L
A
S
S
B
R
I
P
R
A
P
E
S
T
.
7
S
Y
G
E
O
T
E
X
T
I
L
E
E
S
T
.
2
T
O
N
S
C
L
A
S
S
B
R
I
P
R
A
P
w
/
2
E
L
B
O
W
S
w
/
2
E
L
B
O
W
S
C
H
E
C
K
D
A
M
R
O
C
K
R
E
M
O
V
E
E
X
I
S
T
I
N
G
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
C
L
A
S
S
I
I
R
I
P
R
A
P
EST. 100 SY PSRM SEE DETAIL A TOE PROTECTION( Not to Scale)TOE PROTECTIONd-L- STA. 11+00 TO STA. 12+50 LT Front Slope4:1 or Flatterd=1.5 Ft.Type of Liner= PSRM DETAIL A
B
E
N
C
H
U
N
D
E
R
B
R
I
D
G
E
C
L
A
S
S
I
I
R
I
P
R
A
P
O
N
(
N
o
t
t
o
S
c
a
l
e
)
R
I
P
R
A
P
A
T
E
M
B
A
N
K
M
E
N
T
-
L
-
S
T
A
.
1
4
+
3
0
R
T
-
L
-
S
T
A
.
1
3
+
9
1
R
T
D
E
T
A
I
L
C
G
e
o
t
e
x
t
i
l
e
=
7
5
S
Y
C
l
a
s
s
I
I
R
i
p
R
a
p
=
3
0
T
O
N
S
1
0
’
m
i
n
.
1
.
0
’
m
i
n
.
18"
2:1DFlatter4:1 ord( Not to Scale)SPECIAL CUT DITCH-L- STA. 17+00 TO STA. 18+00 LT DETAIL EMax. d=1.5 Ft.Min. D=1.5 Ft.Type of Liner= Class B Rip-Rap Ground Natural
R
O
C
K
C
H
E
C
K
D
A
M
R
E
T
A
I
N
E
X
I
S
T
I
N
G
EL
B
ELB
EL
B
EL
B
O
U
T
S
I
D
E
O
F
B
R
I
D
G
E
O
N
1
.
5
:
1
S
L
O
P
E
O
N
L
Y
C
L
A
S
S
I
I
R
I
P
R
A
P
C
L
A
S
S
B
R
I
P
R
A
P
S
E
E
D
E
T
A
I
L
E
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
w
/
R
I
P
R
A
P
d 2:1BD ( Not to Scale)SPECIAL CUT BASE DITCHFlatterX:1 or-L- STA. 13+00 TO STA. 13+90 RT (X=2)-L- STA. 11+00 TO STA. 13+00 RT (X=4)DETAIL BB=2.0 Ft.Max. d=1.5 Ft.Min. D=1.5 Ft.Type of Liner= Class I Rip-Rap Ground NaturalFlatterX:1 orD2:1 ( Not to Scale)SPECIAL CUT DITCH-L- STA. 15+00 TO STA. 15+75 RT (X=4)-L- STA. 14+50 TO STA. 15+00 RT (X=2)Min. D=1.0 Ft.DETAIL DGroundNatural
N
O
T
E
:
N
O
D
E
C
K
D
R
A
I
N
S
R
E
Q
U
I
R
E
D
C
L
A
S
S
I
R
I
P
R
A
P
S
E
E
D
E
T
A
I
L
B
w
/
R
I
P
R
A
P
S
P
E
C
I
A
L
C
U
T
B
A
S
E
D
I
T
C
H
C
C
F
F
C
C
F
F
C
C
F
C
C
F
C
C
C
F
F
340 350 360 370 380
P
I
=
1
3
+
1
4
.
0
0
E
L
=
3
5
6
.
0
7
’
V
C
=
1
1
5
’
K
=
1
7
P
I
=
1
5
+
9
4
.
0
0
E
L
=
3
5
4
.
