Loading...
HomeMy WebLinkAboutWQ0082821.20171231.NDplans4x 84 l x 846.18 • 841. 6 I X 83 x 840.95 4.38 POND NO. 2 1 S01.111-1E. r. RAILROAD � - x864.65 =. M. RAILROAD SPIKE POLE. EL.=868 3 POND NO. 1 / 8 K65 7 K65 ' "A" x 834.85 x 784.68 IN BASE A, x 71.69 x 870.87 MAIN PLANT PROPERTY LINE ( i X 871.42 x 868.5 76.17 x 849.89 71,08 x 871.50 STORA 871.20 871.37 x 8 0.41 x 1 2 x 848.78 x 871.79 }, ,71,54 x 871.50 x 871.40 x 863.5 K65W6 "A" x 862,39 x 862.9 x865.77 T'�dl p• ‘,:410.6N. mg. 1.100aimileartimmitailikkh, „,7•0100., � 4womasiomina, x 866.12 x 864.69 x 863.33 x 859.09 58.23 x 845.53 x 780.54 lh APPROX. 200' SOUTH OF HWY. 70 APPROX. 800' EAST OF THE PROPERTY LINE EXPLANATION NCDEHNR MONITORING WELL LEI MONITORING WELL POTABLE WATER WELL NOTES: ALL WELL LOCATIONS ARE APPROXIMATE. WELLS K65W4, K65W5, K65W6, K65W7 AND K65W8 WERE SAMPLED AND ANALYZED BY NCDEHNR (9/01/89). WELLS K65W6 "A", K65W6 "B", K65W6 "C", K65W7 "A", K65W7 "B" AND K65W7 "C" WERE SAMPLED AND ANALYZED BY LEI (2/13/90). 0 100 APPROX. SCALE, FT. REF.: SITE TOPOGRAPHIC PLAN PREPARED BY PIEDMONT AERIAL SURVEYS, DATED 1981 LAW ENVIRONMENTAL CHARLOTTE, NORTH CAROLINA MEASURED CONCENTRATIONS FOR N (NO2 + NO3) IN mg/I SOUTHERN STATES FERTILIZER PLANT STATESVILLE, NORTH CAROLINA JOB NO 56-9606 FIGURE N N 475010 N 4700.0 PROPERTY LINE f } t X 84 X 846.18 x 841. X 83 x 856.21 °" SOUTHERN ---t` —Y.. X 864.69 .8 M. RAILROAD SPIKE POLE. EL = 866. 3 ego ..871,54 X 864.69 x 863.33 859.09 58.23 APPROX. 200' SOUTH OF HWY. 70 APPROX. 800' EAST OF THE PROPERTY LINE EXPLANATION NCDEHNR MONITORING WELL LEI MONITORING WELL POTABLE WATER WELL 840 ....••- ESTIMATED GROUND -WATER CONTOUR ELEVATION A, CROSS SECTION LINE REFERENCE FIGURE 4 l*fNOTES: ALL WELL LOCATIONS ARE APPROXIMATE. WATER -LEVEL ELEVATIONS ARE BASED ON NCDEHNR MEASUREMENTS FOR WELLS K65W4, K65W5, K65W6, K65W7 AND K65W8 ON 9/01 /89. WATER -LEVEL MEASURMENTS FOR WELLS K65W6 "A", K65W6 "B", K65W6 "C", `• K65W7 "A", K65W7 "B" AND K65W7 "C" WERE TAKEN BY LEI PERSONNEL ` ON 2/13/90. meniorio '11-4Milintablkhen, 111‘, Note THIS MAP WAc, r(\MPILEn FROM i" : 2000' �7JIl ! V N nT MCrT ki T1 n111AI MAID Ar!'4IDAr, I DUE TO THE LIMITED NUMBER OF MONITORING WELL LOCATIONS, THE CONSIDERABLE TOPOGRAPHIC RELIEF, AND THE SUBSTANTIAL VARIABILITY BETWEEN LEI AND NCDEHNR READINGS, THE ILLUSTRATED CONTOUR LINES DEPICT GENERAL FLOW ONLY; LOCALIZED FLOW MAY BE SOMEWHAT DIFFERENT. 