HomeMy WebLinkAboutNCC222488_ESC Approval Submitted_20220712ff
� . DERSON �S
HENDERSON COUNTY GOVERNMENT
SITE DEVELOPMENT DEPARTMENT
SOIL ERSOSION AND SEDIMENT CONTROL DIVISION
Natalie J. Berry P.E. Deb Johnston, PE
Director Assistant Engineer
-------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------
July 7, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Crab Creek Development, LLC
Dan Collins, Owner
213 S Church St
Hendersonville, NC 28792
Project Name: The Outpost
Project ID: SESC 2022-04-03
Acres Approved:
PIN:
County:
City:
Address:
River Basin:
Stream Class:
Submitted By:
Date Rcvd by HC
Plan Type:
Dear Dan Collins,
23.0
9546-81-7720
Henderson
N/A
227 Outpost Ln (350 14' 34.907" N, -820 31' 22.151" W)
French Broad River Basin
Mud Creek, C, Segment 6-55; Little Cove Creek, C, 6-55-3
Mike Lovoy, PE
July 1, 2022
Revision
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval
must be posted at the job site. This plan shall expire three (3) years following the date of
approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC
4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee is
received, you will receive the COC via email. You MUST obtain the COC prior to
commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Paul Clark at
Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new
responsible party is required to apply for his/her own COC.
240 SECOND AVENUE EAST, SUITE 118
HENDERSONVILLE, NC 28792
TELEPHONE: (828) 694-6553
Letter of Approval with Modifications
The Outpost
July 7, 2022
Page 2 of 3
Title 15A NCAC 413.0118(a) and the NCGO1 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it would be helpful if
you notify this office of the proposed starting date for this project. Your cooperation is
appreciated.
Sincerely,
Assistant Engineer
Soil Erosion & Sedimentation Control Office
Enclosures: Certificate of Approval
NCGO1 Fact Sheet
ec: Mike Lovoy, PE, Advantage Civil Engineering, PA
Stan Aiken PE, DEQ — Asheville
240 SECOND AVENUE EAST, SUITE 118
HENDERSONVILLE, NC 28792
TELEPHONE: (828) 694-6553
Letter of Approval with Modifications
The Outpost
July 7, 2022
Page 3 of 3
MODIFICATIONS
• ZONING APPROVAL FROM THE JURISDICTION HAVING AUTHORITY.
PROJECT CANNOT BEGIN UNTIL THIS DOCUMENT IS RECEIVED IN THIS
OFFICE.
• A DRIVEWAY PERMIT REQUIRED FROM THE JURISDICTION HAVING
AUTHORITY (IF REQUIRED). NO WORK TO BEGIN IN THIS AREA PRIOR TO
OBTAINING THIS PERMIT AND SUBMITTING TO OUR OFFICE FOR THE FILE.
• AN ENCROACHMENT AGREEMENT FOR WORK PROPOSED IN THE RIGHT OF
WAY, SUCH AS SIDEWALK, UTILITIES, ETC (IF REQUIRED). NO WORK TO
BEGIN IN THIS AREA PRIOR TO OBTAINING THIS DOCUMENT AND
SUBMITTING TO OUR OFFICE FOR THE FILE.
• OBTAIN NOI FROM NC DEQ AS INSTRUCTED IN THIS LETTER AND FOLLOW
THE INSPECTION REQUIREMENTS OF NPDES AND SELF INSPECTION AS
DESCRIBED ON SHEET D3.4 OF THE APPROVED DRAWING WHICH IS
INCORPORATED INTO THIS LETTER OF APPROVAL.
• THE APPROVED SOIL EROSION AND SEDIMENTATION CONTROL PLAN
TITLED "THE OUTPOST" AND DATED JUNE 30, 2022, IS REFERENCED HERE
AND INCORPORTED INTO THIS LETTER OF APPROVAL.
• PRE -CONSTRUCTION MEETING REQUIRED PRIOR TO LAND DISTURBANCE.
CONTACT DEB JOHNSTON AT (828) 694-6521 TO SCHEDULE.
Financial Responsible Ownership Signature:
Print Name and Title:
Date:
240 SECOND AVENUE EAST, SUITE 118
HENDERSONVILLE, NC 28792
TELEPHONE: (828) 694-6553