HomeMy WebLinkAboutNCC222476_NOI Application_20220712Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 7/7/2022 11:33:51 AM (NCG01 NOI Submission)
Approve by Broussard, Brooklyn C 7/8/2022 8:24:39 AM (Review - NOI 96711 R-5725 Oak Ridge WO#36178546)
• The task was assigned to Broussard, Brooklyn C by round robin distribution 7/7/2022 11:34 AM
• The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: July 12, 2022 5:00 PM
7/7/2022 11:34 AM
by Workflow 7/8/2022 8:24:49 AM (Workflow Start Event)
Submit by Tran, Kieu M 7/12/2022 8:42:36 AM (Payment Verification for NCC222476)
F Patrick W Sizemore
• Tran, Kieu M assigned the task to Tran, Kieu M 7/12/2022 8:42 AM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: August 19, 2022 5:00 PM
7/8/2022 8:25 AM
�a
NORTH CAROLINA,
Enri--tn! C2-1;ly
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting No
an NOI that was Yes
rejected before?
la. Project Name* R-5725 Oak Ridge WO#36178546
1 b. Specific Lot
This field may be used to list specifc lot numbers.
Numbers
NA
1 c. Parcel ID
List all PINS associated with this project.
Number(s) (PIN)
NA — Linear Utility Easement
2. County*
Guilford
3. Highway or Street NC 68 / NC 150
Address* Street name only is acceptable if no address number assigned yet
4. City or Township* Oak Ridge
5. State* NC
6. Zip Code* 27310
7. Latitude* Enter the latitude in decimal degrees
36.1675
8. Longitude* Enter the longitude in decimal degrees (MUST be negative)
-79.9847
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North
Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
08/29/2022
Estimated Construction Project Start Date
10. Date to End*
12/01/2022
Estimated Construction Project End Date
11. SIC (Primary)*
Commercial (1542)
Standard Industrial Classification for Development
12. Acres to be
1.90
disturbed*
(including off -site borrow and waste areas)
13. Total site area 1.90
(acres)*
14. Post -construction 0.00
impervious area (Estimated)
(acres) *
Project Tracking ID NCC-GUILF-2022-R-5725 Oak Ridge WO#36178546
Assigned automatically (not used)
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter
only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter
up to 3 waterbodies if needed.
15a. Receiving Beaver Creek
Waterbody * Name of waterbody into which stormwater runoff will discharge
15b. Waterbody Index 16-11-2
NO. * NC Waterbody Index Number
Stormwater No
discharges will flow Yes
to additional waters*
15c. Additional HAW RIVER
Receiving Waterbody Waterbody name
15d. Waterbody Index 16-(1)
No. NC Waterbody Index Number
15e. Additional Waterbody name
Receiving Waterbody
15f. Waterbody Index NC Waterbody Index Number
No.
16a. Is this project Yes
subject to the NC No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B.
Permittee Information - Legally Responsible Entity and Individual
........................................................................................................................................................................
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form must be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as
a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
1. Permittee* Legally Responsible Entity
Duke Energy Carolinas, LLC
If permittee is an individual, enter first and last name in this field. Otherwise, enter organization/business name.
Note: If the permittee is a business, the business must be registered with the NC Secretary of State. You can verify the
registration here. Permittee must be the same entity that is responsible for the land -disturbing activity as listed on the NC
SPCA Financial Responsibility/Ownership (FRO) Form.
2. First Name* Patrick
If Corporation, enter Registered Agent First Name
3. Last Name* Sizemore
If Corporation, enter Registered Agent Last Name
3b. Title Senior Engineering Technologist
4. Permitee E-mail Patrick.Sizemore@duke-energy.com
Address*
5. Permittee 336-917-2522
Telephone No.*
6. Permittee Mailing Street Address
Address* 526 South Church Street
Address Line 2
City State / Province / Region
Charlotte NC
Postal / Zip Code Country
28202 US
Check box if the Yes
street address the
same as mailing
address
7. Permittee Street
Street Address
Address*
500 Utility Drive
Address Line 2
City
State / Province / Region
Clemmons
NC
Postal / Zip Code
Country
27012
US
8. Type of
Ownership is only individual if an individual is named in B.1. above.
