Loading...
HomeMy WebLinkAbout20210071 Ver 1_NCDOT DIV 5 2020 non-reporting NWP 3_20220712Impact Category County State Road Erwin Rd - pipe repair Pipe DURHAM SR 1306 Billy Hopkins Rd - pipe replacement Pipe WAKE SR 2314 Parrott Rd - pipe replacement Pipe VANCE SR 1127 Mill Creek Dr - pipe replacement Pipe WARREN SR 1431 Lake Wheeler Rd - pipe extension Pipe WAKE SR 1371 Country Club Rd - pipe replacement Pipe FRANKLIN/WAKE SR 2335 Road Name Location (Distance and direction from closest SR)LAT LONG ERWIN RD 0.19 mi N of Cameron Blvd (NC 751) 35.99983 -78.95239 BILLY HOPKINS RD 0.23 mi N of Fowler Rd 35.88686 -78.36187 PARROTT RD 0.67 mi S of US-158 BYPASS 36.32605 -78.46947 MILL CREEK DR 0.55 mi W of NC 903 (Ebony Rd) 36.54242 -77.95667 LAKE WHEELER RD 150 ft S of Penny Rd 35.71712 -78.68591 COUNTRY CLUB RD 0.75 mi N of Dukes Lake Rd 35.895432 -78.319658 Existing Structure Proposed Structure 54“ RCP with 16ft disconnected reset 4 end joints 128" x 83" CMPA with HW 60ft long 10'-11" x 7'-7" CMPA with HWs 60ft long 60“ CMP 60 ft 11'-5" X 7'-3" at 60ft 100" x 68" CMPA 80ft long 14'-3" X 9'-7" CAPPA with HWs 80ft long double line large pipes RCP and CMP 20ft extension metal sections added to both pipes 60“ CMP 60 ft 29'-8" X 7'-11" aluminum box 60ft long Problem Proposal disconnected pipe 4 joints off on outlet reset end joints and armor outlet and stream channel for stability pipe failure after major storm replace structure and armor pipe ends and stream channel for stability pipe failure after major storm replace structure and armor pipe ends for stability pipe failure after major storm on dead end road required temporary crossing upstream to maintain traffic during construction replace structure and armor pipe ends for stability, restore and mat stream banks upstream of inlet headwall had collapsed, causing shoulder/roadway failure above remove headwall, extend both pipes 20ft, armor outlet and stream channel for stability pipe failure after major storm replace structure and armor pipe ends for stability Nearest Stream Name DWQ Classification Bank Stabilization (Linear Feet) Slope Protection w/jurisdictional impacts Stream Channel (Linear Feet)- Permanent Wetland (Acres) UT to Sandy Creek WS-IV; NSW 10LF outlet concurrent N/A 30LF outlet N/A UT to Little River WS-II; HQW; NSW 40LF 20LF inlet/outlet concurrent N/A 40LF 20LF rip rap upstream and downstream N/A UT to Ruin Creek C; NSW 20LF inlet concurrent, outlet slope protection with no impacts N/A N/A N/A Mill Creek C 25LF 15LF inlet/10LF outlet concurrent N/A N/A N/A UT to Swift Creek WS-III; NSW 5LF outlet concurrent N/A 40LF outlet 20LF pipe and 20LF rip rap N/A Moccasin Creek C; NSW 30LF 10LF inlet/20LF outlet concurrent N/A N/A N/A Type of Wetland Open Water (Acres) Stream Channel (Linear Feet)- Temporary T & E Species Present? Yes or No Historic Concerns Most Recent Site Visit Additional Site Visit Required? N/A N/A 40LF No No 5/7/2020 No N/A N/A 40LF No No 11/6/2020 No N/A N/A 40LF No No 7/21/2020 No N/A N/A 55LF No No 12/30/2020 No N/A N/A 40LF No No 11/5/2020 No N/A N/A 40LF No No 12/30/2020 No Permit Requirements and Comments Cape Fear River Basin/Jordan Lake WSWS EXEMPT from buffer authorization Neuse River Basin EXEMPT from buffer authorization Tar-Pamlico River Basin EXEMPT from buffer authorization Roanoke River Basin No Buffer Impacts Neuse River Basin EXEMPT from buffer authorization Neuse River Basin EXEMPT from buffer authorization