0 100 APPROX. SCALE, FT. REF.: SITE TOPOGRAPHIC PLAN PREPARED BY PIEDMONT AERIAL SURVEYS, DATED 1981. I r 141 LAW ENVIRONMENTAL NORTH CAROLINA fl INV CHARLOTTE, GROUND -WATER CONTOURS SOIL / PARTIALLY WEATHERED ROCK ZONE 1 SOUTHERN STATES FERTILIZER PLANT STATESVILLE, NORTH CAROLINA JOB NO. 56-9606 I FIGURE 2 N 4700C • 1 8- BT 19.0 FT. (1 11 mg/I " K65W6 "B" 10- 12- 12- 10 - 10 - 10 - BT 31.0 FT. 22 mg/IL) �-- E �a•- K65W6 K65W6 "A" 8 12 - 14- 14 - 11 - 17 - 15- 21- 29 - 26 - 28 - 30 - 50/4" - AR 58.0 FT. K65W6 "C" 14- 20 - 30 - 76 50/6" BT 45.0 FT. K65W6 56 mg/I OD K65W6 "A" 370 mg/I (2, 76 mg/I \ N K65W6 "C" 11 - 16 - 16 - 13 - 20 - 18 - 14 - 20 - 30 - 76 50/6' BT 45.0 FT. 76 mg/I NOTES: SOIL CLASSIFICATION AND GROUND WATER LEVEL DATA FOR MONITORING WELLS K65W4, K65W6, K65W7, AND K65W8 WAS PROVIDED BY NCDEHNR WATER LEVEL MEASUREMENTS AND GROUND -WATER SAMPLES TAKEN ON 9/01/89. SOIL CLASSIFICATION AND GROUND -WATER LEVEL DATA FOR MONITORING WELLS K65W6'A', K65W6'B', K65W6'C', K65W7'A', K65W7'B', AND K65W7'C' WAS PROVIDED BY LEI WATER LEVEL MEASUREMENTS AND GROUND -WATER SAMPLES TAKEN DN 2/13/90, K65W7 K65W7 "A" 18- 16- 11- 9 - Imam.. 8 - 12- 24 - 47 - 50/4" -r 50/2" AR 44.0 FT. K65W7 1 140 mg/ICE K65W7 "A" 53 mg/I EXPLANATION FINE TO MEDIUM SAND SILTY SAND CLAYEY SAND SANDY SILT K65W7 "B" 9 - 6 - 13 - 19 - BT 32.0 FT. 21 mg/I4 ) CLAYEY SILT SANDY CLAY SILTY CLAY SAMPLED BY NCDEHNR ON 9/01/89. (2® SAMPLED BY LEI ON 2/13/90. ? UNCERTAIN GEOLOGIC CONDITIONS. - - - WATER TABLE AFTER 24 HOURS REFERENCE FIGURE 2 FOR LOCATION OF STANDARD CROSS - SECTION LINES A - A' AND PENETRATION 47- B - B', RESISTANCE (BLOWS/FOOT) WELL SCREEN INTERVAL NO2+ NO3(AS N) CONCENTRATION (mg/I) AR AUGER REFUSAL BT BORING TERMINATION 10' VERTICAL SCALE 1 INCH = 10 FEET 0 I HORIZONTAL SCALE 1 INCH = 100 FEET 100' VERTICAL EXAGGERATION = 10X K65W7 "C" 12 17 9 9 - 10 BT 23.0 FT. 93 mg/I ELEVATION FEET 880 870 ▪ 860 ▪ 850 - 840 ... 830 ▪ 820 ▪ 810 800 •� 790 780 +111. 770 LAW ENVIRONMENTAL CHARLOTTE, NORTH CAROLINA LITHOLOGIC CROSS SECTIONS A - A' ANDB -B' SOUTHERN STATES FERTILIZER PLANT STATESVILLE, NORTH CAROLINA JOB NO. 56-9606 FIGURE 4 x 846.18 W7 1. (MG/L) 99 ( GIL) KI5,5W " POND NO. 1 x 834.85 x 784.68 B.M. RAILROAD SPIKE POLE . EL .= 868.3 PROPERTY LINE x 870.87 PLANT x8 7 1 . 5 0 STORAG 871.20 x871.37 1 x 871.42 T x 849.89 x 848.78 x 871.13 x 863.5 x 862.9 x 865.77 7k---•-., . ___. _... - x 869. 7 x 866.12 x 864,69 x 863.33 x 859.09 K65W6"F" 0.14 (MG/L) 58.23 411111W 441 e 65 WAFA f411104#441114 :"*V*1 "4-ditateit via%Vaitttalkit;NeL 14. C. DE. RE4OURCES ‘2.4D GOM Nal/BEV OPM 2 1990 1111S121 OF ErlIOOtigIftrit. WOO MOORESO, RESIO X 780.54 Note THIS MAP WA(:: rcni T 100SOUTH OF HWY. 70 CENTERLINE APPROX. 800' EAST OF THE SOUTHERN STATES PROPERTY LINE EXPLANATION NCDEHNR MONITORING WELL LEI PHASE I MONITORING WELL POTABLE WATER WELL aLEI PHASE II WATER TABLE MONITORING WELL UMW NOTES: LEI PHASE II DEEP MONITORING WELL CONCENTRATION ISOPLETH FOR NO2+ NO3 IN MG/L 0 LEI PROPOSED PHASE ID MONITORING WELL WELLS K65W4, K65W5, K65W6, K65W7 AND K65W8 WERE SAMPLED AND ANALYZED BY NCDEHNR (9/01/89). WELLS K65W6"A", K65W6"B", K65W6"C", K65W7''A", K65W7"B" AND K65W7"C" WERE SAMPLED AND ANALYZED BY LEI (2/13/90). GROUND -WATER LEVELS AT WELLS K65W6"A" THROUGH K65W6"E" AND K65W7"A" THROUGH K65W7"G" WERE MEASURED BY LEI (8/1/90). WELLS K65W6"D", K65W6"E", AND K65W7"D" THROUGH K65W7"H" WERE SAMPLED AND ANALYZED BY LEI (8/1/90). ESTIMATED ISOPLETHS ARE FOR WATER -TABLE WELLS AND ARE BASED ON ONE SAMPLING OF EACH WELL AND MAY THEREFORE NOT ACCURATELY REPRESENT ACTUAL CONDITIONS. WELL K65W6"F" WAS SAMPLED AND ANALYZED BY LEI (9/25/90). 0 100 APPROXIMATE SCALE, FT. 200 REF.: SITE TOPOGRAPHIC PLAN PREPARED BY PIEDMONT AERIAL SURV LAW ENVIRONMENTAL CHARLOTTE, NORTH CAROLINA PROPOSED PHASE III WELL LOCATIONS AND ESTIMATED ISOPLE FHS FOR WATER -TABLE WELLS N(NO2 + NO3 ) IN mg/I SOUTHERN STATES FERTILIZER PLANT STATESVILLE, NORTH CAROLINA JOB NO. 56-9606 I FIGURE 1 PPOM ?r)r r). 0,-4-e?Tre'.P ,/) x 866,12 x864.69 x 863.33 x 859.09 x 840.95 x 856.21 POND NO. 1 x8 K65 7 K65 "A" x 784.68 K65W5 M. RAILROAD SPIKE • POLE. EL.=868.3 IN BASE 1 x 870,87 MAIN PLANT x 871,42 x 868,5 76.17 x 871.50 ORA 871.20 871.37 x 871.79 ®K65W4 x 871.50 x 871.40 x 871.13 x 863.5 x 862.9 x 865.77 11°11.11*\4 NAVINVINaraltatal x 845.53 x 780.54 APPROX. 200' SOUTH OF HWY. 70 APPROX. 800' EAST OF THE PROPERTY LINE K65W6"F" EXPLANATION NCDEHNR MONITORING WELL LEI PHASE 1 MONITORING WELL POTABLE WATER WELL PROPOSED PHASE II WATER TABLE MONITORING WELL NOTES: ALL WELL LOCATIONS ARE APPROXIMATE. WELLS K65W4, K65W5, K65W6, K65W7 AND K65W8 WERE SAMPLED AND ANALYZED BY NCDEHNR (9/01/89). WELLS K65W6 "A", K65W6 "B", K65W6 "C", K65W7 "A", K65W7 "B" AND K65W7 "C" WERE SAMPLED AND ANALYZED BY LEI (2/13/90). APPROX. SCALE, FT. REF.: SITE TOPOGRAPHIC PLAN PREPARED BY PIEDMONT AERIAL SURVEYS, DATED 1981. LAM/ ENVIRONMENTAL CHARLOTTE, NORTH CAROLINA PROPOSED PHASE II MONITORING WELL LOCATIONS SOUTHERN STATES FERTILIZER PLANT STATESVILLE, NORTH CAROLINA JOB NO. 56-9606 FIGURE 2 N 47000 X 840.95 K. W7"I" 7: .96 F .� 788.70 FTlIot K65W7"F" X 846.18 / X 841. X 83 .