Loading...
HomeMy WebLinkAbout20140712 Ver 1_Application_20140709(V e r s i o n 1 . 2 ; R e l e a s e d J u l y 2 0 1 2 ) SF - 7 8 0 0 9 2 Co u n t y ( i e s ) : Ro c k i n g h a m Page 1of 2 Pr o j e c t T y p e : D a t e : Ph o n e : Ph o n e : Em a i l : Em a i l : Co u n t y ( i e s ) : CA M A C o u n t y ? De s i g n / F u t u r e : Ex i s t i n g : Su p p l e m e n t a l : Nu t r i e n t S e n s i t i v e W a t e r s ( N S W ) Pr i m a r y : Ha w R i v e r T r i b u t a r y 1 6 Ca p e F e a r 16 - ( 6 . 5 ) be l a m @ s u n g a t e d e s i g n . c o m Pa v e d 1 0 ' l a n e s w i t h s h o u l d e r s e c t i o n P av e d 1 0 ' l a n e s w i t h s h o u l d e r s e c t i o n Jo r d a n L a k e NC D W Q S t r e a m I n d e x N o . : Pr o j e c t / T I P N o . : NC D O T C o n t a c t : Pr o j e c t N o . : SF - 7 8 0 0 9 2 Co n t r a c t o r / D e s i g n e r : gc a i l @ n c d o t . g o v Ra l e i g h , N C 2 7 6 9 9 - 1 5 9 0 Ge n e r a l P r o j e c t I n f o r m a t i o n Ad d r e s s : 5/6/2014 91 5 J o n e s F r a n k l i n R o a d 15 9 0 M a i l S e r v i c e C e n t e r Ra l e i g h , N C 2 7 6 0 6 No r t h C a r o l i n a D e p a r t m e n t o f T r a n s p o r t a t i o n Hi g h w a y S t o r m w a t e r P r o g r a m S T O R M W A T E R M A N A G E M E N T P L A N FO R L I N E A R R O A D W A Y P R O J E C T S Ga l e n C a i l , P E Br i d g e R e p l a c e m e n t ac. Ge n e r a l P r o j e c t N a r r a t i v e : Th i s p r o j e c t i n v o l v e s t h e r e p l a c e m e n t o f B r i d g e N o . 7 8 0 0 9 2 o v e r H a w R i v e r T r i b u t a r y 1 6 o n S R 2 6 9 2 ( K e r n o d l e R o a d ) . T h e e x i s t i n g bridge consists of 1 @ 19', 1 @ 40', 1 @ 19 ' t i m b e r d e c k o n s t e e l I - b e a m s o n t i m b e r p i l e s a n d a b u t m e n t s w i t h a 1 9 ' c l e a r r o a d w a y w i d t h . T h e p r o p o s e d b r i d g e c o n s i s t s o f a 1 @ 8 0 ' 2 7 " B o x B e a m w i t h a 2 4 ' - 1 0 " c l e a r ro a d w a y w i d t h . H a w R i v e r T r i b u t a r y 1 6 i s i n t h e C a p e F e a r r i v e r b a s i n a n d i s p a r t o f t h e J o r d a n L a k e w a t e r s h e d , t h e r e f o r e m e a s u r e s h a v e b e e n t a k e n t o r e d u c e d i r e c t r u n o f f in t o t h e b u f f e r s . T h e b r i d g e r e p l a c e m e n t a n d a s s o c i a t e d a p p r o a c h i m p r o v e m e n t s h a v e b e e n d e s i g n e d t o m i n i m i z e i n c r e a s e s t o i m p e r vious areas. There will be no deck drains on t h e p r o p o s e d b r i d g e d e c k . S h o u l d e r b e r m g u t t e r w i l l c o n v e y s t o r m w a t e r r u n o f f f r o m t h e p r o p o s e d b r i d g e d e c k t o b e c o l l e c t e d i n a 2 G I a n d d i s c h a r g e d o n t o a r i p r a p di s s i p a t o r l o c a t e d o u t s i d e o f b u f f e r z o n e 2 , w h i c h w i l l d r a i n t o an e x i s t i n g n a t u r a l f l a t a r e a . Q 1 0 a t t h e o u t l e t i s r e l a t i v e l y s m a l l ( 0 . 3 c u b i c f e e t p e r s e c o n d ) a n d t h e v e l o c i t y a t t h e en d o f t h e r i p r a p d i s s i p a t o r i s 0 . 5 f e e t p e r s e c o n d . O n t h e so u t h s i d e o f t h e b r i d g e , l a t e r a l V d i t c h e s a r e b e i n g p r o p o s e d o n ea c h s i d e o f t h e r o a d t o c o n v e y w a t e r f r o m e x i s t i n g di t c h e s a n d w i l l d i s c h a r g e i n t o e x i s t i n g d i t c h e s a t t h e e d g e o f b u f f e r z o n e 2 . 2 : 1 f i l l s l o p e s h a v e b e e n u s e d t o r e d u c e i m p a c t s t o t h e b u f f e r s . Ty p i c a l C r o s s S e c t i o n D e s c r i p t i o n : Re f e r e n c e s 130 0. 2 0 Av e r a g e D a i l y T r a f f i c ( v e h / h r / d a y ) : ac . Ot h e r S t r e a m C l a s s i f i c a t i o n : Su n g a t e D e s i g n G r o u p , P A Ci t y / T o w n : (9 1 9 ) 8 5 9 - 2 2 4 3 Hy d r a u l i c s U n i t Ad d r e s s : Re i d s v i l l e (9 1 9 ) 7 0 7 - 6 7 1 1 Ro c k i n g h a m No NC D W Q S u r f a c e W a t e r C l a s s i f i c a t i o n f o r P r i m a r y R e c e i v i n g W a t e r 30 3 ( d ) I m p a i r m e n t s : Ri v e r B a s i n ( s ) : Pr i m a r y R e c e i v i n g W a t e r : Wa t e r S u p p l y V ( W S - V ) Bu f f e r R u l e s i n E f f e c t Pr o j e c t D e s c r i p t i o n Su r r o u n d i n g L a n d U s e : Ru r a l , A g r i c u l t u r e 0. 0 7 2 M i N/ A 0. 1 6 Pr o j e c t B u i l t - U p o n A r e a ( a c . ) Pr o p o s e d P r o j e c t E x i s t i n g S i t e Pr o j e c t L e n g t h ( l i n . M i l e s o r f e e t ) : (V e r s i o n 1 . 