Loading...
HomeMy WebLinkAboutSWA000150_Plansheet - Misc. Detail_20220624 (5)IIIIII_ 4 ± COMPACTED SOIL CHANNEL INSTALLATION IIII III �2' MIN 12" EXISTING-IIIIIIiIIIIIlI1III=� GROUND -IIl-1 II=ICI _ 18" MIN 1' DITCH DEPTH IN I=I�IIII�II ORIGINAL GROUND GROUND =I�I„i 11-III„��IiT=11I=I�I,ii_ 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES STAKES APPROXIMATELY 12" 30cm APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4"-6" (10cm-15cm) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10cm) APART AND 4" (10cm) ON CENTER TO SECURE BLANKETS. 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5cm-12.5cm) (DEPENDING ON BLANKET TYPE) AND STAPLED. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH ON THE BLANKET BEING OVERLAPPED 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9m-12m) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10cm) APART AND 4" (10cm) ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL. 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. N OTE: CRITICAL POINTS * HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF A. OVERLAPS AND SEAMS NECESSARY TO ALLOW STAPLES TO SECURE THE CRITICAL B. PROJECTED WATER LINE POINTS ALONG THE CHANNEL SURFACE. C. CHANNEL BOTTOM/SIDE SLOPE VERTICES **IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR A A STAKE LENGTHS GREATER THAN 6" (15 cm) MAY BE B B NECESSARY TO PROPERLY ANCHOR THE BLANKETS. C C 14649 HIGHWAY 41 NORTH, EVANSVILLE, INDIANA 47725 USA 1-800-772-2040 CANADA 1-800-448-2040 w nagr-cm D3.05 CHANNEL LINER INSTALLATION NOT TO SCALE SLOPE INSTALLATION 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2"-5" (5cm-12.5cm) OVERLAP DEPENDING ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCP ON THE PREVIOUSLY INSTALLED BLANKET. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5cm) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30cm) APART ACROSS ENTIRE BLANKET WIDTH. NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15cm) MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS. CONSTRUCTION SPECIFICATIONS: "" 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, 6' TYP STUMPS, AND OTHER OBJECTIONABLE MATERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE RE -GRADING AND CLEAN OUT. 5. CONSTRUCT ALL TEMPORARY DIVERSION DITCHES WITH A MINIMUM 2% SLOPE. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. TEMPORARY DIVERSION DITCH D3.02 NOT TO SCALE GROUND ELEVATION 4 WOODEN WEDGES WITH NAIL AT TOP PER WATTLE DOWNSTREAM FILTER APRON 8" STAPLES MIN. 10 GA. LINE WIRES (TYP) 12" COIR WATTLE UPSTREAM FILTER APRON WATTLE DETAIL D3.03 NOT TO SCALE R' WAX VARIABLE AS DIRECTED BY ENGINEER ------- 1-- - -I ---j-'' i I I I i i �'�'�` T WOVEN WIRE FABRIC SILT FENCE FILTER FABRIC FRONT VIEW CONSTRUCTION NOTES: 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24" ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4' MIN. OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE RENFORCEMENT, THEN THE FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC TIES SHOULD HAVE A MIN. 50 lb TENSILE STRENGTH. 5. EXCAVATE A TRENCH APPROXIMATELY 4" WIDE AND 8" DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 6. PLACE 12" OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 7. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 8. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. FILTER FABRIC OR DITCH LINER FLOW DITCH LINE STEEL POST PLASTIC OR WIRE TIES (TYP) MIN. 12-1/2 GA INTERMEDIATE ooll� WIRES (TYP) EX. GRADE EROSION CONTROL NOTES GENERAL EROSION CONTROL & STORM NOTES GENERAL: ALL EROSION CONTROL MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH REQUIREMENTS 1. ALL GRADING, STORM INSTALLATION, AND SOIL EROSION CONTROL MEASURES ON THIS SITE OF NCDEQ. THE FOLLOWING CONSTRUCTION SEQUENCE SHALL BE COMPLIED WITH FOR ALL WORK. MUST BE AUTHORIZED BY PERMITS ISSUED BY TOWN OF RUTHERFORDTON. ALL SITEWORK SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE, AND NATIONAL REGULATORY 1. OBTAIN LAND DISTURBING PERMIT. STANDARDS AND ALL REQUIREMENTS IN THE PROJECT TECHNICAL SPECIFICATIONS. 2. INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED BY NCDEQ. 2. CONTRACTOR TO VERIFY WITH ENGINEER THAT THE REQUIRED GRADING, EROSION CONTROL, STORM WATER, LAND DISTURBANCE, AND ASSOCIATED NON -GRADING PERMITS HAVE BEEN 3. OBTAIN CERTIFICATE OF COMPLIANCE THROUGH ON -SITE INSPECTION BY A REPRESENTATIVE OF BURKE COUNTY AND OBTAINED PRIOR TO BEGINNING CONSTRUCTION. NCDEQ PLANNING DEPARTMENT. 3. ALL CONSTRUCTION SHALL BE UNDER THE INSPECTION OF THE ENGINEER, THE OWNER, AND 4. PROCEED WITH GRADING, CLEARING AND GRUBBING. TOWN OF RUTHERFORDTON. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 72 HOURS PRIOR TO BEGINNING WORK. ANY WORK COVERED PRIOR TO ENGINEER'S INSPECTION IS 5. SEED AND MULCH DENUDED AREA WITHIN 15 DAYS AFTER FINISHED GRADE ARE ESTABLISHED. SEED AND SOIL SUBJECT TO UNCOVERING AND BACKFILLING AT THE CONTRACTOR'S EXPENSE. AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING RATES PER ACRE: 4. ALL WORK MUST BE PERFORMED BY A NORTH CAROLINA LICENSED CONTRACTOR. TEMPORARY SEEDING OF BUILDABLE AREAS LIME 4,000 LBS 5. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND VERIFYING THE EXACT LOCATION AND FERTILIZER (10-10-10) 1,000 LBS ELEVATION FOR ALL UTILITIES PRIOR TO CONSTRUCTION; AND TO NOTIFY ENGINEER OF ANY MULCH 300 LBS CONFLICTS OR DISCREPANCIES. THE LOCATION OF SOME UTILITIES SHOWN ON THE PLANS OATS 100 LBS HAVE BEEN APPROXIMATED. ALL BURIED UTILITIES HAVE NOT BEEN SHOWN ON THE PLANS AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR LOCATION PRIOR TO PERMANENT SEEDING OF SLOPES AND PERMANENT STABILIZED AREAS. CONSTRUCTION. LIME 4,000 LBS FERTILIZER (10-10-10) 1,000 LBS 6. PROTECT EXISTING SITE FEATURES (SHOWN TO REMAIN) AND NEWLY COMPLETED WORK KY-31 FESCUE 100 LBS DURING CONSTRUCTION. ANY DAMAGE INCURRED DURING OR RESULTING FROM STRAW MULCH 60-80 BALES CONSTRUCTION ACTIVITY IS THE RESPONSIBILITY OF THE CONTRACTOR AND IS TO BE REPAIRED IN ACCORDANCE WITH APPLICABLE STANDARDS OF APPROPRIATE AGENCIES, AS FOR WINTER SEEDING ADD TO THE ABOVE: WELL AS THE PROJECT PLANS AND SPECIFICATIONS, AT THE CONTRACTOR'S EXPENSE. RYE GRAIN 120 LBS CROWN VETCH 15 LBS-20 LBS 7. THE CONTRACTOR IS TO NOTIFY ALL UTILITY COMPANIES AT LEAST 72 HOURS BEFORE CONSTRUCTION ACTIVITY IS TO BEGIN. THE CONTRACTOR