Loading...
HomeMy WebLinkAboutSWA000150_Plansheet - Misc. Detail_20220624 (6)a EDGE OF PAVEMENT/BACK OF GUTTER 24" (WHERE APPLICABLE) MIN METER BOX A. ROADWAY ea z 3/4" TYPE "K" SOFT COPPER PIPE N WATER LINE ELEVATION VIEW EDGE OF PAVEMENT BACK OF GUTTER (WHERE APPLICABLE TAPPING SADDLE & CORPORATION STOP w /vio3/4" TYPE "K" r Al z SOFT COPPER PIPE `ROADWAY - PLAN VIEW D5.03 TYPICAL WATER METER INSTALLATION NOT TO SCALE FINISHED GRADE SERVICE LINE (INSTALLED BY OTHERS) NOTES: PVC SLEEVE SHALL BE REQUIRED FOR ALL SERVICE LINES INSTALLED UNDERNEATH SIDEWALKS OR OTHER PERMANENT STRUCTURES. PVC SLEEVE DIAMETER SHALL BE AT LEAST 1/2" LARGER THAN THE OUTSIDE DIAMETER OF THE COPPER SERVICE LINE. MINIMUM LENGTH OF BRASS NIPPLE SHALL BE 12 INCHES (12"). WATER METER BOX SERVICE LINE- -THREADED BRASS NIPPLE NOTES 1. TAPPING SLEEVE WILL BE MUELLER #H-615 OR APPROVED EQUAL. 2. APPROVED RESILIENT SEAT TAPPING VALVE. 3. SOLID CONCRETE OR BRICK BLOCKING WILL BE USED AS FOOTING FOR DUCTILE IRON PIPE. 4. CONCRETE WILL NOT CONTACT BOLTS OR ENDS OF MECHANICAL JOINT FITTINGS. 5. SEE APPROPRIATE STANDARD DETAIL FOR THRUST BLOCK AND THRUST BLOCK DIMENSIONS. 6. ALL FITTINGS AND APPURTENANCES SHALL BE RESTRAINED AS PER SECTION 6.05. D5.01 TAPPING SLEEVE AND VALVE ASSEMBLY NOT TO SCALE SHEETED OPEN TRFNCH TRFNCH BACKFILL MATERIAL COMPACTED IN 6" LIFTS BACKFILL MATERIAL COMPACTED IN 3" LIFTS UNDISTURBED EARTH STANDARD EXCAVATION SHEETED OPEN TRENCH TRENCH BACKFILL MATERIAL COMPACTED IN 6" LIFTS 24" MAX 12" MA: 12.. MIN 6" MIN SPRING LINE OF PIPE WASHED STONE- i EMBEDMENT x� 7 UNDISTURBED EART NOTES: CONSTRUCTION OF TRENCHES SHALL BE IN ACCORDANCE WITH THE LATEST OSHA REGULATIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE REGULATIONS. NO BOULDERS OR STONES IN EXCESS OF 4" IN SIZE SHALL BE USED AS PART OF THE INITIAL BACKFILL. PIPE BEDDING MATERIAL SHALL BE # 57 WASHED STONE. STANDARD EXCAVATION IN WET CONDITIONS SHEETED OPEN TRENCH TRENCH BACKFILL MATERIAL COMPACTED IN 6" LIFTS BACKFILL MATERIAL COMPACTED IN 3" LIFTS NOTE: UNDISTURBED BELL HOLES NOT SHOWN EARTH BACKFILL MATERIAL COMPACTED IN 6" LIFT' SPRING LINE OF WASHED STONE EMBEDMENT ADDITIONAL WASHED STONE F UNDERCUT EXCAVATION ONLY AS DIRECTED BY ENGINEER UNDISTURBL_ EARTH D5.02 TYPICAL TRENCH DETAIL NOT TO SCALE OVERCUT EXCAVATION SHEETED I TOPEN UNDERCUT EXCAVATION IN UNSTABLE SOILS TYPES GENERAL NOTES FOR WATER 1. WATER CONSTRUCTION ON THIS SITE MUST BE AUTHORIZED BY PERMITS ISSUED BY THE TOWN OF RUTHERFORDTON WATER DEPARTMENT. ALL SITEWORK SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE, AND NATIONAL REGULATORY STANDARDS; AND ALL REQUIREMENTS IN THE PROJECT TECHNICAL SPECIFICATIONS. 