2 ; R e l e a s e d J u l y 2 0 1 2 ) SF - 7 8 0 0 9 2 Co u n t y ( i e s ) : Ro c k i n g h a m Pa g e 2 o f 2 Sh e e t No . S t a t i o n En e r g y D i s s i p a t o r Ty p e R i p r a p T y p e Dr a i n a g e A r e a (a c ) Q10 (cfs)V10 (fps) S T O R M W A T E R M A N A G E M E N T P L A N FO R L I N E A R R O A D W A Y P R O J E C T S Ha v e m i n i m u m d e s i g n c r i t e r i a , a s p r e s e n t e d i n t h e N C D O T B e s t M a n a g e m e n t P r a c t i c e s T o o l b o x ( 2 0 0 8 ) , N C D O T S t a n d a r d D e t a i l s , o r F H WA HE C - 1 4 ( J u l y 2 0 0 6 ) , b e e n m e t a n d v e r i f i e d , a s a p p l i c a b l e ? I f N o , p r ov i d e f u r t h e r e x p l a n a n t i o n o f w h y d e s i g n c r i t e r i a w a s n o t m et. Ad d i t i o n a l C o m m e n t s Pr o j e c t / T I P N o . : Ri p r a p A p r o n / P a d 13 + 3 7 - L - R T 0.5 15 Pi p e / S t r u c t u r e Di m e n s i o n s (i n ) Pi p e Co n v e y a n c e S t r u c t u r e 4 No r t h C a r o l i n a D e p a r t m e n t o f T r a n s p o r t a t i o n Hi g h w a y S t o r m w a t e r P r o g r a m 0. 0 7 Cl a s s ' B ' 0.3 Pr e f o r m e d S c o u r H o l e s a n d E n e r g y D i s s i p a t o r s * R e f e r t o t h e N C D O T B e s t M a n a g e m en t P r a c t i c e s T o o l b o x , V e r s i o n 1 ( M a r c h 2 0 0 8 ) , NC D O T S t a n d a r d D e t a il s , t h e F e d e r a l H i g h w a y A d m in i s t r a t i o n ( F H W A ) H y d r a u l i c E n g i n e e r i n g C i r c u l a r N o . 1 4 ( H E C - 1 4 ) , Th i r d E d i t i o n , H y d r a u l i c D e s i g n o f E n e r g y D i s s i p a t o r s f o r Cu l v e r t s a n d C h a n n e l s ( J u l y 2 0 0 6 ) , a s a p p l i c a b l e , f o r d e s i g n g u i d a n c e a n d c r i t e r i a . YE S NO WETLAND AND SURFACE WATER IMPACTS PERMIT SHEET 1 OF 4 PERMIT DRAWING STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 10 9 / 0 8 / 9 9 5 / 6 / 2 0 14 L : \ P r o j e c t L i s t \ 114 9 \ 1112 8 - D i v i s i o n 7 A D e s i g n B u i l d \ 7 8 0 0 9 2 - R o c k i n g h a m \ D e s i g n F i l e s \ H y d r a u l i c s \ P E R M IT S _ E n v i r o n m e n t a l \ D r a w i n g s \ S F 7 8 0 0 9 2 _ H y d _ p r m _ w e t _ p s h _ 0 1. d g n j d a l t o n A R T MEN N A S O H D E P T O F TRA S PORT T I O N T A TEOFN RT C AR O LI N A RIGHT OF WAY DATE: LETTING DATE: DESIGN DATA SIGNATURE: SIGNATURE: P.E. PROJECT ENGINEER GRAPHIC SCALES PROJECT LENGTH PLANS PREPARED FOR THE NCDOT BY: STV/RALPH WHITEHEAD ASSOCIATES, INC. 1000 West Morehead St., Ste. 200, Charlotte NC, 28208 NC License Number F-0991 DHV D T V = = = = =MPH ADT N/A N/A =ADT 2025 N/A ENGINEER HYDRAULICS ENGINEER DESIGN ROADWAY 1302009 40 8%MARCH 7, 2012 MARCH 7, 2012 KIT A. PERSIANI, PE 2012 STANDARD SPECIFICATIONS JOSEPH B. BOULOS, EI P.E. PROJECT DESIGNERC O N T R A C T : C 2 0 2 9 2 3 P R O J E C T : 1 7 B P . 7 . R . 6 0 DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA GRADING, PAVING, DRAINAGE, & STRUCTURE ROCKINGHAM COUNTY ON SR 2692 (KERNODLE ROAD) BRIDGE #780092 OVER HAW RIVER TRIBUTARY 16LOCATION: TYPE OF WORK: 17BP.7.R.60 17BP.7.R.60 17BP.7.R.60 CONSTRUCTION R / W & UTILITIES P.E. -L- SR 2692 (KERNODLE RD)-L- STA. 10+83.00 BEGIN PROJECT 17BP.7.R.60 -L- STA. 14+64.00 END PROJECT 17BP.7.R.60 -L- STA. 12+33.30 BEGIN BRIDGE -L- STA. 13+13.30 END BRIDGE HIGH ROCK RD TO SR 2614 PARKDALE RD TO SR 2817 H A W RIVER TRIBU TA RY 16 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION 0 PROFILE (HORIZONTAL) PLANS PROFILE (VERTICAL) 1020 20 2001020 4 2 0 4 8 40 40 TOTAL LENGTH OF PROJECT 17BP.7.R.60 = 0.072 MILES LENGTH OF STRUCTURE PROJECT 17BP.7.R.60 = 0.015 MILES LENGTH OF ROADWAY PROJECT 17BP.7.R.60 = 0.057 MILES NCDOT CONTACT: Transportation Program Management Unit VIRGINIA MABRY N A D 83 N SR S 2007 17BP.7.R.60 VICINITY MAP N.T.S.OFF-SITE DETOUR NC License Number F-0991 SMITH-ROWE, LLC LOCAL FUNC. CLASSIFICATION: SUBREGIONAL TIER DESIGN SUBMITTED: 5-9-14 SUBMITTAL #S-197 PERMIT DRAWINGS BEGIN PROJECT END PROJECT SR 2817PARKDALE RDKERNODLE RD SR 2692 SR 2618 ZEB RD S R 2617 C O U NT Y LINE R D SR 2619 GILLIAM RD S R 2 6 1 4 H I G H R O C K R D CROSS CREEK T R A I L SR 2 6 1 5 SR 2616 S R 2 6 1 7 C O U N T Y L I N E R D 87 87 87 TRIBUTARY 16 HAW RIVER SHEET 2 OF 4 PERMIT DRAWING 4 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. $ F I L E $ $ D A T E $ Scale : 20 10+00 10+50 11+00 NC License Number F-0991 SMITH-ROWE, LLC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS BRIDGE #780092 17BP.7.R.60 630 635 640 645 650 655 630 635 640 645 650 655 625625 STA 12+22.29 BEGIN APPROACH SLAB STA 13+13.30 END BRIDGE STA 13+24.30 END APPROACH SLAB -L- 3’-1" 3’-11" 10 ’ 10 ’ 1 0 ’ 1 0 ’ BRIDGE SKETCH KERNODLE ROAD SR 2692 TYPE III TYPE III TYPE III TYPE III 10 ’ 10 ’ DETAIL SHOWING BRIDGE RELATIONSHIP FOR -L- OVER HERBINS CREEK STA 12+33.30 BEGIN BRIDGE N 21 48’ 59.3" W N AD 83/ N SR S 200 7 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 CONSTRUCTION MUST OCCUR DURING THE SUMMER MONTHS. TO COMMENCING ROADWAY CONSTRUCTION. OTHERWISE, BUS TURN AROUND TO BE CONSTRUCTED PRIORNOTE: T R IB U T A R Y 16 H A W R IV E R H A W R IVE R T R IB UT AR Y 16 2 6 0 . 