Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6140904_APPROVED PLANS_20141023
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. swzl�� DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD 14u111111Iue l� `� f l� T LLV l� l\ `� n A T A DEVELOPMENT NAME DOLLAR GENERAL STREET ADDRESS: --- NO HIGHWAY 42 FUQUAY VARINA, NORTH CAROLINA HARNETT COUNTY PROPERTY IDENTIFICATION # (PIN) 0635-89-9887 & 0636-90-0110 (PORTION OF) PARCEL NUMBER 050635 0153 & 050635 0153 02(PORTION OF) PARCEL ID 0018957 & 0056404 (PORTION OF) DEED: BOOK 01492 PAGE 0205 ZONING DISTRICT(S): INDUSTRIAL (IND) OVERLAY DISTRICT TOTAL SITE ACRES (DO PARCEL): INSIDE TOWN LIMITS: EXISTING USE PROPOSED BUILDING USE PROPOSED TOTAL BUILDING AREA: MAX BUILDING HEIGHT: MIN LOT AREA: MIN LOT 'WIDTH: FRONT SETBACK: REAR SETBACK: SIDE SFTBArK; MAXIMUM LOT COVERAGE: PARKING SETBACK: BUFFER REQUIREMENTS: OFE—STREET PARKING: TOTAL REQUIRED: MAX NUMBER OF SPACES: TOTAL PROVIDED: ACCESSIBLE SPACES PROVIDED PARKING SPACE DIMENSIONS: LOADING AREA: PHASE II POST —CONSTRUCTION STORMWATER 65,517 SF (1.504AC) (PROPOSED DG PARCEL AFTER RECOMBINATION) NO VACANT RETAIL SALES 9,026 SF (7,195SF SALES FLOOR) N/A 43,560 SF (1 AC) 150 FT 50 ET 25 FT (50FT ADJACENT TO RESIDENTIAL) 25 FT (SOFT ADJACENT TO RESIDENTIAL) N/A SOFT STREETYARD BUFFER ADJACENT TO ROAD RAW 15FT TYPE A LANDSCAPE BUFFER ADJACENT TO RESIDENTIAL USES ]OFT TYPE C LANDSCAPE BUFFER ADJACENT TO INDUSTRIAL USES SOFT STREETYARD BUFFER ADJACENT TO ROAD RAW 5FT BUILDING PLANTER AREA 30 (1 SPACE/300 SF GROSS FLOOR AREA) 33 (10% TOTAL REQUIRED — ADDITIONAL SPACES MAY BE POROUS PAVEMENT; 33 2 9'xl8' MIN 1 PROVIDED (12'x35') IMPERVIOUS AREA SUMMARY: PROPOSED SITE AREA=65517 SF (1.504AC) EXISTING BUILDING PADS: 0 SF 0.0 AC EXISTING PAVEMENT: 0 SF 0.0 AC TOTAL EXISTING IMPERVIOUS AREA: 0 SF 0.0 AC PROPOSED BUILDING: 9,026 SF 0.21 AC 13.8% OF SITE PROPOSED SIDEWALK. 1,770 SF 0.04 AC 2.7% OF SITE PROPOSED PAVEMENT 22 630 SF 0.52 AC 34.5% OE SITE PROPOSED IMPERVIOUS AREA: 33,426 SF 0.77 AC 51.0% OF SITE OPEN SPACE: 32,091 SF 0.73 AS 49.0% OF SITE NET INCREASE IN IMPERVIOUS AREA: 33,426 SF 0.77 AC ,P t Rq ENE y a• - + PROPOSED Dollar General Sere Know what's below. Call before you dig. ® BEFORE X STO P CALL t 800 632-4949 N.C. ONE -CALL CENTER IT'S THE IAW NC Highway Fuquay-Varina, Forth Harnett County �r 42 Carolina TENANT & DEVELOPER Dollar General Corporation Glandon Forest Equity, LLC 3900 Merton Drive Suite 210 Raleigh, NC 27609 (919) 459-2601 (919) 459-2604 FX gbarnesCvanguardpg.com VANGUARD PROPERTY GROUP CtVtL ENGINEER Triangle Site Design, PLLC 4006 Barrett Drive SHEET # E¢ OR' / a E e ate° SITE v _ N.c. Nwr 42 4 z a VT C T _T\ T T r-T-1 N T --% t LN IT Y MAP NOT TO SCALE INDEXTO SHEETS DESCRIPTION C-1 COVER SHEET C-2 EXISTING CONDITIONS PLAN C-3 SITE PLAN C-4 GRADING AND DRAINAGE PLAN i C-5 EROSION CONTROL PLAN C-6 UTILITY PLAN C- 7 CONSTRUCTION DETAILS 3 C- 8 CONSTRUCTION DETAILS I C -� EROSION CONTROL DETAILS C- 10 STORMWATER MANAGEMENT DETAILS C-11 LANDSCAPE PLAN I Suite 203 Raleigh, NC 27609 (919) 553-6570 0 mlowder@trianglesitedesign.com ar NC LICENSE�P-0619 TRIANGLE LA3 SITE DESIGN N t� DATE I DESCRIPTION REVISIONS Inspect dur {r;duscuie sarmwater Storm''+mrater Pes%nnft the st9,;a ateerr the permit I This document, together with the concepts and designs presented herein, as on instrument of services, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Triangle Site Design, PLLC shall be without liability to Triangle Site Design, PLLC. SHEE: C-1 DATE: is with the SEAL: d��0 CAROB °. � • 4�o SEAL N9` • 9 24434 JOB NUMBER: September 16, 2014 11�1e 0 FCt r^L JL 8 0C o3 ).9 A r� C k T T THE 1 1 I i YA[ln ;NLJ TOP- 43F 9 I CURVE TABLE CURVE LENGTH RADIUS BEARING CHORD Ct 49.58 955,15 S 13'3436" W 49,57 C2 34.53 25.00 S 50133" W 31,85 C3 ilE 5&36 905.15 S 13.108" W 58,35 C4 TIE1 44.(14 25.00 S 39'01 10" E 38.56 BASED ON A FIELD INVESTIGATION BY PITTMAN SOIL CONSULTING THERE ARE NO STREAMS OR WETLANDS ON THE PROPOSED DEVELOPMENT. FLOOD NOTE: SUBJECT PROPERTY IS NOT LOCATED WITHIN A FLOOD HAZARD ZONE PER FEMA I FIRM PANEL 3720062400J, EFFECTIVE DATE OCTOBER 3, 2006. FEMA FLOOD LOT J l I ZONES ARE SUBJECT TO CHANGE RP ONE, LLC l l OB 1469 PG 81 / l PE? 2007, PG 273 ! ? 'PP 541.4 ' __ 1 , ,,,, "✓ / PIN.: 0636-80-8239 \ \ IND I O \ \ \ / \ \ - S 88'15290 E 249.15" {{ \ \ V LOT 4 o PPP��� RP ONE LLC D8 1492, PG 205 PB 2007, PC 273 PIN: 063s � 0-3252 St c \ \ / / aA � � I � BALANCE OF PARCEL / y � / I o�� , - - 24,783 SF at I _ - >s2 0 \ V ✓rm v \ -\ ON LIMITS OF EXISTING TREE \ o' II I I I I I I DISTURBANCE \ TO REMAIN \\ I I It l \s i 789727 b5E 221.21 ' (PROP) \ I I I I ) �- LOFT .'"PE C BUFFER_ 25F SEBACE I I I I a ICI II I II I II II \ l /Ik`Rm`nE / I� / LOT I ONE RPL 42, PG DB9205 / PB 2007 PG 273 / Know what's below. CaII before you dig, SURVEY NOTE: ALL EXISTING BOUNDARY AND TOPOGRAPHIC INFORMATION TAKEN FROM A LAND SURVEY PREPARED BY: NEWCOMB LAND SURVEYORS. INVN)� 43-749 STREAM/WETLAND NOTE: hNi/(C; 43299' I n / LINE TABLE LINE LENGTH I BEARING L1 TIE 10.08 S 00'15'35" E L2 50.00 N 00'9'17' W L3 71E 69.38 N 69'33'06" E L4 TIE bLJII E SITE VICINITY MAP NOT TO SCALE CAUTIONARY NOTE IN THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS DRAWING ARE BASED ON ABOVE GROUND EVIDENCE OR INFORMATION GATHERED DURING THE FIELD SURVEY PORTION OF THIS PROJECT, AS SUCH, THIS INFORMATION IS SPECULATIVE IN NATURE ONLY AND SHOULD NOT BE CONSTRUED AS FACT. THERE MAY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF THE UNDERGROUND UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO THE START OF ANY AND ALL CONSTRUCTION. UTILITY STATEMENT i THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN-SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH THE SURVEYOR DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. nc� I I I ` I I �'/I / / � PIN: 063��0-2096 DEMOLITION LEGEND ;'► �' -�- II I I. I - - 1 /l l II/ / /7 I�V,� I / ® BUILDINGS TO BE REMOVED og0 4:C _ l I �A HENRY B. & I Io I I I \ �� �� / M�E / l� l �'� PAVEMENT TO BE REMOVED ELIZABETH A. BAKER OB 464, PG 32 \ / PIN: 0636-80-8053 I I RA-20M Itl Ito II I II -4� \ / / g I� �ZJ I �� UTILITIES TO BE REMOVED EXISTING TREES TO BE REMOVED BUILDING \ PROPOSED VG PA CEL I� I -6 5 517 SF \ 1,504 AC 11'[ I I 30 0 EXISTING TREES OLD SEPTIC Q TO REMAIN - - - - - lnror usEo) GRAPHIC SCALE 15 30 60 1 INCH = 30 FEET I DEMOLITION NOTES- 1. II II I \ j i / I IlV 1� l 1. THE CONTRACTOR SHALL FIELD VERIFY AND LOCATE ALL EXISTING UTILITIES ON SITE PRIOR TO DEMOLITION. 2. THE CONTRACTOR SHALL PERFORM DEMOLITION ACTIVITIES AS NOTED AND SHOWN ON THESE PLANS AND AS DIRECTED BY THE OWNER. 3. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN ANY PERMITS AND PAY FEES REQUIRED FOR DEMOLITION AND I _"Jti / HAUL -OFF FROM THE APPROPRIATE AUTHORITIES. _ I" I 4. THE CONTRACTOR SHALL PREPARE ALL DOCUMENTS AND ACQUIRE APPROPRIATE PERMITS AS REQUIRED PRIOR TO THE II I I- COMMENCEMENT OF DEMOLITION. HENRY B & f'ic L )OCAIiON I I ( \ \ /� v 1 I 1 3 5. THE DEMOLITION PLAN IS INTENDED TO DEPICT GENERAL DEMOLITION AND UTILITY WORK. IT IS NOT INTENDED TO ELIZABETH A. BAKER I \ II I ° IDENTIFY EACH ELEMENT OF DEMOLITION OR RELOCATION. CONTRACTOR SHALL COORDINATE WITH THE OWNER AND OB 392, PC 419 I I I I I \ r� APPROPRIATE UTILITY COMPANY PRIOR TO WORK, PIN: 0635-89-8802 I I I I REPE I t ry RA-2oM I 1 \ I IAINQ rhI p 6. CONTRACTOR TO COMPLETELY DEMOLISH AND DISPOSE OF OFFSITE IN A LAWFUL MANNER EXISTING BUILDINGS, INCLUDING FOUNDATIONS AND .ALL APPURTENANCES LOCATED ON AND AROUND THE PROPERTY INCLUDING BUT NOT LIMITED TO all II / BOLLARDS, GAS METERS, AIR CONDITIONING UNITS, SIGNS, CURBS, SIDEWALKS, ELECTRIC METERS, FENCING. ETC. 7. REMOVE AND DISPOSE OF ANY SIDEWALK, FENCES, STAIRS, WALLS, FOUNDATIONS, CONDUITS, LIGHT POLE BASES, DEBRIS AND RUBBISH REQUIRING REMOVAL FROM THE WORK AREA IN AN APPROVED LANDFILL. V A EXISTING TREES 1 \ \ \ TO REMAIN \ paan� I ° 8. REMOVE AND/OR PLUG EXISTING UTILITIES SUCH AS SANITARY SEWER, WATER, GAS, ELECTRIC, AND TELEPHONE AS SHOWN. I ) I ` \ lI I \ I THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING EACH UTILITY COMPANY TO COORDINATE REMOVAL OF ALL UTILITIES EXISTING \ \ ' / / �/ \I 1 AND FOR DETERMINING HORIZONTAL AND VERTICAL LOCATIONS OF UTILITIES PRIOR TO COMMENCING WORK. BuiLDINc I\\\ y' 9. THE CONTRACTOR SHALL CUT AND PLUG, OR ARRANGE FOR THE APPROPRIATE UTILITY COMPANY TO CUT AND PLUG ALL CONTROL CORNER SERVICE PIPING AT THE STREET LINE OR MAIN, AS REQUIRED, OR AS OTHERWISE NOTED. ALL SERVICES MAY NOT BE N: 659,742.70 I I I \ I I \ ° '�. E'3 p i SHOWN ON THIS PLAN. THE CONTRACTOR SHALL INVESTIGATE THE SITE PRIOR TO BIDDING TO DETERMINE THE EXTEND E 2,038,885.39 b 1- 50r; SEFSACK / " I I i OF SERVICE PIPING TO BE REMOVED, CUT OR PLUGGED. F I sOf7 STRF_E YARD Bu R � � \ L� \ �/ �� \ )_!AITS OF 7,245 S.F. T" 1 10. THE CONTRACTOR SHALL ARRANGE FOR RESETTING OF CURB BOXES, VALVE BOXES AND REMOVAL AND/OR RELOCATION OF � � \ I \ DIS'LRBANCE 08 A^''� I ? ' / I I I OVERHEAD UTILITIES AND POLES WITH THE APPROPRIATE UTILITY COMPANY. \ \o '00 FI a„3f/I I I NOTES: 11. INSTALL ALL EROSION AND SEDIMENT CONTROL DEVICES AND TREE PROTECTION PRIOR TO BEGINNING DEMOLITION WORK. 1) All distances are horizontal ground distances unless otherwise noted. 12 THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL UTILITIES TO REMAIN IN PLACE -5'nC .; 2.49CREPE " / \ Nv�i I MYRTLE MYR--' \ 1 ~', / _454 Of <„ %J 72W 705 120,67' \ Pc GRAVEL I r 1r - - = vTE L 1(TIE) - / -- - - - ` ou ou-ou- a c ou- uU-emu ou- ou- ou ou- ou- u- ou - ,l- _-a5S I ��� _ - - _452- _ \ \ ='6 OU OU- OU- „� ter' _ _ h'v.: PAKEMWT U\ \ - o , , . 5 - - - - -\- 15 nGP INV.4,r� 0"� I A P ,✓,..-;,u0.30 2) This survey does not include nor depict any environmental evaluations. i / 3) Field survey performed July, 2014. i 4) Surveyor has made no investigation or independent search for easements of d b th -w-_w_-w__,r: -w�_ --W c�---------'------- -- �-------------- `-'O w- ---- -- w-w- w w_- w_ w-- vi - w- w w-- QGE�]E �YF�d _NT w-'N--- w�,'�I II��Iw w w-�w � o� oU ou ou- ou ou ou- ou DU- ou OU On- OU- OU- C_- ou- on- OIL-- 011#-E•F-6-E• Ou-mo ou OU ou-OU- OU Ou ou OU- oU CC�,�� NC HIGHWAY 42 42�� VARIABLE WIDTH PUBLIC R/W recor , encum rances, restncGve covenants, ownership title evidence or any o er facts that an accurate and current title search may disclose. 5) The locations of underground utilities as shown hereon are based on aboveground structures and visual evidence. Locations of underground utilities/structures may vary from location shown hereon. Additional buried utilities/structures may be encountered. No excavations were made during the progress of this survey to locale buried utilities/structures. 6) Subject property is not located within a special flood hazard zone per FEMA Flood Insurance Rate Map (FIRM) # 3720062400J, effective date October 3, 2006. 7) The State Plane Coordinates for this project were produced with RTK GPS observations and processed using the North Carolina VRS network. The network positional accuracy of the derived positional information is ±0.12'. Horizontal Datum = NAD 83 Vertical Datum = NAVD 88 8) Per Plat Book 2007, Page 273 dated March 23, 2007 Lot 1 as shown hereon does not contain sufficient soils for septic system & repair area unless adjacent wells are properly abandoned. 13, THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS TO AVOID UNNECESSARY DAMAGE TO EXISTING ROAD SURFACE. FINISH SURFACE TO BE REMOVED OR DEMOLISHED SHALL BE CUT ALONG LINES OF JOINTS WHICH WILL PERMIT A NEAT SURFACE WHEN RESTORED. 14. SAWCUT AT INTERFACE OF PAVEMENT OR CURB TO REMAIN. SAWCUT EXISTING PAVEMENT. 15. ALL EXISTING ITEMS TO REMAIN WHICH ARE DAMAGED DURING CONSTRUCTION SHALL BE RESTORED TO ITS ORIGINAL CONDITION AT THE SOLE EXPENSE OF THE CONTRACTOR. 16. DO NOT INTERRUPT EXISTING UTILITIES SERVICING FACILITIES OCCUPIED AND USED BY THE OWNER OR OTHERS DURING OCCUPIED HOURS EXCEPT WHEN SUCH INTERRUPTIONS HAVE BEEN AUTHORIZED IN WRITING BY THE OWNER AND THE LOCAL MUNICIPALITIES. INTERRUPTIONS SHALL ONLY OCCUR AFTER ACCEPTABLE TEMPORARY SERVICE HAS BEEN PROVIDED. 17. SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED EXISTING PIPING OR OTHER UTILITY BE UNCOVERED DURING EXCAVATION, CONSULT THE ENGINEER IMMEDIATELY FOR DIRECTIONS BEFORE PROCEEDING FURTHER WITH WORK IN THIS AREA, 18. ASBESTOS OR HAZARDOUS MATERIAL, IF FOUND ON SITE, SHALL RE REMOVED BY A LICENSED HAZARDOUS MATERIAL CONTRACTOR, 19, THE PROPERTY SELLER SHALL PUMP OUT BUILDING FUEL, GREASE TRAPS, AND WASTE OIL TANKS (IF ANY ARE ENCOUNTERED) AND REMOVE FUEL TO AN APPROVED DISPOSAL AREA BY AN APPROPRIATELY LICENSED WASTE OIL HANDLING CONTRACTOR IN STRICT ACCORDANCE WITH FEDERAL AND STATE REQUIREMENTS BEFORE CONSTRUCTION BEGINS. 20, THE CONTRACTOR SHALL PROPERLY AND LEGALLY DISPOSE OF ALL DEMOLITION DEBRIS OFF OF THE SITE. TRIANGLE SITE DESIGN CONSULTANT: Triangle Site Design, PLLC 4006 Barrett Drive Suite 203 Raleigh, NC 27609 (919)553-6570 mlowderCNtrianglesitedesign corn NC LICENSE #P-0619 SEAL 0 ., ,cry i44s4; .'Tj, FNr tic'E`�t w .I I O, ; -a OWNER/DEVELOPER: GLANDON FOREST EQUITY, LLC 3900 Merton Drive Suite 210 Raleigh, NC 27609 919-459-2601 919-459-2604 fx gbarnes@vanguardpg.com REVISIONS: (approved St rni i ater Pe %nit Documents required by the stormwater permit. North Cal rules require that the stormwater system designer Inspect during construction, certify conformity with the plans and Spilli an stormwater rule] 15A NCAC 2H .1008 (j) ) er t# _S5 0 D Date / o�z It �diw .u.s? C Division of+rVater@neNty Sheet # Revision DstaPEMA-r- LAYOUT COORD: MEL PLANNING MGR. MEL DRAWING BY: MEL DATE: 9/16/14 JOB NUMBER: 004087 TITLE: EXISTING CONDITIONS PLAN SHEET NUMBER: C -- 2 COMMENTS: ti 7 �I �I END FENCE 0 0 0 0 0 zI j O O5 1 g Ix 0 rn x m 0 � oIx ° TRANSFORMER PAD--!I,I HENRY B. & ELIZABETH A. BAKER DB 464, PG J2 PIN 0636-80-8053 ( RA-20M I ' I ' / p LOT 3 �\ RP ONE, LLC 1 / OB 1465,, PG 81 PB 2007, PG 273 I PIN 0536-80-8239 Ip / IND S 68'1529" £ 249.15' LOT 14 nr>Rnr II l l / RP ONE, LLC DB 1492, PG 205 P., 2007, RG 273 PIN: 0636-9090-J252 IND BALANCE OF PARCEL l l l l 24,783 SF l S 0.569 AC 10'x70' SIGHT STORMWATER TRIANGLE (TYP) MANAGEMENT STORMWATER EASEMENT MANAGEMENT EASEMENT _ e S89-27'05'E 221.21 ' (PROP) i f - - - - ---------- / 7 -- - - - 1 LOFT TYPE C BUFFER \ u, R-0 - - --II h o STORMWATER--' \ 'OO `MANAGEMENT l� / I / \ 25FT SETBACK AREA 75 \¢ �A _ -7 v- --- A / LOT 15 V�Av �\NCDOT PAVEMENT RP ONE, LLC \ VA A -r SECTION IN R/W DB 1492, PG 205 \���\\/\� �\ ; I / PB 2007, PG 273 L. �' PIN 0636-90-2096 IND I-.._ ilk I 1 / 5' 14 � O18 I I 15 ROOF DRAIN / `--' O \ TYP EXISTING ( ) BUILDING I I / I . �A � 7 O O y`1 � s' � s uNoscnee OI O E � \ \� 26' j 18' PROPOSEODG PARCEL 65,517 SF 1,504 AC I f l r\ / e / m ; 0 I. F ODD :>._P7IC (NOT ;I,SED) I x a \Q \ \7 14 O W/ h \ I z \ \ , l 4 I J I / \ \ 4& 5 13 /i�� I K l :V Sdj�oo�i � DTI 1 1 \\ J, HENRY B. & W rr 6.L LOCATION ELIZABETH A. BAKER DB 392, PG 419 ` \ PIN: 0635-89-6802 I O \C RA-20M \�.\ \\.\`\ \ \ \'\ 0 4 o t \ \ , I x i \ i 7- EXISTING I \VI / ' I BUILDING NCDOT PAVEMENT / x� __----� ' 'I 7y 0 I I SECTION IN R/W CONTROL CORNER N 15 N. 659,742. 