SHALL NOTIFY NC ONE CALL AT FOR ALL SLOPES 2:1 OR STEEPER ADD TO THE ABOVE: 811, 48 HOURS BEFORE CONSTRUCTION BEGINS. NOTIFY THE ENGINEER AT LEAST 72 SWITCHGRASS 40 LBS HOURS BEFORE STARTING CONSTRUCTION ACTIVITIES. IF HYDROSEEDING IS USED, WOOD CELLULOSE MAY BE SUBSTITUTED FOR STRAW MULCH AT THE RATE OF 1,000 LBS S. EROSION CONTROL IS A FIELD PERFORMANCE BASED ACTIVITY; AND ADDITIONAL SILT PER ACRE. ALL SEEDING SHALL BE MAINTAINED, WATERED, ETC., UNTIL A PERMANENT VEGETATIVE GROUND COVER FENCES, TEMPORARY SEDIMENT BASINS, AND ALL OTHER MEASURES MAY NEED TO BE IS ESTABLISHED OVER ALL DISTURBED AREAS. ADDED IN ADDITION TO THE APPROVED PLAN AS NECESSARY. MEASURES SHOWN CAN AND SHOULD BE ADJUSTED TO ASSURE MAXIMUM PROTECTION ON SITE. CONTRACTOR SHALL 6. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. ADD ADDITIONAL MEASURES AS NEEDED IN ENVIRONMENTALLY SENSITIVE AREAS. 7. REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS. 9. CONTRACTOR IS RESPONSIBLE FOR INSTALLING, MAINTAINING, AND REMOVING ALL NECESSARY EROSION AND SEDIMENTATION CONTROL MEASURES. 8. REQUEST FINAL APPROVAL BY BURKE COUNTY AND NCDEQ. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ADJUSTMENT OF ALL UTILITY SURFACE ACCESSES WHETHER THE CONTRACTOR PERFORMS THE WORK OR A UTILITY COMPANY PERFORMS THE WORK. CONSTRUCTION SEQUENCE 11. ALL AREAS WHERE THERE IS EXPOSED DIRT SHALL BE SEEDED, FERTILIZED AND MULCHED ACCORDING TO THE SPECIFICATIONS NOTES IN THE PLANS. SITE STABILIZATION IS A PERFORMANCE BASED REQUIREMENT, AND THE SITE WILL NOT BE ACCEPTED UNTIL 1. NOTIFY NCDEQ LAND QUALITY SECTION SPECIALIST LQS 48 HOURS BEFORE PROJECT IS ( ) PERMANENT VEGETATION IS ESTABLISHED TO THE SATISFACTION OF THE ENGINEER. TO START. 12. ALL HIGH DENSITY POLYETHYLENE (HDPE) CORRUGATED STORM SEWER DETENTION PIPE 2. INSTALL SITE CONSTRUCTION ENTRANCE/STONE STAGING/MOBILIZATION AREA. SHALL BE TYPE "S" HANCOR SURELOK ADSN12 OR APPROVED EQUIVALENT WITH WATER TIGHT JOINTS MEETING AASHTO M252, M294 OR MP7. ALL HDPE PIPE IS TO BE INSTALLED 3, INSTALL PERIMETER SILT FENCE AND CLEAN WATER DIVERSION DITCHES. ACCORDINGLY TO MANUFACTURERS SPECIFICATIONS AND IN ACCORDANCE WITH ASTM D2321 4. PROCEED WITH DEMOLITION OPERATIONS_ WITH THE EXCEPTION THAT MINIMUM COVER IN TRAFFIC LOAD AREA SHALL BE 24" FOR 4"-48" AND 18" FOR 60". PIPE MATERIAL SHALL MEET THE PRODUCT SPECIFICATIONS OF 5. INSTALL SEDIMENT BASIN AND DIVERSION DITCHES. ASTM F667 AND SHALL HAVE A SMOOTH WALL INTERIOR. FOR ALL STORM SYSTEMS, WORK MUST BEGIN AT THE LOW POINT OF THE SYSTEMS. NOTIFY THE ENGINEER IMMEDIATELY OF 6, PROCEED WITH CLEARING AND GRUBBING UP TO A MAXIMUM OF 2 ACRES UNTIL ANY VARIANCES FROM EXPECTED CONDITIONS. PREVIOUSLY DENUDED AREA HAS BEEN STABILIZED. INSTALL RAIN GAUGE ON -SITE. 13. CURB INLET FRAME, GRATE AND HOOD SHALL CONFORM TO NCDOT 840.03E. DROP INLET 7, PROCEED WITH GRADING AND EROSION CONTROL MAINTENANCE. NPDES LOG TO BE KEPT FRAME AND GRATE SHALL CONFORM TO NCDOT 840.16. FIELD INLET COVER SHALL CURRENT AND ACCESSIBLE AT PROJECT SITE AT ALL TIMES. NO MAJOR GRADING CONFORM TO NCDOT STANDARD DETAIL 840.03, OPENING FACING UPSTREAM. MANHOLE ACTIVITIES OR BASIN CONSTRUCTION IS TO TAKE PLACE DURING WET WEATHER OR RING AND LID TO CONFORM TO NCDOT 840.54. OPEN THROAT INLETS TO CONFORM TO PERIODS OF PREDICTED WET WEATHER. CONTRACTOR TO APPLY SEEDING PER NCDOT 840.04 WITH A MANHOLE RING AND LID INSTALLED IN THE TOP FOR ACCESS TO REQUIREMENTS. THE STRUCTURE. SET ACCESS POINT ADJACENT TO A STRUCTURE WALL AS TO ALLOW ACCESS TO STEPS. 