6
6
’
V
C
=
2
2
7
’
K
=
4
9
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/14/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
5
B
-
5
1
5
1
27-JAN-2014 11:30R:\Roadway\Proj\B5151_Rdy_pfl.dgn$$$$USERNAM E$$$$10+0011+00
1
2
+
0
0
1
3
+
0
0
1
4
+
0
0
1
5
+
0
0
1
6
+
0
0
1
7
+
0
0
1
8
+
0
0
-
L
-
-
L
-
S
T
A
.
1
4
+
5
9
.
5
7
E
N
D
B
R
I
D
G
E
V
=
2
0
M
P
H
V
=
3
5
M
P
H
d
d
3
4
0
3
5
0
3
6
0
3
7
0
3
8
0
E
L
.
=
3
7
2
.
0
0
’
-
L
-
S
T
A
.
1
1
+
0
0
.
0
0
B
E
G
I
N
G
R
A
D
E
E
L
.
=
3
6
3
.
1
7
’
-
L
-
S
T
A
.
1
8
+
0
0
.
0
0
E
N
D
G
R
A
D
E
-
L
-
S
T
A
.
1
3
+
7
4
.
4
3
B
E
G
I
N
B
R
I
D
G
E
El = 349.00’
(
+
)
1.
2
0
%
PI =13+50.00
EL = 369.75’-L- STA. 11+00.00BEGIN RT DITCH GRADE
EL = 346.60’
-L- STA. 13+90.00
END RT DITCH GRADE
EL = 348.50’
-L- STA. 14+50.00
BEGIN RT DITCH GRADE
EL = 350.00’
-L- STA. 15+75.00
END RT DITCH GRADE
D
I
T
C
H
L
E
G
E
N
D
R
I
G
H
T
D
I
T
C
H
D
E
S
I
G
N
D
I
S
C
H
A
R
G
E
D
E
S
I
G
N
F
R
E
Q
U
E
N
C
Y
B
A
S
E
D
I
S
C
H
A
R
G
E
C
F
S
Y
R
S
Y
R
S
B
A
S
E
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
E
L
E
V
A
T
I
O
N
O
V
E
R
T
O
P
P
I
N
G
F
R
E
Q
U
E
N
C
Y
O
V
E
R
T
O
P
P
I
N
G
D
I
S
C
H
A
R
G
E
C
F
S
C
F
S
Y
R
S
F
T
F
T
F
T
D
E
S
I
G
N
H
W
E
L
E
V
A
T
I
O
N
B
A
S
E
H
W
E
L
E
V
A
T
I
O
N
B
R
I
D
G
E
H
Y
D
R
A
U
L
I
C
D
A
T
A
D
A
T
E
O
F
S
U
R
V
E
Y
W
.
S
.
E
L
E
V
A
T
I
O
N
A
T
D
A
T
E
O
F
S
U
R
V
E
Y
F
T
=
3
2
0
0
=
2
5
=
3
5
4
.
5
=
4
7
4
3
=
1
0
0
=
3
5
6
.
8
7
=
3
9
0
0
=
5
0
=
3
5
5
.
6
=
1
0
/
1
5
/
2
0
1
3
=
3
4
4
.
0
EL = 352.53’-L- STA. 13+59.00 18’ RT.BM#1 RR SPIKE IN 18" BIRCHEL = 366.56’-L- STA. 12+11.00 32’ RT.BM#2 RR SPIKE IN 16" PINE
E
L
=
3
5
5
.
5
5
’
S
K
E
W
=
1
0
5
S
P
A
N
=
1
@
8
5
’
3
3
"
B
O
X
B
E
A
M
C
-
L
-
S
T
A
.
1
4
+
1
7
.
0
0
L
O
E
L
E
V
A
T
I
O
N
E
S
T
I
M
A
T
E
D
N
.
W
.
S
.
=
3
4
6
.
0
F
T
F
O
R
S
T
R
U
C
T
U
R
E
P
L
A
N
S
,
S
E
E
S
H
E
E
T
S
S
-
1
T
H
R
U
S
-
?
F
O
R
-
L
-
P
L
A
N
V
I
E
W
,
S
E
E
S
H
E
E
T
4
L
E
F
T
D
I
T
C
H
(-)7
.4
4
3
8
%
(-
)0
.5
0
3
6
%
(-
)0
.5
0
3
6
%
(
+
)
4
.
