HomeMy WebLinkAboutSWA000150_Plansheet - Misc. Detail_20220624 (5)IIIIII_ 4 ± COMPACTED SOIL
CHANNEL INSTALLATION IIII III �2' MIN
12" EXISTING-IIIIIIiIIIIIlI1III=�
GROUND
-IIl-1
II=ICI
_ 18" MIN
1' DITCH DEPTH IN I=I�IIII�II ORIGINAL GROUND
GROUND =I�I„i 11-III„��IiT=11I=I�I,ii_
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED.
NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN.
2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH
APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET
WITH A ROW OF STAPLES STAKES APPROXIMATELY 12" 30cm APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND
COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION OF
BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES
SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET.
3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE
SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING
STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM
STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE
PATTERN.
4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4"-6" (10cm-15cm) OVERLAP. USE A DOUBLE ROW
OF STAPLES STAGGERED 4" (10cm) APART AND 4" (10cm) ON CENTER TO SECURE BLANKETS.
5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES
APPROXIMATELY 12" (30cm) APART IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH
AFTER STAPLING.
6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5cm-12.5cm) (DEPENDING ON BLANKET TYPE) AND
STAPLED. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED
ON TOP) EVEN WITH THE COLORED SEAM STITCH ON THE BLANKET BEING OVERLAPPED
7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9m-12m) INTERVALS.
USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10cm) APART AND 4" (10cm) ON CENTER OVER ENTIRE WIDTH OF THE
CHANNEL.
8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm)
APART IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.
N OTE:
CRITICAL POINTS * HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF
A. OVERLAPS AND SEAMS NECESSARY TO ALLOW STAPLES TO SECURE THE CRITICAL
B. PROJECTED WATER LINE POINTS ALONG THE CHANNEL SURFACE.
C. CHANNEL BOTTOM/SIDE
SLOPE VERTICES **IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR
A A STAKE LENGTHS GREATER THAN 6" (15 cm) MAY BE
B B NECESSARY TO PROPERLY ANCHOR THE BLANKETS.
C C
14649 HIGHWAY 41 NORTH, EVANSVILLE, INDIANA 47725
USA 1-800-772-2040
CANADA 1-800-448-2040
w nagr-cm
D3.05 CHANNEL LINER INSTALLATION
NOT TO SCALE
SLOPE INSTALLATION
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED.
NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN.
2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH
WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE
BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN THE BOTTOM OF THE TRENCH.
BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm)
PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF
STAPLES/STAKES SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET.
3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE
AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES
IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM , STAPLES/STAKES
SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.
4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2"-5" (5cm-12.5cm) OVERLAP DEPENDING
ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING
INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCP ON THE PREVIOUSLY INSTALLED BLANKET.
5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE
3" (7.5cm) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30cm) APART ACROSS ENTIRE
BLANKET WIDTH.
NOTE:
*IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15cm) MAY BE NECESSARY TO
PROPERLY SECURE THE BLANKETS.
CONSTRUCTION SPECIFICATIONS: ""
1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, 6' TYP
STUMPS, AND OTHER OBJECTIONABLE MATERIAL.
2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS
ALL DESIGN REQUIREMENTS.
3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT
THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT.
4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE
RE -GRADING AND CLEAN OUT.
5. CONSTRUCT ALL TEMPORARY DIVERSION DITCHES WITH A MINIMUM
2% SLOPE.
5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT
WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS.
TEMPORARY DIVERSION DITCH
D3.02 NOT TO SCALE
GROUND ELEVATION
4 WOODEN WEDGES
WITH NAIL AT TOP PER
WATTLE
DOWNSTREAM
FILTER APRON
8" STAPLES
MIN. 10 GA. LINE
WIRES (TYP)
12" COIR WATTLE
UPSTREAM FILTER
APRON
WATTLE DETAIL
D3.03 NOT TO SCALE
R' WAX
VARIABLE
AS DIRECTED BY ENGINEER
-------
1--
- -I
---j-''
i
I
I
I
i i
�'�'�` T
WOVEN WIRE FABRIC
SILT FENCE FILTER FABRIC
FRONT VIEW
CONSTRUCTION NOTES:
1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD
STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER
FABRICS.
2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES
NOT EXCEED 24" ABOVE THE GROUND SURFACE. (HIGHER
FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO
CAUSE FAILURE OF THE STRUCTURE.)