2. CONTRACTOR TO VERIFY WITH ENGINEER THAT THE REQUIRED WATER PERMITS AND ASSOCIATED NON -WATER PERMITS HAVE BEEN OBTAINED PRIOR TO BEGINNING CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE UNDER THE OBSERVATION OF THE ENGINEER, THE OWNER, AND THE CITY OF ASHEVILLE. THE ENGINEER SHALL PERIODICALLY OBSERVE THE PROGRESS OF INSTALLATION AND SHALL COMPLETE A FINAL WATER AND SEWER INSPECTION. THE CONTRACTOR SHALL FURNISH, SECURE, AND PROVIDE ALL NECESSARY TESTING MATERIALS, EQUIPMENT, PROCEDURES, AND CERTIFIED LABORATORY TEST RESULTS FOR USE WITH ENGINEERS FINAL CERTIFICATION OF COMPLETION. ANY WORK COVERED PRIOR TO ENGINEER'S INSPECTION IS SUBJECT TO UNCOVERING AND BACKFILLING AT THE CONTRACTOR'S EXPENSE. 4. ALL WORK MUST BE PERFORMED BY A NORTH CAROLINA LICENSED UTILITY CONTRACTOR. 5. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND VERIFYING THE EXACT LOCATION AND ELEVATION FOR ALL UTILITIES PRIOR TO CONSTRUCTION; AND TO NOTIFY ENGINEER OF ANY CONFLICTS OR DISCREPANCIES. THE LOCATION OF SOME UTILITIES SHOWN ON THE PLANS HAVE BEEN APPROXIMATED. ALL BURIED UTILITIES HAVE NOT BEEN SHOWN ON THE PLANS AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR LOCATION PRIOR TO CONSTRUCTION. 6. CONTRACTOR SHALL PROTECT EXISTING AND NEWLY BUILT UTILITIES DURING CONSTRUCTION. ANY DAMAGE TO UTILITIES INCURRED DURING OR RESULTING FROM CONSTRUCTION ACTIVITY IS THE RESPONSIBILITY OF THE CONTRACTOR AND IS TO BE REPAIRED IN ACCORDANCE WITH APPLICABLE STANDARDS OF APPROPRIATE AGENCIES AT THE CONTRACTOR'S EXPENSE. 7. THE CONTRACTOR IS TO NOTIFY ALL UTILITY COMPANIES AT LEAST 72 HOURS BEFORE CONSTRUCTION ACTIVITY IS TO BEGIN. THE CONTRACTOR SHALL NOTIFY ULOCO AT 1-800-632-4949 OR 811, 72 HOURS BEFORE CONSTRUCTION BEGINS. NOTIFY THE ENGINEER AT LEAST 72 HOURS BEFORE STARTING CONSTRUCTION ACTIVITIES. 8. EROSION CONTROL IS FIELD PERFORMANCE BASED AND CONTRACTOR SHALL INSTALL AND MAINTAIN ANY EROSION CONTROL MEASURES NECESSARY TO ASSURE MAXIMUM PROTECTION OF THE SITE. CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL MEASURES REQUIRED TO CONTROL SEDIMENT DURING INSTALLATION ALL WATER PIPES AND APPURTENANCES. 9. ALL WATER LINES AND SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH NC PLUMBING CODES AND THE TOWN OF RUTHERFORDTON WATER RESOURCES DEPARTMENT DESIGN & CONSTRUCTION MANUAL. COORDINATE EXACT LOCATIONS OF SERVICE LINES AND APPURTENANCES WITH THE ARCHITECTURAL, PLUMBING, AND LANDSCAPING PLANS. 10. CONTRACTOR TO PROVIDE 5' MIN. LATERAL SEPARATION BETWEEN WATER LINE AND OTHER UNDERGROUND UTILITIES. SEE DETAILS FOR GENERAL NOTES CONCERNING WATER MAIN INSTALLATION REQUIREMENTS. 11. A 3' COVER DEPTH SHALL BE MAINTAINED FOR ALL PROPOSED WATER LINES, ANY NECESSARY FIELD ADJUSTMENTS MUST BE APPROVED BY THE ENGINEER AND THE CITY INSPECTOR. 12. INSTALL FERROUS PIPING FOR BOTH WATER AND SEWER WITHIN 10' OF A CROSSING IF: A. SEWER LINE CROSSES OVER WATER, OR B. VERTICAL CLEARANCE BETWEEN WATER AND SEWER IS LESS THAN 18". MAINTAIN 10' HORIZONTAL SEPARATION BETWEEN SEWER AND WATER MAINS UNLESS LAID IN SEPARATE TRENCHES WITH THE BOTTOM OF THE WATER LINE AT LEAST 18" ABOVE THE TOP OF SEWER OR USE FERROUS MATERIAL FOR BOTH WATER AND SANITARY SEWER. 