HomeMy WebLinkAboutNCC222477_ESC Approval Submitted_20220711ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
July 1, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Shoppes at Village Green
Jared Fryer, Manager
505 Forsythe Street
Fayetteville, NC 28304
RE: Project Name: OVG Il Truck Parking II
Acres Approved: 1.3
Project TD: CUMBE-2022-186
County: Cumberland City: Fayetteville
Address: Forsythe Street
River Basin: Cape Fear
Stream Classification: Other
Submitted by: Scott Brown
Date Received by LQS: June 8, 2021
Plan Type: Utility
Dear Mr. Fryer:
The subject erosion and sedimentation control plan has been approved by default. The
Sedimentation Pollution Control Act (hereinafter "Act") states that this plan must be filed a
minimum of 30 days (15 days for revised plans) prior to the activity and the approving authority
must approve or disapprove the submitted plan within 30 days (15 days for revised plans) of
receipt of G.S. 113A-54.1. The Act further states that if the approving authority faits to approve
or disapprove the submitted plan within the 30-day (15 days for revised plans) period, the plan
will be deemed approved. The. enclosed Certificate of Approval must be posted at the job site.
This plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129.
As of April 1, 2019, all new construction activities are required to complete and submit
an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC)
under the NCGO10000 Construction Stormwater General Permit. This form MUST be
submitted and COC issued prior to the commencement of any land disturbing activity on
the above -named project. The NOI form may be accessed at deq.nc.gov/N0001. Please
direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or
Paul Clark at Paul.clarkgncdenr.gov. After you submit a complete and correct NOT
Form, a COC will be emailed to you within three business days. Initially, DEMLR will
not charge a fee for coverage under the NCGOI permit. However, on or after June 1,
2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR
igipw
North C:as olina Department of Environmental Quality ;Division of Energy. Mineral and Land R"ourr es
Fayetteville Regional Offire 1 225 Green Street, Suite 714 1 Fayetteville, North Carolina 28301
Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the
NCGO1 permit require that the following documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate
to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land -disturbing activity. This approval does
not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the
information provided in the Financial Responsibility Form, which you provided. You
are requested to file an amended form if there is any change in the information
included on the form. This permit allows for a land -disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the acreage will be a
violation of this permit and would require a revised plan and additional application
fee. Any addition in impervious surface, over that already noted on the approved
plan, would also require a revised plan to verify the appropriateness of the erosion
control measures and the stormwater retention measures. (GS 113A-54.1(b)). In
addition, it would be helpful if you notify this office of the proposed starting date for
this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
c+V. 3AL."
Chris Baker
Assistant Regional Engineer
DEMLR - Fayetteville Regional Office
Enclosures: Certificate of Approval
cc: Scott Brown, P. E., 4D Site Solutions, Inc. — email copy
Joseph Staton, City of Fayetteville Permit Office — email copy
Fayetteville Regional Office
Letter of Approval with Modifications
Date: July 1, 2022
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: OVG II Truck Parking 11
Project ID: CUMBE-2022-186
Counties: Cumberland
The modifications required for the project approval are as follows:
Add temporary sediment basin detail showing the baffles, weir and skimmer. Detail must
include specifications and maintenance requirements.
These modifications must be received at the Fayetteville Regional office no later than July 22,
2022. The permit is not approved and active until the required modifications are received by this
office.