3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS
ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID
JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY
FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST
WITH 4' MIN. OVERLAP TO THE NEXT POST.
4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE
MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE
POSTS. EXTEND THE WIRE MESH SUPPORT TO THE
BOTTOM OF THE TRENCH. FASTEN THE WIRE
RENFORCEMENT, THEN THE FABRIC ON THE UPSLOPE SIDE
OF THE FENCE POST. WIRE OR PLASTIC TIES SHOULD
HAVE A MIN. 50 lb TENSILE STRENGTH.
5. EXCAVATE A TRENCH APPROXIMATELY 4" WIDE AND 8"
DEEP ALONG THE PROPOSED LINE OF POSTS AND
UPSLOPE FROM THE BARRIER.
6. PLACE 12" OF THE FABRIC ALONG THE BOTTOM AND SIDE
OF THE TRENCH.
7. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE
FILTER FABRIC AND COMPACT. THOROUGH COMPACTION
OF THE BACKFILL IS CRITICAL TO SILT FENCE
PERFORMANCE.
8. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES.
FILTER FABRIC OR
DITCH LINER
FLOW
DITCH LINE
STEEL POST
PLASTIC OR
WIRE TIES (TYP)
MIN. 12-1/2 GA
INTERMEDIATE
ooll� WIRES (TYP)
EX. GRADE
EROSION CONTROL NOTES
GENERAL EROSION CONTROL & STORM NOTES
GENERAL: ALL EROSION CONTROL MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH REQUIREMENTS
1.
ALL GRADING, STORM INSTALLATION, AND SOIL EROSION CONTROL MEASURES ON THIS SITE
OF NCDEQ. THE FOLLOWING CONSTRUCTION SEQUENCE SHALL BE COMPLIED WITH FOR ALL WORK.
MUST BE AUTHORIZED BY PERMITS ISSUED BY TOWN OF RUTHERFORDTON. ALL SITEWORK
SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE, AND NATIONAL REGULATORY
1. OBTAIN LAND DISTURBING PERMIT.
STANDARDS AND ALL REQUIREMENTS IN THE PROJECT TECHNICAL SPECIFICATIONS.
2. INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED BY NCDEQ.
2.
CONTRACTOR TO VERIFY WITH ENGINEER THAT THE REQUIRED GRADING, EROSION CONTROL,
STORM WATER, LAND DISTURBANCE, AND ASSOCIATED NON -GRADING PERMITS HAVE BEEN
3. OBTAIN CERTIFICATE OF COMPLIANCE THROUGH ON -SITE INSPECTION BY A REPRESENTATIVE OF BURKE COUNTY AND
OBTAINED PRIOR TO BEGINNING CONSTRUCTION.
NCDEQ PLANNING DEPARTMENT.
3.
ALL CONSTRUCTION SHALL BE UNDER THE INSPECTION OF THE ENGINEER, THE OWNER, AND
4. PROCEED WITH GRADING, CLEARING AND GRUBBING.
TOWN OF RUTHERFORDTON. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 72 HOURS
PRIOR TO BEGINNING WORK. ANY WORK COVERED PRIOR TO ENGINEER'S INSPECTION IS
5. SEED AND MULCH DENUDED AREA WITHIN 15 DAYS AFTER FINISHED GRADE ARE ESTABLISHED. SEED AND SOIL
SUBJECT TO UNCOVERING AND BACKFILLING AT THE CONTRACTOR'S EXPENSE.
AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING RATES PER ACRE:
4.
ALL WORK MUST BE PERFORMED BY A NORTH CAROLINA LICENSED CONTRACTOR.
TEMPORARY SEEDING OF BUILDABLE AREAS
LIME 4,000 LBS
5.
CONTRACTOR IS RESPONSIBLE FOR LOCATING AND VERIFYING THE EXACT LOCATION AND
FERTILIZER (10-10-10) 1,000 LBS
ELEVATION FOR ALL UTILITIES PRIOR TO CONSTRUCTION; AND TO NOTIFY ENGINEER OF ANY
MULCH 300 LBS
CONFLICTS OR DISCREPANCIES. THE LOCATION OF SOME UTILITIES SHOWN ON THE PLANS
OATS 100 LBS
HAVE BEEN APPROXIMATED. ALL BURIED UTILITIES HAVE NOT BEEN SHOWN ON THE PLANS
AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR LOCATION PRIOR TO
PERMANENT SEEDING OF SLOPES AND PERMANENT STABILIZED AREAS.