13. MAINTAIN 18" VERTICAL SEPARATION BETWEEN STORM DRAIN AND WATER OR THE WATER MAIN MUST BE CONSTRUCTED OF FERROUS MATERIALS FOR A DISTANCE OF AT LEAST 10-FEET TO EITHER SIDE OF THE CROSSING. 14. MAINTAIN 5' HORIZONTAL DISTANCE BETWEEN WATER LINES AND THE DRIP LINE, AT MATURITY, OF TREES AND OTHER SHRUBS. 15. TOWN OF RUTHERFORDTON OWNERSHIP AND MAINTENANCE ENDS AT WATER METER AND/OR THE FIRE LINE ISOLATION VALVE. WATER SYSTEM BEYOND IS TO BE PRIVATELY OWNED AND MAINTAINED. 16. METERS, VAULTS, AND FIRE HYDRANTS ARE TO BE PLACED IN RELATIVELY FLAT AREAS. 17. BRASS FITTINGS MUST BE LEAD FREE PER TOWN OF RUTHERFORDTON REQUIREMENTS. 18. CONTRACTOR RESPONSIBLE FOR ADJUSTING EXISTING WATER APPURTENANCES AS NECESSARY DUE TO ANY SITE CONSTRUCTION OR INSTALLATION. 19. TRENCH BACKFILL AND COMPACTION TESTING SHALL BE PERFORMED BY A CERTIFIED SOILS LABORATORY UNDER ALL PAVED AREAS. 20. CONTRACTOR SHALL SUPPLY THE ENGINEER WITH RECORD OF DEVIATIONS FROM PLANS FOR PREPARATION OF FINAL RECORD DRAWINGS. 21. PRESSURE TEST WATER MAINS TO 200 PSI MIN. AND 250 PSI MAX. AS PER CITY OF ASHEVILLE REQUIREMENTS. DISINFECT WATER LINES AND PROVIDE ACCEPTABLE BACTERIOLOGICAL TEST FROM A CERTIFIED TESTING LABORATORY FOR USE WITH THE ENGINEERS CERTIFICATION OF COMPLETION. 22. THE PERMITS REQUIRE CERTIFICATION OF COMPLETION BY THE ENGINEER OF THE WATER SYSTEM PRIOR TO ISSUANCE OF FINAL OPERATION APPROVAL BY THE CITY OF ASHEVILLE. SERVICE WILL BE PROVIDED ONCE FINAL CLOSEOUT SUBMITTALS HAVE BEEN APPROVED BY THE CITY OF ASHEVILLE'S ENGINEERING DEPARTMENT. 23. CROSS -CONNECTION CONTROL PROTECTION DEVICES ARE REQUIRED BASED ON DEGREE OF HEALTH HAZARD INVOLVED AS LISTED IN APPENDIX-B OF THE RULES GOVERNING PUBLIC WATER SYSTEMS IN NORTH CAROLINA. THESE GUIDELINES ARE THE MINIMUM REQUIREMENTS. THE DEVICES SHALL BE LISTED ON THE UNIVERSITY OF SOUTHERN CALIFORNIA APPROVED ASSEMBLIES. THEY SHALL BE INSTALLED AND TESTED (BOTH INITIAL AND PERIODIC TESTING THEREAFTER) IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS OR THE LOCAL CROSS -CONNECTION CONTROL PROGRAM, WHICHEVER IS MORE STRINGENT. 24. RESTRAINED JOINTS BY AN APPROVED PIPE MANUFACTURER ARE TO BE USED FOR ALL PUBLIC LINES WHERE THRUST RESTRAINING IS REQUIRED; HOWEVER, THRUST BLOCKS ARE PERMITTED WHERE CONNECTIONS ARE MADE TO EXISTING WATER LINES OR WHERE THE USE OF MECHANICAL RESTRAINT IS NOT FEASIBLE. UTILITY DETAILS jC 00 � w co � LLrf M co N � r` ~ � � w L? > a N N U� Lo Z N N Z W c0 c0 Z lu-ap OG O_j cm J c0 c0 w J co coN a w Z Q cc > w x cox p LL N w p LL cflQa. ZQa 33 N Lo cn cn cn 12 a o 0 w w 3: w ~ w_ n > w w d w w w w z cn > 0 � �od_c' o r- 0oo moon(s Qoc w 00 "o� z �Qcp ° MooW s-0 �°� cy0 ° ° ..o- OD OD N U w U) z w U J cn J w m U z �Im z 0 w U rn w 0 ofz MW It O V J J_ a J O W ch Q U It ZZ O 0 O w G✓ 1 w I oJ L J w cr d O O W J Q w Q O � m m J w DRAWN BY: DMS CDC PROJECT NO.: --- XXX PERMIT NO. xxx SHEET C951