\ POND NO. 1 x 834.85 :. M. RAILROAD SPIKE • POLE. EL 866.3 IN BASE X 870.87 MAIN PLANT X '1,a9 X 871.42 X 868.5 x 849.89 X 871.50 X 871.79 K65 k I Te+NK ,37 ( TANK x 848.78 6'1.40 X 863.5 B 65 FT.Alkil ��- 'K65W6 "A" 8 6 X 862.3 X 867.16 X862.9 X 865.77 11 VW INNEWITeassm x 780.54 100' SOUTH OF HWY. 70 CENTERLINE APPROX. 800' EAST OF THE SOUTHERN STATES PROPERTY LINE X 866.12 X 864.69 X 863.33 4OFI. 58.23 Nore THIS MAP v44' nn- lt�,_ Fi-:i_.Y i.. 1 fl, "• kitV RI A.I ♦r-GT MAT/MA) MAO *PryiESAry -r RrF K65W6"F" (DRILLED 9 / 18/90; TEST RESULTS NOT YET AVAILABLE) EXPLANATION NCDEHNR MONITORING WELL LEI PHASE I MONITORING WELL POTABLE WATER WELL LEI PHASE 11 WATER TABLE MONITORING WELL LEI PHASE II DEEP MONITORING WELL t it CROSS SECTION LINE, REFERENCE FIGURES 4 AND 5 NOTES: DUE TO THE LIMITED NUMBER OF MONITORING WELL LOCATIONS, THE CONSIDERABLE TOPOGRAPHIC RELIEF, AND THE SUBSTANTIAL VARIABILITY BETWEEN LEI AND NCDEHNR READINGS, THE ILLUSTRATED CONTOUR LINES DEPICT GENERAL FLOW ONLY; LOCALIZED FLOW MAY BE SOMEWHAT DIFFERENT. WELLS K65W4, K65W5, K65W6, K65W7 AND K65W8 WERE SAMPLED AND ANALYZED BY NCDEHNR (9/01/89). WELLS K65W6 "A", K65W6 "B", K65W6 "C", K65W7 "A", K65W7 "B" AND K65W7 "C" WERE SAMPLED AND ANALYZED BY LEI (2/13/90). GROUND -WATER LEVELS AT WELLS K65W6"A" THROUGH K65W6"E" AND K65W7"A" THROUGH K65W7"G" WERE MEASURED BY LEI (8/1/90). WELLS K65W6"D", K65W6"E", AND K65W7"D'! THROUGH K65W7"H" WERE SAMPLED AND ANALYZED BY LEI (8/1/90). 0 N. C. DEPT. OF NATEMILF RESOURCES AND \. 100 ONr01UNI' Y DEVELOPMENT! APPROX. SCALE, FT. SP'2 1990 OIVl1LN n ENV!73',n7171, e M9 Sb �: I L s E it 0 REF.: SITE TOPOGRAPHIC PLAN PREPARED BY PIEDMONT AERIAL SURVEYS, DATED 1981. el3LAW ENVIRONMENTAL CHARLOTTE, NORTH CAROLINA GROUND -WATER CONTOURS SOIL / PARTIALLY WEATHERED ROCK ZONE SOUTHERN STATES FERTILIZER PLANT STATESVILLE, NORTH CAROLINA JOB NO. 56-9606 E FIGURE 2 EMEN.T FICE B 11 mgil BT 19.0 FT. K65W7"D" 15 22 11 8 25 36 - 50/2" BT 23.0 FT. '11 mg/i II11-E -� 10 - BT 23.0 FT. 93 mg/I 50 B' K65W6"C" 16 - 13- 20 - 18- 14- 20 - 30 - 76 50/6 BT 45.0 FT. 12 12 16- 11- 13- 76 mg/I 2 K65W 7"E" 15 mg/I 25 BT 35.0 FT. U ELEVATION FEET - 870 - 860 - 850 - 840 - 830 - 820 810 ELEVATION FEET - 830 - 820 - 810 - 800 - 790 - 780 770 CD E2 EXPLANATION FINE TO MEDIUM SAND SILTY SAND CLAYEY SAND SANDY SILT NI rip CLAYEY SILT SANDY CLAY SILTY CLAY SANDY CLAYEY SILT 1� SAMPLED BY NCDEHNR ON 9/01/89. SAMPLED BY LEI ON 2/13/90. 