70 END FENCE E 2,0 685 39 0 , ,, 11 5OFT SETBACK Ix� 5OFT STREETYARD BUFFER -T- LOT 1 + 1 47245 S.F. I 1'iY I L1 1,08 AC EP C & �`. ` ITS N I I / O IO'x7O' SIGHT x� S REPAIR AREA �1 t 1 w'Rrtt I I TRIANGLE (TYP) / I I i o I u t T 1 o / _ _ w�„ ° N 897705" W 120.67" IQ � I cRAUEL I I I L 1(TlE) OU- OU- OU- OU- OU- OF- OU- OUP / \ 1) � a OF- OU- Du- �OU- 7 \ EDGE OF PAVEMENT ll \- _ - - - - - - - - - - - - - - - - - - - - - - - / - �O WOOD SCREEN FENCE j OU- OU OU 0I OU OU OU OL OU- -10 ---- �f-X - - - - - - - - - - - - - p- - - - - - - - °L 0 � F EDGE OF PAVEMENT -- OUOU- Du- OU- CU-- OIL-- OU- 2CII--y¢-�-a. OU---nU OU OU- OU OU OU OU OU OU OU \ NC HIGHWAY 42 42 VARIABLE WIDTH PUBLIC R\W SUE VICINITY MAP NOT TO SCALE TRAFFIC CONTROL NOTES: THE DISTRICT OFFICE OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO CONSTRUCTION. TRAFFIC MUST BE MAINTAINED AT ALL TIMES AND TRAFFIC CONTROL MUST COMPLY WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND WITH THE CURRENT EDITION OF THE NCDOT STANDARDS AND SPECIFICATIONS. ALL LANES OF TRAFFIC ARE TO BE OPEN DURING THE HOURS OF 6:00 M A TO 9:00 AM AND FROM 400 PM TO 6:00 PM. A MINIMUM OF ONE 12-FOOT LANE SHALL BE MAINTAINED AT ALL TIMES. ALL ROADWAY SIGNS WHICH ARE TO BE REMOVED DURING CONSTRUCTION ARE TO BE REINSTALLED AS SOON AS POSSIBLE. DURING NON -WORKING HOURS, EQUIPMENT IS TO BE PARKED AS CLOSE TO THE RIGHT OF WAY LINE AS POSSIBLE AND BE PROPERLY BARRICADED IN ORDER TO PREVENT ANY EQUIPMENT OBSTRUCTION WITHIN THE TRAVEL LANE. ALL CONTRACTORS DOING WORK WITHIN STATE RIGHT OF WAY ARE TO HAVE A COPY OF THESE PLANS ON THE JOB SITE. WHEN PERSONNEL AND/OR EQUIPMENT ARE WITHIN 5' OF AN OPEN TRAVEL LANE, THE CONTRACTOR SHALL CLOSE THE OPEN TRAVEL LANE ADJACENT TO THE WORK AREA USING APPROPRIATE TRAFFIC CONTROL MEANS AND METHODS UNLESS WORK IN THAT AREA IS PROTECTED BY BARRIER OR GUARDRAIL. THE CONTRACTOR SHALL NOT WORK SIMULTANEOUSLY ON BOTH SIDES OF AN OPEN TRAVEL WAY WITHIN THE SAME LOCATION ON A TWO-LANE, TWO-WAY ROAD. THE MAXIMUM LENGTH OF A LANE CLOSURE ON THE PROJECT SHALL BE ONE MILE, MEASURED FROM THE BEGINNING OF THE MERGE TAPER TO THE END OF THE LANE CLOSURE. THE CONTRACTOR SHALL BACKFILL AT 6:1 SLOPE UP TO THE EDGE AND ELEVATION OF EXISTING PAVEMENT IN AREAS ADJACENT TO AN OPENED TRAVEL LANE THAT HAS A DROP-OFF OF MORE THAN 3", WHEN BACKFILL IS REQUIRED, IT SHALL BE AT NO EXPENSE TO THE OWNER, THE MAXIMUM DIFFERENCE IN ELEVATION BETWEEN OPEN LANES OF TRAFFIC SHALL BE 2". WHEN LANE CLOSURES ARE NOT IN EFFECT, CHANNELING DEVICES IN WORK AREAS SHALL BE SPACED NO GREATER THAN TWICE THE POSTED SPEED LIMIT, EXCEPT 10' ON -CENTER IN RADII, AND SHALL BE SET 3' OFF THE EDGE OF AN OPEN TRAVEL -WAY, DURING INSTALLATION, PROPER TRAFFIC CONTROL DEVICES, SIGNS, ETC. BE INSTALLED TO ENSURE PUBLIC SAFETY IN ACCORDANCE WITH THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION'S STANDARDS AND SPECIFICATIONS ALL DISTURBED AREAS ARE TO BE FULLY RESTORED TO NCDOT MINIMUM ROADWAY STANDARDS. MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE NCDOT ROADWAY STANDARDS AND SPECIFICATIONS (LATEST EDITION). OWNER CERTIFICATION: AS THE OWNER OF RECORD, I HEREBY FORMALLY CONSENT TO THE PROPOSED DEVELOPMENT SHOWN ON THIS SITE PLAN AND ALL REGULATIONS AND REQUIREMENTS OF THE HARNETT COUNTY ORDINANCES. DATE OWNER SIGNATURE HARNETT COUNTY NOTES: 1. HIGHWAY 42 IS ON THE HARNETT COUNTY THOROUGHFARE PLAN 2. HIGHWAY 42 IS ON THE HARNETT COUNTY COMPREHENSIVE TRANSPORTATION PLAN. 3. NO HAZARDOUS MATERIALS WILL BE STORED ON THE PROPOSED DEVELOPMENT 4. PROPERTY OWNER WILL BE RESPONSIBLE FOR MAINTENANCE OF THE PARKING AREAS, DRIVE AISLES, LANDSCAPE BUFFERING, AND STORMWATER EVE 5. EXTERIOR WALL MOUNTED LIGHTS SHALL COMPLY WITH ARTICLE AT, SECTION 7.0, PAGE 163 OF THE LIDO. 6. ALL MECHANICAL AREAS LOCATED ON, BESIDE, OR ADJACENT TO ANY BUILDING OR DEVELOPMENTS SHALL BE SCREENED FROM THE VIEWS OF STREETS AND ADJACENT PROPERTIES. 7. LIGHTING SHALL BE LOCATED IN SUCH A MANNER AS TO PREVENT DIRECT GLARE AND UGHTING ONTO ADJACENT PROPERTY OR INTO THE PUBLIC RIGHT(S)-OF-WAY. ALL FLOOD LIGHTS SHALL BE INSTALLED SUCH THAT THE FIXTURE SHALL BE AIMED DOWN AT LEAST 45 DEGREES FROM VERTICAL. B. HOURS OF OPERATION: 8:00 AM TO 10:00 PM (7 DAYS A WEEK) KEY NOTES: O1 CONCRETE MONOLITHIC CURB/SIDEWALK - SEE DETAIL SHEET C-7 OCONCRETE PAVEMENT DESIGN AS PER GEOTECHNICAL REPORT SPECIFICATIONS - SEE DETAIL SHEET C-7 EXPANSION AND CONTROL JOINTS - SEE DETAILS SHEET C-7 OASPHALT PAVEMENT DESIGN AS PER GEOTECHNICAL REPORT SPECIFICATIONS - SEE DETAIL SHEET C-7 O STANDARD DUTY PAVEMENT ® HEAVY DUTY PAVEMENT ® NCDOT PAVEMENT SECTION O HANDICAP PARKING SIGN - SEE DETAIL SHEET C-7 O BOLLARD - SEE DETAIL SHEET C-8 O6 CONCRETE LIGHT POLE BASE O7 CONCRETE SIDEWALK - SEE DETAIL SHEET C-7 FOR SIDEWALKS AROUND BUILDING. O8 DUMPSTER LAYOUT - 6' HIGH MASONRY ENCLOSURE W/GATES - SEE DETAIL SHEET C-8 O9 6'-0" LONG CONCRETE WHEEL STOP, PINNED TO PAVEMENT - SEE DETAIL SHEET C-7. LOCATE 2'-6" FROM FACE OF CURB OR SIDEWALK (NOT USED) ip PYLON SIGN (UNDER SEPARATE PERMIT) 11 4" WIDE PARKING STRIPE PAINTED YELLOW (TYP) 12 4" WIDE PARKING DIAGONAL STRIPES (� CONCRETE HANDICAP RAMP - MAXIMUM SLOPE 1:12 (8.33%) (PER A.D.A. REQUIREMENTS) \-�!C/ ANY RAMPS LESS THAN 1:20 SHALL HAVE DETECTABLE WARNINGS AND CONTRASTING COLOR. SEE DETAIL SHEET C-7. 14 NEW GRASS/LANDSCAPE AREA 5 CONCRETE CURB AND GUTTER - SEE DETAIL SHEET C-8 16 STOP SIGN - SEE DETAIL SHEET C-8 17 PAVEMENT MARKINGS - SEE DETAIL SHEET C-8 18 NEW CURB CUT, MATCH EXISTING FOP & APPROACH PER LOCAL CODES & SPECS. 19 (NOT USED) 20 DELIVERY DOOR ACCESS - REFER TO DETAIL THIS SHEET 21 CONCRETE FLUME - REFER TO DETAIL ON SHEET C-8 (NOT USED) 22 WOOD SCREEN FENCE - REFER TO DETAIL ON SHEET C-8 PROPOSED PARKING COUNT GENERAL NOTES. 1. THE CONTRACTOR SHALL EMPLOY ALL NECESSARY BARRICADES, SIGNS, FENCES, FLASHING LIGHTS, FLAGMEN, ETC. FOR MAINTENANCE AND PROTECTION OF TRAFFIC AS REQUIRED BY HARNETT COUNTY AND THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. REFER TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), LATEST EDITION, FOR DETAILS OF TRAFFIC CONTROL STANDARDS AND DEVICES. 2. THE CONTRACTOR SHALL PROTECT ALL MONUMENTS, IRON PINS, AND PROPERTY CORNERS DURING CONSTRUCTION. 3. APPROVAL OF THESE PLANS IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. 4, COORDINATE ALL CURB AND STREET GRADES IN INTERSECTIONS WITH INSPECTOR. 5. NON-STANDARD ITEMS (I.E. PAVERS, IRRIGATION SYSTEMS, ETC) IN THE RI HT -OF -WAY REQUIRE A RIGHT-OF-WAY ENCROACHMENT AGREEMENT WITH THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEFORE INSTALLATION. 6. ALL SITE DIMENSIONS ARE REFERENCED TO THE FACE OF CURBS OR EDGE OF PAVING UNLESS OTHERWISE NOTED, ALL BUILDING DIMENSIONS ARE REFERENCED TO THE OUTSIDE FACE DF THE STRUCTURE. 7, EXISTING SITE CONDTONS, GRADES, CONTOURS, UTILITIES AND OTHER IX STING FEATURES FROM A SURVEY PR EPARED BY NEWCOMB LAND SURVEYORS. 8. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE LATEST EDITION OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION "STANDARD DETAILS AND SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION" AND APPLICABLE HARNETT COUNTY CODES AND ORDINANCES. THE CONTRACTOR RACT R WELL MAINTAIN A CURRENT EDITION OF THE STATE AND LOCAL CODES, ORDINANCES, STANDARD SPECIFICATION AND STANDARD DETAILS ON THE PROJECT SITE FOR REFERENCE DURING CONSTRUCTION OF THE PROJECT. 9. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS AND SHALL REPORT ANY DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD N I➢ TH CONDITIONS E OWNER OR OWNERS REPRESENTATIVE IMMEDIATELY. COMPACTOR SHALL WAIT FOR INSTRUCTION PRIOR 1D PROCEEDING WITH WORK. 10. THE CONTRACTOR SHALL PROVIDE SMOOTH TRANSITIONS FROM PROPOSED FEATURES TO EXISTING FEATURES AS NECESSARY. 11. THECONTRACTOR SHALL S THE F P C SEAL E EDGE 0 EXISTING ASPHALT PAVEMENT WITH TACK COAT IN ACCORDANCE WITH THE NORTH CAROUNA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS WHERE NEW PAVEMENT JOINS EXISTING PAVEMENT. 12. THE CONTRACTOR SHALL REPAIR, RESURFACE, RECONSTRUCT OR REFURBISH ANY AREAS DAMAGED DURING CONSTRUCTION BY THE CONTRACTOR, HIS SUBCONTRACTORS OR SUPPUERS AT NO ADDITIONAL COST TO THE OWNER. JOINTS 1 A PAVEMENT J NTS SHALL BE SAW- PRIOR T PAWN T PROVIDE A 3 ALL CUT 0 0 G O 0 IDE DURABLE AND UNIFORM JOINT. 14. CONTRACTOR SHA:L REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF TRUCK DOCKS, EXIT DOORS, SIDEWALKS, PREDSE BUILDING DIMENSIONS, AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. 15. ALL PAINT STRIPING, PAVEMENT MARKINGS, AND SIGNAGE SHALL CONFORM TO THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" OR AS OTHERWISE SPECIFIED. ALL REFERENCED SIGN STANDARDS ARE TAKEN FROM THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES". ALL NEW SIGNS SHALL BE MOUNTED ON GALVANIZED POSTS AND IN ACCORDANCE WITH STATE AND LOCAL REGULATIONS, 16. CONTRACTOR SHALL INSTALL ACCESSIBLE RAMPS PER LOCAL MUNICIPALITY AND ADA STANDARDS AT ALL DRIVE AND BUILDING LOCATIONS AS REQUIRED, 17. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION. AT LEAST 48 HOURS PRIOR TO ANY DEMOLITION, GRADING, OR CONSTRUCTION ACTMTY THE CONTRACTOR SHALL NOTIFY THE HARNETT COUNTY PUBLIC UTIUTIES DEPARTMENTS FOR PROPER IDENTIFICATION OF EXISTING UTILITIES WITHIN THE PROJECT SITE. 18, PROOF ROLL BUI3NG AND PARKIN AR NOTIFY WN R R EN f ANY UNACCEPTABLE ALL G AREAS. 0 0 E DOLLA GENERAL O V CCE TABLE AREAS. / 19. THE CONTRACTOR SHALL PROM DE AS-BUI i RECORDS OF ALL CONSTRUCTION(INCLUDING UNDERGROUND UTILITIES AND STORM DRAINAGE) TO OWNER/DOLLAR GENERAL PRIOR TO COMPLETION OF CONSTRUCTION STRIPING LEGEND YE.LOW CURBING SURFACES SHOULD BE CLEAN, DRY AND AND BOLLARDS - METAL SURFACES FREE OF HEAVY RUST PARKING LOT 2 COATS SHERWIN WILLIAMS - KEM 4000 ACRYLIC ALKYD ENAMEL SAFETY YELLOW B55Y300 STRIPING - SURFACES SHOULD BE CLEAN, DRY. PARKING LOT TOP COAT SHERWIN WILLIAMS - PRO MAR TRAFFIC MARKING PAINT YELLOW HANDICAP SURFACES SHOULD BE CLEAN, DRY STRIPING - TOP COAT SHERWIN WILLIAMS - PRO PARKING LOT MAR TRAFFIC MARKING PAINT "H.C." BLUE CURVE TABLE CURVE I LENGTH I RADIUS I BEARING CHORD CI "" 95515 . S 13'34'36" W 49.57 C2 34.53 KOO S 50'S6'33" W 31.85 C3TIE 58.36 905,15 I S13-10'18"W 58.35 C4 TIE 44.04 1 25.00 1 S 39'01'10" E 38.56 LINE TABLE LINE LENGTH I BEARING TIE L1 10.08 S 00'15'35" E L2 50.00 N 00'9'IT W L3 TIE 69.38 N 59'33'O6" E L4(TIE) 1 51 .311 S 65'02'20" E GRAPHIC SCALE 30 0 15 30 60 1 INCH = 30 FEET TRIANGLE SITE DESIGN CONSULTANT: Triangle Site Design, PLLC 4006 Barrett Drive Suite 203 Raleigh, NC 27609 (919)553-6570 mlowder®trianglesitedesign.com NC LICENSE #P-0619 SEAL: W C OWNER/DEVELOPER: GLANDON FOREST EQUITY, LLC 3900 Merton Drive Suite 210 Raleigh, NC 27609 919-459-2601 919-459-2604 fx gbarnes@vanguardpg.com REVISIONS: ppprovF d ,orr. water Ps snit t ocumentsH with these documents is required by the stormwater permit. NoffITLaroom rules requlr69 thai the stounwater system designer Inspect during construction; certify conformity with the dens and-APeseanfi rndi compliance with the - sWrmwalSrules, (15A NCAC 2H .1DOB (j) / Perm O Date 49 Division of Lr2 Sheet #_- _ Revision Da -1P LAYOUT COORD: \,,EL PLANNING MISR. MEL DRAWING BY: "Ii1'1;L DATE: 9jlo; i-+ JOB NUMBER: 00408" TITLE: SITE PLAN SHEET NUMBER: C-0 COMMENTS: � 1 2 li in"F'i I '31. ✓f, O YA I) TP 4 l I n N.0 Know what's below. or J l Call before dig. ° RP ONE, LLC DB 1466, PO 81 l I you PR 2007, PG 273 P/N 063 - 0-82J9IND CURVE TABLE. CliRVE ''I 2WGTIRT RADIUS BEARING CHORD CI 4a 58I H5L IS S 13'34'36" W 49,W 12 34 ._ .I 25.GO r 6 33 11 .I .85 53..76 905.15 S 17 iC 18=W 5835 „4; 44.N 25.00 S H<01".O" E 3856 I1NE T�BLL I:NE F H rlEAR1NG I NGI L1 UE L2 I 0.08 Su 00 69.38 o 0 U 35 N L9 I N 59 33 06 E L4 T',El I DL,,I1 °5 .2J 88'1529" E 249.15' 4 c HAcpt ,ya l� � I LOT 14 RP ONE, LLC OB 1492, PG 205 \ N PB 2007, PG 273 PIN: 0636-90-J252 \ / y lNO 0 \ I � 1 I L l I o\ \ c \ eALANCE of PARCEL-- _ _ o \ 0.569 AD rpLITt - - �- \ 0 \ \I I LIMITS oF \ No \ \ DISTURBANCE' OUTLET CONTROL STRUCTURE \ I / REFER TO SHEET C-10 I / / ht ` I BIO-RETENTION POND FOR DETAILS \ I I I 1 REFER TO SHEET C-10 \\ III I I I I I I INV 444.0 FOR DETAILS FES INV=444.0 lIT \ 10 I I I I 445 448A(TP) 444 I II II I � /�1 / ;T 1� I I / FES / r a INV=440.6 Q 40'-15"HDPE ��•r' - - 00.5% (WATER -TIGHT) 442.6(TP) / L07 15 I �-448.8(TC) I 447.1(TC) I /I I / RP ONE, LLC 448.3(GT) CATCH BASIN 446.6(GT) t7 I I HENRY B & ELIZABETH A. BAKER OB J92, PG 419 PIN: 0635-89-8802 RA-20M /RIM=aas.a OB 1492, PG 205 � I I /� SI \ PH 2007, PC 27J \ INV=444.1 PIN: 0636N9 0-2096 MATCH EXISTING PAVEMENT 447.4(TC) I �( / ., IT 443.Ot T , \ � / �q I 1 72'-15'RCP I I ® 0.56% _ - I�� , PIPE INLET / INV=441.0IT 1 V I I I� PROPOSED DO PA CEL ql �//I I IT �448.8(TP) 65,517 SF I I YI L504 AC 3 / y�It TLC / If It MIRS IF CID SEPTIC -x 1 �ld1,Tl (J$ti)�) I - I FfE=449.5I� I I DISTURBANCE 172'-15 HOPE + W ro - CATCH BASIN . I I (WATE RSRD- CLEANDUTINV=444.7 449.5TS) RIM=448,5 1 1 / - wV=445.0 o o l a 1 449.3(TS) 449.0(GR) / s FBI Io 1 It PAD GRADING NOTE 449.2(TS) 449.2(TS� I GRADING CONTRACTOR TO GRADE SUB -GRADE __ _ ,:: 448.7(TP) - 448 7(TP) M- c o FES W 44(TS) �.._ Is,' / INV=444.2 / / TO 8" BELOW FINISH FLOOR ELEVATION (FEE). 448 8,(TP) I / � I I I GRADING CONTRACTOR TO INSTALL 4" COMPACTED = I 1 POROUS FILL OVER THE SUB -GRADE PER THE i )r- �_ o SITE GEOTECHNICAL REPORT REQUIREMENTS. j 449.0(TC) I _ I I I I TOP OF POROUS FILL SHALL BE 4" BELOW ')� I, xl 448.5(GT)I I ( j _ c.7 T h1 I \ I ','I SDI I FINISH FLOOR ELEVATION 448.8 TC 449.2(TC) ry ! 144&8(TS) I, j 4 as.3�crj I x Il/ 448.7 GT tUFLL LOCATiON VdaI / \ 1 C L .i a4az rc / 449.0(Tc)% 448.6(TS) 94HDPE -15449.I o " / I 448.5(GT) '"0(Tr` 448.7(GT)$ 7� R oGHT) aaes(cr) aaas(Tc) \ (WATER-TlcFlr) \ l lI ___I ? � 1 � of I aaa.o(cT)�A 449.7(TC) 1 I It aaa.2(cr) DISTURBANCE o 4ae2(rP) LIMITS OF ` { \ 1 j MATCH EXISTING I \ \ ( \ I y 4� / o- PAVEMENT 446.5t EXISTING I I ! \ 4 \I 1 BUILDING 47 64'-IS"RCP , I 1 ; V I rug 48 a489(TC) CONTROL CORNER I i ; N. 659,742.70 448.4(cT) I j A \ i� �. III 4a85(TC) E $CJ$8B559 b \ \ p x I 448.0(GT)� CATTY BASIN 1 LOT / \ R,.,=aa7.a �i245 SE �. V I Y 1,J=445.5 I k.08 AIilo 10i 3 PIPE INLET I V A I 4, lI < 4`�I INV=444.6 gp�/ t sEP Ic & \ 01 I / I REPAIR ARFF� \ I n �.. A;,,Y 5 I I It HENRY B & ELIZABETH A. BAKER De? 464, PG J2 PIN. 0636-80-8053 RA-20M I A I CATCH BASIN) RIM=447 B (i INV=444 2 100'-15"HDPE R� -_-, 777 (WATER -TIGHT) 1 \ 1 \ I 448.9('R - I I I �I I ✓ 448.3(GT) /III Flo III xl I cXESTING b BUILDING I I =1 x 449.3(GR)�1 I I I -t 449.41 449.5(TS) I II I I I CONNECT ROOF DRAINS 449.1(TC) 448.6(GT)--_-"-- !,II 449.3(TS) 1y 448.8(TP) TO HOPE HEADER PIPE (TYP) -----No - -�_ - ___ - o ti 89'2705 W 120.67' GRAVEL I r - _ /l tom- OU OU OU a'/a Oti LT a 017= -" �- OU=� 6U - _ OLT SOU- 4- OU- O� OU -OU-- .- O_U-O_U OU- U-\�53-452- OU OU- _ EOCEOFPAVEMWr- - - - - - - - - - So LIMITS OF \ 1 I 71STURBANCE � X -- \0 W ---- V1�- -- - _ - - - - - W_W_W_ nFnE N-W-i'_VV_W_ W_W_�WVFWWW-W oU OU OU OU- OTT_OUT_oU OUT_OU- OU:OU- OU-OU- OJ- OIL- OU- OIL- T�GmOU�U OU- OL OU OLJOU OU- OU OU OU NC HIGHWAY 42 \ C. \ VARIABLE WIDTH PUBLIC R/W STORMWATER MANAGEMENT NOTES: I. THE DEVELOPER OR HIS AGENT SHALL CONTACT THE ENGINEER WHEN THE BEST MANAGEMENT PRACTICE(S) ARE CONSTRUCTED AND ABOUT TO BECOME OPERATIONAL SO A FINAL INSPECTION CAN BE PERFORMED TO DETERMINE COMPLIANCE WITH THE APPROVED PLAN CAN BE PERFORMED. 1, PRIOR TO CONSTRUCTION, A SOIL TEST OF THE BIO-RETENTION FILTER MEDIA SHALL BE REVIEWED AND APPROVED BY THE ENGINEER OF RECORD WITH A COPY SENT TO THE ENGINEER. THE TEST SHALL CONSIST OF BOTH THE STANDARD SOIL TEST FOR pH, PHOSPHORUS, MAGNESIUM, AND POTASSIUM AND ADDITIONAL TESTS OF ORGANIC MATTER, AND SOLUBLE SALTS, ALL TESTING RESULTS SHALL COME FROM THE SAME TESTING FACILITY THE NO DEPARTMENT OF AGRICULTURE (NCDA) LAB IS THE PREFERRED TESTING FACILITY. SHOULD THE pH FALL OUT OF THE ACCEPTABLE RANGE, IT MAY BE MODIFIED (HIGHER) WITH LIME OR (LOWER) WITH IRON SULFATE PLUS SULFUR OR AS DIRECTED BY THE NCDA OR ENGINEER. 3. PRIOR TO CONSTRUCTION A COMPOSITION TEST OF THE BIO-RETENTION FILTER MEDIA SHALL BE REVIEWED AND APPROVED BY THE ENGINEER OF RECORD WITH A COPY SENT TO THE ENGINEER. FILTER MEDIAF SHALL CONFORM TO THE FOLLOWING: 65-887 SAND (USDA TEXTURAL CLASSIFICATION), 8-12,- FINES (SILT AND CLAY), AND 3-59. ORGANIC MATTER (PEATMOSS OR PINE BARK) BY VOLUME 4. PERFORM A DOUBLE RING INFILTRATION TEST P MINIMUM OF J TESTS OR 1 PER 500 SF OF FILTER MEDIA WHICHEVER IS GREATER) AT THE COMPLETION OF THE BID -RETENTION BMP. INFILTRATION RATE OF THE CONSTRUCTED BIO-RETENTION MEDIA SHALL BE BETWEEN 1-6 IN7HR, PROVIDE A COPY OF THE RESULTS TO THE ENGINEER. 5. THE OWNER IS RESPONSIBLE FOR MAINTAININ G THE STORMWATER BMP. ANNUAL MAINTENANCE INSPECTION AND REPORT REQUIRED - THE OWNER OF A PERMITTED STRUCTURAL STORMWATER BMP CONTROLS N HALL ANNUALLY SUBMIT A MAINTENANCE AND INSPECTION REPORT FOR EACH LIMP TO THE STORMWATER ADMINISTRATOR. ANNUAL INSPECTIONS SHALL BEGIN WITHIN ONE YEAR OF THE RECORDATION OF ANY DEED(S) SHOWING STORMWATER BMPs/CONTROL STRUCTURES 6. UPON COMPLETION OF THE PROJECT, AND BEFORE A CERTIFICATE OF OCCUPANCY SHALL BE GRANTED, THE ENGINEER OF RECORD SHALL CERTIFY THAT THE COMPLETED PROJECT IS IN ACCORDANCE WITH THE APPROVED STORMWATER MANAGEMENT PLANS AND DESIGNS, 7. A FINAL INSPECTION OF THE SITE AND STORMWATER MANAGEMENT BMRICONTROLS TO BE SCHEDULED WITH AND COMPLETED BY THE ENGINEER & INSPECTOR. 8, THE AS -BULLY' PLANS SHALL SHOW THE FINAL DESIGN SPECIFICATIONS FOR ALL STORMWATER MANAGEMENT FACILITIES AND PRACTICES AND THE FIELD LOCATION, SIZE, DEPTH, AND PLANTED VEGE7A710N DF ALL MEASURES, CONTROLS AND DEVICES, AS INSTALLED. THE AS -BUILT SHALL ALSO INCLUDE STORM DRAINAGE PIPE SYSTEMS. THE ENGINEER OF RECORD FOR THE STORMWATER MANAGEMENT MEASURES AND PLANS SHALL CERTIFY, UNDER SEAL, THAT THE AS -BUILT STORMWATER MEASURES, CONTROLS AND DEVICES ARE IN COMPLIANCE WITH THE APPROVED STORMWATER MANAGEMENT PLANS AND DESIGNS AND WITH THE REQUIREMENTS OF THE MUNICIPALITY 9. THE ENGINEER'S CERTIFICATION OF COMPLETION WILL BE REQUIRED PRIOR TO THE FINAL PLAT OR CERTIFICATE OF OCCUPANCY THE STORMWATER CONTROL IS TO BE INSPECTED TO ENSURE IT IS FUNCTIONING AS DESIGNED AND HAS FULL DESIGN VOLUME PRIOR TO ISSUANCE OF THE FINAL CERTIFICATE OF OCCUPANCY. FLOOD NOTE SUBJECT PROPERTY IS NOT LOCATED WITHIN A FLOOD HAZARD ZONE PER FEMA FIRM PANEL 3720062400J, EFFECTIVE DATE OCTOBER 3, 2006. FEMA FLOOD ZONES ARE SUBJECT TO CHANGE WETLAND NOTE: THERE ARE NO WETLANDS AND/OR STREAM FEATURES ON THE PROPOSED PARCEL Downspout ,Transition Boat ,Wire screen for rodents Grade Bend _8" on LOOT Min. Slope Refer to drainage plan✓ for size of storm sewer NOTE: 1 DOWNSPOUT DETAIL PIPEDSHALLPBETSCHEDULOR -4 N.T.S. 40 PVC OR HOPE DRAINAGE NOTES: 1. A MINIMUM GRADE OF 0.50 Z SHALL BE MAINTAINED ON ALL PIPES, UNLESS OTHERWISE NOTED. 