Loading...
HomeMy WebLinkAboutNCG150048_Renewal COC_20220701STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG150000 CERTIFICATE OF COVERAGE No. NCG150048 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Shelby -Cleveland County Regional Airport is hereby authorized to discharge stormwater from a facility located at: Shelby -Cleveland County Regional Airport 830 College Ave Shelby Cleveland County to receiving waters designated as First Broad River and Hawkins Branch, class C waters in the Broad River Basin(s), in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in General Permit No. NCG150000 which can be downloaded by entering "deq.nc.gov/SW-industrial" in the browser window and navigating to the "NPDES Stormwater General Permits" web page. This certificate of coverage shall become effective July 1, 2022. This Certificate of Coverage shall remain in effect for the duration of the General Permit or until rescinded. for Brian Wrenn Director, Division of Energy, Mineral and Land Resources By the Authority of the Environmental Management Commission