CONSTRUCTION.
LIME 4,000 LBS
FERTILIZER (10-10-10) 1,000 LBS
6.
PROTECT EXISTING SITE FEATURES (SHOWN TO REMAIN) AND NEWLY COMPLETED WORK
KY-31 FESCUE 100 LBS
DURING CONSTRUCTION. ANY DAMAGE INCURRED DURING OR RESULTING FROM
STRAW MULCH 60-80 BALES
CONSTRUCTION ACTIVITY IS THE RESPONSIBILITY OF THE CONTRACTOR AND IS TO BE
REPAIRED IN ACCORDANCE WITH APPLICABLE STANDARDS OF APPROPRIATE AGENCIES, AS
FOR WINTER SEEDING ADD TO THE ABOVE:
WELL AS THE PROJECT PLANS AND SPECIFICATIONS, AT THE CONTRACTOR'S EXPENSE.
RYE GRAIN 120 LBS
CROWN VETCH 15 LBS-20 LBS
7.
THE CONTRACTOR IS TO NOTIFY ALL UTILITY COMPANIES AT LEAST 72 HOURS BEFORE
CONSTRUCTION ACTIVITY IS TO BEGIN. THE CONTRACTOR SHALL NOTIFY NC ONE CALL AT
FOR ALL SLOPES 2:1 OR STEEPER ADD TO THE ABOVE:
811, 48 HOURS BEFORE CONSTRUCTION BEGINS. NOTIFY THE ENGINEER AT LEAST 72
SWITCHGRASS 40 LBS
HOURS BEFORE STARTING CONSTRUCTION ACTIVITIES.
IF HYDROSEEDING IS USED, WOOD CELLULOSE MAY BE SUBSTITUTED FOR STRAW MULCH AT THE RATE OF 1,000 LBS
S.
EROSION CONTROL IS A FIELD PERFORMANCE BASED ACTIVITY; AND ADDITIONAL SILT
PER ACRE. ALL SEEDING SHALL BE MAINTAINED, WATERED, ETC., UNTIL A PERMANENT VEGETATIVE GROUND COVER
FENCES, TEMPORARY SEDIMENT BASINS, AND ALL OTHER MEASURES MAY NEED TO BE
IS ESTABLISHED OVER ALL DISTURBED AREAS.
ADDED IN ADDITION TO THE APPROVED PLAN AS NECESSARY. MEASURES SHOWN CAN AND
SHOULD BE ADJUSTED TO ASSURE MAXIMUM PROTECTION ON SITE. CONTRACTOR SHALL
6. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED.
ADD ADDITIONAL MEASURES AS NEEDED IN ENVIRONMENTALLY SENSITIVE AREAS.
7. REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS.
9.
CONTRACTOR IS RESPONSIBLE FOR INSTALLING, MAINTAINING, AND REMOVING ALL
NECESSARY EROSION AND SEDIMENTATION CONTROL MEASURES.
8. REQUEST FINAL APPROVAL BY BURKE COUNTY AND NCDEQ.
10.
THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ADJUSTMENT OF ALL
UTILITY SURFACE ACCESSES WHETHER THE CONTRACTOR PERFORMS THE WORK OR A
UTILITY COMPANY PERFORMS THE WORK.
CONSTRUCTION SEQUENCE
11.
ALL AREAS WHERE THERE IS EXPOSED DIRT SHALL BE SEEDED, FERTILIZED AND MULCHED
ACCORDING TO THE SPECIFICATIONS NOTES IN THE PLANS. SITE STABILIZATION IS A
PERFORMANCE BASED REQUIREMENT, AND THE SITE WILL NOT BE ACCEPTED UNTIL
1. NOTIFY NCDEQ LAND QUALITY SECTION SPECIALIST LQS 48 HOURS BEFORE PROJECT IS
( )
PERMANENT VEGETATION IS ESTABLISHED TO THE SATISFACTION OF THE ENGINEER.
TO START.
12.