2. PIPE LENGTHS AND SLOPES INDICATED ON THE PLANS ARE APPROXIMATE ONLY. 3. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A NO MORE THAN 500 OF OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. D. MATERIAL USED FOR BACK -FILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. E. RESTABALIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE EROSION AND SEDIMENT CONTROL REGULATIONS. F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. 4. CATCH BASINS, MANHOLES, FRAMES, GRATES, ETC. SHALL MEET THE REQUIREMENTS OF THE LATEST EDITION OF THE NORTH CAROUNA DEPARTMENT OF TRANSPORTATION STANDARD DRAWINGS. REFERENCE THE FOLLOWING STANDARD DETAILS: 840.02 - CONCRETE CATCH BASIN 40.03 - FRAME GRATES AND HO D FOR 0 0 CATCH BASINS 840.04 -CONCRETE OPEN THROAT CATCH BASIN 840.14 -CONCRETE DROP INLET 840.16 - DROP INLET FRAME AND GRATES 840.31 - CONCRETE JUNCTION BOX SALEM - TRAFFIC BEARING GRATED DROP INLET 84045 - PRECAST DRAINAGE STRUCTURE 840.52 - PRECAST MANHOLE 838.80 - PRECAST CONCRETE ENDWALL 5.ALL PIPES SHALL BE LAID ON STRAIGHT ALIGNMENTS AND EVEN GRADES USING A PIPE USER OR OTHER ACCURATE METHOD. 6, STORM PIPE SHALL BE AS FOLLOW UNLESS OTHERWISE NOTED: TYPE I: RCP, CLASS III PER ASTM C-76, WITH FLEXIBLE PLASTIC BITUMEN GASKETS AT JOINTS. TYPE 2: HIGH DENSITY POLYETHYLENE PIPE (HOPE) - AASHTO DESIGNATION M252 TYPE S. M294 TYPE S AND MP7-97 TYPE S, SMOOTH INTERIOR/ANNULAR EXTERIOR. ONLY PERMITTED WHEN SPECIFICALLY INDICATED ON THE CONSTRUCTION DRAWINGS, PIPE SHALL BE INSTALLED IN ACCORDANCE WITH PIPE MANUFACTURER'S INSTALLATION GUIDELINES. PIPE JOINTS AND FITTINGS SHALL BE WATERTIGHT. 7. ALL STORM DRAINAGE WITHIN THE PUBUC ROADS SHALL BE CLASS III REINFORCED CONCRETE PIPE UNLESS OTHERWISE NOTED. 8, EXISTING DRAINAGE STRUCTURES TO BE INSPECTED AND REPAIRED AS NEEDED, AND EXISTING PIPES TO BE CLEANED OUT TO REMOVE SILT AND DEBRIS. 9. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION D SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 10. ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS WATERTIGHT. 11, PRECAST STRUCTURES MAYBE USED AT CONTRACTORS OPTION. 12. ALL STORM SEWER MANHOLES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT, AND SHALL HAVE TRAFFIC BEARING RING & COVERS. MANHOLES IN UNPAVED AREAS SHALL BE 6" ABOVE FINISH GRADE. LIDS SHALL BE LABELED "STORM SEWER". 13. STRUCTURE TOP ELEVATIONS SHOWN HERE ARE APPROXIMATE. CONTRACTOR SHALL ADJUST AS NECESSARY. 14. RIM ELEVATIONS AS NOTED ARE TO THE GUTTER FLOW ONE. GRADING NOTES: 1. REFER TO THE SITE PUN FOR RELATED NOTES. 2, ALL CONTOURS AND SPOT ELEVATIONS REFLECT FINISHED GRADES 3 ALL ELEVATIONS ARE IN REFERENCE TO THE BENCHMARK AND THIS MUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO GROUND BREAKING. 4 THE CONTRACTOR SHALL IMMEDIATELY REPORT TO OWNER ANY DISCREPANCIES FOUND BETWEEN ACTUAL FIELD CONDITIONS AND CONSTRUCTION DOCUMENTS AND SHALL WAIT FOR INSTRUCTION PRIOR TO PROCEEDING. 5 THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING EXISTING UTILITIES, AND SHALL REPAIR ALL DAMAGE TO EXISTING UPUTIES THAT OCCUR DURING CONSTRUCTION. 6, THE CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE. 7. LIMITS OF CLEARING SHOWN ON GRADING PUN ARE BASED UPON THE APPROXIMATE CUT AND FILL SLOPE LIMITS, OR OTHER GRADING REQUIREMENTS. 8. THE PROPOSED CONTOURS SHOWN IN DRIVES AND PARKING LOTS AND SIDEWALKS ARE FINISHED ELEVATIONS INCLUDING ASPHALT. REFER TO PAVEMENT CROSS SECTION DATA TO ESTABLISH CORRECT SUBBASE OR AGGREGATE BASE COURSE ELEVATIONS TO BE COMPLETED UNDER THIS CONTRACT. 9. THE CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE SO THAT RUNOFF WILL DRAIN BY GRAVITY FLOW ACROSS NEW PAVEMENT AREAS TO NEW OR EXISTING DRAINAGE INLETS OR SHEET OVERLAND. 10. ANY GRADING, BEYOND THE UNITS OF CONSTRUCTION AS SHOWN ON THE GRADING PLAN, 6 SUBJECT TO A FINE, II. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS SUBJECT TO A FINE. 12. STABILIZATION IS THE BEST FORM OF EROSION CONTROL, TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON DENUDED AREAS AND ESPECIALLY WHEN THE CONSTRUCTION SEQUENCE REQUIRES IT. 13. ALL GRADED SLOPES ARE TO BE SEEDED OR LANDSCAPED WITHIN 15 DAYS OF COMPLETION OF GRADING. ALL REMAINING AREAS ARE TO BE SEEDED WITHIN 30 DAro. 14. EXISTING GRADES, CONTOURS, UTILITIES AND OTHER EXISTING FEATURES FROM SURVEY BY NEWCOMB LAND SURVEYING. 15. THE CONTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE ANY DE -WATERING NECESSARY TO CONSTRUCT THE PROJECT AS SHOWN ON THE PUNS, 16. THE CONTRACTOR IS RESPONSIBLE FOR THEDESIGN AND IMPLEMENTATION OF ALL SHEETING, SHORING BRACING AN P EXCAVATION LE ETI , B C O SPECIAL AL EXCAV 0 MEASURES REQUIRED TO MEET OSHA, FEDERAL, STATE, AND LOCAL REGULATIONS PURSUANT TO THE INSTALLATION OF THE WORK INDICATED ON THESE DRAWINGS. THE DESIGN ENGINEER ACCEPTS NO RESPONSIBILITY FOR THE DESIGNS) TO INSTALL SAID ITEMS. 17. THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR EXACT LOCATION, ELEVATION, AND DIMENSIONS OF EXIT DOORS, RAMPS, BUILDING DIMENSIONS, AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. 18. ALL FILL MATERIALS, EXISTING BUILDING FOUNDATIONS, PAVEMENT AND. UTILITY STRUCTURES, TOPSOIL, AND ANY OTHER DELETERIOUS MATERIALS SHALL BE COMPLETELY REMOVED FROM WITHIN THE BEARING ZONE BELOW THE STRUCTURE, 19. ALL FOUNDATION EXCAVATION SHALL BE INSPECTED BY A QUALIFIED GEOTECHNICAL REPRESENTATIVE TO DETERMINE WHETHER UNSUITABLE MATERIAL MUST BE REMOVED. ALL UNDESIREABLE MATERIAL SHALL BE REMOVED, BACKFILLED AND COMPACTED AS REQUIRED BY THE GEOTECHNICAL REPRESENTATIVE. 20. ALL CUT OR FILL SLOPES SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE NOTED OR DEPICTED. 21. THE CONTRACTOR SHALL ADHERE TO ALL TERMS & CONDITIONS AS OUTLINED IN THE GENERAL N.P.D.E.S PERMIT FOR STORM WATER DISCHARGE ASSDCIATED WITH CONSTRUCTION ACTNRIES. 22. CONTRACTOR SHALL ADJUST ANDj OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE. 23. CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS FOR ALL NATURAL AND PAVED AREAS. 24. ALL UNSURFACED AREAS DISTURBED BY GRADING OPERATION SHALL RECEIVE 4 INCHES OF TOPSOIL CONTRACTOR SHALL APPLY STABIUZATION FABRIC TO ALL SLOPES 3111V OR STEEPER. 25. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. LEGEND: TO .......... TOP OF CURB GT.... ._..GUTTER FLOW LINE TP . ...TOP OF PAVEMENT TS...... _TOP OF SIDEWALK T'N....... _TOP OF WALL BIN .......... BOTTOM OF WALL CB .......... CATCH BASIN GI....... GRATE INLET FES. ..FLARED END SECTION YI.......... YARD INLET GR.. . GROUND Irv-► .. FLOW DIRECTION ARROW NOTE TO CONTRACTOR: THE HARNETT COUNTY & NCDENR STORMWATER MANAGEMENT PERMIT REQUIRES THE DESIGN PROFESSIONAL TO PERIODICALLY OBSERVE THE CONSTRUCTION OF THE STORMWATER MANAGEMENT SYSTEM AND TO PREPARE A DESIGNER'S CONSTRUCTION CERTIFICATION FOR SUBMITTAL TO HARNETT COUNTY & NCDENR PRIOR TO THE CERTIFICATE Of OCCUPANCY BEING ISSUED FOR THE PROJECT, THE CONTRACTOR SHALL COORDINATE WITH THE DESIGN CONSULTANT FOR THE CONSTRUCTION OBSERVATION AND PREPARATION OF THE CONSTRUCTION CERTIFICATION BY CONTACTING: M4TT LOWDER, PE - TRIANGLE SITE DESIGN, PLLC 919-555-657C mlowder®trionglesltedeslgn.com EROSION CONTROL NOTE: AN EROSION AND SEDIMENTATION CONTROL PERMIT SHALL BE REOUIRED BY NCDENR PRIOR TO START OF CONSTRUCTION. GRAPHIC SCALE 30 0 15 30 60 1 INCH = 30 FEET TRIANCL SITE DESIGI\ CONSULTANT: Triangle Site Design, PLLC 4006 Barrett Drive Suite 203 Raleigh, NC 27609 (919)553-6570 mlowder@trianglesitedesign.com NO LICENSE #P-0619 SEAL: W Z W �J n r ss�" r4e' I O � : 4��Y C 9r •� " SEAL Ys 2443zl 9J,•• f /GLEN Q Q, r•qr u. V. 06 O J � O S tz0 C C O i � T � @ O C7 OWNER/DEVELOPER: GLANDON FOREST EQUITY, LLC 3900 Merton Drive j Suite 21C Raleigh, NC 27609 919-459-2601 919-459-2604 fx gbarnes®vanguardpg.com REVISIONS: .� roved 52T3rnra ater Pe rmit Documents, Conshucticn in accordance with these ocumen s "-- required byy the atormwater permit. North Carottne rules require that the stormwater system designer inenaM durim construction: certdv conformity with the plans and specs; and certify compliance with the stormwatereules.(15ANCAC2H.1008(i))^/ _�•� Sheet # LAYOUT COORD: )IEI PLANNING MGR. ME! DRAWING BY: ME - DATE: 9 16/14 JOB NUMBER: 004067 TITLE GRADING AND DRAINAGE PLAN SHEET NUMBER: C-4 COMMENTS: d I CURVE TABLE 'CURVE LENGTH RADIOS BEARING 1 CHORD CI_ 49.58 955.15 :. S 133< 6 W 49.57 ^� _ 34.53 25.00 S °056 S" W 31.85 C3 TIE' 836 _ 905.15 � S 13 10 5" C4 TIE' 44 C4 25,07 S Z9'01'10' E 38.5E 1 l I 1 aF '4Rt1 ll-.., I - -3L. 9G N✓141 �: 433.49' � I INV (L,)r 43Z,99 e I T / I PB 2007 PG 273 '�' CPP Ti 4 I.47"- s _ � PhV: 0636-80-8239 IND \ V I S 88'1519" V A IT I o �- - - - - -E 249.15' - --\ it - --- - - �� -I I l IT l I LINE TABLE LINE LENGTH BEARING _!fTIEI 10.08 S 00'15'35"' E LE 5G.00 1 N 00 9 ' '17" W L.. I TI 1 E 69.3E N 59'3306 E . LA(TIEI 57.31 1 S 55'02 20" E lI LOT 3 RP ONE, LLC DB 146E PG 81 \ \ ORS"F . re` 11-1 l LOT 14 \ N RhF o RP ONE CLC IP: I DB 1492 PG 205 PB 2007, Pc 273 0 I L PIN 063E 90 - - ' 3752 I / \ 3 / I IND O � \ I � I �\ \ \ BALANCE OF PARCEL \ TEMPORARY \ / I I v/iT 24,783 SF g SILT FENCE / /.h 1 TOP- r3.. 04 // RIP -RAP AP / / RCN 1 li 1 OUTLET w 9 14 REFER To DETAL SHEET s2 0 �l FOR CONSTRUCTION' f \ ✓,: (,�, - _�ZU' A REQUIREMENTS RIP RAP REFER To erAL ADETAILSHEET 2 I / / 1 v ti \ I � / \ Q \ 1 I \ FOR CONSTRUCTION I/ ht I l LWITS OF REQUIREMENTS DISTURBANCE\ TEMPORARY INLET TEMPORARY I I l I/� \ 'vg II I I I I I PROTECTION (TYP) / SILT FENCE I TREE PROTECTION FENCE IT IT RIP -RAP APRON#5 / \\ REFER TO DETAIL SHEET Il0 445 - !16 - - REQUIREMENTS FOR CONSTRUCTION \ I I I I T Al- a IT i �-:' 4) SYY I / 1 TEMPORARY DIVERSION DITGHryII - / E I / RIP -RAP APRON#4 liT a .•,.� CONiTRI TION AREOUIRFHEIFS • - --' - 3 REFER TO DETAIL SHEET REFFn TO �F F r' >i`� -7 - - a 1 / p FOR CONSTRUCTION 'iPTCH TO BE STABILIZEDvu.THN / / REQUIREMENTS G o r n. I / �Y R TI T TIME' I�.AId� S .CC E / I \ 1 / LOT 15 REQUREMENTS w RP ONE, LLC 1 - I SKIMMER DEVICES -DRAIN .1 TO NATURAL GRADE 3 DB 1492, PC 205 STUB PIPE 10� 1 I I Alp I � n � SPILLWAY PB 2007, PC 273 DIVERSION DITCH I I \ STOCKPILE AREA \ / 1," PIN: 0636-90-2096 1 - BAFFLE(TYP) x l IND LIMITS OF DISTURBANCE --�/ I / SKIMMER DEVICE - REFER TO II I i ) ill �"•�•O:COO k_ I I / / \"(\E� / > SHEET C-9 FOR CONSTRUCTION \ _ - r.� t DETAILS & SIZE REQUIREMENTS HENRY B & \ ION - I I I - / /1 h ELIZABETH A. BAKER \ ED I I I \ STUB PIPE TO I I l � l DB 464, PG 32 \ I I I O\ SKIMMER (BASIN 11 / I PIN: 0636-80-8053 I I \ _ SILT FENCE 11 Zy l l RA-20M 11 10 _ I I I I I- I OUTLET III C I I I I.I' TEMPORARY DNERSION DITCH#2� II I I REFER TO DETAIL THIS SHEET FOR O EXISTING DITCH STOUBE OREQUIREMENTS STABILIZED WITHIN BUILDING I I I -- \ 7 DAYS ACCORDING TO TIMESHARE I I REQUIREMENTS �/ p PROPOSED DO R4 CELL _ l ,V I l I HORSESHOE INLET 65,517 SF I - A/ 1 1,504 AC I / 1 PROTECTION O / \ 1 y • 42 / TREE PROTECTION FENCE / r (07 USED) TEMPORARY a / ti t I IMITS OF I / I SILT FENCE � 1 IfI� I DISTURBANCE lWI l TEMPORARY INLET �z�4 ^ I I /E,AF / LP TREE PROTECTION FENCE / PROTECTION (TYR) /e 'A RIP -RAP APRON#3 o 1 s� I ° REFER r0 DETAIL SHEET FOR coNSTRuwoN I CS, REQUIREMENTS \ I \ � �I I ; \ ITEMPORARY PIPE N _, ,,,. �� AT CONSTRUCTION HENRY B. & vYCL� L:/�..)TIOAI �I \ ENTRANCE I ELIZABETH A. BAKER DB 392, PG 419 PIN.'0635-89-8802 W 1 .oh I RA-zoM oI I�;'3 Fa ✓ 1 o I I C TEMPORARY CONSTRUCTION \ I I I I O I I� NMATERAE YARD /. EXISDNG 11 1 \ I \ \ \ �� �I OBSTRUCTION BUILDING 1 ! �d / 1 ENTRANCE , to \ 611 \ 448 I I CONTROL CORNER I I \ CONCRE-=-/ n N. 659,742.70 I I A \ WASH ARE_v E 2038,88539 TREE PROTECTION ��� LOT 1 R I I FENCE TENT=ERAR` NLEi A / PRO_-CnON ;_YP) 7,245 SE 1 C --) 1 �' ? / QR$E$HQE INLET TREE 0� '{( A, ,5 R,TEMPORARY I PROTECTION \ T=CTCTION --� �1 GR4 / I SILT FENCE I l LIMITS OF \ FENCE L DISTURBANCE \\ - o I I`w.t s lJ 8927105 W 120.67' \ P` N - - GL / \\ 'A GRAVEL I r �-- - - -\ �� - ✓rRnE / A J a L1(FIE) i u ou \ _ _ ou- ou- \ - _ - b -q52- - \ OU- OU- OU OU- OU- OU OU OU- / EDGE AUE T FP G 0 MEN - PCP !l '.: 45r vo, - IOZ' W W_W. W,W -L -- -- _ -. _-- / -- --- --------}.-_ 1 --- _ _ ---- ------ �C/ A/ w- w- w- w w- QfEOE YF�f�Z w- w__ w __ w- w 1 A-w W_ VV 'k OE OU OU OF- OU OU- OU- Ou- OU OU- OU OU- OU- UUU Iu1 OU- OU- C CDC- oLI- \ LDL-M4-b9�J-- OU-�pU DU_ OU OU CCU- OU OU- CCU- IOU- oU NC HIGHWAY 42 42 H VARIABLE WIDT H PUBLIC R W EROSION CBONTROL NOTES: TREE PROTECTIO NOTES: 1 TOTAL AREA I. THE CONTRACTOR SHALL PROTECT ALL TREES AND SHRUBS OJTSIDE OF CUT/FILL LINES, TOTAL SITE AREA = 1.504 ACRES SOIL TYPE = POCALLA LOAMY SAND IN ADDITION TO THOSE MAT RECEIVE TREE/SHRUB PROTECTION BARRIERS. THE CONTRACTOR IS ALSO REQUESTED TO SAVE ALL OTHER EXISTING TREES AND SHRUBS 2, UNLESS OTHERWISE INDICATED, ALL VEGEACRE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN WHERE POSSIBLE. ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE NCDENR EROSION AND SEDIMENT CONTROL HANDBOOK 2. WHEN ROOT PRUNING IS NECESSARY, CUT ROOTS CLEANLY USING A DISC TRENCHER 3, THE CONTRACTOR SHALL INSTALL AND MAINTAIN THROUGHOUT THE PROJECT CONSTRUCTION ALL EROSION CONTROL MEASURES SHOWN WITHIN THESE PUNS AND IMMEDIATELY COVER ALL ROOT CUT SURFACES URGER THAN TWO INCHES IN IN ACCORDANCE WITH APPLICABLE NORTH CAROLINA EROSION AND SEDIMENT CONTROL REGULATIONS. DIAMETER WITH TREE WOUND DRESSING. USE PLYWOOD FORMS WHEN TREE ROOTS ARE ADJACENT TO PROPOSED CURB & GUTTER OR SIDEWALK. 1. CONSTRUCTION WORK SHALL BE IN COMPLIANCE WITH REGULATIONS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM IMBUES) STORM WATER 3. NO SOIL DISTURBANCE OR COMPACTION, CONSTRUCTION MATERIALS, TRAFFIC, BURIAL GENERAL PERMIT. PITS, TRENCHING OR OTHER LAND DISTURBING ACTIVITY ALLOWED IN THE TREE PROTECTION ZONE. TREE BARRICADES MUST BE INSTALLED BEFORE ANY DEMOLITION, 5. EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE. GRADING OR CONSTRUCTION BEGINS, AND NOT REMOVED UNTIL FINAL INSPECTION. 6, A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES_ 4, NO GRUBBING WITHIN TREE PROTECTION ZONE. LEAVE SOIL AND LEAF LITTER UNDISTURBED. SUPPLEMENT WITH 1-2 INCHES OF MULCH. RE -SEED WITH GRASS ONLY 7. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZE EROSION, THE N DISTURBED/GRADED AREAS. CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE NCDENR EROSION CONTROL INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. 5, TREE BARRICADES MUST BE INSTALLED BEFORE ANY DEMOLITION, CLEARING, GRADING OR CONSTRUCTION BEGINS AND IS NOT TO BE REMOVED UNTIL AFTER CONSTRUCTION. g, APPROVAL OF THIS PUN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS. A REVISED PUN SHOWING OFF -SITE IMPACTS SHOULD BE SUBMITTED AND APPROVED 6, TREE PROTECTION FENCE IS TO BE LOCATED 1 FOOT PER TREE DIAMETER INCH AWAY PRIOR i0 ANY OFF -SITE GRADING. CONTACT PROJECT ENGINEER AND PROJECT EROSION CONTROL INSPECTOR TO ENSURE ADDITIONAL EROSION CONTROL FROM THE TREE. MEASURES ARE INSTALLED PRIOR TO OFF -SITE GRADING. 9, PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF -SITE NOTE TO C O NTRAi� ��� BORROW OR WASTE AREAS, STAGING OR STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT A SUPPLEMENTARY EROSION CONTROL PUN TO THE OWNER FOR REVIEW AND TO NCDENR FOR APPROVAL. CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL NECESSARY MEASURES AT NO SEPARATE PAYMENT, THE CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER A COPY OF THE AMENDED PERMIT. THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER AND THE EROSION CONTROL INSPECTOR OF THE LOCATION OF ANY OFF -SITE BORROW SOURCE OR OFF -SITE WASTE 10, EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED CON➢NUOUSLY, RELOCATED WHEN AND AS NECESSARY, AND SHALL DE CHECKED MATERIAL DISPOSAL SITE. OFF -SITE DISTURBANCES COUNT TOWARDS THE OVERALL AFTER EVERY RAINFALL. SEEDED AREAS SHALL BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED, RE-EEDED AND MULCHED AS NECESSARY PROJECT DISTURBED AREA AND MUST BE COVERED BY THE PERMIT FOR THIS PROJECT TO OBTAIN A DENSE STAND OF GRASS. AND/OR THE PERMIT FROM ANOTHER AC TIVE HARNETi COUNTY OR NCDENR PERMITTED / U II. STABILIZATION IS THE i FORM BEST 0 OF EROSION CONTROL. ALL DISTURBED AREAS WHICH ARE NOT OTHERWISE STABILIZEDDERMA SHALL DE TOP SOILED AND SHE THAT IS APPROPRIATE FOR THE INTENDED USE (LE. APPLICABLE MININGACCORDANCE SEEDED TEMPORARILY OR PERMANENTLY IN WITH THE NCDENR SEDIMENT CONTROL REGULATIONS. PERMANENT SEEDING AND GRASS REQUIREMENTS). NO OFF -SITE ACTNITIES SHALL OCCUR UNTIL THE PERMIT FOR THIS ESTABLISHMENT IS REQUIRED PRIOR TO PROJECT COMPLETION AND ACCEPTANCE. PROJECT HAS BEEN MODIFIED TO INCLUDE LU E THE AFFECTEDAR R IT HAS BEEN AREAS 0 VERIFIED WITH THE CONTROL INSPECTOR THAT THE OFF -SITE E AREAS ARE 12. WHEN A H i CRUSHED STONE CONSTRUCTION ENTRANCE HAS BEEN V EE COVERED WITH SOIL OR HAS BEEN PUSHED INTO THE SG r T L B CONS RUCTION TRAFFIC IT COVERED UNDER ACTIVE APPLICABLE HARNEiT COUNTY OR NCDENR PERMITS. E SHALL BE REPLACED WITH A DEPTH OF STONE EQUAL i0 THAT OF THE ORIGINAL APPLICATION. 13. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND ALL CONSTRUCTION ACCESS LOCATORS INTO NON -PAVED AREA. SIX INCHES OF STONE SHALL BE USED FOR THE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE. ALL DRAINAGE INLETS SHALL BE PROTECTED FROM SILTATION. INEFFECTIVE PROTECTION DEVICES SHALL BE IMMEDIATELY REPLACED AND THE INLET CLEANED. C BASIN TNOTES:14. N FLUSHING IS NOT AN ACCEPTABLE METHOD OF CLEANING. 15. SEDIMENT BASINS AND TRAP PERIMETER S. DIKES AND OTHER MEASURES INTENDED T ES E LIED 0 TRAP SEDIMENT SHALL BE CONSTRUCTEDA S A BE SKIMMER BASIN BASED ON }OATS TO DRAIN. FIRST STEP IN ANY LAND -DISTURBING ACTMIY A AND MADE ND SHALL BE MADE FUNCTIONAL BEFORE UP -SLOPE LAND DISTURBANCE TAKES PUCE. BASIN AND DIVERSIONS SHALL BE SEEDED, MULCHED AND 16. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE ANCHORED/LINED AND PINNED UPON INSTALLATION OF MEASURES, DEVELOPMENT UNTIL FINAL STABILIZATION 15 COMPLETED. 17. DURING DE -WATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECEIVING OUTLET. 18, THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING EVENT, ANY NECESSARY REPAIRS STABILIZATION TIMEFRAME SLT£ AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS PERIMETER LIKE$ ARGUES, 7 DAYS NONE DITCHES AND SLOPES HLCN ODAU7Y PIAIER (HOW) 7 DAYS NONE ZONES SLOPES STEEPER THAN d7 7 DAYS IF SLOPES ARE AS' OR LESS AN LENGTH AND ARE NOT STEEPER THAN 2 1, 14 DAYS ARE AL10410 SLOPES 37 OR FLAAER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50FT N LENGTH ALL OTHER AREAS WITH SLOPES NONE EXCEPT FOR PERIMETERS AND FLATTER THAN 4.1 14 DAYS I HOW ZONES DR CLEANUP TO MAINTAIN ME EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. CONSTRUCTION SEQUENCE: I. CONTACT NCDENR REGIONAL OFFICE AT (FAYETTEVILLE) BEFORE ANY AND DISTURBANCE OCCURS. 2. CONTRACTOR SHALL ENSURE THAT ALL NECESSARY PERMITS HAVE BEEN RECEIVED AND THAT THOSE REQUIRED TO BE DISPLAYED ON -SITE ARE AVAILABLE. 3. CONTRACTOR SHALL HOLD A PRE -CONSTRUCTION MEETING AT LEAST 48 HOURS BEFORE THE ACTUAL START OF CONSTRUCTION. CONTACT NWENR INSPECTOR. 4. CONTRACTOR SHALL CONTACT CAROLINA ONE CALL AND ALL ENTITIES HAVING BURIED UTIFUTIES AT LEAST 72 HOURS PRIOR TO DIGGING OR AS DIRECTED AT THE PRE -CONSTRUCTION MEETING. 5, CONTRACTOR SHALL INSTALL TEMPORARY CONSTRUCTION ENTRANCES AT EACH POINT OF ACCESS TO STORAGE AND CONSTRUCTION AREAS. 6, INITIAL PHASE SEDIMENT AND EROSION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH PLANS BEFORE STARTING WORK INCLUDING SILT FENCE, INLET PROTECTION, SKIMMER WIN, DIVERSION DITCHES, TREE PROTECTION, ETC., CLEARING ONLY AS NECESSARY FOR THE INSTALLATION OF THESE MEASURES. CONTRACTOR SHALL INCLUDE A RAIN GAUGE AND LOG BOOK CONTAINING THE INSPECTION RECORDS FOR THE SITE 7 (� T i GROUND COVER REQUIREMENTS: INSTALL SKIMMER BASIN - SEED & MULCH BASIN & TEMPORARY DIVERSION (ACHES IMMEDIATELY AFTER INSFALLHON STABILIZE EARTH BERMS AS t u WELL AS BASIN SLOPES PRIOR TO BEGINNING MASS GRADING OF THE SITE THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO CHEATER THAN THE ANGLE THAT CAN RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EVENT, ALL DEMOLITION DEBRIS IS 70 GO i0 AN APPROVED LANDFILL OR RELATED FACILITY EXPOSED WILL ACCORDING i0 THE FOLLOWING CHART L, BE PIASTER OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER DEVICES OR STRUCTURESFF SUFFICIENT i PERMANENT 0 RESTRAIN EROSION. PROVISIONS FOR DERMA EN INITIALLY CONSTRUCT THE GRADINGH I 0 THE BUILDING PAD AND THE PARKING AREAS lHA7 ARE DRAINING 70 THE TEMPORARY SKIMMER BASIN, SUFFICIENT TO RETAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS ACCORDING i0 THE GROUNDCOFOLLOWING MAINTAINING RUNFFOR RUNOFF TOWARD THE fl451N. ADJUST THE LOCATOR OF TEMPORARY DITCHES AS NECESSARY TO DfVERT RUNOFF FROM THE STEMS CH FOLLOWING CHART FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. S TO SYSTEMS TO THE TEMPORARY SKIMMER BASIN. DIVERSION DITCHES AND GRASS CHANNELS ARE TO BE STABILIZED IMMEDIATELY AFTER INSTALLATION INSTALLATION. CONSTRUCT STORM DRAINAGE SYSTEMS - USE TEMPORARY DIVERSION DITCHES TO DIVER! STORMWATER RUNOFF FROM THE DRAINAGE SYSTEMS TO THE SKIMMER BASIN TO PROTECT THE STORMWATER MANAGEMENT AREAS FROM ACCUMULATED SEDIMENT. FLOW LONG. ONCE THESE AREAS ARE UP TO GRADE AND STABILIZED WITH CONCRETE, PAVEMENT, OR VEGETATION THEN DIVERT STORMWATER RUNOFF TO THE DITCH Q(10) SLOPE(%) H 8 W SS CHANNEL LINING PROPOSED STORMWATER MANAGEMENT DEVICES ANY THE TEMPORARY SKIMMER 84SIN CAN BE DEWATEREY (REFER TO FILTER BAG DETAIL) AND REMOVED AND ME REMAINDER OF THE PARKING AREA CAN BE COMPLETED TEMPORARY 20 CFS 1% 1.0, TO, 50' 2:1 STRAW WITH NET DITCH 1 NAG DS75 TEMPORARY 2.0 CFS I$ LO' 1.0, 50, 2,1 STRAW WITH NET DITCH 2 NAG DS75 CONTRACTOR TO USE PARKING AREAS ADJACENT TO THE PROPOSED BUILDING FOR LAY-DOWN7STAGING AREAS - MAINTAIN THESE AREAS SO rHAr SEDIMENT LADEN RUNOFF WILL BE DIVERTED TO EROSION CONTROL MEASURES. INSTALL SILT FENCE AROUND STOCKPILE AREA AS SHOWN 7. CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. w EXTEND LINING i0 EXTEND LINING TO TOP OF DITCH TOP OF DITCH �\ 6" MIN. FREEBOARD / H CHANNEL LINING ff �tl � SS EROSION CONTROL MAT SHALL BE AS NOTED OR APPROVED B _ EQUAL. TEMPORARY DIVERSION DITCH DATA BLOCK REFER TO SHEET C-9 FOR TEMPORARY DITCH DETAIL EROSION CONTROL NOTES: REFER TO DETAIL SHEETS C-9 FOR CONSTRUCTION DETAILS OF THE PROPOSED EROSION CONTROL MEASURES TO BE USED IN THE DEVELOPMENT OF THIS SITE. REFER TO SHEET C-9 FOR TEMPORARY AND PERMANENT SEEDING SCHEDULES FOR PROVIDING GROUND COVER THE FOR THE DEVELOPMENT. ALL APPLICABLE TAUS CONTROL MEASURES MUST BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED, 8, STOCKPILE RIP -RAP ON SITE AND INSTALL ALL EROSION CONTROL MEASURES WHERE THE WORK IS OCCURRING. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY THE ENGINEER OR UPON RECOMMENDATION OF NCDENR INSPECTION PERSONNEL AS CONDITIONS WARRANT. 9. ALL DISTURBED AREAS SHALL HAVE GROUND STABILIZATION BY THE CONTRACTOR ACCORDING TO THE CHART ON THIS SHEET. I0. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISHED GRADE. I. UPON COMPLETION OF THE INSTALLATION AND WITH APPROVAL OF NCDENR, ALL EROSION CONTROL DEVICES SHALL BE REMOVED AND DISPOSED OF IN AN ACCEPTABLE MANNER EACH SECTION SHALL BE SEEDED AT EARLIEST POSSIBLE DATE AFTER INSTALLATION OF PIPE, STRUCTURE. OR ACCESS. COORDINATE WITH THE EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. 12. ONCE GROUND COVER IS FIRMLY ESTABLISHED, ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED WITH THE APPROVAL OF NCDENR INSPECTOR. TEMPORARY SKIMMER BASIN TO BE DEWATERED THROUGH A FILTER BAG PRIOR TO REMOVAL. 13. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION & SEDIMENT CONTROL PUNNING AND DESIGN MANUAL. DODGE U.S. DEPT. OF AGRICULTURE, AND COUNTY STANDARDS. GENERAL NOTES: I. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL INSPECTIONS, CERTIFICATIONS, EQUIPMENT, ETC. THAT MAY BE REQUIRED, 2. THE CONTRACTOR SHALL NOTE THAT THE DRAWINGS ARE SCHEMATIC IN NATURE AND DO NOT SHOW EVERY OFFSET, TRANSITION, FITTING, ETC. THAT MAY BE REQUIRED FOR A COMPLETE AND WORKING SYSTEM. 3. THE ENGINEER AND H? OWNER DISCAM ANY ROLE IN THE E MEANS AND METHODS ASSCCMTED WITH THE PROJECT /AS SET FORTH IN THESE PANS, 4. CONTRACTOR SHALL MAINTAIN AN 'AS BUILT' SET OF DRAWINGS TO RECORD THE EXACT LOCATION OF ALL PIPING PRIOR TO CONCEALMENT. DRAWINGS SHALL BE GIVEN TO THE ENGINEER UPON COMPLETION OF THE PROJECT WITH A COPY OF THE TRANSMITTAL LETTER TO THE OWNER. 5. IF DEPARTURES FROM THE SPECIFICATIONS OR DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE ENCJNEER FOR REVIEW. NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN PERMISSION OF THE OWNER. 6. THE CONTRACTOR MUST, AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES OR HIS WORK. ALL DEBRIS SHALL BE REMOVED FROM THE PROJECT SITE ON A DAILY BASIS. SEDIMENT & EROSION CONTROL NOTES: I. THE EROSION AND SEDIMENTATION CONTROL MEASURES (BMPS) WERE DESIGNED USING THE NORTH CAROLINA NCDENR REQUIREMENTS AND SHALL BE INSTALLED ILED ACCORDINGLY. CONTRACTOR SHALL PERFORM ALL IN STRICT COMPLIANCE WITH THE NORTH CAROLINA NPDES GENERAL PERMIT FOR STORM WATER DISCHARGESRGES FROM FROM URGE AND SMALL CONSTRUCTION ACTIVITIES (GENERAL PERMIT). 2. REFER TO THE EROSION AN SEDIMENT D SED E CONTROL DETAIL SHEETS FOR EROSION CONTROL DETAILS AND DESIGN TABLES FOR SEDIMENT BASINS, DIVERSION DITCHES, AND CULVERTS, SLOPE DRAINS, RIP -RAP APRONS AND OTHER EROSION CONTROL MEASURES. 3. EXISTING BOUNDARIES, TOPOGRAPHY, 100-YR FLOODPAN, UTILITY AND ROAD INFORMATION TAKEN FROM AN EXISTING CONDITIONS SURVEY. ALL EXISTING INFORMATION IS TO BE FIELD VERIFIED BY THE CONTRACTOR. .>. 4. SEE THE LANDSCAPE PUN FOR LOCATIONS OF PROPOSED PLANTINGS AND FINAL STABILIZATION. A 5. TEMPORARY DIVERSION DITCHES AND BERMS SHALL BE MAINTAINED AS THE SITE IS BROUGHT TO GRADE. 6, DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES i0 MINIMIZE EROSION. THE s SITE x< ra CONTRACTOR RMAINTAIN CLOSE CONTACT WITH THE EROSION CONTROL INSPECTORS SO THAT PERIODIC INSPECTIONS 42 CAN BE PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. 7, SEE THE GENERAL NOTES SHEET AND THE GRADING AND DRAINAGE PAN FOR OTHER NOTES REGARDING GRADING ACTIVITIES, B. SEE SITE PLAN, GRADING AND DRAINAGE PAN, UTILITY PUN. PUNTING PUN AND OTHER PAN SHEETS FOR DETAILED Id DESIGN INFORMATION OF PERMANENT SITE APPURTENANCES SHOWN ON THIS SHEET. 9. WHERE THE LIMITS NF DISTURBANCE AND TEMPORARY FENCE (SF, SF-PF, OR PF) UNFITS ARE ADJACENT, THE TEMPORARY FENCE LINE IS THE UNFITS OF DISTURBANCE. THE LINE TYPES ARE SHOWN SEPARATED FOR ILLUSTRATIVE PURPOSES ONLY. 10, CONTRACTOR SHALL NOT DISTURB MY EXISTING VEGETATIVE GROUND COVER OR TREES OUTSIDE OF THE LIMITS OF DISTURBANCE OR WITHIN ANY REQUIRED BUFFER LIMITS UNLESS OTHERWISE NOTED OR ILLUSTRATED. 7 11, PROVIDE CONTROLS OF POLLUTANTS, INCLUDING, BUT NOT LIMITED TO DUST CONTROL, DE -WATERING, SOLID WASTE / DISPOSAL, AND HAZARDOUS MATERIALS. �l 12. CLEAR ONLY AS REQUIRED TO INSTALL EROSION AND SEDIMENTATION CONTROL MEASURES MASS CLEARING AND N 0 0 ��� GRUBBING CAN BEGIN ONLY AFTER ALL DOWNSTREAM MEASURES HAVE BEEN INSTALLED 13. USE ROCK OR WASHED STONE TO BRING CONSTRUCTION EXIT TO GRADE. IMPLEMENT WHEEL WASHES AS NECESSARY THROUGHOUT ALL PHASES OF CONSTRUCTION. 14. DIVERT STORM WATER RUNOFF FF T TH ED HE PAGE E SEDIMENT BASIN USING DIVERSION DITCHES AND SLOPE EROSION CONTROL NARRATIVE ELOPES U DRAINS. CONTRACTOR SHALL MAINTAIN AND RELOCATE DIVERSION DITCHES AND SLOPES DRAINS i0 ENSURE STORM WATER RUNOFF DOES NOT ERODE THE FACE OF FINAL SLOPES. DOLLAR GENERAL, FUQUAY VARINA, HARNETT COUNTY, NC 15. MAINTAIN POSIT F i NE LOIN 0 THE SEDIMENT BASINS THROUGHOUT ALL PHASES OF CONSTRUCTOR. PACE EXCAVATEDCONTRACTOR SHA CROTRCTO, WILL FIRST INSTALL THE CONSTRUCTOR ENTRANCE THE LL THEN ON SITE AND INSTALL THE TEMPORARY EROSION CONTROL DEVICES INCLUDING i F N IN LEAD SILT E CE, INLET SOILS ALONG DOWNSTREAM EDGE OF THE DIVERSION DITCHES 70 PROVIDE ADDITIONAL CAPACITY. a , ONLY PROTECTION, SKIMMER BASIN, AND OTHER DEVICES IN ACCORDANCE WITH THE PGA. •CLEARING ONLY AS NECESSARY i0 INSTALL THESE ITEMS). BEGIN DEMOLITION, CLEARING AM SITE GRADING i6. REFER THE GRADING ANON DRAINAGE PUN FOR FINAL SITE AND PAVEMENT GRADES AND ELEVATIONS OF THE STRUCTURESITT IMMEOw kIYR - OPER4TIONS. STABILIZATION OF EARTHEN S REQUIRED 7ELY INSTALUTON. THE ON SITE STORM EWER SYSTEM CAN NOW DE INSTALLED. IMMEDIATELY AFTER AN INLET IS S INSTALLED, INLET PROTECTION SHALL PROPERLY INSTALLED ON THE STRUCTURE THE ON -SITE SANITARY SEWER AND WATER SYSTEMS MAY ALSO BE INSTALLED ONCE THE SITE IS BROUGHT UP TO E PROPOSED STORM SEWER SYSTEMS. A RA THE li PA WILL BE PREPARED FOR THE PROPOSED BUILDING. THE FCv,GH GRAD WILL THENESTABLISHEDF R THE SITE. INSTALLATION F R AN II WI GRADE ESE D E LL E BE 00 CUB D GUTTER WILL THEN BE PERFORMED. 17. LAND i ACTIVITIES TES SHALL NOT COMMENCE UNTIL APPROVAL TO DO SO HAS BEEN RECEIVED BY GOVERNING P AN FIN DISTURBED AREA WI_ BE F BASE STONE WILL THEN BE ACED D E GRADED. ALL DIS U S DRESSED AND SEEDED. REMOVE ALL INLET PROTECTION FROM STORM STRUCTURES WHEN PAVING IS TO BEGIN. RITIDISTURBINGi AUTHORITIES. THE GENERAL CONTRACTOR SHALL STRICTLY ADHERE 70 THE APPROVED EROSION AND SEDIMENT CONTROL PAVING AND STRIPING VALL THEN BE COMPLETED. FINALIZE STORMWATER POND 5 RUCTURE ONCE UPSTREAM AREAS HAVE BEEN STABILIZED (REMOVE ACCUMULATED SEDIMENT). ALL LANDSCAPING WILL DE DRAWINGS DURING CONSTRUCTION OPERATIONS. COMPLETED. THE ON -SITE STORM SEWER SYSTEM SHALL BE CLEANED OF ANY ACCUMULATED SEDIMENT WHICH SHALL BE DISPOSED OF IN A LAWFUL MANNER. ALL ACCUMULATED SEDIMENT BEHIND SILT FENCE AND OTHER SEDIMENT DEVICES SHALL BE REMOVED AND DISPOSED OF IN 4 LAWFUL MANNER. ACCORDING TO THE GROUND STABILIZATION REQUIREMENTS ON THIS SHEET, REMOVE ALL REMAINING 18, GENERAL CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL ORDINANCES THAT APPLY. SEDIMENT CONTROLMEASURES FROM THE Sli . CONTRACTOR SHALL MINIMIZE THLENGTH OF TIME BETWEEN INITIAL LAND DISTURBANCE AND FINAL VEGETATION STABILIZATION OF THE SITE. 19. ALL WORK SHALL BE CONFINED TO PERMIT LIMITS SHOWN ON PLANS. UNLESS OTHERWISE NOTED, THE SITE PLAN THE PROPOSED EROSION AND SEDIMENT CONTROL MEASURES ARE INTENDED i0 RAP ANY STORMWATER RUNOFF FROM THE CONSTRUCTION SITE AND DETAIN IT LONG ENOUGH FOR SEDIMENT AND PROPERTY LIMITS SHALL BE CONSIDERED THE PERMIT LIMITS. POLLUTANTS TO SETTLE OUT OF THE STORMWATER BEFORE DISCHARGE. VARIOUS EROSION CONTROL MEASURES ARE USED TO PREVENT POLLUTANT -LADEN STORMWATER RUNOFF FROM FLOWING ONTO ADJACENT PROPERTIES. 20, SUFFICIENT EROSION CONTROL PRACTICES MUST BE INSTALLED AND MAINTAINED TO RETAIN SEDIMENT WITHIN THE BOUNDARIES OF THE SITE NOTIFICATION OF COMBINED SELF -MONITORING AND SELF -INSPECTION FORM. 21, ADDITIONAL EROSION CONTROL MEASURES OR SILT BARRIERS TO BE PLACED AS SHOWN AND/OR DIRECTED BY THE THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER PROJECT ENGINEER AND/OR LOCAL JURISDICTIONAL INSPECTOR. EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED, RULES DETAILING THE DOCUMENTATION OF ESE INSPECTIONS TOOK EFFECT OCTOBER I 2010. THESE 22, FOR ALL CONSTRUCTION ALONG AND/OR ACROSS WATERWAYS, BANK PROTECTION AND STABILIZATION SHALL BE REQUIRED AS PER LOCAL JURISDICTIONAL EROSION CONTROL LAWS. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND BABES SELF -MONITORING REPORTS, DWO AND DEMLR DEVELOPED A COMBINED FORM. THE SELF -INSPECTION 23, ALL TREE PROTECTION AND EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCING CONSTRUCTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE AND SHALL BE MAINTAINED IN PROPER WORKING ORDER UNTIL ALL DISTURBED AREAS ARE STABILIZED AND GROUND SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS COVER IS ESTABLISHED. CONSTRUCTION ENTRANCE PADS SHALL BE INSTALLED BY THE Ai CONTRACTOR CONSTRUCTION SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: ACCESS POINTS PRIOR TO LAND DISTURBANCE. HTTP�//PORTAL.NCDENR.ORG/WEB/LR/EROSION 24 ALL EASEMENTSDISTURBED CCCEPTANCE i BE DRESSED AND GRASSED 70 CONTROL EROSION IN ACCORDANCE WITH EASEMENT PLATS PRIOR O IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CALL THE APPUCABLE NCDENR REGIONAL OFFICE: (RALEIGH: 919-791-4200) (FAYETTEVILLE: 910-433-3300) (WILMINGTON: 910-796-7215) (WASHINGTON: 252-946-6481) (WINSTCN-SALEM: 336-771-5000) (MOORESVILLE: 704-663-1699) (ASHEVILLE: 828-296-4500). 