HomeMy WebLinkAboutNCG150048_Renewal COC_20220701STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
GENERAL PERMIT NO. NCG150000
CERTIFICATE OF COVERAGE No. NCG150048
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Shelby -Cleveland County Regional Airport
is hereby authorized to discharge stormwater from a facility located at:
Shelby -Cleveland County Regional Airport
830 College Ave
Shelby
Cleveland County
to receiving waters designated as First Broad River and Hawkins Branch, class C waters in
the Broad River Basin(s), in accordance with the effluent limitations, monitoring
requirements, and other conditions set forth in General Permit No. NCG150000 which can
be downloaded by entering "deq.nc.gov/SW-industrial" in the browser window and
navigating to the "NPDES Stormwater General Permits" web page.
This certificate of coverage shall become effective July 1, 2022.
This Certificate of Coverage shall remain in effect for the duration of the General Permit or
until rescinded.
for Brian Wrenn
Director, Division of Energy, Mineral and Land Resources
By the Authority of the Environmental Management Commission