ALL HIGH DENSITY POLYETHYLENE (HDPE) CORRUGATED STORM SEWER DETENTION PIPE
2. INSTALL SITE CONSTRUCTION ENTRANCE/STONE STAGING/MOBILIZATION AREA.
SHALL BE TYPE "S" HANCOR SURELOK ADSN12 OR APPROVED EQUIVALENT WITH WATER
TIGHT JOINTS MEETING AASHTO M252, M294 OR MP7. ALL HDPE PIPE IS TO BE INSTALLED
3, INSTALL PERIMETER SILT FENCE AND CLEAN WATER DIVERSION DITCHES.
ACCORDINGLY TO MANUFACTURERS SPECIFICATIONS AND IN ACCORDANCE WITH ASTM D2321
4. PROCEED WITH DEMOLITION OPERATIONS_
WITH THE EXCEPTION THAT MINIMUM COVER IN TRAFFIC LOAD AREA SHALL BE 24" FOR
4"-48" AND 18" FOR 60". PIPE MATERIAL SHALL MEET THE PRODUCT SPECIFICATIONS OF
5. INSTALL SEDIMENT BASIN AND DIVERSION DITCHES.
ASTM F667 AND SHALL HAVE A SMOOTH WALL INTERIOR. FOR ALL STORM SYSTEMS, WORK
MUST BEGIN AT THE LOW POINT OF THE SYSTEMS. NOTIFY THE ENGINEER IMMEDIATELY OF
6, PROCEED WITH CLEARING AND GRUBBING UP TO A MAXIMUM OF 2 ACRES UNTIL
ANY VARIANCES FROM EXPECTED CONDITIONS.
PREVIOUSLY DENUDED AREA HAS BEEN STABILIZED. INSTALL RAIN GAUGE ON -SITE.
13.
CURB INLET FRAME, GRATE AND HOOD SHALL CONFORM TO NCDOT 840.03E. DROP INLET
7, PROCEED WITH GRADING AND EROSION CONTROL MAINTENANCE. NPDES LOG TO BE KEPT
FRAME AND GRATE SHALL CONFORM TO NCDOT 840.16. FIELD INLET COVER SHALL
CURRENT AND ACCESSIBLE AT PROJECT SITE AT ALL TIMES. NO MAJOR GRADING
CONFORM TO NCDOT STANDARD DETAIL 840.03, OPENING FACING UPSTREAM. MANHOLE
ACTIVITIES OR BASIN CONSTRUCTION IS TO TAKE PLACE DURING WET WEATHER OR
RING AND LID TO CONFORM TO NCDOT 840.54. OPEN THROAT INLETS TO CONFORM TO
PERIODS OF PREDICTED WET WEATHER. CONTRACTOR TO APPLY SEEDING PER
NCDOT 840.04 WITH A MANHOLE RING AND LID INSTALLED IN THE TOP FOR ACCESS TO
REQUIREMENTS.
THE STRUCTURE. SET ACCESS POINT ADJACENT TO A STRUCTURE WALL AS TO ALLOW
ACCESS TO STEPS.
8, APPLY TEMPORARY AND PERMANENT SEEDING, RIP RAP AND STABILIZATION MEASURES.
14.
CONCRETE AND MASONRY SHALL MEET THE REQUIREMENTS OF APPROPRIATE SECTION OF
9. ONCE SITE HAS BEEN STABILIZED, CONVERT SEDIMENT BASIN TO BIORETENTION BASIN
NCDOT STANDARD SPECIFICATIONS FOR ROAD AND STRUCTURES (LATEST EDITION).
AND REMOVE PERIMETER SILT FENCE.
CONCRETE SHALL BE CLASS A OR B, 4000 PSI MINIMUM, MEETING THE REQUIREMENTS OF
SECTION 900, CONSTRUCTED IN ACCORDANCE WITH SECTION 825. MASONRY SHALL MEET
10. MAINTENANCE INSPECTIONS SHALL BE PERFORMED WEEKLY AND AFTER EACH RAINFALL.
THE REQUIREMENTS OF SECTION 940, CONSTRUCTED IN ACCORDANCE WITH SECTION 830
ALL REPAIRS NECESSARY SHOULD BE MADE IMMEDIATELY AND IN STRICT ACCORDANCE
AND/OR 834.
WITH NCDEQ STANDARDS AND NPDES PERMIT.
15.
TRENCH BACKFILL AND COMPACTION TESTING SHALL BE PERFORMED BY A CERTIFIED SOILS
11. NOTIFY THE NCDEQ LQS WHEN PROJECT IS READY FOR A CLOSE OUT INSPECTION. FILE
LABORATORY UNDER ALL PAVED AREAS.
FOR THE NPDES NCGO10000 E-NOTICE OF TERMINATION AFTER A FINAL CLOSE OUT
INSPECTION REPORT IS RECEIVED FROM NCDEQ LQS
16.
CONTRACTOR RESPONSIBLE FOR KEEPING ACCURATE LOG OF SITE CONDITIONS IN
ACCORDANCE WITH NPDES PERMIT. MAINTENANCE INSPECTIONS SHALL BE PERFORMED
WEEKLY AND AFTER EACH RAINFALL. ALL REPAIRS NECESSARY SHOULD BE MADE
IMMEDIATELY AND IN STRICT ACCORDANCE WITH TOWN OF RUTHERFORDTON STANDARDS
AND NPDES PERMIT. CONTRACTOR SHALL SUPPLY THE ENGINEER WITH RECORD OF
DEVIATIONS FROM PLANS FOR PREPARATION OF FINAL RECORD DRAWINGS.
17.
ALL SLOPES GREATER THAN 2:1 SLOPE AND OVER 5' IN HEIGHT SHALL BE CERTIFIED BY A
LICENSED PROFESSIONAL AS REQUIRED BY TOWN OF RUTHERFORDTON.
18.
CONTRACTOR IS REQUIRED TO OBTAIN AND PROVIDE A COPY OF THE EROSION CONTROL
PERMIT FOR ANY OFFSITE BORROW/ SPOIL AREA. CONTRACTOR MUST PROVIDE COPY OF
STEEL POST
PERMIT TO TOWN OF RUTHERFORDTON INSPECTOR PRIOR TO CONSTRUCTION.
WOVEN WIRE FABRIC
19.
IF BORROWED OR WASTE FILL MATERIAL IS GENERATED, AN APPROVED GRADING PERMIT
SILT FENCE FILTER FABRIC
MUST BE SECURED FOR THE BORROW OR WASTE MATERIAL SITE PRIOR TO INITIATION OF
ANY LAND DISTURBING ACTIVITY
0 5 -0
20.
ALL FILL SLOPES SHALL BE COMPACTED FULL DEPTH TO NOT LESS THAN 95% MAXIMUM
DENSITY (STANDARD PROCTOR), SHALL BE PLACED ON A SURFACE CLEARED OF GROWTH
AND DEBRIS, AND BE PROPERLY BENCHED AND DRAINED.
21.
COMPACTION REPORTS MUST BE PROVIDED TO TOWN OF RUTHERFORDTON STORMWATER
SERVICES DIVISION INDICATING THAT FILL HAS BEEN COMPACTED TO NOT LESS THAN 95%
o /may III �y� FILL SLOPE
MAXIMUM DENSITY (STANDARD PROCTOR).
<�
1
22.
ALL FILL MATERIAL, UNLESS A PERMIT FROM NCDEQ DIVISION OF WASTE MANAGEMENT TO
EX. GRADE
OPERATE A LANDFILL IS ON FILE FOR THE OFFICAL SITE, SHALL BE FREE OF ORGANIC OR
OTHER DEGRADABLE MATERIALS, MASONRY, CONCRETE AND BRICK SIZES EXCEEDING 12
�\ ANCHOR 12" LONG SKIRT IN
INCHES, AND ANY MATERIALS WHICH COULD CAUSE THE SITE TO BE REGULATED AS A
TRENCH 8" DEEP AND 4" WIDE*
LANDFILL BY THE STATE OF NORTH CAROLINA.
MATERIALS NOTES:
1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY
WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS
CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS
CONFORMING TO THE REQUIREMENTS IN ASTM D 6461,
WHICH IS SHOWN IN PART IN TABLE 6.62b OF THE
NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND
DESIGN MANUAL.
2.
SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET
RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM
OF 6 MONTHS OF EXPECTED USUABLE CONSTRUCTION LIFE
AT A TEMPERATURE RANGE OF 0 TO 1207.
3. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33
LB/LINEAR FT STEEL WITH A MINIMUM LENGTH OF 5 FEET.
MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO
FACILITATE FASTENING THE FABRIC.
4. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER
FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND
A MAXIMUM MESH SPACING OF 6 INCHES.
NOTES:
USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT
EXCEED 1/4 ACRE AND NEVER IN AREAS OF
CONCENTRATED FLOW
* FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED
STONE. AS AN ANCHOR WHEN SILT FENCE IS PROTECTING
CATCH BASIN.
SIDE VIEW
2"-3" COARSE
AGGREGATE (SUCH AS
RAILROAD BALLAST)
N OTES:
1. A STABILIZED PAD OF CRUSHED STONE SHALL BE LOCATED WHERE
TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR
FROM AN EXISTING ROAD.
2. FILTER FABRIC SHALL BE PLACED UNDER. THE ENTRANCE/EXIT AND
SHALL BE MIRAFI 500 OR EQUAL.
3. STONE TO BE 2 - 3 INCH WASHED STONE.
4. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL
PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS
OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING
WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR
CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.
5. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC
STREETS MUST BE REMOVED IMMEDIATELY.
6. WHEN NECESSARY WHEELS MUST BE CLEANED TO REMOVE SEDIMENT
PRIOR TO ENTERING A PUBLIC STREET, WHEN WASHING IS REQUIRED, IT
SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH
DRAINS INTO AN APPROVED SEDIMENT BASIN
EROSION CONTROL MAINTENANCE NOTES:
1. INSPECT EROSION CONTROL MEASURES ONCE A WEEK AND AFTER EVERY SIGNIFICANT RAINFALL.
CONTRACTOR TO INSPECT MEASURES FOR COMPLIANCE WITH PLANS AND DETAILS; INCLUDING
SEDIMENT ACCUMULATION BEYOND DETAIL ALLOWANCE, AND ALSO DAMAGE OR FAILURE OF
MEASURES.
2. WHEN SEDIMENT ACCUMULATION EXCEEDS DETAIL ALLOWANCE, CONTRACTOR TO REMOVE SEDIMENT
AND/OR DEBRIS, AND RELOCATE TO ANOTHER AREA WITH SEDIMENT CONTROLS.
3. WHEN MEASURES ARE FOUND TO BE DAMAGED, CONTRACTOR TO REPAIR IMMEDIATELY TO BRING
MEASURE BACK INTO COMPLIANCE WITH PLANS AND DETAILS.
4. IF MEASURES ARE FOUND TO BE INSUFFICIENT, CONTRACTOR TO INSTALL ADDITIONAL MEASURES
AS NEEDED TO ENSURE SEDIMENT REMAINS CONTROLLED ONSITE AS REQUIRED.
5. CONTRACTOR TO REMOVE MEASURES AND BRING AREA TO GRADE ONCE CONFORMATION OF SITE
STABILIZATION HAS BEEN REQUESTED AND RECEIVED FROM PROJECT ENGINEER.
ROUGH GRADING AND EROSION
CONTROL DETAILS
j 4 CO �
W CO � L�rf
It
M co
N �
r
~ 00 �
W L?
>
a
N
N U
Z N N
z ui co co
�z r a
I- Do aJ
N N
J CO CO
W J N co
W j C`0 0
a W Z Q
Cc W K
DO=0LL
Nw0LL
c Q a
Z Q 0.
33
N
w
cn cn cn
m m m
0 0 0
Ld
w w
cn co
w ~
w rn
Ld I w
w d
of w o
w w w
z cn
0 �
N N N
L N 0)
N I� �
0 0 0
o
\' �o
o-
r000
coo
L�0
or
woo zo
Q co o o
= V �
a�o
wM 000i
yl bay
4_°
d'0N
a
0 ���,
OD
T
N
1
U
W
U)
z
W
U
J
W
J
W
m
U
z
�Im
ofz
MW
It
O
V J
J_
a
z
F
J
0
W
Q
(r
O �
U
�
0
n
J z
Q
O
z
~ O
w
o
�
J
0
�
� Q
z
W
�
o
U
D
z
0
U
LO
O
LLd
J
w
o c r
0
o
z ..L
Q
Lu
c�
CD
z �
o
a
Q
w
�
o
Q
0
_
0
m
m
O
7)
o
w
=
ll�
F-
DRAWN BY: DMS
CDC PROJECT NO.: ---
XXX PERMIT NO. XXX
SHEET
.06EROSION CONTROL SLOPEMATTINGINSTALLATION
NOT TO D3
SILT FENCE
D3.04 NOT TO SCALE
D3.01 STABILIZED CONSTRUCTION ENTRANCE
NOT TO SCALE
C931