Loading...
HomeMy WebLinkAboutNCC222476_ESC Approval Submitted_20220712SfA7F'4 ROY COOPER$�� Governor ELIZABETH S. BISER Secretary BRIAN WRENN NORTH CAROLINA Director EnWontnental Quality June 29, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Duke Energy Carolina, LLC ATTN: Patrick Sizemore, Senior Engineering Technologist 526 South Church Street Charlotte, NC 28202 RE: Project Name: R-5725 Oak Ridge WO# 36178546 Acres Approved: 1.9 Project ID: GUILF-2022-038 County: Guilford City: Oak Ridge Address: NC 68/NC 150 River Basin: Jordan Lake Watershed Buffer Stream Classification: other Submitted By: Dewberry Engineers, Inc Date Received by LQS: June 10, 2022 Plan Type: New Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000' Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. North Carolina Department of Environmental Quality I Divislon of Energy. Mineral and Land Resources �D_E Q�� Wnston-Salem Regional Office 145O Hanes Milt Road, Sutte 300 I Winston-Salem, North Carolina 27103 336.776.9800 Letter of Approval with modifications Duke Energy Carolina, LLC June 29, 2022 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Matthew Davis Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval cc: Frederick Rash, Dewberry Engineers Inc. (via e-mail) WSRO file Letter of Approval with modifications Duke Energy Carolina, LLC June 29, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: R-5725 Oak Ridge WO# 36178546 Project ID: GUILF-2022-038 County: Guilford Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. All potentially affected property owners must be notified prior to utility construction even though the activity is covered under an easement. [G.S. 113A-54.1(a1)] 2. The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. Bare spots should be stabilized immediately after any land disturbance. [15A NCAC 4B .0115] Additional Comments: 1. Please maintain access for the public and residents when working across driveways and roads. Coordination for access will be necessary. (General comment) Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities 00 w Ar••� ' > O O f" V rh C� w � � � • ram'+ ,� � � !� C� w p ON I� �i OLI,�, � � v„ Q� 00 Z �V Iv �I` ��y ^� Qj '� •�" ao Q U w '" •� O > u > N Z Lr,) z O O ►-� c