0 0 ’ EXISTING R/W EXISTING R/W 6 0.0 0 ’ EXISTING R/W EXISTING R/W HISTORICAL SOCIETY ROCKINGHAM COUNTY WILLIAM D. BULLARD Jr. WANDA BULLARD and DB 867 PG 712 PB 20 PG 30 DB 1040 PG 1034 KAREN D. RAMEY TANYA CHILTON JASON CHILTON, and wife, DB 1381 PG 1095 PB 50 PG 3 RAY E. SOYARS DB 911 PG 1522 -L- 15 + 0 0 KERNODLE ROAD SR 2692 TYPE III TYPE III TYPE III TYPE III P O T Sta. 1 0 + 0 0.0 0 P C Sta. 1 1 + 1 1.6 2 P T S t a . 12 + 3 3 .2 8 P O T S t a . 15 + 4 3 .13 GRAU-350 TL-2 GRAU-350 TL-2 GRAU-350 TL-2 TL-2 GRAU-350 1 2 + 0 0 11 + 0 0 14 + 0 0 13 + 0 0 * EL = 639.19’ 54.53’ LT -L- STA 12+27.22 BMI EL = 639.39’ 16.84’ LT -L- STA 12+19.90 BL-3 (-) 8. 3634 % E XI ST TO BE REMOVED EXIST BRIDGE EL = 650.76’ -L- STA 10+83.00 EL = 648.64’ -L- STA 14+64.00 EXISTING GRADE BEGIN PROJECT 17BP.7.R.60 END PROJECT 17BP.7.R.60 PROPOSED GRADE -L- STA 13+13.30 END BRIDGE -L- STA 12+33.30 BEGIN BRIDGE 1. 5 : 1 1.5 :1 (+)9.2982%EXIST LOW POINT PI = 11+85.00 EL = 642.66’ (-) 7. 9412 % VC = 90’ K = 12 PI = 13+64.00 EL = 641.35’ (-)0.7318%(+)6.5714% VC = 80’ K = 11 PI = 14+34.00 EL = 645.95’ (+)6.5714% (+)8.9667% VC = 60’ K = 25 1.5:1 (TYP.) CLASS II RIP RAP 1.5:1 (TYP.) CLASS II RIP RAP ELEV = 641.61’ STA 13+32.02 * DS = 15 MPH ****DS = 20 MPH DS = 15 MPH AND STOPPING SIGHT DISTANCES DESIGN EXCEPTION FOR VERTICAL CURVE K-VALUES * SUB-REGIONAL TIER DESIGN GUIDELINES. LESS THAN OVERALL DESIGN SPEED PER AT -L- STATION 14+34.00 IS UP TO 20 MPH DESIGN SPEED SHOWN FOR VERTICAL CURVE DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 1400 = 25 = 634.2 = 2000 = 100 = 635.99 = 2700+ = 500+ = 642.1 = 9-14-12 = 625.4 (-) 9. 40 % E L = 6 4 3 .2 S T A . 11 + 5 0 - L - R T (- ) 9. 0 0 % E L = 6 3 8 .3 S T A . 12 + 15 - L - L T (-)0.67% E L = 6 3 8 .4 S T A . 12 + 0 0 - L - L T E L = 6 4 2 .9 S T A . 11 + 5 0 - L - L T E L = 6 3 8 .5 S T A . 12 + 0 0 - L - R T NWSE=625.4 SEE DETAIL #2 CL ’B’ RIP RAP TOE PROTECTION SEE DETAIL #1 W/ CL I RIP RAP LAT ’V’ DITCH SEE DETAIL #1 W/ CL I RIP RAP LAT ’V’ DITCH EXTG DITCH TIE TO 2 ELBOWS 15" W/ EXISTING DITCH TIE TO 15"15" TEMPORARY 15" TEMPORARY F F F F F F F F F F F F F F F F F F F F CC F C C F F SHEET 3 OF 4 PERMIT DRAWING 6 2 5 6 2 5 6 2 5 625 6 2 6 626 62 6 6 2 7 6 2 7 6 2 7 6 2 8 62 8 6 2 9 6296 3 0 6 3 0 6 3 0 630 6 3 1 6 3 1 63 2 6 3 2 6 3 3 6 3 3 633 6 3 4 6 3 4 63 4 635 6 3 5 6 3 5 6 3 5 6 3 5 6 3 5 6 3 6 6 3 6 6 3 6 637 637 63 7 637638 638 63 8 6 3 8 639 6 3 9 639 6 3 9 6 4 0 640 640 6 4 0 64 0 640 6 41 641 642 6 4 2 642 643 6 4 3 644 6 4 4 6 4 5 645 6 4 5 645 646 6 4 6 647 647 648 648 6 4 9 649 6 5 0 650 6 5 0 650 6 5 0 650 65 1 651 651 652 652 653 653 6 5 4 6 5 4 6 5 5 655 6 5 5 6 5 5 6 5 6656 6 5 6 65 7 6 57 657 6 5 7 6 5 7 658 658 6 5 8 6 5 9 4 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. $ F I L E $ $ D A T E $ Scale : 20 10+00 10+50 11+00 NC License Number F-0991 SMITH-ROWE, LLC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS BRIDGE #780092 17BP.7.R.60 630 635 640 645 650 655 630 635 640 645 650 655 625625 STA 12+22.29 BEGIN APPROACH SLAB STA 13+13.30 END BRIDGE STA 13+24.30 END APPROACH SLAB -L- 3’-1" 3’-11" 10 ’ 10 ’ 1 0 ’ 1 0 ’ BRIDGE SKETCH KERNODLE ROAD SR 2692 TYPE III TYPE III TYPE III TYPE III 10 ’ 10 ’ DETAIL SHOWING BRIDGE RELATIONSHIP FOR -L- OVER HERBINS CREEK STA 12+33.30 BEGIN BRIDGE N 21 48’ 59.3" W NA D 83/ N SR S 2007 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 CONSTRUCTION MUST OCCUR DURING THE SUMMER MONTHS. TO COMMENCING ROADWAY CONSTRUCTION. OTHERWISE, BUS TURN AROUND TO BE CONSTRUCTED PRIORNOTE: T R IB U T A R Y 16 H A W R IV E R H A W R IVE R T R IB UT AR Y 16 3 1 6 0 . 0 0 ’ EXISTING R/W EXISTING R/W 6 0.0 0 ’ EXISTING R/W EXISTING R/W HISTORICAL SOCIETY ROCKINGHAM COUNTY WILLIAM D. BULLARD Jr. WANDA BULLARD and DB 867 PG 712 PB 20 PG 30 DB 1040 PG 1034 KAREN D. RAMEY TANYA CHILTON JASON CHILTON, and wife, DB 1381 PG 1095 PB 50 PG 3 RAY E. SOYARS DB 911 PG 1522 -L- 15 + 0 0 KERNODLE ROAD SR 2692 TYPE III TYPE III TYPE III TYPE III P O T Sta. 10 + 0 0.0 0 P C Sta. 1 1 + 11.6 2 P T S t a . 12 + 3 3 .2 8 P O T S t a . 15 + 4 3 .13 GRAU-350 TL-2 GRAU-350 TL-2 GRAU-350 TL-2 TL-2 GRAU-350 1 2 + 0 0 1 1 + 0 0 14 + 0 0 13 + 0 0 * EL = 639.19’ 54.53’ LT -L- STA 12+27.22 BMI EL = 639.39’ 16.84’ LT -L- STA 12+19.90 BL-3 (-) 8. 3634 % E XI ST TO BE REMOVED EXIST BRIDGE EL = 650.76’ -L- STA 10+83.00 EL = 648.64’ -L- STA 14+64.00 EXISTING GRADE BEGIN PROJECT 17BP.7.R.60 END PROJECT 17BP.7.R.60 PROPOSED GRADE -L- STA 13+13.30 END BRIDGE -L- STA 12+33.30 BEGIN BRIDGE 1. 5 : 1 1.5 :1 (+)9.2982%EXIST LOW POINT PI = 11+85.00 EL = 642.66’ (-) 7. 9412 % VC = 90’ K = 12 PI = 13+64.00 EL = 641.35’ (-)0.7318%(+)6.5714% VC = 80’ K = 11 PI = 14+34.00 EL = 645.95’ (+)6.5714% (+)8.9667% VC = 60’ K = 25 1.5:1 (TYP.) CLASS II RIP RAP 1.5:1 (TYP.) CLASS II RIP RAP ELEV = 641.61’ STA 13+32.02 * DS = 15 MPH ****DS = 20 MPH DS = 15 MPH AND STOPPING SIGHT DISTANCES DESIGN EXCEPTION FOR VERTICAL CURVE K-VALUES * SUB-REGIONAL TIER DESIGN GUIDELINES. LESS THAN OVERALL DESIGN SPEED PER AT -L- STATION 14+34.00 IS UP TO 20 MPH DESIGN SPEED SHOWN FOR VERTICAL CURVE DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 1400 = 25 = 634.2 = 2000 = 100 = 635.99 = 2700+ = 500+ = 642.1 = 9-14-12 = 625.4 (-) 9. 