25, CONSTRUCTION LIMITS SHALL NOT BE EXCEEDED WITHOUT THE APPROVAL Of NCDENR. TITIAN = SITE DESI(' CONSULTANT: Triangle Site Design, PLLC 4006 Barrett Drive Suite 203 Raleigh, NC 27609 (919)553-6570 mlowderCitrianglesitedesign.com NC LICENSE #P-0619 SEAL: OWNER/DEVELOPER: GLANDON FOREST EQUITY, LLC 3900 Merton Drive Suite 210 Raleigh, NC 27609 919-459-2601 919-459-2604 fx gbarnes@vanguardpg.com REVISIONS: Approved Stir ater Pe' snit Uvcurnentz GOti6hnetiM in "eesrdanse •' w. YnaftP documents is. required byy the slormwater permit. North Carolina rules requke thai the stormwater system designer Inspect during construction; certify conformity with the ni with P ^^m U nr h the end ee n LsatTd s ece fy - storIC P mwater rules. (15A NCAC 2H .1008 ()) ) Per #SW O O Date/O.z� i Division of Sheet # Revision Dalq .. LAYOUT COORD: MEL PLANNING MGR. MEL DRAWING BY: _MEL DATE: 91/16,14 JOB NUMBER: 004087 TITLE: EROSION CONTROL PLOT SHEET NUMBER: C-5 COMMENTS: GRAPHIC SCALE 30 0 15 TO 60 1 INCH = 30 FEET NOTE: i NA WITH HARM COUNTY PUBILIC UTILITY CONTRACTOR 0 COORDINATE T HARNETT DEPARTMENT -OR WATER METER & BACKFLOW PREVENTION REQUIREMENTS FIRE PROTECTION NOTE: THE PROPOSED BUILDING WILL NOT HAVE A FIRE SPRINKLER SYSTEM UTILITY NOTES:__ G Pi AI 7 1 PM (7 CAYS A MEEK) I HOURS of anHON soa ✓ o goo 2. SENER USAGE CALCULATION: l2G GD 1000 SF z'9C2E >. 1084 GP D WATER CSAr.E CALCUTADON" T PER Y = 1 " " fl S PC BG.0 MINUTES _R WORK DAY) 19 GPM S A LICENSEDJ R A TL"'..TY CONTRACTOR SHALL INSTAL", THE WATE AND SA NITARY SEWER S R DES A_ REQUIRED BY HARNFTT COUNTY DEFT. OF PUBLIC UTILITIES (HCDPU) HCDPU MAINH NANCE ENDS AT THE EASEMENT CR RIGHT-OF-WAY LINE AND DOES NOT EXTEND INTO THE PRIVATE PROPERTY. E 6, WATER AND SEWER CAPACITY FEES MUST BE PAID PRIOR TO SERVICES BEING ACTIVATED ON TdE PROPERTY. MUST P A ,CONTRACTOR .1LST JOINTLY PROVIDE HOEFT) DEVELOPER AND THE UTILITY 7. THE DEVEL vIMPROVEMENTSIN TALLER TO i' ANtt N A L WATER AND SEWER S ON E 1) YEAR NARK 0 L SERVE THE LOTS HENRY B. & ELJZ48FTH A. BAKER OR 392, PG 419 PIN- 0635-89-8802 RA-20M TRANSFORMER PAD (IF REQUIRED) ' CONTRACTOR TO COORDINATE WITH UTILITY PROVIDER FOR SERVICE REQUIREMENTS. _ 7r;• ;P Dil 4 / P6 NLL, I P 436909 / hVV Ni . 43 � .NV 'EJ. 432 9 -'' / o z \ r 3 Know b@SOW. \ what's LOT 3 Call before di � Pic ONE, LLC / . you Y g DB 7466, PG 81 ESE 2007, PG 273 ' I , i✓✓:: <'44G -- I PIN: 0636-80-8239 IND } ) / I I BEFORE YOU DIG �' STO P S 8B'1 5 29 ` E 249.15' A cu I D eoe32 99 - - N.C- ONE -CALL CENTER - - CRLPL n, - I l LOT 14 IT'S THE LAW 11 TSf '�� l I I RP ONE, LLC 0 I O DB 1492, PC 205 P 007, P 73 B2 G7 r- O PIN. 0636-90-3252 / 3 � IND / \ O a z c _ -./- � � BALANCE OF PARCEL 1'0 ' IS 7 � 24,783 SF / 1 o 4.S6rEe' 0 3 I � m S O G 2 I ti I / o• UNDERGROUND ELECTRIC/ � I TELEPHONE SERVICE � �- O CONTRACTOR TO COORDINATE SERVICE CONNECTIONS WITH APPROPRIATE UTILITY COMPANY � r 589'27'05 "E 221.21 ' (PROP) l -� O \ uRnnrl t l l I R4 � p \\ �STORMWATER 2 \ A. 10. MANAGEMENT " I 0 0 \\\ A NO- _ _ - - - rnx LOT 15 �? I#" PVC CONDUIT - I RP ONE, LLC -�(BACKFILL WITH DB 1492 PG 205 /j oIx � coMPAc7ABLE GRAVEL) � / / / / PB 2007, PG 773 o ' PIN: 06 INO 0-2096 _--- - - - - -- A POLE MOUNTED TRANSFORMER IS PREFERRED ,.;^ TO SERVE THE SITE IF ALLOWED BY -' O 0 _ S �Il 55''// S TI PROVIDER. I UTILITY SERVICE L SE HENRY B. & c / g ELIZABETH A. BAKER / l DB 464, PG 32 T I PIN 0636-80-8053 7w !y RA-20M x o j" RPZ BACKFLOW PREVENTE 1 y" GATE VALVE IN HEATED ENCLOSURE PER - HCDPU REQUIREMENTS / l I 4 I ' I IX 1ISTING WATER SERVICE & o II- ' PRO CONDUIT � EXISTING f r / METER i0 BE REUSED - BUILDING I - (BACKFILL WITH / COORDINATE SERVICE Ii COMPACTABLE GRAVEL) � Ix r 1_.,., II W / / 1 CONNECTION WITH HCDPU � i I I I O I- _ PROPOSED DO PARCEL / r" I/ `� I I l 65,517 SF j i ) / / 1.504 AC 31 a / PF w O V I / /If 01 D J[r 11C - x / APPROXIMATE LOCATION Y„;TIT (l. L [)) ( III i - FFE=449.5 h ' / / I EX15TING WATER MAIN - I I r / - " I IWATER- SERVICE Y W/ ti SERVICE -' Tn a/ 1 / --- 2-WAY S.S. CLEANOUT J xs, - RIM=449.4 INV=444.0 h ' O �co / 0 I I W' �W7 o 1/ 1 1 -1 x� CURVE TABLE CURVE LENGTH RADIUS BEARING CHORD C1 49.5E 955.15 S 13'34'36" W 49.57 C2 34,53 215.00 S 50'S6'33" W 31.85 C3 TIE 58.35 905.15 S 13'10`18" W 58.35 C 4 TIE 44.0. 25.00 S 39'01 10 E 38.56 LINE TABLE LINE 1 LENGTH BEARING LI LE''. G.Oa S 00'15 35 E _2 50.00 N 00'9'17' W L3(TI_) 1 59,38 N 59'33 O6" E L4 h�l 51.31 S 65'0220" E HARNETT COUNTY WATER NOTES A notify Harnett County the The Utility Contractor shall n f r un Department of Public Utilities HCDPU and h Y P L. The Utility Contractor shall conduct a pneumatic pressure test using compressed air or other ins t as on Y P P 8 P r g Professional Engineer (PE) at least two days prior to construction commencing. The Utility Contractor must the stainless steel tapping sleeves prior to motto the to on the existing water main. This pneumatic pp g O p g p g p m schedule a pre -construction conference with Mr. Nan Moss, HCDPU Utility Construction Inspector at least pressure test must be witnessed by the HCDPU Utility Construction Inspector. The Utility Contractor shall two 2 days before construction will begin and the Utility' � ate with HCDPU for O Y g Contractor must coordinate use Romac brand stainless tee tapping sleeves or approved equal for a 1 ss steel all taps made in Hornell Count PP g O PP 9 P Y regular inspection visitations and acceptance of the water w all 6e performed ter s Construction work shall m s . Cans r g P P Y O All new water Line extensions must begin with a resilient wedge type ale valve sized equal to the diameter g g YP g 9 only during the normal working hours of HCDPU which is 8:00 am - S:DO pm Monday through Friday. 0 of the new wafer line extension in order to provide a means of isolation between Hornell County s existing Holiday and weekend work is not permitted by HCDPU, water mains and the new water line extensions under construction. IS The Utility Contractor shall provide the HCDPU Utility Construction Inspector with material submittals and M. All water mains will be constructed with SDR-21 PVC Pipe or Class 50 Ductile Iron Pipe rated for at least shop drawings for all project materials prior to the construction of any water line extensom(s), and 200 psi or greater. All pipes must be protected during loading, transport, unloading, staging, and associated water services in Harnett County. The materials to be used on the project must meet the installation. PVC pipe must be protected from extended exposure to sunlight prior to installation. established specifications of HCDPU and be approved by the Engineer of Record prior to construction. All N. All water mains will be flushed and disinfected in strict accordance with the standard specifications of the substandard materials or materials not approved for use in Harnett County found on the project site must Harnett County Department of Public Utilities. All water samples collected for bacteria testing will be be removed immediately when notified by the HCDPU Utility Construction Inspector. collected by the HCDPU Utility Construction Inspector and tested in the HCDPU Laboratory. C. The water main(s), fire hydrants, service lines, meter setters and all associated appurtenances shall be 0. All fittings larger than two (2") inches diameter shall be ductile iron. HCDPU requires that mechanical constructed in strict in accordance with the standard specifications of the Harnett County Department of joints be assembled with grip rings as 'Megalug" fittings are not approved by Harnett County for pipe sizes Public Utilities (HCDPU). The Utility Contractor shall be responsible to locate the newly installed water smaller than twelve inches 12" diameter. PVC pipe used for water mains shall be connected ( ) P P .ne ed by slip joint norms), water service lines and all associated meter setters and meter boxes for other utility companies or mechanical joint with grip rings. Glued pipe joints are not allowed on PVC pipe used for water mains in and their contractors until the new water mains) have been approved by the North Carolina Department of Harnett County. Environment and Natural Resources - Division of EnvironmentalI Section Health, Public Water Supply P. HCDPU requires that the Utility Contractor install tracer wire in the trench with all waterfines. The tracer 9 Y NCDENR-cce PWSS end accepted b HCDPU. ( ) P Y wire shall be 12 ga. insulated, solid copper conductor and it shall be terminated at the top of the valve 'n D. Prior to will be inspected ' insure that the depth boxes or manholes. No spliced wire connections shall be made underground on tracer wire installed i P g acceptance, all services �o the are installed at proper P P P P P Y Harnett County. The tracer wire may be secured with duct tape La the to of the pipe before hoc �li khl n Y Y P P PP € I meter boxes must be (lush with the round level a t be a L finish rode and the meter setters must g g Q The Utility Contractor will Professional Engineer (PE) and the HCDPU Utility Construction Inspector minimum of Be below the meter box lid. Meter setters shall be centered in the meter box and supported minimum provide by brick, block or stone. with a set of red line field drawings to identify the installed locations of the water line(s) and all E. The Utility Contractor shall provide the Professional Engineer (PE) and HCDPU Utility Construction Inspector associated services. All change orders must be pre -approved by HCDPU and the Professional Engineer (PE) w' w 'anti the with a sal of red line drawings s identifying n h complete water system installed for each project. The red m a g Yt g P P 1 Y in writing and properly documented in the red line field drawings. 8 P P Y B line drawings should identify the materials pipe sizes of a water lines as well as and approximate depths h g Y P P PP P R. The UtilityContractor shall spot di to expose each unlit pipe or line which may conflict with P g P YPP Y the ate valves fire hydrants, meter setters blow oft - fed appurtenances for all assemblies and all g Y P P construction of proposed water line extensions well in advance to verify locations o h f the existing utilities. P P Y g water lines constructed in Harnett County. The red w of an deviations hoe drawings s should clear) () Y d clearly g Y Y Y The UtilityContractor shall provide both horizontal and vertical clearances to the Professional Engineer En n r PE P g ( ) and from the NCDENR approved laps All change orders must be approved HCDPU and the Professional p g ppro ed by H to allow the L w order to avoid conflict with e PE o adjust the star line design i� s I h existing underground J g g g Engineer in writing and properly documented in the red line field drawings. utilities. The Utility Contractor shall coordinate with the utility owner and be responsible for temporary F. Potable water mains crossing other utilities and non -potable wafer lines (sanitary sewer, storm sewer, RCP, relocation and/or securing existing utility poles, pipes, wires, cables, signs anon, utilities including services be laid to minimum distance )went 24^ inches between the in accordance with the utilityowner requirements during water line installation radio and street q g g % etc. shall provide a vertical of -four potable P Y ( ) construction. water main and all other utilities. NCDOT requires the e storm new water mains to be installed under the o m S. Prior to the Commencement of any work within established utility easements or NCDOT right-of-ways the water lines. The potable water main shall be installed with twenty-four (24") inches of vertical separation Utility Contractor is required to have a signed NCDO'F encroachment agreement posted on site and notify all f e place ,,,_.der o nn notable a line sanitary and with ductile iron pipe when designed .o b_ .___d w i much as sa _ar water PF under concerned utility wul-aucea w accadau�e with GS. B ivc The Utility Contractor must call the NO One Y p Y sewer or storm sewer lines. If these separations coon w shall be P of he maintained then the star main a Call Center at 8to installed with ductile iron pitor. Both the potable Ovate w line musr be cast r mom and the non -potable star I n PP P vor erify 800 632-4949 to verify the location existingutilities nor to the beginning of construction. ( ) iron or ductile iron pipe DIP if the state minimum separations cannot be maintained The ductile iron PP (DIP) P P g g g n utilities shown m these plans are taken from maps furnished by various utility companies and hive no. have no. pipe must be laid so the mechanical joints are at least NO) feet from the point where the potable water been physically located or verified by the P.E. (i.e. TELEPHONE CABLE, WATER, SEWER, ELECTRICAL POWER, main crosses the non -potable water line. FIBER OPTIC, NATURAL GAS, ETC.). The Utility Contractor will be responsible to repair any and all damages G. Potable water mains installed parallel to non -potable water lines (sanitary sewer, storm sewer, RCP, etc.) to the satisfaction of the related utility company. shall be laid to provide a minimum horizontal distance o ten 10' e between the potable water main f feet P ( P T. The UtilityContractor will be responsible for an and all repairs due to leakage damage from poor and sanitary sewer mains, sewer laterals and services. The horizontal separation between the potable workmanship during the one (1) year warranty period once the water system improvements have been water main and any other utility or storm sewer shall not be less than five (5') feet. The potable water accepted by Harnett County. Harnett County will provide maintenance and repairs when requested and bill main must be ductile iron pipe if this horizontal separation t cannot be maintained. The p p p atmn of en (10) feet an the Developer and/or Utility Contractor if necessary doe to lack of response within 49 hours of notification ductile iron pipe shall extend at least ten HO') feet beyond the point where the minimum required of warranty work. The Utility Contractor will be responsible for any and all repairs due to damages horizontal separation of Len (IRE) feet can be re-established. resulting from failure to locate the new water lines and associated appurtenances for other utilities and H. Meter setters shall be installed in pairs on every other lot line where possible to leave adequate space for their contractors until the water lines have been approved by NCDENR and accepted by HCDPU. The final other utilities to be installed at a later time. The meter setters shall be installed at least one (l') foot inspection of water system improvements cannot be scheduled with HCDPU until the streets have been inside the right-of-way and at least three (3') to five (5') feet from the property line between the lots. paved, the rights -of -way and utility easements have been seeded and stabilized with an P , g Y Y h adequate stand of L HCDPU requires that meter boxes for %" services shall be He wide x 17" long ABS plastic boxes at least grass in place to prevent erosion issues on siteIS-. in height with cast iron lids/covers. Meter boxes for 1" services shall 1T' wide x 21" long ABS U. The Engineer of Record is responsible to insure Chat construction is at all times in compliance w g P p with plastic in height with plastic lids and cast iron flip covers in the center the lids. covers plastic boxes al least 18"services accepted sanitary engineering radices and approved laps and specifications No field changes to the es p Y g g P P P g h height Meter boxes for 2" services shall be 20" wide x 32" long ABS plastic boxes at least 20" in height with to approved plans are allowed without prior written approval by HCDPU. A copy of each engineer's field report plastic lids and cast iron flip covers in the center of the lids is to be submitted to HCDPU as each such inspection is made on system improvements or testing is J. The Utility Contractor will install polyethylene SDR-9 water service lines that cross under the pavement performed by the contractor. Water and sewer infrastructure must pass all tests required by HCDPU inside a schedule 40 PVC conduit to allow for removal and replacement in the future. Two (2) independent specifications and those of all applicable regulatory agencies. These tests include, but are not limited to: S' water service lines may be installed inside one (1) - two (2") inch schedule 40 PVC conduit or two (2) air test, vacuum lest, mandrel Lest, visual Lest, pressure test, bacteriological lest, etc. A HCDPU Inspector must be present during testing and all Lest results shall be submitted to HCDPU. All tests must be independent 1" water service lines may be installed inside one (1) -three (7) inch schedule 40 PVC satisfied before the final inspection will be scheduled with the HCDPU Inspector. The Engineer o[ Record conduit, but each water service shall be tapped directly to the water main. Split services are not allowed must request in writing to schedule the final inspection once all construction is complete. The Developers by HCDPU. K. The water main(s), fire hydrants, gate valves, service lines, meter setters and associated appurtenances Engineer of Record and the HCDPU Utility Construction Inspector shall prepare a written punch list of any defects or deficiencies noted duringthe final inspection, should an exist. Upon completion of the punch P P must be rated for 200 psi and hydrostatically pressure tested to 200 psi The hydrostatic pressure test s P Y Y P P Y P O lisle The Developer's Engineer of Record will schedule another inspection. In the event Lhe number of must no witnessed by the HCDPU Utility Construction Inspector The Utility Contractor must notify HCDPU inspections performed by the HCDPU exceeds two, additional fees may be accessed to the Developer they they are ready to begin filling in lines and coordinate with Harnett County to witness all pressure testing. UTILITY SERVICE NOTES: WATER SERVICE CONTRACTOR TO PROVIDE AND INSTALL A 1" WATER SERVICE GENERAL C E L 0 E E LINE FROM EXISTING MAIN TO BUILDING PER MUNICIPAL REQUIREMENTS, CONTACT: HARNETT COUNTY PUBLIC UTILITIES TELEPHONE: 910-893-7575 ELECTRIC SERVICE "POWER CO." TO PROVIDE UNDERGROUND 120/208/3 PHASE SERVICE. GENERAL CONTRACTOR TO PROVIDE AND INSTALL TWO 4" CONDUIT E DA W/ PULL WIRE TO UTILITY COMPANY POINT OF CONNECTION. CONTACT: DUKE PROGRESS ENERGY TELEPHONE: 800-452-2777 TELEPHONE SERVICE 'TELEPHONE CO." TO PROVIDE NEW UNDERGROUND SERVICE. GENERAL CONTRACTOR TO PROVIDE AND INSTALL A 4" DIA. PVC CONDUIT W/ PULL WIRE FROM PHONE PANEL BOARD TO UTILITY COMPANY POINT OF CONNECTION. CONTACT: WINDSTREAM TELEPHONE: SANITARY SEWER GENERAL CONTRACTOR TO PROVIDE AND INSTALL A 4" SC 4 PV E L O SCHEDULE 0 C FROM EXISTING SEWER TO LAST CLEAN OUT OUTSIDE OF BUILDING. (MIN. 1% SLOPE). PROVIDE CLEAN OUTS EVERY 75' (TYPICAL). CONTACT: HARNETT COUNTY HEALTH DEPARTMENT TELEPHONE: 910-893-7550 NATURAL GAS GENERAL CONTRACTOR TO COORDINATE WITH NATURAL GAS UTILITY FOR SERVICE LINE TO PROPOSED BUILDING. CONTACT: NOT AVAILABLE TELEPHONE: A ; aD OVER SS / I / ,� I o / FINISHED GRADE O INV=445.15 q �/ 18' SQ. PLUG O SS INV=443.7 N rFl ; ;fir 1 xc " / { / / CAST IRON MANHOLE VALVE BOX Of BROS. i�_cc LOCATION `rJ I 1I" AN CONDUIT / / V I IglB N0. MH-VA-4 OR E0. FOR 4"-6" DIA. PIPE I F H �' 1 ° (BACKFILL WITH / I / � `o i W R N MH-VA- F \ ` DE EY B OS. 0. 