1
2
9
3
%
EL = 357.40’
-L- STA. 17+00.00
BEGIN LT DITCH GRADE
EL = 361.40’
-L- STA. 18+00.00
END LT DITCH GRADE
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
S
E
E
S
T
R
U
C
T
U
R
E
P
L
A
N
S
C
L
A
S
S
I
I
R
I
P
R
A
P
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
S
E
E
S
T
R
U
C
T
U
R
E
P
L
A
N
S
E
N
D
B
E
N
T
E
X
C
A
V
A
T
I
O
N
(
+
)
4
.
0
0
%
El = 357.00’
(-) 8
.5
0
%
(-) 8
.0
0
%
(-
) 6
.0
0
%
PI =12+50.00
(
S
T
R
U
C
T
U
R
E
P
A
Y
I
T
E
M
)
S
E
E
S
T
R
U
C
T
U
R
E
P
L
A
N
S
C
L
A
S
S
I
I
R
I
P
R
A
P
N
.
W
.
S
.
=
3
4
6
.
0
’
(
1
0
/
1
5
/
2
0
1
3
)
W
.
S
.
=
3
4
4
.
0
’
00 00
5
5
5
5
1
0
1
0
1
0
1
0
1
5
1
5
1
5
1
5
2
0
2
0
2
0
2
0
2
5
2
5
2
5
2
5
3
0
30
3
0
30
3
5
35
3
5
35
4
0
40
4
0
40
4
5
45
4
5
45
5
0
50
5
0
50
5
5
55
5
5
55
6
0
60
6
0
60
6
5
65
6
5
65
7
0
70
7
0
70
7
5
75
7
5
7517-JAN-2014 12:41R:\Roadway\XSC\B5151_Rdy_xpl_L.dgn$$$$USERNAME$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
375
3
7
5
380
3
8
0
370
3
7
0
1
0
+
5
0
.
0
0
370
3
7
0
375
3
7
5
365
3
6
5
1
1
+
0
0
.
0
0
365
3
6
5
370
3
7
0
375
3
7
5
360
3
6
0
1
1
+
5
0
.
0
0
360
3
6
0
365
3
6
5
370
3
7
0
375
3
7
5
1
2
+
0
0
.
0
0
355
3
5
5
360
3
6
0
365
3
6
5
1
2
+
5
0
.
0
0
X
-
1
B
-
5
1
5
1
-
L
-
2
.
5
5
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
3
7
5
.
4
9
3
7
2
.
0
0
4
:
1
0
.
0
3
4
0
.
0
2
7
3
6
9
.
6
4
4
:1
2:1
3
6
9
.
7
5
3
6
8
.
4
4
2:1
4
:1
4
:
1
0
.
0
1
0
0
.
0
0
8
3
6
5
.
5
0
3
6
5
.
8
4
3
6
4
.
6
7
2:1
4
:1
4
:
1
0
.
0
1
4
0
.
0
1
4
3
6
1
.
2
5
3
6
0
.
7
9
8
:
1
2:1
4
:1
0
.0
3
8
0
.0
3
8
3
5
7
.
0
0
00 00
5
5
5
5
1
0
1
0
1
0
1
0
1
5
1
5
1
5
1
5
2
0
2
0
2
0
2
0
2
5
2
5
2
5
2
5
3
0
30
3
0
30
3
5
35
3
5
35
4
0
40
4
0
40
4
5
45
4
5
45
5
0
50
5
0
50
5
5
55
5
5
55
6
0
60
6
0
60
6
5
65
6
5
65
7
0
70
7
0
70
7
5
75
7
5
7517-JAN-2014 12:41R:\Roadway\XSC\B5151_Rdy_xpl_L.dgn$$$$USERNAME$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
355
3
5
5
360
3
6
0
365
3
6
5
350
3
5
0
1
3
+
0
0
.
0
0
350
3
5
0
355
3
5
5
360
3
6
0
365
3
6
5
345
3
4
5
1
3
+
5
0
.
0
0
345
3
4
5
350
3
5
0
355
3
5
5
360
3
6
0
340
3
4
0
1
4
+
0
0
.