0 SAMPLED BY LEI ON 8/1/90. ® NO SOIL SAMPLING - DRILLED UTILIZING AIR ROTARY DRILLING TECHNIQUES UNCERTAIN GEOLOGIC CONDITIONS • STABILIZED WATER TABLE - STANDARD 47 - PENETRATION RESISTANCE (BLOWS/FOOT) WELL SCREEN INTERVAL NO2 + NO3(AS N) CONCENTRATION (mg/I) - . - ESTIMATED CONCENTRATION ISOPLETH AR AUGER REFUSAL BT BORING TERMINATED 10 - VERTICAL SCALE 1 INCH = 10 FEET NOTES: SOIL CLASSIFICATION AND GROUND WATER LEVEL DATA FOR MONITORING WELLS K65W4, K65W6, K65W7. AND K65W8 WAS PROVIDED BY NCDEHNR WATER LEVEL MEASUREMENTS AND GROUND -WATER SAMPLES TAKEN ON 9/01/89. SOIL CLASSIFICATION AND GROUND -WATER LEVEL DATA FOR MONITORING WELLS K65W6' A K65W6"B", K65W6"C` WAS PROVIDED BY LEI WATER LEVEL MEASUREMENTS AND GROUND -WATER SAMPLES TAKEN ON 2/13/90 AND 8, 1 /90. REFERENCE FIGURE 2 FOR LOCATION OF CROSS - SECTION LINES B - B AND C - C. I HORIZONTAL SCALE 1 INCH = 100 FEET 100 VERTICAL EXAGGERATION = 10X 0 CHARLOTTE, NORTH CAROLINA LAW ENVIRONMENTAL LITHOLOGIC CROSS SECTIONS B- B'ANDC -C' SOUTHERN STATES FERTILIZER PLANT STATESVILLE, NORTH CAROLINA JOB NO 56-9606 DRAWING It 11 8 BT 19.0 FT. 11 mg/I K65W6 "B" 10- 10 - 3 - 9 - BT 31.0 FT. 22 mg/I �' \ K65W6 K65W6 "A" 8- 17- 15- 21- 29 - 26 - 28 - 30 - 50/4" - AR 58.0 FT. B' K65W6 "C" 14- 20 - 30 - 76 50/6" BT 45.0 FT. K65W6 56 mg/I (1) K65W6 "A" 370 mg/I L (2 76 mg/I K65W6 "C" 11 - 16 - 16- 13 - 20 - 18 - 14 - 20 30- 76 50/6" BT 45.0 FT. 76 mg/I NOTES: SOIL CLASSIFICATION AND GROUND WATER LEVEL DATA FOR MONITORING WELLS K65W4, K65W6, K65W7, AND K65W8 WAS PROVIDED BY NCDEHNR WATER LEVEL MEASUREMENTS AND GROUND -WATER SAMPLES TAKEN ON 9/01/89. SOIL CLASSIFICATION AND GRDUND-WATER LEVEL DATA FOR MONITORING WELLS K65W6'A', K65W6'B', K65W6'C', K65W7'A', K65W7'B', AND K65W7'C' WAS PROVIDED BY LEI WATER LEVEL MEASUREMENTS AND GROUND -WATER SAMPLES TAKEN ON 2/13/90, REFERENCE FIGURE 2 FOR LOCATION OF CROSS - SECTION LINES A - A' AND B - B'. K65W7 K65W7 "A" 18- 16- 11 - 8 - 12- 24 - 47 - 50/4" 50/2" AR _44.0 FT. K65W7 (1 i 140 mg/1- K65W7 "A" 53 mg/I(2) EXPLANATION FINE TO MEDIUM SAND SILTY SAND CLAYEY SAND SANDY SILT K65W7 "B" 11 - 19 - 14 - 11- 9 - 6 - 13 - 19 - BT 32.0 FT. (2) 21 mg/I " CLAYEY SILT SANDY CLAY SILTY CLAY 0 SAMPLED BY NCDEHNR ON 9/01/89. SAMPLED BY LEI ON 2/13/90. ? UNCERTAIN GEOLOGIC CONDITIONS. - - - WATER TABLE AFTER 24 HOURS STANDARD PENETRATION 47- RESISTANCE (BLOWS/FOOT) 10' WELL SCREEN INTERVAL NO2+ NO3(AS N) CONCENTRATION (mg/I) AR AUGER REFUSAL BT BORING TERMINATION VERTICAL SCALE 1 INCH = 10 FEET 0 I HORIZONTAL SCALE 1 INCH = 100 FEET 100' VERTICAL EXAGGERATION = 10X K65W7 "C" 12 11 17- 9 - 9 10- BT 23.0 FT. 93 mg/I A ELEVATION FEET 880 .. 870 860 ■- 850 ■- 840 n- 830 - 820 -- 810 .. 800 .- 790 .• 780 .. 770 LAIN ENVIRONMENTAL LITHOLOGIC CROSS SECTIONS A - A' ANDB -B' SOUTHERN STATES FERTILIZER PLANT STATESVILLE, NORTH CAROLINA JOB NO. 56-9606 FIGURE