Loading...
HomeMy WebLinkAbout20120659 Ver 1_Certification of Completion_20120708mcm North Carolina Department of"Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue dharies Wakild, RE Dee Freeman Governor Director Secretary DWQ Project No.: County: F-o f-s y k4 Applicant: �(�C.� Project'Name: y > __4 3-(N f jtti Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to DWQ by the applicant, the applicant's authorized`agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, _ _ _.}hereby state that, to the best of my abilities, due care and diligence was us in the bservation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: - (�� - -- - - - -- - - -- Date: Agent's Certification I, —_ __ __ ____, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules; the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Partial Final Date: I, , as a duly registered Professional Engineer.in the State of North Carolina,`having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature _ Registration bAt£a°W: _ s Date X014