40 % E L = 6 4 3 .2 S T A . 11 + 5 0 - L - R T (-) 9. 0 0 % E L = 6 3 8 .3 S T A . 12 + 15 - L - L T (-)0.67% E L = 6 3 8 .4 S T A . 12 + 0 0 - L - L T E L = 6 4 2 .9 S T A . 11 + 5 0 - L - L T E L = 6 3 8 .5 S T A . 12 + 0 0 - L - R T NWSE=625.4 SEE DETAIL #2 CL ’B’ RIP RAP TOE PROTECTION SEE DETAIL #1 W/ CL I RIP RAP LAT ’V’ DITCH SEE DETAIL #1 W/ CL I RIP RAP LAT ’V’ DITCH EXTG DITCH TIE TO 2 ELBOWS 15" W/ EXISTING DITCH TIE TO 15"15" TEMPORARY 15" TEMPORARY F F F F F F F F F F F F F F F F F F F F CC F C C F F Ha n d Existing Existing Pe r m a n e n t T e m p . E x c a v a t i o n M e c h a n i z e d C l e a r i n g P e r m a n e n t T e m p . C h a n n e l C h a n n e l N a t u r a l Si t e S t a t i o n S t r u c t u r e F i l l I n F i l l I n i n C l e a r i n g i n S W S W I m p a c t s I m p a c t s S t r e a m No . ( F r o m / T o ) S i z e / T y p e W e t l a n d s W e t l a n d s W e t l a n d s i n W e t l a n d s W e t l a n d s i m p a c t s i m p a c t s P e r m a n e n t T e m p . D e s i g n ( a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( a c ) ( f t ) ( f t ) ( f t ) 1 2 + 3 4 T O 1 3 + 1 2 - L - 1 @ 8 0 ' 2 7 " B O X B E A M TO T A L S * : 0 0 0 *R o u n d e d t o t a l s a r e s u m o f a c t u a l i m p a c t s NO T E S : AT N R e v i s e d 3 / 1 2 / 1 3 SH E E T 4OF 4 W E T L A N D P E R M I T I M P A C T S U M M A R Y WE T L A N D I M P A C T S SU R F A C E W A T E R I M P A C T S ROCKINGHAM COUNTY BRIDGE 92 ON SR 2692 OVER HAW RIVER TRIB 16 NC D E P A R T M E N T O F T R A N S P O R T A T I O N DIVISION OF HIGHWAYS 5-6-14 BUFFER IMPACTS PERMIT SHEET 1 OF 5 BUFFER DRAWING STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 10 9 / 0 8 / 9 9 5 / 6 / 2 0 14 L : \ P r o j e c t L i s t \ 114 9 \ 1112 8 - D i v i s i o n 7 A D e s i g n B u i l d \ 7 8 0 0 9 2 - R o c k i n g h a m \ D e s i g n F i l e s \ H y d r a u l i c s \ P E R M IT S _ E n v i r o n m e n t a l \ D r a w i n g s \ S F 7 8 0 0 9 2 _ H y d _ p r m _ b u f _ p s h _ 0 1. d g n j d a l t o n A R T MEN N A S O H D E P T O F TRA S PORT T I O N T A TEOFN RT C AR O LI N A P R O J E C T : 1 7 B P . 7 . R . 6 0 C O N T R A C T : C 2 0 2 9 2 3 0 PROFILE (HORIZONTAL) RIGHT OF WAY DATE: LETTING DATE: DESIGN DATA SIGNATURE: SIGNATURE: P.E. PROJECT ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) 1020 20 2001020 4 2 0 4 8 PLANS PREPARED FOR THE NCDOT BY: STV/RALPH WHITEHEAD ASSOCIATES, INC. 1000 West Morehead St., Ste. 200, Charlotte NC, 28208 NC License Number F-099140 DHV D T V = = = = =MPH ADT N/A N/A =ADT 2025 40 N/A SUBREGIONAL TIER DESIGN LOCAL FUNC. CLASSIFICATION: ENGINEER HYDRAULICS ENGINEER DESIGN ROADWAY 1302009 40 8% TOTAL LENGTH OF PROJECT 17BP.7.R.60 = 0.072 MILES LENGTH OF STRUCTURE PROJECT 17BP.7.R.60 = 0.015 MILES LENGTH OF ROADWAY PROJECT 17BP.7.R.60 = 0.057 MILES MARCH 7, 2012 MARCH 7, 2012 KIT A. PERSIANI, PE 2012 STANDARD SPECIFICATIONS JOSEPH B. BOULOS, EI P.E. PROJECT DESIGNER DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA LOCATION: TYPE OF WORK:GRADING, PAVING, DRAINAGE, & STRUCTURE ROCKINGHAM COUNTY ON SR 2692 (KERNODLE ROAD) BRIDGE #780092 OVER HAW RIVER TRIBUTARY 16 17BP.7.R.60 17BP.7.R.60 17BP.7.R.60 17BP.7.R.60 P.E. R / W & UTILITIES CONSTRUCTION DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS NC License Number F-0991 SMITH-ROWE, LLC -L- STA. 10+83.00 BEGIN PROJECT 17BP.7.R.60 -L- SR 2692 (KERNODLE RD) -L- STA. 12+33.30 BEGIN BRIDGE -L- STA. 13+13.30 END BRIDGE H A W RIVER TRIBU TA RY 16 HIGH ROCK RD TO SR 2614 -L- STA. 14+64.00 END PROJECT 17BP.7.R.60 PARKDALE RD TO SR 2817 PROJECT LENGTH NCDOT CONTACT: Transportation Program Management Unit VIRGINIA MABRY N A D 83 N SR S 2007 VICINITY MAP N.T.S.OFF-SITE DETOUR PERMIT DRAWINGS SUBMITTED: 5-9-14 SUBMITTAL #S-197 BEGIN PROJECT END PROJECT SR 2817PARKDALE RDKERNODLE RD SR 2692 SR 2618 ZEB RD S R 2617 C O U NT Y LINE R D SR 2619 GILLIAM RD S R 2 6 1 4 H I G H R O C K R D CROSS CREEK T R A I L SR 2 6 1 5 SR 2616 S R 2 6 1 7 C O U N T Y L I N E R D 87 87 87 TRIBUTARY 16 HAW RIVER SHEET 2 OF 5 BUFFER DRAWING ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 4 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. $ F I L E $ $ D A T E $ Scale : 20 10+00 10+50 11+00 NC License Number F-0991 SMITH-ROWE, LLC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS BRIDGE #780092 17BP.7.R.60 630 635 640 645 650 655 630 635 640 645 650 655 625625 STA 12+22.29 BEGIN APPROACH SLAB STA 13+13.30 END BRIDGE STA 13+24.30 END APPROACH SLAB -L- 3’-1" 3’-11" 10 ’ 10 ’ 1 0 ’ 1 0 ’ BRIDGE SKETCH KERNODLE ROAD SR 2692 10 ’ 10 ’ DETAIL SHOWING BRIDGE RELATIONSHIP FOR -L- OVER HERBINS CREEK STA 12+33.30 BEGIN BRIDGE N 21 48’ 59.3" W N AD 83/ N SR S 200 7 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 CONSTRUCTION MUST OCCUR DURING THE SUMMER MONTHS. TO COMMENCING ROADWAY CONSTRUCTION. OTHERWISE, BUS TURN AROUND TO BE CONSTRUCTED PRIORNOTE: T R IB U T A R Y 16 H A W R IV E R H A W R IVE R T R IB UT AR Y 16 3 1 6 0 . 