8, APPLY TEMPORARY AND PERMANENT SEEDING, RIP RAP AND STABILIZATION MEASURES. 14. CONCRETE AND MASONRY SHALL MEET THE REQUIREMENTS OF APPROPRIATE SECTION OF 9. ONCE SITE HAS BEEN STABILIZED, CONVERT SEDIMENT BASIN TO BIORETENTION BASIN NCDOT STANDARD SPECIFICATIONS FOR ROAD AND STRUCTURES (LATEST EDITION). AND REMOVE PERIMETER SILT FENCE. CONCRETE SHALL BE CLASS A OR B, 4000 PSI MINIMUM, MEETING THE REQUIREMENTS OF SECTION 900, CONSTRUCTED IN ACCORDANCE WITH SECTION 825. MASONRY SHALL MEET 10. MAINTENANCE INSPECTIONS SHALL BE PERFORMED WEEKLY AND AFTER EACH RAINFALL. THE REQUIREMENTS OF SECTION 940, CONSTRUCTED IN ACCORDANCE WITH SECTION 830 ALL REPAIRS NECESSARY SHOULD BE MADE IMMEDIATELY AND IN STRICT ACCORDANCE AND/OR 834. WITH NCDEQ STANDARDS AND NPDES PERMIT. 15. TRENCH BACKFILL AND COMPACTION TESTING SHALL BE PERFORMED BY A CERTIFIED SOILS 11. NOTIFY THE NCDEQ LQS WHEN PROJECT IS READY FOR A CLOSE OUT INSPECTION. FILE LABORATORY UNDER ALL PAVED AREAS. FOR THE NPDES NCGO10000 E-NOTICE OF TERMINATION AFTER A FINAL CLOSE OUT INSPECTION REPORT IS RECEIVED FROM NCDEQ LQS 16. CONTRACTOR RESPONSIBLE FOR KEEPING ACCURATE LOG OF SITE CONDITIONS IN ACCORDANCE WITH NPDES PERMIT. MAINTENANCE INSPECTIONS SHALL BE PERFORMED WEEKLY AND AFTER EACH RAINFALL. ALL REPAIRS NECESSARY SHOULD BE MADE IMMEDIATELY AND IN STRICT ACCORDANCE WITH TOWN OF RUTHERFORDTON STANDARDS AND NPDES PERMIT. CONTRACTOR SHALL SUPPLY THE ENGINEER WITH RECORD OF DEVIATIONS FROM PLANS FOR PREPARATION OF FINAL RECORD DRAWINGS. 17. ALL SLOPES GREATER THAN 2:1 SLOPE AND OVER 5' IN HEIGHT SHALL BE CERTIFIED BY A LICENSED PROFESSIONAL AS REQUIRED BY TOWN OF RUTHERFORDTON. 18. CONTRACTOR IS REQUIRED TO OBTAIN AND PROVIDE A COPY OF THE EROSION CONTROL PERMIT FOR ANY OFFSITE BORROW/ SPOIL AREA. CONTRACTOR MUST PROVIDE COPY OF STEEL POST PERMIT TO TOWN OF RUTHERFORDTON INSPECTOR PRIOR TO CONSTRUCTION. WOVEN WIRE FABRIC 19. IF BORROWED OR WASTE FILL MATERIAL IS GENERATED, AN APPROVED GRADING PERMIT SILT FENCE FILTER FABRIC MUST BE SECURED FOR THE BORROW OR WASTE MATERIAL SITE PRIOR TO INITIATION OF ANY LAND DISTURBING ACTIVITY 0 5 -0 20. ALL FILL SLOPES SHALL BE COMPACTED FULL DEPTH TO NOT LESS THAN 95% MAXIMUM DENSITY (STANDARD PROCTOR), SHALL BE PLACED ON A SURFACE CLEARED OF GROWTH AND DEBRIS, AND BE PROPERLY BENCHED AND DRAINED. 21. COMPACTION REPORTS MUST BE PROVIDED TO TOWN OF RUTHERFORDTON STORMWATER SERVICES DIVISION INDICATING THAT FILL HAS BEEN COMPACTED TO NOT LESS THAN 95% o /may III �y� FILL SLOPE MAXIMUM DENSITY (STANDARD PROCTOR). <� 1 22. ALL FILL MATERIAL, UNLESS A PERMIT FROM NCDEQ DIVISION OF WASTE MANAGEMENT TO EX. GRADE OPERATE A LANDFILL IS ON FILE FOR THE OFFICAL SITE, SHALL BE FREE OF ORGANIC OR OTHER DEGRADABLE MATERIALS, MASONRY, CONCRETE AND BRICK SIZES EXCEEDING 12 �\ ANCHOR 12" LONG SKIRT IN INCHES, AND ANY MATERIALS WHICH COULD CAUSE THE SITE TO BE REGULATED AS A TRENCH 8" DEEP AND 4" WIDE* LANDFILL BY THE STATE OF NORTH CAROLINA. MATERIALS NOTES: 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461, WHICH IS SHOWN IN PART IN TABLE 6.62b OF THE NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 2. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USUABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 1207. 3. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/LINEAR FT STEEL WITH A MINIMUM LENGTH OF 5 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. 4. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND A MAXIMUM MESH SPACING OF 6 INCHES. NOTES: USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW * FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE. AS AN ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. SIDE VIEW 2"-3" COARSE AGGREGATE (SUCH AS RAILROAD BALLAST) N OTES: 1. A STABILIZED PAD OF CRUSHED STONE SHALL BE LOCATED WHERE TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM AN EXISTING ROAD. 2. FILTER FABRIC SHALL BE PLACED UNDER. THE ENTRANCE/EXIT AND SHALL BE MIRAFI 500 OR EQUAL. 3. STONE TO BE 2 - 3 INCH WASHED STONE. 4. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 5. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 6. WHEN NECESSARY WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET, WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN EROSION CONTROL MAINTENANCE NOTES: 1. INSPECT EROSION CONTROL MEASURES ONCE A WEEK AND AFTER EVERY SIGNIFICANT RAINFALL. CONTRACTOR TO INSPECT MEASURES FOR COMPLIANCE WITH PLANS AND DETAILS; INCLUDING SEDIMENT ACCUMULATION BEYOND DETAIL ALLOWANCE, AND ALSO DAMAGE OR FAILURE OF MEASURES. 2. WHEN SEDIMENT ACCUMULATION EXCEEDS DETAIL ALLOWANCE, CONTRACTOR TO REMOVE SEDIMENT AND/OR DEBRIS, AND RELOCATE TO ANOTHER AREA WITH SEDIMENT CONTROLS. 3. WHEN MEASURES ARE FOUND TO BE DAMAGED, CONTRACTOR TO REPAIR IMMEDIATELY TO BRING MEASURE BACK INTO COMPLIANCE WITH PLANS AND DETAILS. 4. IF MEASURES ARE FOUND TO BE INSUFFICIENT, CONTRACTOR TO INSTALL ADDITIONAL MEASURES AS NEEDED TO ENSURE SEDIMENT REMAINS CONTROLLED ONSITE AS REQUIRED. 5. CONTRACTOR TO REMOVE MEASURES AND BRING AREA TO GRADE ONCE CONFORMATION OF SITE STABILIZATION HAS BEEN REQUESTED AND RECEIVED FROM PROJECT ENGINEER. ROUGH GRADING AND EROSION CONTROL DETAILS j 4 CO � W CO � L�rf It M co N � r ~ 00 � W L? > a N N U Z N N z ui co co �z r a I- Do aJ N N J CO CO W J N co W j C`0 0 a W Z Q Cc W K DO=0LL Nw0LL c Q a Z Q 0. 33 N w cn cn cn m m m 0 0 0 Ld w w cn co w ~ w rn Ld I w w d of w o w w w z cn 0 � N N N L N 0) N I� � 0 0 0 o \' �o o- r000 coo L�0 or woo zo Q co o o = V � a�o wM 000i yl bay 4_° d'0N a 0 ���, OD T N 1 U W U) z W U J W J W m U z �Im ofz MW It O V J J_ a z F J 0 W Q (r O � U � 0 n J z Q O z ~ O w o � J 0 � � Q z W � o U D z 0 U LO O LLd J w o c r 0 o z ..L Q Lu c� CD z � o a Q w � o Q 0 _ 0 m m O 7) o w = ll� F- DRAWN BY: DMS CDC PROJECT NO.: --- XXX PERMIT NO. XXX SHEET .06EROSION CONTROL SLOPEMATTINGINSTALLATION NOT TO D3 SILT FENCE D3.04 NOT TO SCALE D3.01 STABILIZED CONSTRUCTION ENTRANCE NOT TO SCALE C931