0
0
350
3
5
0
355
3
5
5
360
3
6
0
345
3
4
5
1
4
+
5
0
.
0
0
X
-
2
B
-
5
1
5
1
-
L
-
2
.
5
5
3
5
6
.
7
2
2:1
3
:1
0
.0
4
0
0
.0
4
0
3
5
2
.
5
0
4
%
D
R
I
V
E
W
A
Y
3
5
2
.
6
3
2:1
8
:
1
0
.0
4
0
0
.0
4
0
355.50
3
4
9
.
0
0
2:1
3
4
7
.
7
4
0
.0
4
0
0
.0
4
0
3
5
5
.
1
2
0
.0
4
0
0
.0
4
0
00 00
5
5
5
5
1
0
1
0
1
0
1
0
1
5
1
5
1
5
1
5
2
0
2
0
2
0
2
0
2
5
2
5
2
5
2
5
3
0
30
3
0
30
3
5
35
3
5
35
4
0
40
4
0
40
4
5
45
4
5
45
5
0
50
5
0
50
5
5
55
5
5
55
6
0
60
6
0
60
6
5
65
6
5
65
7
0
70
7
0
70
7
5
75
7
5
7517-JAN-2014 12:41R:\Roadway\XSC\B5151_Rdy_xpl_L.dgn$$$$USERNAME$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
350
3
5
0
355
3
5
5
360
3
6
0
345
3
4
5
1
5
+
0
0
.
0
0
350
3
5
0
355
3
5
5
360
3
6
0
345
3
4
5
1
5
+
5
0
.
0
0
355
3
5
5
360
3
6
0
365
3
6
5
350
3
5
0
1
6
+
0
0
.
0
0
355
3
5
5
360
3
6
0
365
3
6
5
370
3
7
0
1
6
+
5
0
.
0
0
X
-
3
B
-
5
1
5
1
-
L
-
2
.
5
5
3
5
5
.
0
6
3:
1
0
.0
4
0
0
.0
4
0
3
.5
0
:1
2:1
3
4
9
.
1
0
3
5
5
.
3
8
4
:
1
2:1
4
:1
0
.0
4
0
0
.0
4
0
3
4
9
.
7
0
3
5
6
.
0
8
4
:1
4
:
1
0
.0
4
0
0
.0
4
0
3
5
7
.
1
7
4
:
1
0
.0
4
0
0
.0
4
0
2
.8
:1
00 00
5
5
5
5
1
0
1
0
1
0
1
0
1
5
1
5
1
5
1
5
2
0
2
0
2
0
2
0
2
5
2
5
2
5
2
5
3
0
30
3
0
30
3
5
35
3
5
35
4
0
40
4
0
40
4
5
45
4
5
45
5
0
50
5
0
50
5
5
55
5
5
55
6
0
60
6
0
60
6
5
65
6
5
65
7
0
70
7
0
70
7
5
75
7
5
7517-JAN-2014 12:41R:\Roadway\XSC\B5151_Rdy_xpl_L.dgn$$$$USERNAME$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
360
3
6
0
365
3
6
5
370
3
7
0
375
3
7
5
355
3
5
5
1
7
+
0
0
.
0
0
360
3
6
0
365
3
6
5
370
3
7
0
375
3
7
5
1
7
+
5
0
.
0
0
360
3
6
0
365
3
6
5
370
3
7
0
375
3
7
5
1
8
+
0
0
.
0
0
365
3
6
5
370
3
7
0
375
3
7
5
360
3
6
0
1
8
+
5
0
.
0
0
X
-
4
B
-
5
1
5
1
-
L
-
2
.
5
5
3
5
9
.
0
4
2:1
4
:1
4
:
1
0
.0
4
0
0
.0
4
0
3
5
7
.
4
0
3
6
1
.
1
8
4
:1
2:1
4
:
1
0
.
0
3
6
0
.
0
3
4
3
5
9
.
4
0
3
6
3
.
1
7
2:1
3
:1
4
:
1
0
.
0
2
0
0
.
0
1
1
3
6
1
.
4
0
3
6
5
.
1
3