0 0 ’ EXISTING R/W EXISTING R/W 6 0.0 0 ’ EXISTING R/W EXISTING R/W HISTORICAL SOCIETY ROCKINGHAM COUNTY WILLIAM D. BULLARD Jr. WANDA BULLARD and DB 867 PG 712 PB 20 PG 30 DB 1040 PG 1034 KAREN D. RAMEY TANYA CHILTON JASON CHILTON, and wife, DB 1381 PG 1095 PB 50 PG 3 RAY E. SOYARS DB 911 PG 1522 -L- 15 + 0 0 KERNODLE ROAD SR 2692 TYPE III TYPE III TYPE III TYPE III P O T Sta. 1 0 + 0 0.0 0 P C Sta. 1 1 + 1 1.6 2 P T S t a . 12 + 3 3 .2 8 P O T S t a . 15 + 4 3 .13 GRAU-350 TL-2 GRAU-350 TL-2 GRAU-350 TL-2 TL-2 GRAU-350 1 2 + 0 0 11 + 0 0 14 + 0 0 13 + 0 0 * EL = 639.19’ 54.53’ LT -L- STA 12+27.22 BMI EL = 639.39’ 16.84’ LT -L- STA 12+19.90 BL-3 (-) 8. 3634 % E XI ST TO BE REMOVED EXIST BRIDGE EL = 650.76’ -L- STA 10+83.00 EL = 648.64’ -L- STA 14+64.00 EXISTING GRADE BEGIN PROJECT 17BP.7.R.60 END PROJECT 17BP.7.R.60 PROPOSED GRADE -L- STA 13+13.30 END BRIDGE -L- STA 12+33.30 BEGIN BRIDGE 1. 5 : 1 1.5 :1 (+)9.2982%EXIST LOW POINT PI = 11+85.00 EL = 642.66’ (-) 7. 9412 % VC = 90’ K = 12 PI = 13+64.00 EL = 641.35’ (-)0.7318%(+)6.5714% VC = 80’ K = 11 PI = 14+34.00 EL = 645.95’ (+)6.5714% (+)8.9667% VC = 60’ K = 25 1.5:1 (TYP.) CLASS II RIP RAP 1.5:1 (TYP.) CLASS II RIP RAP ELEV = 641.61’ STA 13+32.02 * DS = 15 MPH ****DS = 20 MPH DS = 15 MPH AND STOPPING SIGHT DISTANCES DESIGN EXCEPTION FOR VERTICAL CURVE K-VALUES * SUB-REGIONAL TIER DESIGN GUIDELINES. LESS THAN OVERALL DESIGN SPEED PER AT -L- STATION 14+34.00 IS UP TO 20 MPH DESIGN SPEED SHOWN FOR VERTICAL CURVE DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 1400 = 25 = 634.2 = 2000 = 100 = 635.99 = 2700+ = 500+ = 642.1 = 9-14-12 = 625.4 (-) 9. 40 % E L = 6 4 3 .2 S T A . 11 + 5 0 - L - R T (- ) 9. 0 0 % E L = 6 3 8 .3 S T A . 12 + 15 - L - L T (-)0.67% E L = 6 3 8 .4 S T A . 12 + 0 0 - L - L T E L = 6 4 2 .9 S T A . 11 + 5 0 - L - L T E L = 6 3 8 .5 S T A . 12 + 0 0 - L - R T NWSE=625.4 SEE DETAIL #2 CL ’B’ RIP RAP TOE PROTECTION SEE DETAIL #1 W/ CL I RIP RAP LAT ’V’ DITCH SEE DETAIL #1 W/ CL I RIP RAP LAT ’V’ DITCH EXTG DITCH TIE TO 2 ELBOWS 15" W/ EXISTING DITCH TIE TO 15"15" TEMPORARY 15" TEMPORARY F F F F F F F F F F F F F F F F F F F F CC F C C F F SHEET 3 OF 5 BUFFER DRAWING 6 2 5 6 2 5 6 2 5 625 6 2 6 626 62 6 6 2 7 6 2 7 6 2 7 6 2 8 62 8 6 2 9 6296 3 0 6 3 0 6 3 0 630 6 3 1 6 3 1 63 2 6 3 2 6 3 3 6 3 3 633 6 3 4 6 3 4 63 4 635 6 3 5 6 3 5 6 3 5 6 3 5 6 3 5 6 3 6 6 3 6 6 3 6 637 637 63 7 637638 638 63 8 6 3 8 639 6 3 9 639 6 3 9 6 4 0 640 640 6 4 0 64 0 640 6 41 641 642 6 4 2 642 643 6 4 3 644 6 4 4 6 4 5 645 6 4 5 645 646 6 4 6 647 647 648 648 6 4 9 649 6 5 0 650 6 5 0 650 6 5 0 650 65 1 651 651 652 652 653 653 6 5 4 6 5 4 6 5 5 655 6 5 5 6 5 5 6 5 6656 6 5 6 65 7 6 57 657 6 5 7 6 5 7 658 658 6 5 8 6 5 9 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 4 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. $ F I L E $ $ D A T E $ Scale : 20 10+00 10+50 11+00 NC License Number F-0991 SMITH-ROWE, LLC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS BRIDGE #780092 17BP.7.R.60 630 635 640 645 650 655 630 635 640 645 650 655 625625 STA 12+22.29 BEGIN APPROACH SLAB STA 13+13.30 END BRIDGE STA 13+24.30 END APPROACH SLAB -L- 3’-1" 3’-11" 10 ’ 10 ’ 1 0 ’ 1 0 ’ BRIDGE SKETCH KERNODLE ROAD SR 2692 10 ’ 10 ’ DETAIL SHOWING BRIDGE RELATIONSHIP FOR -L- OVER HERBINS CREEK STA 12+33.30 BEGIN BRIDGE N 21 48’ 59.3" W N AD 83/ N SR S 200 7 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 CONSTRUCTION MUST OCCUR DURING THE SUMMER MONTHS. TO COMMENCING ROADWAY CONSTRUCTION. OTHERWISE, BUS TURN AROUND TO BE CONSTRUCTED PRIORNOTE: T R IB U T A R Y 16 H A W R IV E R H A W R IVE R T R IB UT AR Y 16 3 1 6 0 . 0 0 ’ EXISTING R/W EXISTING R/W 6 0.0 0 ’ EXISTING R/W EXISTING R/W HISTORICAL SOCIETY ROCKINGHAM COUNTY WILLIAM D. BULLARD Jr. WANDA BULLARD and DB 867 PG 712 PB 20 PG 30 DB 1040 PG 1034 KAREN D. RAMEY TANYA CHILTON JASON CHILTON, and wife, DB 1381 PG 1095 PB 50 PG 3 RAY E. SOYARS DB 911 PG 1522 -L- 15 + 0 0 KERNODLE ROAD SR 2692 TYPE III TYPE III TYPE III TYPE III P O T Sta. 1 0 + 0 0.0 0 P C Sta. 1 1 + 1 1.6 2 P T S t a . 12 + 3 3 .2 8 P O T S t a . 15 + 4 3 .13 GRAU-350 TL-2 GRAU-350 TL-2 GRAU-350 TL-2 TL-2 GRAU-350 1 2 + 0 0 11 + 0 0 14 + 0 0 13 + 0 0 * EL = 639.19’ 54.53’ LT -L- STA 12+27.22 BMI EL = 639.39’ 16.84’ LT -L- STA 12+19.90 BL-3 (-) 8. 3634 % E XI ST TO BE REMOVED EXIST BRIDGE EL = 650.76’ -L- STA 10+83.00 EL = 648.64’ -L- STA 14+64.00 EXISTING GRADE BEGIN PROJECT 17BP.7.R.60 END PROJECT 17BP.7.R.60 PROPOSED GRADE -L- STA 13+13.30 END BRIDGE -L- STA 12+33.30 BEGIN BRIDGE 1. 5 : 1 1.5 :1 (+)9.2982%EXIST LOW POINT PI = 11+85.00 EL = 642.66’ (-) 7. 