2 OR E . OR 8" 1 COMPACTABLE GRAVEL I h Q i 8" o f ( /T w o DIA. PIPE S.S. CLEANOUT / i / OT POURED ASPHALT JOINT FRIM-448b CONC. COMPOUND ° INV=443.3 coLuaR / SEPTIC SYSTEM TI REPAIR AREA PVC FORGE M6CLEANOUT RISER MATERIAL AND DIA. TO •+ - / / LINE REFER TO SEPTIC PERMIT FOR TANK MATCH THAT OF MAIN FOR I 60' 30' OR 45' SHORT BAD. ELBOW SEPTIC SYSTEM REQUIREMENTS O I I w CONTRACTOR TO VERIFY LOCATION, Ix PRESSURE / rn J LENGTH AND ELEVATION OF PROPOSED EXISTING MANIFOLD\ m' / 07 4"PVC(SDR35) SEPTIC DRAIN FIELD WITH THE COUNTY BUILDING - I / I S.S. LATERAL 0 / CONC. REST 6" PR COMPACTED BACKFILL HEALTH DEPARTMENT TOR p 1.0% MIN. SLOPE TO CONSTRUCTION x -- we wL g / / / BLOCK -� CONTROL CORNER i✓� �� ��1 / A, I l , \ N. 659, 74270 f1 > • MIN. � 2, 038, 88539 0 � `a � a I S.S. CLEANOUT IF CLEANOUT ® END OF LINE, INSTALL Ixc l LOT 1 SEPTC; TANK I 1 RIM=448.0 ,: PLUG HERE V o\\ 147,25 SF, / ir�y / / INV=443.1 PLAN 0 1.08 AC. ) aI afP I Ir MWsFT l �1 SANITARY SEWER CLEANOUT x� REPAIR AREA \ t ly / / C-g NOT TO SCALE \\\\ 1 a i.4L7., " S W1 T �1 o 1 i _ 3{ 'mac '1------------ - "� -- {�� a �Y w Z GRAVEL I o N 89'27105" W 120.67' FiS EXISTING \ �� w / i / I I L1(TIE) / 7 FIRE HYDRANT \ / NOTE: - J (/ \ _ _ _ _� MODECLEAL 003533 SERIES -OUT TO BE EORP EQUAL PE oU ou oU-T" oU�-q' =-olr- _"'��"- �17""� 6U - OU- OU- OU-- DU- Oil- oU- DU- OU- OU- OU- OIL- Ou a INSTALLATION SHALL BE FLUSH WITH =-B Ou �ll--- Ou oU- I^„V, e vEF, .11 6G. - W ._- W _- w_- ti,� Wl w� W" OU OU OIL- OF OU OLEOU OU- OF)- OIl- / SURROUNDING FLOOR SURFACES. - - EDGE OF PAVEMENT - _ _ _ - - I -\ -� - - - - - - - -\ _7 F RCP INV,: "50.B0, mooFLUSH WITH FLOOR LINE - - - _ _ _ _ _ X - - -C)E, ---------------- ------ M`��W�W�W��r.��W�W W�W�W� D\O . QGE11E 86 VFMFNT w -- W - " -_ w - w-W_W�W--t� ou- ou ou- CC-Ou- oU- GAT- Z v - ou ou ou JJJ Our—OF)-OU- OIL Du OUT—ou LOW NC HIGHWAY 42 4 UTILITY NOTES: 1. THE CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. CONTACT THE LOCAL MUNICIPALITY PUBLIC WORKS DEPARTMENT 48 HOURS PRIOR TO COMMENCEMENT OF WORK FOR UTILITY LOCATING SERVICES. ALL UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY AND HAVE BEEN COMPILED FROM THE LATEST AVAILABLE MAPPING, THE EXACT LOCATION OF ALL UNDERGROUND UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. 2. CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE HARNETT COUNTY PUBLIC UTILITIES DEPARTMENT & HEALTH DEPARTMENT. 3. CONTRACTOR IS RESPONSIBLE FOR COMPLYING TO THE HARNETT COUNTY PUBLIC UTILITIES DEPARTMENT AND HEALTH DEPARTMENT WITH REGARDS TO MATERIALS AND INSTALLATION OF THE WATER AND SEWER LINES. 4, CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS. A PRE -CONSTRUCTION MEETING WITH THE VARIOUS BLIJtt COMPANIES IS REQUIRED PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITY. 5. CONTRACTOR SHALL NOTIFY THE UTILITY AUTHORITIES INSPECTOR 72 HOURS BEFORE CONNECTING TO ANY EXISTING LINE. 6. THE CONTRACTOR SHALL COORDINATE ANY INTERRUPTION OF UTILITY SERVICE WITH THE OWNER AND THE UTILITY COMPANY, ANY PLANNED INTERRUPTION OF UTILITY SERVICE SHALL BE GIVEN A 48 HOUR NOTICE TO THE UTILITY COMPANY AND THE OWNER. 7. SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED UTILMES BE ENCOUNTERED, THE CONTRACTOR SHALL CONTACT THE OWNER IMMEDIATELY FOR DIRECTIONS, B. PRESSURE REDUCING VALVES WILL BE REQUIRED ON THE DOMESTIC WATERLINES FOR EACH BUILDING IF THE STATIC PRESSURE IN THE WATERMAIN P PLANS. EXCEEDS 80 PSI, SEE MECHAN CAL/LU M ING B E 9. ROUTES SHOWN FOR WATER SERVICES, ELECTRIC, SANITARY SEWER BUILDING LATERALS AND ROOF DRAIN PIPING ARE SUBJECT TO CHANCE. 10. THE CON TRACTOR SHALL SAW CUT REMOVE, AND REPLACE ASPHALT PAVEMENT AS NECESSARY TO INSTALL LL UNDERGROUND ELECTRIC TELEPHONE SEWER AND WATER. 11. THE CONTRACTOR SHALL VISIT THE SITE AND VERIFY THE ELEVATION AND LOCATION OF ALL UTILITIES BY VARIOUS MEANS PRIOR TO BEGINNING ANY EXCAVATION. TEST PITS SHALL BE DUG AT ALL LOCATIONS WHERE SEWERS CROSS EXISTING UHUTIES, AND THE HORIZONTAL AND VERTICAL LOCATIONS THE CONTRACTOR H4 CONTACT OWNER T F ANY UNFORESEEN F F UTILITIES SHALL BE DETERMINED.0 S LL CO C OWE IN HE EVENT 0 U ORESEEN CONFLICTS BETWEEN EXISTING 0 HE U AND PROPOSED UTILITIES SO THAT AN APPROPRIATE MODIFICATION MAY BE MADE. 12. THE CONTRACTOR SHALL INSURE THAT ALL UTILITY COMPANIES AND HARNETT COUNTY PUBLIC UTILITIES & HEALTH DEPARTMENT STANDARDS FOR MATERIALS AND CONSTRUCTION METHODS ARE MET. THE CONTRACTOR SHALL PERFORM PROPER COORDINATION WITH THE RESPECTIVE UTILITY COMPANY, THE CONTRACTOR SHALL COORDINATE WORK TO BE PERFORMED BY THE VARIOUS UTILITY COMPANIES AND SHALL PAY ALL FEES FOR CONNECTIONS, DISCONNECTION, RELOCATIONS, INSPECTIONS, AND DEMOLITION. 13. THIS PLAN DETAILS PIPES UP TO 5' FROM THE BUILDING FACE. REFER TO THE BUILDING DRAWINGS FOR BUILDING CONNECTIONS, SUPPLY AND INSTALL PIPE ADAPTERS AS NECESSARY, 14, ALL EXISTING PAVEMENT WHERE UTILITY PIPING IS TO BE INSTALLED SHALL BE SAW CUT AND REPLACED IN ACCORDANCE WITH THE PAVEMENT REPAIR REQUIREMENTS OF THE HARNETT COUNTY PUBLIC UTILITIES, HEALTH DEPARTMENT AND NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 15. MAINTAIN MINIMUM 10'-0' HORIZONTAL SEPARATION BETWEEN ON -SITE SAN. SEWER AND DOMESTIC OR IRRIGATION WATER PIPING WHENEVER POSSIBLE. PIPING R OVER SAN. SEWER PIPING MAINTAIN A MINIMUM 18" VERTICAL SEPARATION. WHERE SAN. SEWER PIPING MUST WHERE WATER I G MUST CROSS E S MINIMUM 24" P R OVER WATER PIPING MAINTAIN A U VERTICAL SEPARATION AND PROVIDE MIN. 4" THICK CONCRETE ENCASEMENT OR 4' CONTINUOUS CROSS , CAST IRON PIPE SLEEVE ON WATER PIPING FOR A MINIMUM OF 10'-0" ON EACH SIDE OF THE SAN. SEWER CROSSING. WHERE PERMITTED BY LOCAL CODE, DOMESTIC WATER AND SMJ. SEWER SERVICE PIPING MAY BE INSTALLED IN A COMMON TRENCH. TRENCH AND PIPING PLACEMENT SHALL COMPLY WITH ALI GOVERNING CODES AND REGULATIONS. REDUCED PRESSURE 1/4 TURN FULL PORT PRINCIPLE ASSEMBLY BRONZE BALL SHUT-OFF VALVE #1 SEE NOTE #2 CHECK VALVE #2 1/4 TURN FULL PORT BRONZE BALL SH CHECK VALVE #1 -7 7 NOTE #zUT-OFF VALVE #2 SEE SLOPE GROUND AWAY FROM COVER (TYP.) EXTRA HEAVY DUTY CAST IRON ADJUSTABLE SCORIATED SECURED COVER BRONZE TAPER THREAD PLUG WITH COUNTER SUNK HEAD LINE LENGTH TO SUIT I FLOW 4" l VARIABLE WIDTH PUBLIC R1W 2 2-WAY CLEAN OUT DETAIL - NOT TO SCALE OPTIONAL I FLOW - I TEST COCK #I- (SEE NOTE #3) LOWEST POINT OR RELIEF VALVE OUTLET N p APPROVED RPZ ASSEMBLIES 3/4' ASSEMBLIES CONBRACO 40-204-02 FESCO 81 825YA-BV HERSEY ERR II RAINBIRD RP-QT-075 WATTS 909 QT, 009M1 OF, 009M2 QT \WILKINS 975XL J 3 RPZ BACKFLOW PREVENTER C- NOT TO SCALE SUPPORT AND PAD AS REQUIRED BY DESIGNER (PAD IS OPTIONAL) 4" MINIMUM #67 WASHED STONE BACKFLOW PREVENTION NOTES INSULATED ENCLOSURE WITH DRAIN PORTS. 1. THERE SHALL BE NO TAPS, PIPING BRANCHES, UNAPPROVED BYPASS PIPING, HYDRANTS, FIRE DEPARTMENT CONNECTION POINTS OR OTHER WATER -USING APPURTENANCES CONNECTED TO THE SUPPLY LINE BETWEEN ANY WATER METER AND IT'S UTILITY DEPARTMENT REQUIRED BACKFLOW PREVENTER. 2. EACH UTILITY DEPARTMENT REQUIRED BACKFLOW PREVENTER ASSEMBLY IS REQUIRED TO BE TESTED BY AN APPROVED CERTIFIED TESTER PRIOR TO PLACING THE WATER SYSTEM INTO SERVICE. 3. REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTION ASSEMBLIES SHALL BE INSTALLED ABOVE -GROUND WITHIN INSULATED ENCLOSURE PER UTILITY DEPARTMENT REQUIREMENTS (HEATED TO 40 DEG F MIN.). ENCLOSURE TO INCLUDE DRAIN PORT(S) FOR DISCHARGE WATER. SEE DETAIL. TRIANGLE D� SITE DESIGN CONSULTANT: Triangle Site Design, PLLC 4006 Barrett Drive Suite 203 9 Raleigh, NC 2r60J (919)553-6570 mlowder@trianglesitedesign.com NC LICENSE #P-0619 SEAL: OWNER/DEVELOPER: GLANDON FOREST EQUITY, LLC 3900 Merton Drive Suite 210 Raleigh, NO 27609 919-459-2601 919-459-2604 fx gbarnes@vanguardpg.com i REVISIONS: �pprovad 5t rrr..r°aEer Perini4 6"Clit 4s ConstructiQ an accordance �TtTmese doclRnenisia reQu1red by stormw eleP permit. It. Nor th C aroln rules require that the stormwater system designer 1ncpf during construction; certify conformity with the pans and specs; and ce I r, stQ;mwataf toles. (15A NCAC 2H .10080))It 2� Permit # p Date1 �t , 7� _ J Sheet # __.Revision Da:eyE/f%L LAYOUT COORD: PLANNING MGR. C DRAWING BY: MElL DATE: 9/16/14 JOB NUMBER: 004087 TITLE: UTILITY PLAN SHEET NUMBER: U ) COMMENTS: d 3" SF-9.5A PER DODGE STANDARDS (2) 1.5" LIFTS 3" 119,OB PER ROBOT STANDARDS 10' COMPACTED AGGREGATE BASE OR 5" B-25.08 PER NCDOT STANDARDS FOR AREAS 6' WIDE OR LESS COMPACTED SUB GRADE MATERIALS AND CONSTRUCTION REQUIREMENTS PER THE NORTH CAROLINA NCDOT PAVEMENT SECTION DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS, LATEST EDITION SCALE NOT TO SCALE ACCESSIBLE PARKING SIGNAGE NOTES: 1, ALL LETTERS ARE TO BE PER THE LATEST EDITION OF THE MUTCD. 2. TOP PORTION OF SIGN SHALL HAVE A REFLECTORIZED (ENGINEERING GRADE) BLUE BACKGROUND WITH WHITE REFLECTORIZED LEGEND AND BORDER. 3. BOTTOM PORTION OF SIGN SHALL HAVE A REFLECTORIZED (ENGINEERING GRADE) WHITE BACKGROUND WITH BUCK OPAQUE LEGEND AND BORDER. 4_ FINE NOTIFICATION SIGN SHALL HAVE A REFLECTORIZED (ENGINEERING GRADE) WHITE BACKGROUND WITH BUCK OPAQUE LEGEND AND BORDER, CONTRACTOR SHALL VERIFY FINE AMOUNT AND ORDINANCE NUMBER. 5. ONE (1) SIGN REQUIRED FOR EACH ACCESSIBLE PARKING SPACE. 6, INSTALLED HEIGHT OF SIGN SHALL BE IN ACCORDANCE WITH SECTION 24-23 OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. (MUTCD) 7. SIGN MAY BE MOUNTED ON BUILDING/WALL, AT PROPER HEIGHT, IF AUGNED WITHIN 12" OF CENTER OF PARKING SPACE. ,... A ACCESSIBLE' MUTCD R7-8P 12"x6" RESERVED PARKING I' MUTCD R7-8 12"x18" MAXIMUM PENALTY 12"x9" $250 a-31,a HANDICAP SIGN v A N ACCESSIBLE MUTCD R7-8P 12"x6" '':RESERVED' PARKING ; MUTCD :L-/Q� R7-8E 12"x26" MAXIMUM PENALTY $250 Sp0* RAF �k PAVEMENT GENERAL NOTES: STANDARD BOLLARD 6" CURB WITH H.C. PARKING SPACE HEIGHT 1. DETAILS ARE DOLLAR GENERAL MINIMUM REQUIREMENTS AND MAY INCREASE WITH VARIOUS SOIL CONDITIONS. A STRIPING PARKING SIGN SLID MAX SLOPE CONCRETE SLOPE GEOTECHN?CAL INVESTIGATION WITH PAVEMENT DESIGN RECOMMENDATIONS SHALL BE COMPLETED FOR EACH AWAY FROM BUILDING DEVE-OPMENT THE FOLLOWING DETAILS ARE MINIMUM DOLLAR GENERAL PAVEMENT REQUIREMENTS. 1/8' PER FOOT INCREASED RECOMMENDATIONS ARE TO BE USED \' O 2. ThE SUBGRADE MATERIALS SHALL BE PROOF ROLLED AND/OR SCARIFIED AND COMPACTED PRIOR TO PLACEMENT 'CURB lXT� OF BASE MATERIAL. WHERE EXISTING SUBGRADE MATERIALS ARE UNSUITABLE, THEY SHALL BE REMOVED AND HEIGHT REPLACED WITH COMPACTED SELECT MATERIAL IN ACCORDANCE WITH GEOTECHNICAL RECOMMENDATIONS. Ag/ p Pg12' " lu ��.Ati � M'`Nl � BOLLARD PAINTED 3. HEAVY DULY CONCRETE PAVEMENT AND STANDARD DUTY CONCRETE PAVEMENT (AS RECOMMENDED BY THE g, YELLOW GEOTECHNICAL REPORT OR DOLLAR GENERAL MINIMUMS) SHALL BE STEEL REINFORCED. REINFORCEMENT TYPE SHALL BE PRIOR APPROVED BY DOLLAR GENERAL. 4. CONCRETE PAVEMENT PLAN SHALL BE PROVIDED TO DOLLAR GENERAL FOR PRIOR APPROVAL. ALL JOINTS MUST BE - " - SLID MAX SEALED WITH AN APPROVED SEALANT STEEL REINFORCING SHALL BE USED AT JOINTS. REFER TO ACI 330R (GUIDE -. Tp - SLOPE FOR nrgrp! AND CONSTRUCTION OF CONCRETE PARKING LOTS) FOR JOINT DESIGN AND LAYOUT. ACCESS AISLE BOLLARD " " WITH H C. PARKING SIGN "e4O 4' CUR HEIGHT g: 3" ASPHALT WEARING COURSE (2) 1.5" LIFTS INDOOR SF-9.5A 6" CUR HEIGHT GENTLY WARP THE PARKING LOT (AS NEEDED) UP TO THE ACCESSIBLE RAMP MAINTAIN A 4 CURB HEIGHT TO THE IMMEDIATE LEFT AND RIGHT SIDE OF THE ACCESSABLE RAMP, 6" COMPACTED AGGREGATE BASE COMPACTED SUB GRADE STANDARD DUTY ASPHALT DETAIL SCALE. NOT TO SCALE MATERIALS AND CONSTRUCTION REQUIREMENTS PER THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS, LATEST EDITION 1.5" ASPHALT WEARING COURSE NCDOT SF-9.5A 2.5" ASPHALT BINDER COURSE NCDOT I-19.OB 8" COMPACTED AGGREGATE BASE COMPACTED SUB GRADE HEAV`i DUT`IASPHALT DETATT IL SCALE: NOT TO SCALE MATERIALS AND CONSTRUCTION REQUIREMENTS PER THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS, LATEST EDITION REINFORCING AS RECOMMENDED BY GEOTECHNICAL CONSULTANT ) (RE: NOTE 3 ABOVE) 5" 4,000 PSI CONCRETE 4" COMPACTED AGGREGATE BASE COMPACTED SUB GRADE STANDARD DUTY CONCRETE DETAIL SCALE: NOT TO SCALE MATERIALS AND CONSTRUCTION REQUIREMENTS PER THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS, LATEST EDITIC:NI REINFORCING AS RECOMMENDED J BY GEOTECHNICAL CONSULTANT (RE: NOTE 3 ABOVE) :. 6" 4,000 PSI REINFORCED CONCRETE AT DUMPSTER/LOADING AREA 6" COMPACTED AGGREGATE BASE COMPACTED SUB GRADE HEAVY DUTY CONCRETE DETAIL SCALE: NOT TO SCALE MATERIALS AND CONSTRUCTION REQUIREMENTS PER THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARDS AND SPECIFICATIONS, LATEST EDITION I PAVEMENT DETAILS C - 7 NOT TO SCALE HANDICAP PARKING, ACCESS RAMP AND ACCESS AISLE DETAILS NOT TO SCALE SITE ACCESSIBILITY DETAIL NOTES I. REFER TO SITE PLAN FOR EXACT LOCATION OF HANDICAP PARKING, WALKWAYS AND RAMPS. 2. ALL WALKWAYS, RAMPS, AND HANDICAP PARKING SIGNAGE, ETC. SHALL MEET APPROVED AMERICANS WITH DISABILITIES ACT (ADA) STANDARDS AND LOCAL ACCESSIBILITY CODE. 3. ONE OUT OF EVERY SIX (6) ACCESSIBLE PARKING SPACES, BUT NOT LESS THAN ONE, IS REQUIRED TO BE VAN ACCESSIBLE. 4. ALL CONCRETE ACCESSIBLE RAMPS (3000 PSI) SURFACES SHALL HAVE COLORED TOOLED/SERRATED SLIP RESISTAND SURFACING AND/OR TACTILE WARNING DEVICE PER ADA STANDARDS AND LOCAL ACCESSABILITY CODE. 5. ALL CONCRETE ACCESSIBLE RAMPS SHALL BE COLOR IMPREGNATED TO PROVIDE VISUAL CONTRAST (DARK TO LIGHT) WITH ADJOINING CONCRETE SURFACES (MINIMUM 70% COLOR CONTRAST). 6. THE MATERIAL USED TO PROVIDE COLOR CONTRAST IN CONCRETE ACCESSIBILE RAMPS SHALL BE AN INTEGRAL (PERMANENT) PART OF THE CONCRETE AND SHALL NOT BE PAINTED ON OR CAPABLE OF FADING OR WEARING OFF. 7. FINISHED GRADES OF PAVEMENT IN HC PARKING AND ACESSIBUTY AISLE SHALL NOT EXCEED 1:50 SLOPE IN ANY DIRECTION. SEE ARCH PLANS H.C. / SHOPPING CART RAMP TO BE CENTERED ABOUT THE FRONT DOOR, 0 SIDEWALK - Z 1:10 MAX. SLOPE 5'-0" - 5'-0 5'- BULLARD WITH HANDICAP PARKING SIGN, AS REQUIRED. 'n BOLLARD PAINTED YELLOW 9'-0" MIN 10'-0" 9'-0" MIN 4 HANDICAP PARKING DETAIL C —7 NOT TO SCALE STANDARD STATE APPROVED HANDICAPPED SIGNAGE INSTALLED ON A METAL COLUMN AT THE PROPER HEIGHT REQUIRED. PROVIDE ADDITIONAL SIGNAGE AS REQUIRED PER REGULATIONS BOLT SIGNS TO GALVANIZED METAL PIPE COLUMN 6" DIAMETER CONCRETE FILLED STEEL PIPE BOLLARD, PAINTED YELLOW d� A I - III 1LIII i 6" MIN. HANDICAP PARKING SIGN DETAIL NOT TO SCALE STDC �Cq�� COLORED TOOLED/SERRATED SLIP RESISTANT SURFACING AND/OR TACTILE WARNING DEVICE AS REQUIRED BY AMERICAN WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES AND CODE REQUIREMENTS 1:10 MAX. SLOPE PAINTED YELLOW BOLLARD WITH HANDICAP PARKING SIGN, AS REQUIRED. 