Loading...
HomeMy WebLinkAbout820621_routine_20220617Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Type of Visit: .ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 04t<tine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Farm Name: 67`'02. Arrival Time: 4t4tuLt ("I -0 Owner Name: Mailing Address: Physical Address: Facility Contact: JUtL Cze),771-4. Departure Time: Owner Email: Phone: County:Region; re"- D L Onsite Representative: Title: r?:414,4Certified Operator: e¢ e.a Back-up Operator: Location of Farm: Latitude: Integrator: Phone: Certification Number: Certification Number: Longitude: Layer Non -Layer Design Current Capacity Pon, Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes io ❑ NA ❑ NE ❑ Yes 0 No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) 0 Yes 0 No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes 0 No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes U < ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 2/4/2015 Continued Facility Number: $ '- - to;'21 Date of Inspection: 42-i7- , - Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [ To ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): J5 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes E No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes u 1V o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ❑°No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ENo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area F 12. Crop Type(s): (ryy r /� t 4 /rf72ftttJ,- ib ' °;4� . 6_7 13. Soil Type(s): 0/ . 1, L. 14. Do the receiving crops differ from those desi nated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes allo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ©''1Vo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes E No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: ❑ Yes Ergo ❑ NA ❑ NE ❑ Yes U 110 ❑ NA ❑ NE ❑ Yes I o ❑ NA ❑ NE 21. Does record keeping need improvement? If yes, check the appropriate box below. Yes ❑ No ❑ NA ❑ NE El Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers [ "feather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield El 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? El Yes JNo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes CNo ❑ NA ❑ NE Page 2 of 3 5/12/2020 Continued Facility Number: - 69 -i Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [ To ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ©moo ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes L'"J 1`' o ❑ NA ❑ NE ❑ Yes ONo ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes [-] No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes rfiVNo ❑ NA ❑ NE [ENo ❑NA ❑NE 'No ❑ NA ❑ NE 'No ❑ NA ❑ NE ❑ Yes ❑ Yes n Yes Comments (refer to question #): Explain any YES answers and/or any additional recommendations or Use drawings of facility to better explain situations (use additional pages as necessary). other '&71)41 11.-) ;:t Fp/iv- Reviewer/Inspector Name: Phone: jO3-0 15 e( Reviewer/Inspector Signature: Date: Page 3 of 3 5/12/2020