9412 % VC = 90’ K = 12 PI = 13+64.00 EL = 641.35’ (-)0.7318%(+)6.5714% VC = 80’ K = 11 PI = 14+34.00 EL = 645.95’ (+)6.5714% (+)8.9667% VC = 60’ K = 25 1.5:1 (TYP.) CLASS II RIP RAP 1.5:1 (TYP.) CLASS II RIP RAP ELEV = 641.61’ STA 13+32.02 * DS = 15 MPH ****DS = 20 MPH DS = 15 MPH AND STOPPING SIGHT DISTANCES DESIGN EXCEPTION FOR VERTICAL CURVE K-VALUES * SUB-REGIONAL TIER DESIGN GUIDELINES. LESS THAN OVERALL DESIGN SPEED PER AT -L- STATION 14+34.00 IS UP TO 20 MPH DESIGN SPEED SHOWN FOR VERTICAL CURVE DESIGN DISCHARGE DESIGN FREQUENCY BASE DISCHARGE CFS YRS YRS BASE FREQUENCY OVERTOPPING ELEVATION OVERTOPPING FREQUENCY OVERTOPPING DISCHARGE CFS CFS YRS FT FT FT DESIGN HW ELEVATION BASE HW ELEVATION BRIDGE HYDRAULIC DATA DATE OF SURVEY W.S. ELEVATION AT DATE OF SURVEY FT = 1400 = 25 = 634.2 = 2000 = 100 = 635.99 = 2700+ = 500+ = 642.1 = 9-14-12 = 625.4 (-) 9. 40 % E L = 6 4 3 .2 S T A . 11 + 5 0 - L - R T (- ) 9. 0 0 % E L = 6 3 8 .3 S T A . 12 + 15 - L - L T (-)0.67% E L = 6 3 8 .4 S T A . 12 + 0 0 - L - L T E L = 6 4 2 .9 S T A . 11 + 5 0 - L - L T E L = 6 3 8 .5 S T A . 12 + 0 0 - L - R T NWSE=625.4 SEE DETAIL #2 CL ’B’ RIP RAP TOE PROTECTION SEE DETAIL #1 W/ CL I RIP RAP LAT ’V’ DITCH SEE DETAIL #1 W/ CL I RIP RAP LAT ’V’ DITCH EXTG DITCH TIE TO 2 ELBOWS 15" W/ EXISTING DITCH TIE TO 15"15" TEMPORARY 15" TEMPORARY 60.00 +23.44 60.00 +83.78 30.29 +80.00 30.26 +30.00 60.00 +56.87 60.00 +18.75 29.95 +15.00 30.03 +60.00 F F F F F F F F F F F F F F F F F F F F CC F C C F F RO A D CR O S S I N G B R I D G E PA R A L L E L IM P A C T ZO N E 1 (f t 2) ZO N E 2 (f t 2) TO T A L (f t 2) ZO N E 1 (f t 2) ZO N E 2 (f t 2) TO T A L (f t 2)ZONE 1 (ft2)ZONE 2 (ft2) 80 ' - 2 7 " B O X B E A M 1 2 + 0 0 - 1 4 + 4 0 - L - X 3 1 8 1 4 9 0 1 8 0 8 X 3 7 6 4 3 7 6 4 TO T A L : 40 8 2 1 4 9 0 5 5 7 2 0 0 0 N. C . D E P T . O F T R A N S P O R T A T I O N DI V I S I O N O F H I G H W A Y S RO C K I N G H A M C O U N T Y S H E E T 4 O F 5 PR O J E C T : 1 7 B P . 7 . R . 6 0 ( S F - 7 8 0 0 9 2 ) 5/6/2014 IM P A C T BU F F E R I M P A C T S S U M M A R Y TY P E SI T E N O . ST R U C T U R E S I Z E / TY P E ST A T I O N (F R O M / T O ) AL L O W A B L E MI T I G A B L E BUFFER REPLACEMENT Rev. May 2006 ZO N E 1 (f t 2) ZO N E 2 (f t 2) 12 + 0 0 - 1 4 + 4 0 - L - 0 0 TO T A L : 00 N. C . D E P T . O F T R A N S P O R T A T I O N DIVISION OF HIGHWAYS ROCKINGHAM COUNTY S H E E T 5 O F 5 PR O J E C T : 1 7 B P . 7 . R . 6 0 ( S F - 7 8 0 0 9 2 ) 5/6/2014 WE T L A N D S I N B U F F E R I M P A C T S S U M M A R Y WE T L A N D S I N BU F F E R S SI T E N O . ST A T I O N (F R O M / T O ) Rev. Jan 2009 Scale : 40 VICINITY MAP N.T.S. LOCATION: TYPE OF WORK:GRADING, PAVING, DRAINAGE, & STRUCTURE -L- 4 N A D 83 See Sheet 1-B For Standard Symbology Sheet See Sheet 1-A For Index of Sheets OFF-SITE DETOUR N SR S 2007 P R E L I M I N A R Y P L A N S ON SR 2692 (KERNODLE ROAD) SR 2692 (KERNODLE RD)-L- STA. 10+83.00 BEGIN PROJECT 17BP.7.R.60 -L- STA. 14+64.00 END PROJECT 17BP.7.R.60 -L- STA. 12+33.30 BEGIN BRIDGE -L- STA. 13+13.30 END BRIDGE HIGH ROCK RD TO SR 2614 PARKDALE RD TO SR 2817 BRIDGE #780092 OVER HAW RIVER TRIBUTARY 16 H A W RIVER TRIBU TA RY 16 GRAPHIC SCALE STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET DIVISION OF HIGHWAYS Prepared in the Office of: STATE OF NORTH CAROLINA 6 / 10 / 2 0 14 S F 7 8 0 0 9 2 _ E C _ d s n _ p s h _ 0 1 . d g n j d a l t o n PLAN FOR PROPOSED HIGHWAY EROSION CONTROL EROSION AND SEDIMENT CONTROL MEASURES CONSTRUCTION. GRUBBING PHASE OF FOR CLEARING AND EROSION CONTROL PLANS THIS PROJECT CONTAINS Temporary Silt Ditch Temporary Silt Fence Silt Basin Type B Stilling Basin TDTemporary Diversion Temporary Rock Silt Check Type-B Temporary Rock Silt Check Type-A Temporary Rock Sediment Dam Type-A Temporary Rock Sediment Dam Type-B Type A Type B Type C A B C Temporary Silt Fence TSD Std. #Description Symbol Temporary Berms and Slope Drains Rock Inlet Sediment Trap: 1630.03 1630.05 1605.01 1622.01 1633.01 1634.01 1634.02 1635.01 1635.02 1630.04 1632.01 1632.02 1632.03 Rock Pipe Inlet Sediment Trap Type-A Rock Pipe Inlet Sediment Trap Type-B Temporary Rock Sediment Dam Type A Temporary Rock Sediment Dam Type B Temporary Silt Fence Roadway Standard Drawings The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design revison thereto are applicable to this project and by reference hereby are considered a part of these plans. Rock Pipe Inlet Sediment Trap Type A EC-1 1606.01 Special Sediment Control Fence 1634.01 1634.02 1635.01 1605.01 1630.01 Temporary Berms and Slope Drains 1606.01 1622.01 Special Sediment Control Fence Riser Basin 17BP.7.R.60 1635.02 Rock Pipe Inlet Sediment Trap Type B 1604.01 Railroad Erosion Control Detail 1607.01 Gravel Construction Entrance Skimmer Basin for Special Considerations. Refer To E. C. Special Provisions ON THIS PROJECT SENSITIVE AREA(S) EXIST ENVIRONMENTALLY STANDARDS. SENSITIVE WATERSHED BEEN DESIGNED TO THIS PROJECT HAS Tiered Skimmer Basin Infiltration Basin Special Stilling Basin1630.06 Temporary Rock Silt Check Type-A with Matting and Polyacrylamide (PAM) Wattle/Coir Fiber Wattle Wattle/Coir Fiber Wattle with Polyacrylamide (PAM) 1630.02 1633.02 2012 STANDARD SPECIFICATIONS NATURAL RESOURCES DIVISION OF WATER QUALITY. ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE AUGUST 3, 2011 WITH THE REGULATIONS SET FORTH BY THE THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2012 and the latest 1630.05 Temporary Diversion 1630.04 Stilling Basin 1630.03 Temporary Silt Ditch 1630.02 Silt Basin Type B 1630.06 Special Stilling Basin 1631.01 Matting Installation 1632.02 1632.01 Rock Inlet Sediment Trap Type B Rock Inlet Sediment Trap Type A 1632.03 Rock Inlet Sediment Trap Type C 1633.01 1633.02 Temporary Rock Silt Check Type B Temporary Rock Silt Check Type A 1640.01 Coir Fiber Baffle 1645.01 Temporary Stream Crossing EW CFW PLANS 20 0 40 915 JONES FRANKLIN ROAD RALEIGH, NORTH CAROLINA 27606 SUNGATE DESIGN GROUP, P.A. ENG FIRM LICENSE NO. C-890 TEL (919) 859-2243 FAX (919) 859-6258 P R O J E C T : 1 7 B P . 7 . R . 6 0 C O N T R A C T : C 2 0 2 9 2 3 17BP.7.R.60 17BP.7.R.60 17BP.7.R.60 P.E. CONSTRUCTION ROCKINGHAM COUNTY R/W & UTILITIES SUBMITTED: 6-18-14 PLANS EROSION CONTROL RFC SUBMITTAL S-210 LEVEL III CERTIFICATION NO. 3552 LEVEL III NAME JOSHUA G. DALTON, PE, CPESC BEGIN PROJECT END PROJECT SR 2817PARKDALE RDKERNODLE RD SR 2692 SR 2618 ZEB RD S R 2617 C O U NT Y LI NE R D SR 2619 GILLIAM RD S R 2 6 1 4 H I G H R O C K R D CROSS CREEK T R A I L SR 2 6 1 5 SR 2616 S R 2 6 1 7 C O U N T Y L I N E R D 87 87 87 TRIBUTARY 16 HAW RIVER HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 17BP.7.R.60 EC-2A NATURAL GROUND NATURAL GROUND FLOW 2’(MAX.) CROSS SECTION CROSS SECTION TRAPEZOIDAL DITCH VEE DITCH EDGE OF PAVEMENT ISOMETRIC VIEW PAVEMENT SHLD. SLOPE BACK SLOPEDITCH STAKE 2’ UPSLOPE MATTING STAKE 2’ DOWNSLOPE STAKE 2’ UPSLOPE MATTING STAKE 2’ DOWNSLOPE TOP VIEW 6’(MIN.) 12"(MIN.) EXCELSIOR WATTLE STAKE UPSLOPE STAKE DOWNSLOPE MATTING MATTING See Inset B INSET B STAPLES VAR. 2’(MIN.) 2 IN. See Inset A INSET A STAKES WATTLE DETAIL STANDARD SPECIFICATIONS. INSTALL MATTING IN ACCORDANCE WITH SECTION 1631 OF THE BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH. PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE STAKES AT AN ANGLE TO WEDGE WATTLE TO BOTTOM OF DITCH. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE WASH AROUND WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED. ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT CROSS SECTION. USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL USE MINIMUM 12 IN. DIAMETER EXCELSIOR WATTLE. NOTES: FLOW A A WIDTH PLAN SECTION A-A SECTION B-B B B 2/3 CHANNEL STRUCTURAL STONE SEDIMENT CONTROL STONE 12" MATTING EXCELSIOR MATTING EXCELSIOR CLASS B STONE PAM INSET A See Inset A USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE. TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES. MATTING EXCELSIOR CLASS B STONE HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. EC-2B HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 17BP.7.R.60 NOT TO SCALE TEMPORARY ROCK SILT CHECK TYPE ’A’ WITH EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM) TO BE APPLIED TO EACH ROCK SILT CHECK. MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM) (4 OZ.) H = 2’ MIN 1’ MIN 1’ MIN ACCORDANCE WITH ROADWAY STANDARD DRAWING NO. 1633.01. INSTALL TEMPORARY ROCK SILT CHECK TYPE A IN NOTES: SHEET NO.PROJECT REFERENCE NO. DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER 17BP.7.R.60 SITE DESCRIPTION SOIL STABILIZATION TIMEFRAMES STABILIZATION TIME 7 DAYS TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10’ OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. NONE SLOPES 3:1 OR FLATTER 14 DAYS 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50’ IN LENGTH. ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES. EC-3A SHEET NO.PROJECT REFERENCE NO. 17BP.7.R.60 EC-3B DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA SOIL STABILIZATION SUMMARY SHEET HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER SIDESTATION TO STATION FROM LINESHEET NO. CONST ESTIMATE (SY)STATION TO SIDESTATION FROM LINE SHEET NO. CONST ESTIMATE (SY) MATTING FOR EROSION CONTROL PERMANENT SOIL REINFORCEMENT MAT 4 TOTAL -L-10+15 10+65 LT 20 4 -L-14+75 15+35 RT 25 45 CLEARING AND GRUBBING PLAN EC-04/CONST.04 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 17BP.7.R.60 CONSTRUCTION SHEET 04 EROSION CONTROL FOR CLEARING AND GRUBBING NOTE: PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B DRAINAGE OUTLETS. AND TEMPORARY ROCK SILT CHECKS TYPE - A AT INSTALLED DURING CLEARING AND GRUBBING PHASE. PERIMETER EROSION CONTROL MEASURES SHALL BE NOTE: SEE PROJECT SPECIAL PROVISIONS ENVIRONMENTALLY SENSITIVE AREA NA D 83/ N SR S 2007 H A W R IVE R T R IB UT AR Y 16 3 2 1 6 0 . 