HomeMy WebLinkAboutNCC205099_NOT Closeout Documents_20220707Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699
County: Iredell Project: 190601.000 Third Creek Middle School River basin: Yadkin-PeeDee
Person financially responsible: Iredell County Board of Education - Robert A Project 9: IREDE-2021-003
Jackson, Director of Construction
Address: 549 Race Street, Statesville, NC 28677
1. Project Location: East Barkley Road, Statesville
Pictures: No
2. Weather and soil conditions: Sunny, workable soil Initial inspection: No
3. Is site currently under notice of violation? No
d. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one on site Title:
Inspection report: Sent Report Date given/sent: June 03, 2022
9. Corrective action needed:
10. Comments: Overall the site has sufficient permanent ground cover to restrain erosion, however there are
some bare areas and rills that need to be repaired and stabilized. No additional self -monitoring
or self -inspections are required. Project is in compliance and released under the SPCA.
Termination of coverage under the NPDES General Stormwater Permit for Construction
Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT).
The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note
that this correspondence must be uploaded as part of completing the NOT process.
All project that have been approved prior to April 01, 2019, under the old permit system, are
not required to take any additional actions. The stormwater permit is terminated at the same
time as the termination of this erosion control permit.
Reported by: Jesse McDonnell Others present:
Date of inspection: June 01, 2022 Time arriving on site: 2:00 pNl Time leaving site: 2AO PM
cc: