HomeMy WebLinkAboutSWA000150_Plansheet - Misc. Detail_20220624 (3)PEAK ROOF TRASHRACK
SKIMMER
(SEE DETAIL)
RISER CREST
ELEV. 863.00'
SEDIMENT REMOVAL MARK �\
ELEV. 862.00'
6'
MIN.
RISER INVERT
ELEV. 861.00'
1 I I � III1 I I1
CLASS B STONE PAD 1III-III=
(4'x4'x1' MIN) i1=ii1=ii1=T
FLEXIBLE CONNECTION TO _
SKIMMER (SEE DETAIL)
CONCRETE
ANTI -FLOATATION
PAD
ELEVATION OF OVERFLOW
(SEE PLAN VIEW FOR
ELEVATIONS)
CONCRETE RISER
STRUCTURE (SEE PLAN °
VIEW FOR SIZING)
BOTTOM OF
SEDIMENT TRAP _
4" SCH 40 COUPLING
FROM POND SKIMMER
TO BE CONNECTED TO
4" SCH 40 PIPE
1.0" MIN
FREEBOARD
SELECTED FILL
PLACED IN LAYERS
AND COMPACTED
BERM TOP
EMBANKMENT STABILIZED
WITH VEGETATION
2:1 SLOPE MAX.
I-IDPE BARREL_
WF7
I III=III=II
I=III=III= -
II; ,III,��III���IIII��III_„III,-11t
1��ANTI-SEEP COLLAR
(SEE DETAIL)
L
CUT-OFF TRENCH
2' DEEP, 3' BOTTOM
2:1 SIDE SLOPES
SECTION THROUGH EMBANKMENT
RIP RAP APRON
AT OUTLET
1. LOCATE THE SEDIMENT INLETS TO THE BASIN THE GREATEST DISTANCE FROM THE PRINCIPLE SPILLWAY.
2. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES.
3. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH NCDEQ PRACTICE STANDARD 6.65.
4. INSTALL SKIMMER AND COUPLING TO RISER STRUCTURE OR DIRECTLY INTO THE EMBANKMENT 1 FT. FROM BOTTOM OF BASIN
5. THE ARM PIPE SHALL HAVE A MINIMUM LENGTH OF 6 FT. BETWEEN THE SKIMMER AND THE COUPLING.
6. ALLOW THE MAXIMUM REASONABLE DETENTION PERIOD BEFORE THE BASIN IS COMPLETELY DE -WATERED (AT LEAST 10 HOURS).
7. REDUCE THE INFLOW VELOCITY AND DIVERT ALL SEDIMENT -FREE RUNOFF.
8. SEDIMENT BASIN EMBANKMENTS TO BE PROVIDED WITH ADEQUATE GROUND COVER IMMEDIATELY UPON CONSTRUCTION.
ELEV 1' BELOW
TRAP BOTTOM
I
D3.08 SEDIMENT BASIN
TRASH RACK NOT TO SCALE
10' WIDE BERM
TEMPORARY HDPE
//z�/j�/j�/j�/j�/j�/j�/j\ r' PIPE
PIPE TO TIE INTO
/\\//\\//\\//\\//\\//\\//\\// STORM STRUCTURE
//i.//i.//i //i.//i.//i.//i //i.//i.//i //i.// (SEE PLAN)
1% MIN --->
REINFORCED
CONCRETE SLAB
TEMPORARY RISER STRUCTURE
D3.09 AT TEMPORARY SEDIMENT BASIN
NOT TO SCALE
4' MAX
N OTE:
1. TOP, FRAME, AND GRATE SHALL
BE PLACED ON TOP OF BRICKS
NCDOT #5 OR #57
WASHED STONE
BRICKS TO ALLOW
DE -WATERING
THROUGH VOID��
(DOoCO(g °0000l' o
2" STEEL ANGLE SET
18" IN GROUND
-_ 2:1 SLOPE,
GRAVEL FILTER
•ramr�rr_�rry�.r.>rr��
PROPOSED 2' CONTOURS (TYP)
I \ �
\�10 _ \\
(\ v
x�\
PROPOSED TEMPORARY SKIMMER SEDIMENT
BASIN 'A (SEE DETAIL D3.08)
STORAGE SURFACE AREA: 3087 SF
STORAGE DEPTH: 2'
MAX. SIDE SLOPES: 2:1
PROPOSED BAFFLE (SEE DETAIL D3.10)
^ PROPOSED BASIN BOTTOM
ELEV.: 861.00
PROPOSED 1.5" SKIMMER WITH 1.5"0 ORIFICE
(TYP) (SEE DETAIL D3.11)
\ x
x PROPOSED TOP OF STORAGE
(ELEV.: 863.00)
PROPOSED SILT FENCE (TYP)
PROPOSED LIMITS OF DISTURBANCE (TYP)
PROPOSED TEMPORARY
RISER STRUCTURE
PROPOSED 18" HDPE PIPE \
(1.0% MIN. SLOPE) (SEE DETAIL D3.09) \
INSPECT TEMPORARY SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT
AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN
IT ACCUMULATES TO ONE-HALF THE DESIGN DEPTH. PLACE REMOVED SEDIMENT IN AN AREA WITH
SEDIMENT CONTROLS. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT
THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL
TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL AREA.
+ +
BAFFLE (TYP.) + T
EARTHEN EMBANKMENT + ++ +
+ + -III
++ + I-
+ + + --I
+ � III =III=
+
+ II III -III=
+ III -III -I
+-I-�
+ + --
+-
�� 11111=I +
+ +
+
+
3'-4' 19 GAUGE HARDWARE CLOTH + + + I- + + ++ INLET ZONE
(1/4 MESH OPENINGS ++ + + + + ++ + 25% OF SURFACE AREA
+ + =III=11 1= + -III-+ + +
+ +-� + +
BRICK WITH 4" SPACES + ++ + + + III III ++ + + + FIRST CHAMBER
BETWEEN BRICKS TO ALLOW + + + +- -III + + 25% OF SURFACE AREA
TEMPORARY SEDIMENT POOL 3' DE -WATERING THROUGH VOIDS + ++ + ++ ++ + + ++ ++ +
SECOND CHAMBER
\\ 2' 25% OF SURFACE AREA
NOTES:
OUTLET ZONE
1. POROUS BAFFLE USING JUTE NET BACKED 25% OF SURFACE AREA
Xx
1' MIN. %////////////\ A\//�/��/j\/j\/j\/j\/j\/j SEDIMENT16 BY COIR EROSION BLANKET (OR EQUIVALENT).
2' MAX./ // // // // //2. SEE FIGURE 6.6513 OF NCDENR a
FOR CROSS SECTION OF POROUS BATTLE. OUTLET STRUCTURE
WITH RISER BARREL
(SEE DETAIL)
D3.07 SEDIMENT TRAP / BASIN BAFFLE DETAIL
CONSTRUCTION NOTES: NOT TO SCALE
1. LAY BRICK ALONG TOP OF CATCH BASIN WITH 4" SPACES BETWEEN BRICKS. SET FRAME AND GRATE ON BRICKS.
2. CAREFULLY FIT HARDWARE WIRE OR COMPARABLE WIRE MESH WITH 1/2-INCH OPENINGS AROUND CATCH BASIN TO HOLD SUPPORT POST,
GRAVEL IN PLACE. SUPPORT ROPE TO 24" INTO BOTTOM STAKE TO
WIRE TO PREVENT OR SIDE SUPPORT WIRE
3. USE CLEAN GRAVEL, 3/4- TO 1/2-INCH IN DIAMETER, PLACED 2 INCHES BELOW THE TOP OF THE GRATE ON A 2:1 SAGGING
SLOPE OR FLATTER AND SMOOTH IT TO AN EVEN GRADE. DOT #57 WASHED STONE IS RECOMMENDED.
\
'
/ J
SEDIMENT BASIN 'A' DETAIL
1 "- l n'
SCH 40 COUPLING
CONNECTION (TYP)
VENT (TYP)
INLET (TYP)
PROPOSED NYLON ROPE
(ROPE TO RUN EMBANKMENT
TO PROVIDE METHOD TO PULL
SKIMMER)
INLET EXTENSION
SCH 40 SOLID PVC
BARREL OR "ARM"
SUPPLIED BY USER (TYP)
HOSE (TYP)
NOTES:
1. SKIMMER SHOWN IN FLOATING POSITION
2. FAIRCLOTH SKIMMER OR APPROVED EQUIVALENT
3. SKIMMER TO BE REMOVED UPON REMOVAL OF SEDIMENT TRAP
4. COUPLING CONNECTION INTO PROPOSED OUTLET STRUCTURES MUST BE SEALED UPON
REMOVAL OF SKIMMER
POND SKIMMER DETAIL
D3.11 NOT TO SCALE
/<
4. SEDIMENT SHALL BE REMOVED AND TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS �ii�\%/\\%/\ //\\%/\\%/�. BAFFLE MATERIAL
ACCUMULATED TO 1/2 THE DESIGN DEPTH OF THE TRAP. �j\\j\\ j\ / \�\j��\� 11 GAUGE
LAN D SSCAPING
TAP LE
5. REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE.
6. THE STRUCTURE SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT AFTER EACH STORM \/\\%\\ \\\\ \
EVENT AND REPAIRS MADE AS NECESSARY. A/V/� �V/V/\�` /V/V/V/V/� </V/V/V/\/ V/\ V/
^�A VA �A VA VA A VA VA VA VA VA VA VA VA �A VA VA VA V�
// / // // //// // STEEL POST
7. CONSTRUCTION OPERATIONS SHALL BE CARRIED OUT IN SUCH A MANNER THAT EROSION AND WATER POLLUTION ARE //\/// jj\//�/j/\/jj\//�/j/\/j/\/jj %\�j\\�////\/jj
�� VA \ VA VA VA AA VA ��\OVA \ VA
MINIMIZED. //\//\ //\//\//\// \// j %/\//\/ BAFFLE MATERIAL SHOULD B E
v I
SECURED TO THE BOTTOM OF
8 THE STABILIZED. SUFFICIENTLY NT TRAP LL BE REMOVED DEWA ER BASINS,NDFILLH THEREA BASIN USING DWHEN THE STOC PILED SOIL AND BRING TO FINISHBEEN
GRADEA PERMANENTLY/�\/���/ ^ //�/\j �/ 12 E LANDSCAPE BASIN
PLES USING
COMPACTED LIFTS. SMOOTH THE BASIN SITES TO BLEND WITH THE SURROUNDING AREA, ENSURING THE BASIN SITES WILL ` \`�\�\\ \%
NOT POND WATER, AND IMMEDIATELY STABILIZE.
COIR MESH OR SIMILAR,
9, ON LARGER DRAINAGE AREAS RIP RAP MAY BE REQUIRED UNDER THE WASHED STONE TRENCHED INTO BOTTOM
OR SIDE
STONE INLET PROTECTION
D3.12 NOT TO SCALE BAFFLE DETAIL
D3.lO NOT TO SCALE
EXISTING 2' CONTOURS (TYP)
ROUGH GRADING AND EROSION
CONTROL DETAILS
j 4 00 �
co � LLrf
W It
M co
N
r` It
~ co�
Ill� Lo
>clicli
a
N C4 co
N U�
Z N N
LLI co co
�z a
F-Lj ao eo
OZ
J 00 co
W J O`0 ONO
IL w Z Q>
W x
co x0LL
(nuw0LL
cfl<
ZQ0.
33
N
Lo
cn cn cn
a o 0
w w
C/) co
I
wIn fk�
> I-- w
w
w o
w w w
z cn
o �
1�
° ° ���0
\' �oP
d"�o��=
-co°o�P
Coro
w�
-Q°En
= U o L�l
c/l r7 G1 o
s°oo
��O
�_°4
d
�o ��
°J
N
W
cc
O
CD
J_
a
z
J
O
W
m
Q
(r
o
U
m
U7
J z
Q
O
z
~ O
w
o
�
J
O
z p
z
W
o
U
�
�
z
0
U
�
U
LLd
J
w
0
Z
Q
W
O
m
c�
CD
z
o
�
a
Q
�
3:
o
Q
0
_
0
m
�
m
O
w
=
m
�
DRAWN BY:
DMS
CDC PROJECT NO.:
XXX PERMIT NO.
xxx
SHEET
C932