4" PAINTED STRIPES - HC BLUE COLOR 0 24" O.C. AT 45 DEGREES. 4" PARKING SPACE STRIPE. BLUE COLOR, ALL HANDICAPPED RAMP AND ACCc� AISLES SHALL MEET ALL CODES AND ANAG REGULATIONS. SURROUND AROUND PIPE COLUMN 1 3/8' I � REENSTREAK PAVING CAP SEAL ROLEE #610 - SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. TYPICAL EXPANSION JOINT 5 CONCRETE JOINTS C -7 Nor TO SCALE 6_0" 0 0 PLAN CONTRACTOR TO COORDINATE EXACT REBAR HOLE SIZES AND LOCATIONS WITH WHEEL STOP MANUFACTURER. g WHEEL STOP C —7 NOT TO SCALE SEALANT 5X6 - 107 4" CON COMPACTED SUBGRADE (REFER TO GEOTECHNICAL REPORT) #4 CONTINUOUS `. REBAR (TOP AND BOT 9'-0" (MIN) WIDE TURN -DOWN STYLE CONCRETE SIDEWALK IN FRONT OF BUILDING - SLOPE AWAY FROM BUILDING. NOTE: SEE SPECIFICATIONS FOR SPACING REQUIREMENTS TYPICAL CONTROL JOINT 42" TO FACE OF BUILDING 8" ASPHALT PAVEMENT 7�� Y " DIA. HOLE LURRY-- 3/4" - 1 18" #3 REBAR. ALL HOLE WITH S MIX OF NON -SHRINK GROUT AFTER REBAR INSTALLATION. = SEC110N CURB EDGE CONCRETE SIDEWALK NOT TO SCALE INSTALL A GROOVE 6" FROM FACE OF CONCRETE SIDEWALK g SIDEWALK DETAIL C-% NOT TO SCALE 'AVEMENT 1SPHALT PAVEMENT COMPACTED STONE BASE COMPACTED SUB BASE SAWCUT JOINT - FILL WITH SELF LEVELING ELASTOMERIC SEALANT TRIANGLE SITE DESIGN �W CONSULTANT: Triangle Site Design, PLLC 4006 Barrett Drivc Suite 203 Raleigh, NC 27609 (919)553-6570 mIcwder@trianglesitedeSLEr corn NC LICENSE �P-0619 SEAL: ,,L11"111� FcSS/0 J- CFGL "yytT �111111'e 3 I Ij 4 1 c r 1 jGi• 1' f■ Ilia c6 C> C\2 O LZ0 C,' C 0 O U Z � � R QU CY- I = oQ OWNER/DEVELOPER: GLANDON FOREST EQUITY, LLC 3900 Merton Drive Suite 210 Raleigh, NC 27609 919-459-2601 919-459-2604 fx gbarnes@vanguardpg.com REVISIONS: LAYOUT COORD: MET_, PLANNING MGR. A1EL DRAWING BY: +TACT_ DATE: 6,' I JOB NUMBER: 004087 TITLE: CONSTRUCTION DETAILS SHEET NUMBER: C COMMENTS: B 2 1/4" (TYR) 6" DIA, STL CONC, FILLED GATE POST FRAME AND CROSS BRACE METAL GATE FENCING GATE HINGE GATE POST DETAIL 6' DIA. STL CONC. FILLED GATE POST BOLLARDS BOLLARDS A d a L-A DOUBLE DUMPSTER LAYOUT DETAIL CON�PAD DUTY CONCRETE) 4" PRE -CAST CAP BLOCK DUMPSTER - - - - -_-- SCREEN WALL -. #5'S AT 32" ON CENTER VERTICALLY. 8" BLOCK TO -- MATCH BUILDING ELEVATION REFER CONCRETE SUB TO GRADING PLAN NOTE, FoorlNc TO U MATCH BUILDING SEE STRUCTURAL DWGS. (TYP. FTG.) m3 J HANDLE SECTION B-B - CATE / 1 \ DOUBLE DUMPSTER DETAILS G —8 NOT TO SCALE SECTION A -A - WALL SECTION � 1/2" STEEL DROP BARS I" DIA. PVC SLEEVES 6' LONG EL HINGE METAL :;ATE 6" DIA. STL CCNC. FILLED GATE PCST GATE HINGES ANCHORED TO POST AND FASTENED TO DOOR BRACE. 6" DIA STL. CONC. RLLED GATE PEST A B BACKFILL TO TOP OF CURB 12 6" ASPHALT PARKING LOT _ ° a sT U CONCRETE COMPRESSIVE STRENGTH SHALL BE 3600 PSI IN 28. CONFIRM WITH GEOGRAPHICAL LOCATION OF THIS PARTICULAR PROJECT. 2 CURB/GUTTER DETAIL C - 8 NOT TO SCALE 8" BLOCK NOTE: SET BOLLARD INTO CONCRETE FOOTER AS SHOWN. POUR CONCRETE SIDEWALK TO BOLLARD, CONCRETE WASH DOME - PROVIDE SMOOTH, ROUND SURFACE METAL DUMPSTER GATE 4" PIPE - CONCRETE FILLED, REFER TO PLANS FOR SIZE AND LOCATION. PAINT — OSHA SAFETY YELLOW. SLOPE SURFACE AWAY FROM PIPE TO 1/2" PRE -MOLDED EXPANSION JOINT (TYP.) ASHPHALT (OR) CONIC. PAVING —� 6 STOP SIGN DETAIL G— 8 NOT TO SCALE r I - -III _--- STEEL PIPE EMBEDDED IN CONCRETE FOOTING. / 3 \ TYPICAL BOLLARD DETAIL C— B NOT TO SCALE NOTE: 1. WORDS AND ARROWS FOR DRIVEWAYS SHALL BE APPLIED ACCORDING TO REQUIREMENTS AS OUTLINED IN SECTION 3B OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS 2. THESE WORDS AND ARROWS ARE TO BE PAINTED REFLECTIVE WHITE. PAVEMENT MARKINGS NOT TO SCALE 2"x4" STRINGERS TOP, CENTER, & BOTTOM 4"x4" POSTS 6'-0" TO 8'-0" O.C. HINGE 1 "x4" x 5'-0" FENCING 7 WOOD SCREEN FENCE G -8 NOT TO SCALE VOTE - NO GATE IS REQUIRED FOR THIS DEVELOPMENT DUE TO THE SHORT LENCTh DF PROPOSED FENCING, WOOD FENCE NOTES 1) ALL POST AND STRINGERS SHALL BE OSMOSIS TREATED OR PENTA TREATED PINE, TO BE APPROVED BY ENGINEER. 2) ALL FENCE SIDING SHALL BE OSMOSIS TREATED OR PENTA TREATED PINE, TO BE APPROVED BY ENGINEER 3) ALL METAL FASTENERS SUCH AS BOLTS, NAILS, HINGES, HASPS, AND ETC. SHALL BE HOT DIPPED GALVANIZED, 4) FENCE DIRECTION AS NOTED ON PUNS OR AS DIRECTED BY OWNER. 5) SPLICE STRINGERS AT POSTS ONLY. r TRH` SITE DESIGN CONSULTANT: Triangle Site Design, PLLC 4006 Barrett Drive Suite 203 Raleigh, NC 27609 (919)553-6570 mlowderCtrianglesitedesign.com NC LICENSE #P-0619 SEAL: OWNER/DEVELOPER: GLANDON FOREST EQUITY, LLC 3900 Merton Drive Suite 210 Raleigh, NC 27609 919-459-2601 919-459-2604 fx gbarnes@vanguardpg com REVISIONS: LAYOUT COORD: MEL PLANNING MGR. MEL DRAWING BY: LrlEi. DATE: 9/16;14 JOB NUMBER: 00401 TITLE: CONSTRUCTION DETAILS _ SHEET NUMBER: C-8 COMMENTS: of CLASS 1 RIP RAP (SEE SECTION THIRD BASIN BELOW) MAINTEM/ VICE ,;N5PCCT INLET PROTECTON ONCE A WEEK AND AFTER EERY RAINFALL. R� / W / UAM�IAT IM NT FROM EDEL YREMO✓ESED E 0M lHE ROW AREA AND REPA/R THE 0/%ERSION REPAIR HE CHANNEL UN/NG RIP RAP HEADWALL AS NECESSARY PER THE TION �PECU F9ENTS C ECK OUTLETS AN0 _�semN//llllllll!l,'I il� 53W O��H GHED TM MINIMUM 0'" THICK MAKE /MELY REPAIRS AS NEEDED TO I enz sroaAc A Z A10/D 0.'THAT47,01V WHEN THE E AREA ABO/F EYE lllt PROTECTION /5 �SFMANEI T Y STAB/[ PP 0 PEMOVE THE .'RO,ECTION AND F/L AND STAB✓COPF THE CHANNEL TO BLEND WlTfi %HE NATURAL o SURFACE �` PERSPECTIVE VIEW NO SCALE TOP OF SILT FENCE MUST BE AT LEAST 1' SEDIMENT STORAGE ABOVE THE TOP OF AREAS TC BE DISTURBED RIP RAP THE WASHED STONE (CUT, FILL, ETC FLOOD STORAGE ZONE HEADWALL 2 -u INVERT NATURAL GROUND 1 Qw �� 151 _ 3 ____-_ __ FLOW CLASS 1 RIP -RAP MAXIMUM SEDIMENT DEPTH I -1- - `#'5 WASHED STONE (CLEAN OUT POINT) SECTION THRU CATCH BASIN FILTER AND CULVERT PIPE GENERAL NOTES: 1. A STABILIZED PAD OF CRUSHED STONE SHALL BE LOCATED WHERE TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM A PUBLIC STREET. 2. STONE TO BE 2"-3" WASHED STONE 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT FLOW ONTO PUBLIC STREETS OR EXISTING PAVEMENT THIS MAY RE UIRE P RI T P STEEL FENCE PD WIRE FENCE HARDWARE CLOTH NOTES: I. REMOVE SEDIMENT Q E ODC 0 DRESSING WITH ADDITIONAL i x 'vU n' '` r t T �T FILTER OF #57 - FILTER OF 57 J < S STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. \Y �`< FIT AG ,� �� /:• WHEN HALF OF STONE i # y F E ti<T.� r% % WASHED STONE a Ts, WASHED STONE P �`z' r. OUT VER 4. ALL SEDIMENT SPILLED, DROPPED WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY ^;'* Y .>%< LET S CO ED ED ED TWH n > ;, r A ru '�>y .., , x WHEN NECESSARY WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN '"'r\t�.r >> ,xj� 2, REPLACE STONE AS „ °IT,';d * 3' FILTER FABRIC WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN _< >y a�F<'E; .,�`> ��'✓ ''T� - NEEDED TO ENSURE '� " `£"% xj�'vnC �x �':P to vac< �'mo," �ON GROUND APPROVED SEDIMENT BASIN, DEWATERING. 5. FILTER FABRIC SHALL BE MIRAFI 500 OR EQUAL. a y.. } •/`- 'F Sbc 'Y ,-cif%S' 6. ENTRANCE SHALL BE A MINIMUM OF 20' IN WIDTH OR THE WIDTH OF THE EXIT, WHICHEVER IS GREATER. PUMP DISCHARGE HOSE ` < " ^� 100 MIN 12 IN MIN. BURY WIRE FENCE AND HARDWARE CLOTH BOTTOM OF WIRE FENCE AND PUBLIC STREET MULCH, LEAF/WOOD COMPOST, FILTER FABRIC BURIED B" PLAN VIEW WOODCHIPS, SAND, OR STRAW BALES RAp VERTICALLY AND 4" HORIZONTALLY r �,< f �x r X K>: EXISTING GROUND -I z ,N 91 ° JII HL-I " _U1 L. - MAINTENANCE ST SLOPE SECTION VIEW IN EXCAVATED TRENCH 11 ;I E J SOIL STABILIZATION FABRIC CNSPECTCONSTRUCTIONENTRANCE FLOW >c�; 'y,..nk.��,-x '^ �„ '�Yi xT%`%E -' `T, 5%MAX. ,avNTA'ANCENarzs ,T- UNDER WASHED STONE PER/ODICACLY FOR CONDITION OF J' 1 K-j;fi', F'P xk-X J <}r'a %E A RISER OU7LE7S SHALL BE INSPECTED Br Bff EIIANCNaY RESPONSIBLE PARTY OR HIS ACan IMMOAMY SURFACE. TOP -DRESS WITH NEW p ��� 5 , c ,T .i, . �s x AFFER EACH RNNFALL AND AT LEA57 B4/LY OUR/NC PROLONCE'0 RUNFALL ANY REPAIRS NEEDED SHALL BE M40E 4' MIN. -I ,SILT FENCE GRAVEL AS NEEDED. q _ /MMEdA7EZY. NO $SALE FRONT VI W �� STEEL FENCE POST BURY WIRE FENCE, / g \ HORSESHOE INLET PROTECTION MN MAX Ma ART FILTER FABRIC' AND HARDWARE �C-9 NOT TO SCALE 3 SILT FENCE OUTLET ceouND aorH IN TRENCH � C-9 NOT TO SCALE ®. e- c s MACNTENANCE O PE41ODICALL CvfCY THL �DEO - SZ6PES FOP P S,9N0 WA<HFS FILL AREAS 5LIGHTLYA OV ME I SECV VfS 4M7 �. OPI„INA� GRAI., _ Mb!(CH' AS SOON AS P0,PPIPF .- USE DOZER TRACKS TO CREATE GROOVES - P PENDICULAR TO THE 5_OPE. GROOVES II,- CATC-I SEED EPTLIZER, MULCH, R INFALL AND 9_CRES-E SEDIMENT IN RJNOFF MINIMUM 10 GAUGE LINE WIRES z ry -I ICI-UI!-a 111-I IIL_II .I ,I ilti I-,�- 'n- 1�14111 L 4,IK IY'llr_ 2 7HE STONE SHALL BE REPLACED PR0MPRYAETER ANY EVENT THAT HAS CILtiCEO OR REMOVED IT. FILTER BAG CONSTRUCTION SPECIFICATIONS ELEVATION 8 IN MIN. J SEDIMENT DEPoSBS SHOULD BE REMOVED WHEN OEPoS/A RUCK HALF THE HEIGHT OF THE 844R1ER. ANY 1. IGHTLY SEAL SLEEVE AROUND THE PUMP DISCHARGE HOSE WITH A STRAP OR SIMILAR DEVICE. SEDIMENT DEPOSITS REA(4LNIM0 /N PLACE AFTER THE SILT EENCE OU71E7/S REMOVCO SHALL BE ORESSED TO PREPARED AN0 SEEDED. 2. PUCE FILTER 70 OF 71577NG CR40C L1ER BAG ON SUITABLE BASE (E.G., MULCH, IFAF/WOOD COMPOST, WOODCNIPS, SAND, OR STRAW BALES) LOCATED DNA ' LEVEL OR 5% MAXIMUM SLOPING SURFACE. DISCHARGE TO A STABILIZED AREA. EXTEND SASE A MINIMUM OF 12 INCHES FROM EDGES OF BAG. 3. CONTROL PUMPING RATE TO PREVENT EXCESSIVE PRESSURE WITHIN THE FILTER BAG IN ACCORDANCE WITH THE MANUFACTURER 'N UMIZ P RECOMMENDATIONS. AS THE BAG FILLS WITH SEDIMENT, REDUCE PUMPING RATE. INSPECT TEMPORr7RY 01NV?XN DITCH NOTES: 4. REMOVE AND PROPERLY DISPOSE OF FILTER BAG UPON COMPLETION OF PUMPING OPERATIONS OR AFTER BAG HAS REACHED ONCE A WEAK AND AFTER EVERY 1. TEMPORARY DIVERSION DITCH TO BE USED TO INTERCEPT FLOW AND/OR DIVERT TO A m CAPACITY, WHICHEVER OCCURS FIRST. SPREAD THE DEWATERED SEDIMENT FROM THE BAG IN AN APPROVED UPLAND AREA AND RAINFALL /MMSDATRYREMOVE SEDIMENT CONTROL MEASURE OR BMP. d STABILIZE WITH SEED AND MULCH BY THE END OF THE WORK DAY. RESTORE THE SURFACE AREA BENEATH THE BAG TO ORIGINAL SEDIMENT FROM ONE ROW AREA AND 2 SILT SHALL BE REMOVED WHEN DITCH IS ONE-HALF FULL. CONDITION UPON REMOVAL OF THE DEVICE. REPAIR THE LIVERS/ON REPA/R THE 3. DITCH SHALL BE RECONSTRUCTED WHEN DAMAGED BY EQUIPMENT OR COVERED BY 5. USE NONWOVEN GEOTEXTLE WITH DOUBLE STITCHED SEAMS USING HIGH STRENGTH THREAD. SIZE SLEEVE TO ACCOMMODATE A CAMAIVEL LINING AS NECESSARY PER FILL. MAXIMUM 4 INCH DIAMETER PUMP DISCHARGE HOSE. THE BAG MUST BE MANUFACTURED FROM A NONWOVEN GEOTEXTILE IHF MANUFACNRERS /NSTALLAI/ON q STABILIZE DIVERSION DITCH BERM WITH TEMPORARY SEEDING, MULCH WITH SAC, rr 5. REPLACE FILTER BAG IF BAG CLOGS OR HAS RIPS, TEARS, OR PUNCTURES. DURING OPERATOR! KEEP CONNEC➢ON BETWEEN PUMP RfOU/REMENTS. CHECK OU22 IS AND ARID OR EROSION CONTROL NETTING. CONSTRUCTION CTION ENTRANCE HOSE AND FILTER BAG WATER TIGHT. REPLACE BEDDING IF IT BECOMES DISPLACED. MAKE BMQYRMA/R5 AS NEEDED TO / 4 AYB9 CULLY FORAM77ON WHEN THE AREA ABODE 7HE 7EMPoR4PY DIAERS/ON WASTE MATERIAL -COMPACT, L C-9 NOT To SCALE 11 FILTER BAG INCH/SPERMANENTLr5TAB1LIZED, -F SEED & MULCH AFTER �2 MIN NOTE' C-9 NOT TO SCALE 5TA8UOF THE REMOVE THE CHANNEL TOafmo AND RDL NW7M " /LE SCOpF FFF--- vARCONSTRUCTION OF DITCH USE SILT FENCE ONLY WHEN DRAINAGE THE N4ruR4L suREAcf �2 - 10' 12" 6'-0" MAXIMUM AREA DOES NOT EXCEED 1/4 ACRE AND 1 =� SILT FENCE FABRIC r U 1` INSTALLED TO SECOND 4'✓k S ' Nf fh II I t WIRE FROM TOP dl .y I I FRONT VIEW :. MAINTENANCE NOTE5: - FIL ER OUTLETS SHALL BE INSPECTED BY THE FINANCIALLY i P; RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH a NEVER IN AREAS OF CONCENTRATED FLOW. TEMPORARY SEEDING SPECIFICATIONS/SCHEDULE - IjJ =,-- T#" f ov"R2� - - REMOVE SEDIMENT DEPOSITED AS NEEDED Date Type Planting Rate 12 -, - II `_';I TO PROVIDE STORAGE VOLUME FOR THE March - Oct. Browntop Millet 40 Ibs/acre NEXT RAIN AND TO REMOVE PRESSURE Nov. - Feb. Winter Rye 120 Ibs/acre ON THE SILT FENCE. CROSS SECTIONAL VIEW MINIMUM 12-1/2 GAUGE SEEDING SPECIFICATIONS/SCHEDULE �� ( 2 1 TEMPORARY DIVERSION DITCH :GRADE INTERMEDIATE WIRES FOR SHOULDERS, SIDE DITCHES, SLOPES (MAX 3:1) C-9 NOT TO SCALE Date Type Planting Rate STEEL POST Aug IS - Nov 1 Tall Fescue 300 Its acre all WOVEN WIRE FABRIC Nov I - Mar 1 Tall Fescue & Abruzzi Rye 300 Ibs/acre Mar 1 - Apr 15 Tall Fescue 300 as/acre SEEDBED PREPARATION: Apr 14 -Jun 30 Hulled Common Bermuda Grass 25 Ibs/acre 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE, SILT FENCE FABRIC Jul 1 - Aug 15 Tall Fescue & Browntop Millet 240 Ibs/acre-Tall Fescue: 2. RIP THE ENTIRE AREA TO SIX INCHES DEEP, or Sorghum -Sudan Hybrids 35 Its/acre Browntop Millet 30 Ibs/ocre Sorghum -Sudan Hybrids 3. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS, LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. N FILL SLOPE 3 FOR SHOULDERS, SIDE DITCHES, SLOPES 3:1 - 2:1 ( I 4. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE SEEDING MIXTURE), f Date Type Planting Rate TTE-' _ RAINFALL AND AT [FAST GAILY DURING PROLONGED RA/NFALL. Mar 1 - Jun 1 Sericea Lespedeza (scarified) & 50 Ibs/acre (Serica Lespedeza) 5. CONTINUE TILLAGE UNITL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED FOUR TO SIX INCHES DEEP. ANY ITS NEEDED SHALL BE M40E IMMEDIATELY. GRADE Mar 1 - Apr 15 use the following combinations: Add Tall Fescue 240 Ibs/acre 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. STRAW BALE B!NDER WIRE 2. THE STONE SHALL BE REPLACED PROMPTLY AFTER ANY EVENT STAPLES - -_ "-�12" Mar 1 - Jun 30 Or add Julled Common 25 Ibs/acre (2 PER BALE) THAT HAS CLOGGED OR REMOVED /L MIN. ANCHOR Bermuda Grass 7, MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 10 mil PLASTIC LINING _:I ., SKIRT Jun 1 - Sep 1 Toll Fescue. & Browntop Millet 240 Ibs/acre Tall Fescue PLYWOOD 48"X24' J SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS F !- "� or Sar hum -Sudan H bnds 9 X 35 Ibs acre Brownto Millet l p B. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND NATIVE MATERIAL BLACK LETTERS (OPTIONAL) PAINTED WHITE 6' HEIGHT REACH 6INCHES ANY SEDIMENT DEPOSITS REMAINING IN BOTTOM OF WIRE FENCE AND �t`._ 30 Ibs/acre Sorghum -Sudan Hybrids SHOULD BE MORE THAN 60% DAMAGED, RE-ESTABLISH FOLLOWING THE ORIGINAL LIME, FERTILIZER AND SEEDING RATES. PLACE AFTER THE SILT FENCE OUTLET lS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE PREPARED _ FILTER FABRIC BURIED 8" Sep 1 - Mar 1 Sericea Lespedeza (Unhulled- Unscarafied & Toll Fescue 70 Ibs/ocre Sericea Lespedeza 240 as/acre Tall Fescue 9. CONSULT S&EC ENVIRONMENTAL ENGINEERS ON MAINTENANCE TREATMENT AND FERTIUZATION AFTER PERMANENT COVER IS ESTABLISHED. 7 C-9 DEWATERING !/// \ SLOPE TRACKING DETAIL' WOOD OR METAL STAKES (2 PER BALE) CONCRETE WASH AREA NOTES: 1. ACTUAL LAYOUT TO BE DETERMINED SECTION B-B NOT TO SCALE 10' MINIMUM 36' 'I= € CONCRETE WASHOUT AND SEEDED. LAG SCREWS 5 SILT FENCE WOOD POST C - 9 NOT TO SCALE 3.5"X3.5'X8' LIT - VERTICALLY AND 4 HORIZONTALLY Nov 1 - Mar 1 Add Abruzzi Rye 25 Ibs/acre IN EXCAVATED TRENCH CONSULT S&EC ENGINEER FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED SIDE VIEW AREAS. THE ABOVE VEGETATION RATES ARE THOSE THAT DO WELL UNDER LOCAL CONDITIONS; OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. ••• TEMPORARY: RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW MORE THAN 12" IN HEIGHT BEFORE MOWING; OTHERWISE, FESCUE MAY BE SHADED OUT. SEEDING MIXTURE: 2 TONS/ACRE (3 TONS/ACRE IN CLAY SOILS) 1,000 LBS/ACRE - 10-10-10 500 LBS/ACRE - 20% ANALYSIS 2 TONS/ACRE -SMALL GRAIN STRAW ASPHALT EMULSION AT 400 GALS/ACRE NOT TO SCALE /-CONCRETE BLOCK AGRICULTURE LIMESTONE: FERTILIZER: SUPERPHOSPHATE: MULCH: ANCHOR: -III[= E IN THE FIELD. 1 *"^` -- 2. A CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30' OF THE va. -""�� TEMPORARY CONCRETE WASHOUT FACILITY. B �- �.-'"• �� 3. MATERIALS USED TO CONSTRUCT '-� TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE REMOVED FROM --�- THE SITE OF THE WORK AND VARIES DISPOSED OF OR RECYCLED. 4. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY 21 SLOPE, GRAVEL FILTER THE REMOVAL OF THE TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE BACKFILLED, REPAIRED, WIRE SCREEN AND STABILIZED TO PREVENT TEMPORARY SEDIMENT POOL EROSION, if 11 1� 36' B � CONCRETE WASHOUT SIGN DETAIL (OR EQUIVALENT) �I �2„ 8" 12" DIA STEEL WIRE DEWATERING 10 mil PLASTIC LINING STAPLE STRAW BALE DETAIL 16"MIN"Er , x FIR,' 1G PLAN NOT TO SCALE TYP ( ) 2'MAX,e, C - A.: i„'ce ltA.�:. „= L L r= coNs RucnoN SPECIFICATIONS 10 CONCRETE WASH AREA 1, LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS I SEDIMENT I SIDE ON THE BOTTOM ROW TO ALLOW POOL DRAINAGE THE \ 1.