0 0 ’ EXISTING R/W EXISTING R/W 6 0.0 0 ’ EXISTING R/W EXISTING R/W HISTORICAL SOCIETY ROCKINGHAM COUNTY WILLIAM D. BULLARD Jr. WANDA BULLARD and DB 867 PG 712 PB 20 PG 30 DB 1040 PG 1034 KAREN D. RAMEY TANYA CHILTON JASON CHILTON, and wife, DB 1381 PG 1095 PB 50 PG 3 RAY E. SOYARS DB 911 PG 1522 -L- 15 + 0 0 KERNODLE ROAD SR 2692 P O T Sta. 10 + 0 0.0 0 P C Sta. 1 1 + 1 1.6 2 P T S t a . 12 + 3 3 .2 8 P O T S t a . 15 + 4 3 .13 1 2 + 0 0 11 + 0 0 14 + 0 0 13 + 0 0 F F F F F F F F F F F F F F F F F F F F CC F C C F F 625 6 2 5 6 2 5 625625 6 2 5 6 2 6 626 626 6 2 7 62 7 627 6 2 8 628 6 2 8 6 2 9 629 6 2 9 6 3 0 6 3 0 630 6 3 0 6 3 0 6 3 0 6 3 1 631 631 6 3 2 632 6 3 2 6 3 3 6 3 3 63 3 6 3 4 6 3 4 6 3 4 6 35 6 3 5 6 3 5 635 6 3 5 6 3 5 6 3 5 6 3 6 6 3 6 6 3 6 637 63 7 6 3 7 637 638 6 3 8 6 3 8 6 3 8 639 6 3 9 63 9 639 6 4 0 640 640 6 4 0 640 640 64 0 6 4 0 641 6 4 1 64 1 642 6 4 2 64 2 6 4 2 643 6 4 3 6 4 3 644 6 4 4 64 4 6 4 5 6 4 5 6 4 5 6 4 5 645 645 6 4 5 6 4 6 646 647 647 648 64 8 649 649 6 5 0 65 0 6 5 0 650 65 0 6 5 0 651 651 6 5 1 6 5 2 652 6 5 3 65 3 6 5 4 6 5 4 6 5 5 655 655 6 5 5 6 5 6 656 656 6 5 7 657 657 6 5 7 6 5 7 6 5 8 658 6 5 8 659 659 66 0 661 SEE DETAIL #2 CL ’B’ RIP RAP TOE PROTECTION SEE DETAIL #1 W/ CL I RIP RAP LAT ’V’ DITCH SEE DETAIL #1 W/ CL I RIP RAP LAT ’V’ DITCH EXTG DITCH TIE TO 2 ELBOWS 15" W/ EXISTING DITCH TIE TO 15"15" TEMPORARY 15" TEMPORARY +70.00 29.03, 40.00 +30.00 29.60, 40.00 +45.00 30.39, 40.00 +70.00 30.97, 40.00 60.00 +23.44 60.00 +83.78 30.29 +80.00 30.26 +30.00 60.00 +56.87 60.00 +18.75 29.95 +15.00 30.03 +60.00 +33.28 40.00 +33.28 40.00 EC-05/CONST.04 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 17BP.7.R.60 CONSTRUCTION SHEET 04 EROSION CONTROL FOR FINAL GRADE Sta. 11+50 to Sta. 12+30 on Slope as Work Allows. Place Matting for Erosion Control Sta. 13+13 to Sta. 13+75 on Slope as Work Allows. Place Matting for Erosion Control Sta. 13+13 to Sta. 14+00 on Slope as Work Allows. Place Matting for Erosion Control Sta. 12+00 to Sta. 12+30 on Slope as Work Allows. Place Matting for Erosion Control D D D D as Work Allows. on Disturbed Areas Under Bridge Place Coir Fiber Matting NA D 83/ N SR S 2007 FINAL GRADE PLAN PROPOSED DITCH LINE. INSTALL PSRM IN THE D PROPOSED DITCH LINE. INSTALL PSRM IN THE D H A W R IVE R T R IB UT AR Y 16 6 0 . 0 0 ’ EXISTING R/W EXISTING R/W 6 0.0 0 ’ EXISTING R/W EXISTING R/W -L- 15 + 0 0 KERNODLE ROAD SR 2692 P O T Sta. 10 + 0 0.0 0 P C Sta. 1 1 + 1 1.6 2 P T S t a . 12 + 3 3 .2 8 P O T S t a . 15 + 4 3 .13 1 2 + 0 0 11 + 0 0 14 + 0 0 13 + 0 0 SEE DETAIL #2 CL ’B’ RIP RAP TOE PROTECTION SEE DETAIL #1 W/ CL I RIP RAP LAT ’V’ DITCH SEE DETAIL #1 W/ CL I RIP RAP LAT ’V’ DITCH EXTG DITCH TIE TO 2 ELBOWS 15" W/ EXISTING DITCH TIE TO 15"15" TEMPORARY 15" TEMPORARY C PIPE SLOPE DRAIN 12 INCH D PIPE SLOPE DRAIN 12 INCH D +70.00 29.03, 40.00 +30.00 29.60, 40.00 +45.00 30.39, 40.00 +70.00 30.97, 40.00 60.00 +23.44 60.00 +83.78 30.29 +80.00 30.26 +30.00 60.00 +56.87 60.00 +18.75 29.95 +15.00 30.03 +60.00 +33.28 40.00 +33.28 40.00 F F F F F F F F F F F F F F F F F F F F CC F C C F F STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET HEALING IN DIBBLE PLANTING METHOD firming soil at top. 5. Push handle forward PLANTING NOTES: N.C.D.O.T. - ROADSIDE ENVIRONMENTAL UNIT protected area. 1. Locate a healing-in site in a shady, well the root collar is at ground level. against the sloping end so that 4. Place a single layer of plants as necessary and water thoroughly. 6. Repeat layers of plants and sawdust correct depth. and place seedling at 2. Remove planting bar USING THE KBC PLANTING BAR SEEDLING / LINER BAREROOT PLANTING DETAIL PLANTING DETAILS MIXTURE, TYPE, SIZE, AND FURNISH SHALL CONFORM TO THE FOLLOWING: toward planter. as shown and pull handle 1. Insert planting bar root systems from drying. container to prevent the canvas bag or similar shall be kept in a moist During planting, seedlings PLANTING BAG soil at bottom. toward planter, firming 4. Pull handle of bar thoroughly. hole open. Water 6. Leave compaction RF-1 12 in - 18 in BR 12 in - 18 in BR 12 in - 18 in BR 12 in - 18 in BR 25% BETULA NIGRA 25% FRAXINUS PENNSYLVANICA 25% PLATANUS OCCIDENTALIS 25% LIRIODENDRON TULIPIFERA RIVER BIRCH GREEN ASH SYCAMORE TULIP POPLAR 17BP.7.R.60 12 inches deep and provide drainage. 2. Excavate a flat bottom trench a sloping angle. sawdust over the roots maintaining 5. Place a 2 inch layer of well rotted at one end of the trench. well rotted sawdust at a sloping angle rotted sawdust. Place a 2 inch layer of 3. Backfill the trench with 2 inches well 2 inch from seedling. 2 inches toward planter 3. Insert planting bar 1 inch thick at center. 4 inches wide and be 12 inches long, cross section, and shall blade with a triangular Planting bar shall have a KBC PLANTING BAR root collar. 10 inches below the no roots extend more than pruned, if necessary, so that All seedlings shall be root ROOT PRUNING REFORESTATION AVERAGING 8 FT. ON CENTER, APPROXIMATELY 680 PLANTS PER ACRE. TREE REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT. ON CENTER, RANDOM SPACING, REFORESTATION REFORESTATION DETAIL SHEET