Ownership*
Non -Government
C. Site Contact Information
Part C.
Project Site Contact Information
.................................................................................................................................................................................................................................................................................................................................................................................................
1. Primary Site Patrick
Contact - First
Name*
2. Primary Site Sizemore
Contact - Last Name*
3. Title Senior Engineering Technologist
4. Site Contact E-mail Patrick.Sizemore@duke-energy.com
Address*
5. Site Contact 336-917-2522
Telephone No.*
6. Organization Name Duke Energy Carolinas, LLC
7. Site Contact Street Address
Mailing Address* 526 South Church Street
Address Line 2
City
Charlotte
Postal / Zip Code
28202
8. Consultant Name (optional)
Zachary Eulo
First and Last name
9. Consultant E-mail zeulo@dewberry.com
This person will be copied on all correspondence.
10. Consultant 919-425-7610
Telephone No.
11. Billing E-mail (For Annual Fee correspondence)
Patrick.Sizemore@duke-energy.com
Default is legally responsible person e-mail
12. Billing Telephone (For Annual Fee correspondence)
336-917-2522
Default is legally responsible person telephone
State / Province / Region
NC
Country
us
D. E&SC Plan
Part D.
Erosion & Sediment Control (E&SC) Plan Approval Information
1. Date E&SC Plan 06/29/2022
Approved *
2. E&SC Plan Project GUILF-2022-038
Number/ID* Assigned by agency or local program
3. E&SC Plan State DEQ Office
Approved by* Local Program
4. State DEQ Office* Winston-Salem (WSRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can
include the beginning point and end point coordinates in the "Notes" box below).
5. E&SC Plan
5_GUILF-2022-038.pdf
3.86MB
Approval letter or
Must be PDF format
Grading Permit
6. Signed FRO
Financial Responsibility/Ownership Form
6_FRO_Signed.pdf
73.01 KB
Must be PDF format
7. Site Location Map
Must be PDF format (limit 20 MB)
7—Pages from R-5725_100_pct_for_permitting.pdf
1.15MB
Please do not upload entire set of E&SC plans.
8. Notes (Optional)
Provide any additional information that might help the reviewer better understand how uploaded documents
support the application. Include additional waterbodies if necessary.
This is a linear distribution project
9. NOI Certification
9_R-5725 NOI.pdf
71.65KB
Form
Must be PDF format
This is an Express
• No
Review Project*
Yes
E. Certification
North Carolina General Statute 143-215.613 (i) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document
filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000).
Under penalty of law, I certify that:
* I am the person responsible for the construction activities of this project, for satisfying
the requirements of this permit, and for any civil or criminal penalties incurred due to
violations of this permit.
* The information submitted in this NOI is, to the best of my knowledge and belief, true,
accurate, and complete based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information.
* I will abide by all conditions of the NCG010000 General Permit and the approved
Erosion and Sediment Control Plan.
* I hereby request coverage under the NCG010000 General Permit and understand that
coverage under this permit will constitute the permit requirements for the discharge(s)
and is enforceable in the same manner as an individual permit.
Specify if you are:* The Legally Responsible Person named on this Notice of Intent
Authorized Responsible Person' (signing on behalf of Legally Responsible Person
named in Part B)
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee.
*An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
C rPGYrrt� %%e 5Z�W,-,, -
Type Name* Patrick W Sizemore
Title Senior Engineering Tech
Organization Legally Responsible Entity
Duke -Energy
Date * 07/07/2022
F. Tracking and COC Info
NOI Tracking No. 96711
NC Reference No. NCG01-2022-2476
Indicates NCG01 or NCG25. Uses NOI number until approved, then uses NUMBER incremented by SP (passed
from workflow if eNOI approved)
Certificate of NCC222476
Coverage (COC) No.* Uses NOI number until approved, then uses NUMBER incremented by SIP (formatted and passed from workflow if
eNOI approved)
Initial Invoice No. NCC222476-2022
Invoice Due Date 8/7/2022
Initial Fee $ 100.00
Invoice Status OPEN