-9 / NOT TO SCALE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCH BELOW THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF THE BLOCK AGAINST THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW MAINTENANCE 5POPOTGOARONS OCCURS. IF NEEDED, GIVE LATERAL SUPPORT TO SUBSEQUENT INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT ROWS BY PLACING 2x4 WOOD STUDS THROUGH BLOCK OPENINGS. OFINCH AS 6OROTf RAINFALL EVENT CLEAR THE MESH WIROW 2 CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE WIRE MESH OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS TAKE CARE NOT TO DAMAGE OR WITH 1/2-INCH OPENING OVER ALL BLOCK OPENING TO HOLD UNDERCU THE WIRE ME5H OURAIC SEDIMENT REMO'/AL REPS CE GRAVEL IN PLACE. STONE AS NEEDED. 3. USE CLEAN GRAVEL,3/4-TO 1/2-INCH IN DIAMETER, PLACED 2 INCHES BELOW THE TOP OF THE BLOCK ON A 2:1 SLOPE OR FLATTER AND SMOOTH IT TO AN EVEN GRADE. DOT #57 WASHED STONE IS RECOMMENDED. 1 TEMPORARY INLET PROTECTION NOT TO SCALE HUB END ON OUTLET B END SECTIONS. SPIGOT END ON INLET END .T NATURAL GRADE SECTIONS. E 1 2 RIP -RAP 2 D P STEEL BACK ROD 4" 5 WA N SHEDS 0 E AB PLAN :' MIN. LAYER OF FILTER FABRIC NOTES RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2.1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIP -RAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. MAXIMUM TAPER TO RECEIVING CHANNEL 5.1. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. ALL SUBGRADE STRUCTURE TO BE COMPACTED TO 95% OR GREATER. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. MAINTENANCE' INSPECT RIP -RAP APRON AT REGULAR INTERVALS AS WELL AS AFTER MAJOR RAINS AND MAKE REPAIRS PROMPTLY GLUE SPECIAL ATTENTION TO /FIE POINT WHERE CONCENTRATED STORM 9 RIP -RAP APRON WATER FROM DRAINAGE PIPE SYSTEMS ENTER THE APRON CAREFULLY CHECK 5TASIL17Y OF RIPRAPAND LOOK FOR C-9 NOT TO SCALE 1NOIC47DONS OF P✓RIFN SCOUR HOLES, OR BANK FAILURES MAKE REPAIRS IMMEDIATELY Rip -Rap Aprori DIMENSIONS ENTRY WIDTH 3.8 FF LENGTH 7.5 FT EXIT WIDTH 8.8 FT MIN. THICKNESS 22 IN MIN. STONE DIAMETER 6 IN STONE CLASS B Rip -Rap Apron#2 DIMENSIONS ENTRY WIDTH 3.8 FT LENGTH 7.5 FT EXIT WIDTH 8.8 FF MIN. THICKNESS 22 IN MIN. STONE DIAMETER 6 IN STONE CLASS B Rip -Rap Aprerl DIMENSIONS ENTRY WIDTH 3.8 FT LENGTH 7.5 FT EXIT WIDTH 8.8 FF MIN. THICKNESS 22 IN MIN. STONE DIAMETER 6 IN STONE CLASS B Rip -Rap Apron#4 DIMENSIONS ENTRY WIDTH 3.8 FT LENGTH 7.5 FIF IXIT WIDTH 8.8 FF MIN. THICKNESS 22 IN MIN. STONE DIAMETER 6 IN STONE CLASS B Rip -Rap Apron#5 DIMENSIONS ENTRY WIDTH 3.8 ET LENGTH 7.5 FT EXIT WIDTH 8.8 FT MIN. THICKNESS 22 IN MIN. STONE DIAMETER 6 IN STONE CLASS B SEDIMENT BASIN REQUIREMENTS. SEDIMENT BASINS AND TRAPS SHALL MEET THE FOLLOWING REQUIREMENTS: A) OUTLET STRUCTURES SHALL BE UTILIZED THAT WITHDAW WATER FROM THE SURFACE. B) FOR BASINS OR TRAPS THAT HAVE A DRAINAGE AREA OF LESS THAN 1,0 ACRE, DRAW -DOWN DESIGNS SPECIFIED IN THE DIV19ON OF LAND RESOURCES OR DELEGATED LOCAL PROGRAM REQUIREMENTS ARE ACCEPTABLE, C) CHEMICAL TREATMENT: 1) ALL TREATMENT CHEMICALS MUST BE STORED IN LEAK -PROOF CONTAINERS THAT ARE KEPT UNDER STORM -RESISTANT COVER OR SURROUNDED BY SECONDARY CONTAINMENT STRUCTURES DESIGNED TO PROTECT ADJACENT SURFACE WATERS. 2) ALL TREATMENT CHEMICALS MUST BE USED IN ACCORDANCE WITH DOSING SPECIFICATIONS AND APPLICATION RATES PROVIDED BY THE MANUFACTURER, SUPPLIER AND AS SPECIFIED BY THE DIVISION OF WATER QUALITY. 3) THE PERMITTER MUST ONLY USE CHEMICALS THAT HAVE BEEN APPROVED BY THE NC DIVISION OF WATER QUALITY AND POSTED ON THEIR "NORTH CAROLINA DIVISION OF WATER QUALITY APPROVED PAMS ILOCCWLANT T" FOUND N THEIR / S LIST" 0 E WEB SITE AT: http://portaLncdenr.org/web/wq/ws/su, 4) THE PERMITTED MUST ROUTE STORMWATER TREATED WITH POLYMERS, FLOCCULANTS, OR OTHER TREATMENT CHEMICALS THROUGH SEDIMENT TRAPPING, FILTERING, AND/OR SETTLING DEVICES(S) TO ENSURE ADEQUATE REMOVAL OF SEDIMENT FLOCCULENT PRIOR TO DISCHARGE TO SURFACE WATERS. Of DISCHARGE REQUIREMENT - DISCHARGES MUST MEET THE STATUTORY REQUIREMENTS OF THE SEDIMENT POLLUTION CONTROL ACT AND UTILIZE THE PROVISIONS OF SECTION 6.74 OF THE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL TO ASSURE THAT BUFFERS AND VEGETATED AREAS WILL BE USED TO REDUCE THE POTENTIAL FOR VISIBLE SILTATION OUTSIDE OF THE 25% BUFFER ZONE NEAREST THE LAND -DISTURBING ACTIVITY. IPB1iAAINIV� PVC TEE END VIEW ARM ASSEMBLY PERSPECTIVE VIEW PVC ELBOW n WATER SURFACE - PVC END CAP PVC PIPE SCHEDULE 40 1/2- DERSIIDE$ IN PVC PIPE FLEXIBLE FRONT VIEW VENT PIPE SKIMMER CONTACT INFORMATION J.W. FAIRCLOTH & SONS, INC. P.O. BOX 757 HILLSBOROUGH, NO 27278 919-732-1244 919-732-1266 FX - "C" ENCLOSURE WATER ENTRY UNIT PVC TEE SCHEDULE 40 PVC PIPE ORIFICE PLATE SKIMMERS SHALL BE FAIRCLOTH SKIMMERS Skimmer Basin SURFACE AREA REQUIRED 1,170 SF SURFACE AREA PROVIDED 1,320 SF VOLUME REQUIRED 1,800 CF VOLUME PROVIDED 2,048 CIF STORAGE DEPTH 2.0 FT STORAGE ELEVATION 60 x 22 FT 444.00 TOP OF DAM 68 x 30 FT 446.00 EMGY. SPILLWAY LENGTH 10 FT 444.50 BOTTOM OF BASIN 52 x 14 FT 442.00 SKIMMER SIZE 1.5 IN SKIMMER ORIFICE DIAMETER 1 1.0 IN SKIMMER ORIFICE RADIUS 0.5 IN INFLOW STRUCTURE DEWATERING ZONE - FILTER FABRIC DATA BLOCK AREA SURFACE SPILLWAY CROSS-SECTION VIEW SEDIMENT STORAGE ZONE I' FREED 6" MAX. DEPTH OF FLOW OVER EMERGENCY SPILLWAY BASIN DRAINAGE (ACRES) DENUDED ACRES) Qo BASIN VOLUMEWEE A A AREA DEPTHN(FT.) H/2 (FEET) (FEET) (FEET) (FEET) (FEET) (CUBIC FT.) (CUBIC FT. S FT. $Q ET. BASIN 1.0 1.0 d6 1800 204E - 1170 1320 1.0 2.0 4.0 10 1.5 50 W=5' MIN. EMBANKMENT j T=1.5' MIN. III EMERGENCY SPILLWAY ANTI -SEEP COLLAR [ENT GENCY WAY REFER TO DETAILS NOTES: SCHEDULE 40 FOR SKIMMER SIZE 1. BAFFLE MATERIAL SHOULD BE SECURED AT THE BOTTOM AND SIDES COUPLING CONNECTION REQUIREMENTS USING STAPLES OR BY TRENCHING AS FOR SILT FENCE. CONSTRUCTION SPECIFICATIONS: 2. MOST OF THE SEDIMENT WILL ACCUMULATE IN THE 1ST BAY, 1. CLEAR, GRUB, AND STRIP THE AREA UNDER THE EMBANKMENT OF ALL VEGETATION AND ROOT MAT. REMOVE ALL SURFACE SOIL STANDARD SKIMMER DETAIL WHICH SHOULD BE READILY ACCESSIBLE FOR MAINTENANCE. CONTAINING HIGH AMOUNTS OF ORGANIC MATTER, AND STOCKPILE OR DISPOSE OF IT PROPERLY. HAUL ALL OBJECTIONABLE MATERIAL 3. PROVIDE 3 BAFFLES (USE TWO IF LESS THAN 20 FEET IN LENGTH). PROVIDE TO THE DESIGNATED DISPOSAL AREA. SUPPORT POST 5 BAFFLES FOR DRAINAGE AREAS GREATER THAN 10 ACRES. 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS WOODY VEGETATION ORGANIC MATTER AND OTHER SUPPORT ROPE 4. TO WIRE TO 24'" INTRO BOTTOM BAFFLE SHALL BE 70D G M2 COIR EROSION BLANKET. / OBJECTIONABLE MATERIAL. PLACE THE FILL IN LIFT$ NOT TO EXCEED 9 INCHES. AND MACHINE COMPACT IT. OVER FILL THE BAFFLE MAINTENANCE PREVENT SAGGING OR SIDE STAKE TO 5. SUPPORT WIRE TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE TOP OF THE BERMS EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT. INSPECT BAFFLES AT LEAST ONE A WEEK AND AFTER FENCE AND FABRIC 6. INSPECT BAFFLES FOR REPAIR ONCE A WEEK AND AFTER EACH RAINFALL S 3. CONSTRUCT THE OUTLET SECTION IN THE EMBANKMENT. PROTECT THE CONNECTION BETWEEN THE RIP -RAP AND THE SOIL FROM EACH R4/NFALL. MAKE ANY REQUIRED REPAIRS BURIED IN TRENCH PIPING BY USING FILTER FABRIC OR KEYWAY CUTOFF TRENCH BETWEEN THE RIP -RAP STRUCTURE AND SOIL IMMEDIATELY r--STEEL POST - PLACE THE FILTER FABRIC BETWEEN THE RIP -RAP AND THE SOIL, EXTEND THE FABRIC ACROSS THE SPILLWAY FOUNDATION AND SIDES TO THE TOP OF THE DAM; OR BE SURE TO MAINTAIN ACCESS TO THE BAFFLES 6"X6' TRENCH �I , yw, �' �I I''• - EXCAVATE A KEYWAY TRENCH ALONG THE CENTER LINE OF THE SPILLWAY FOUNDATION EXTENDING UP THE SIDES TO THE HEIGHT OF SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, BACKFILLED AND 1 Ij�df!{I,�I��1�� r °�, .� T'IIL Y ��_ THE DAM. THE TRENCH SHOULD BE AT LEAST 2 FEET DEEP AND 2 FEET WIDE WITH 1:1 SIDE SLOPES. DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT COMPACTED i� - _ - - _ ----_ __� _� _ 4. CLEAR THE POND AREA BELOW THE ELEVATION OF THE CREST OF THE SPILLWAY TO FACILITATE SEDIMENT CLEANOUT. PROMPTLY. COIR MESH OR SIMILAR, STAPLED OR _ _ _�-_' - =_- 5. ALL CUT AND FILL SLOPES SHOULD BE 2:1 OR FATTER. TRENCHED INTO BOTTOM OR SIDE SECTION VIEW AT OPENING _--- = 6. ENSURE THAT THE STONE (DRAINAGE) SECTION OF THE EMBANKMENT HAS A MINIMUM BOTTOM WIDTH OF 3 FEET AND A MAXIMUM SIDE REMOVE SED/MENT DEPOSITS WHEN IT REACHES FlA F L _ _ _ _ = - - - -- - - - - - - SLOPE OF 1:1 THAT EXTENDS TO THE BOTTOM OF THE SPILLWAY SECTION. FULL TO PROD/DE ADEQUATE STORAGE ✓OLUME FOR CROSS SECTION -_ _ -_ _ -_ -_ _- _ _ - _ _ _ _ __ - _ = 7. CONSTRUCT THE MINIMUM FINISHED STONE SPILLWAY BOTTOM WIDTH, AS SHOWN ON THE PLANS, WITH 2:I SIDE SLOPES EXTENDING TO THE NEXT RAIN AND TO REDUCE PRESSURE ON THE - - - - THE TOP OF THE OVER FILLED EMBANKMENT. KEEP THE THICKNESS OF THE SIDES OF THE SPILLWAY OUTLET STRUCTURE AT A BAFFLES TAKE CARE TO AVOID DAMAG/TUG THE TO/T. SKIMMER B4.S/N MAINTENANCE _ -- MINIMUM OF 21 INCHES. THE WEIR MUST BE LEVEL AND CONSTRUCTED TO GRADE TO ASSURE DESIGN CAPACITY. BAFFLES DURING C4AE SEDIMENT DEPTH INSPECT SKIMMER SEDIMENT Ei4SlN AT CEAS7 WEEKLY AN? AFTER EACH SIGNIFICANT (ONE-HALF INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDG4TEC Y. _ _ _ - - - -_ = er T, _ _ _ - _ 8. MATERIAL USED IN THE STONE SECTION SHOULD BE A WELL -GRADED MIXTURE OF STONE WITH A D50 SIZE OF 9 INCHES (CLASS B SHOULD NEVER EXCEED HALF THE DESIGNED REAfOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE XIEICHT OF THE FIRST BAFFLE PULL = - _ = -�'-3 '- _ _ = CONTROL STONE IS RECOMMENDED) AND A MAXIMUM STONE SIZE OF 14 INCHES. THE STONE MAY BE MACHINE PLACED AND THE STORAGE DEPTH THE SKIMMER TO ONE SIDE SO T1147 THE SEDIMENT UNO£RNFATH IT CAN BE EXCAVATED EXCAVATE THE SEDIMENT FROM THE ENTIRE &1SlN, NOT ✓UST AROUND _ _ _ _ __ --= _ _ _ -i IA SMALLER STONES WORKED INTO THE VOIDS OF THE LARGER STONES. THE STONE SHOULD BE HARD, ANGULAR, AND HIGHLY THE SKIMMER OR THE FIRST CELL. MAKE SURE VEGETATION GROWING /N THE BOTTOM OF THE 645IN DOES NOT HOLD 012W1 THE SKIMMER _ _ _ _ _ WEATHER -RESISTANT. AFTER THE CON791BU71NG DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ADS BAFFLE 9DISCHARGE INLET WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION, USE TEMPORARY SLOPE DRAINS OR DIVERSIONS WITH , - MATERIALS AND UNSTABLE SEDIMENT DEPoS/75, REPAIR THE BAFFLES IF THEY ARE DAMAGED RE -ANCHOR THE BAFFLES IF WAT R lS FLOWINC UND UNDERNEATH OR AROUND THEM E OUTLET PROTECTION TO DIVERT SEDIMENT -LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY. BRING THE AREA TO GRADE, AND STABILIZE IT. 10. ENSURE THAT THE STONE SPILLWAY OUTLET SECTION EXTENDS DOWNSTREAM PAST THE TOE OF THE EMBANKMENT UNTIL STABLE /F THE SKIMMER 15' CLOGGED WITH TRASH AND THERE lS WATER IN THE 9ASIN, USUALLY JERKING ON THE ROPE WILL MAKE THE SKIMMER BOB UP ANO DOWN AND INLET ZONE 1sl Cell 2ntl Cell OUTLET ZONE CONDITIONS ARE REACHED AND OUTLET VELOCITY IS ACCEPTABLE FOR THE RECEIVING STREAM KEEP THE EDGES OF THE STONE I 0/2006E THE DEBRIS AND RESTORE FZOW, lF THIS DOES NOT WORK, PULL THE SKIMMER OVER TO THE SIDE OF THE BASIN ANO REMOVE THE DEBRIS ALSO 25% of 25% of basin 25% of basin 25% of OUTLET SECTION FLUSH WITH THE SURROUNDING GROUND, AND SHAPE THE CENTER TO CONFINE THE OUTFLOW STREAM. CHECK THE ORIFICE INSUC THE SKIMMER TO SEE IF IT lS CLOGGED,/F 50 REMOVE THE DEBRIS. basin surface area surface area surface crop basin surface area 11. DIRECT EMERGENCY BYPASS TO NATURAL, STABLE AREAS. LOCATE BYPASS OUTLETS SO THAT FLOW WILL NOT DAMAGE THE EMBANKMENT, IF THE SKIMMER ARM OR BARREL PIPE lS CLOGGED, THE 0RIRCE CAN BE REMOVED AND THE OBSTRUCTION CCFARED W/7H A PLUMBERS SNAKE OR BY FLUSHING 12. STABILIZE THE EMBANKMENT AND ALL DISTURBED AREAS ABOVE THE SEDIMENT POOL AND DOWNSTREAM FROM THE TRAP IMMEDIATELY WITH WATER BE SURE AND REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER PLAN VIEW AFTER CONSTRUCTION. '.. 13. SHOW THE DISTANCE FROM THE TOP OF THE SPILLWAY TO THE SEDIMENT CLEANOUT LEVEL G THE DESIGN DEPTH) ON THE PLANS CHECK THE FABRIC CINEO SPILLWAY FOR DAMAGE AND MAKE ANY REOUIREO REPAIRS WITH FABRIC THAT SPANS THE FULL WON OF THE SPILLWAY. CHECK THE AND MARK IT IN THE FIELD. 1 SKIMMER BASINS EM&WKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS 14, INSTALL POROUS BAFFLES AS SPECIFIED IN PRACTICE 6.65, POROUS BAFFLES. j IMMEDIATELY REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL Al C-9 NOT TO SCALE EREEZING WEATHER CAN RESULT /N ICE FORMING /N THE 84SIN SOME SPECIAL PRECAUTIONS SHOULD BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH lC£ J 6' ! �TRIANGLF�. SI T E DE..IL CONSULTANT: Triangle Site Design, PLLC 4006 Barrett Drive Suite 203 Raleigh, NC 27609 (919)553-6570 mlowder@trianglesitedesign.com NC LICENSE #P-0619 { SEAL: A•......PrPeee O �rC v 'u; •G c l . P" 24434 Q-: �e9j, L F`F ADDt•: •arrrr..�`j W O S-. U CS2 _4 0 >> TS 0 0 t~ C E J U CZ OWNER/DEVELOPER: { GLANDON FOREST EQUITY, LLC 3900 Merton Drive ! Suite 210 j Raleigh, NC 27609 919-459-2601 919-459-2604 fx i gbarnes(@vanguardpg,corn REVISIONS: LAYOUT COORD: NIEL PLANNING MGR. MF1, DRAWING BY: MEL DATE: 91/16/ 14 JOB NUMBER: 004067 TITLE: EROSION CONTROL DETA LS SHEET NUMBER: U9 COMMENTS: PVFr eene , Potential Drc Lem: How I will renrediate the problem .The entire ME Trash/debris is present Remove the trash/debris The perimeter of the bio-relenCion cell Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed remove the gully, and then plant aground cover and water until it 1 is established. Provide lime and a one-time fertilizer application Maintain vegetation of a height of approximately six inches. The Inlet device- pipe, stone verge or The pipe Is clogged. Unclog the pipe. Dispose of the Swale sediment off -site. Replace the pipe. The pipe is cracked or otherwise dame ed Erosion is occurring In the Regrade the swale If necessary swale to smooth It over and provide erosion control devices such as reinforced turf matting or riprop to avoid future problems with I erosion. stone is clogged or covered Remove sediment and clogged stone In sedln-ent and replace with clean stone. Thep Leatment are, Flow is oyrosIeng pretreatment Re -grade if necessary to route all area and/or gullies have formed flow to the pretreament area. Res(abilize the area after grading. Sediment has accumulated to a Search for the source of the sediment depth greater than three Inches and remedy the problem If possible. Remove the sediment and restobilize the pretreatment area. Erosion has secured Provide additional erosion protection such as reinforced turf matting or I rip-rop if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by here. �re a rcertorr cell- Best professional practices Prune according to best r gets on show that pruning is needed professional practices maintain optmal D'ont ecith. iLr ants -:e dead diseased o• the source of the (Determine sting, problem sells, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessar . -red stoves wires ore present six Remove tree stakes wires which can months after planting. kill the tree if not removed) f_- Ire so -retention cell Mulch is breaking down or has Sea,, mulch If there are only random void ,soils and mulch floated away. areos. Replace whole mulch layer if necessary. Remove the remaining mulch and replace with triple stressed hard wood mulch at a maximum depth of three inches. Sods and/or mulch ore cloaaed :Determine the extend of the clogging. with sedFnenl Remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in on appropriate off -site location. Use triple shredded hard wood mulch of a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that pH has Dolomitic lime shall be applied as dropped or heavy metals hove accumulated recommended per the soil test and in the soil media (axle soils shall be removed, disposed of properly and replaced with new planting material. The underdrain system Clogging has occurred. Wash out the underdrain system The drop inlet Clogging has occured Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged. Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the local NO Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at L 919-733-1786. BIO-RETENTION SOIL MIXTURE GEM PERCENT BY VOLUME MATERIAL SAND 85%-88% CONSTRUCTION SAND FINES i 8%-12% SILT ORGANIC MATTER 3%-5% COMPOST/PEAT MOSS PERMEABILITY THE PERMEABILITY SHOULD FALL BETWEEN 1 AND 6 INCHES PER HOUR, AND 1-2 INCHES PER HOUR IS PREFERRED. PHOSPHOROUS INDEX RANGE BETWEEN 10 AND 30 (CONFIRM WITH SOIL ANALYSIS REPORT FROM NCDA LAB) GRASS SOD NOTE: GRASS SOD SHALL BE EITHER HYBRID BERMUDA GRASS OR CENTIPEDE THAT HAS BEEN GROWN IN A SOIL THAT IS FREE OF AN IMPERMEABLE LAYER (SUCH AS CLAY), BIO-RETENTION SOIL MIXTURE: Bio-Perenhon Soil Mixture (BSM): shall be placed and graded using low ground-contocf pressure equipment or by excavators and/or backhoes on ground adjacent to the bio-retention facility No heavy equipment shall be used within the perimeter of the bio-retention operating o e g ou dl y yp facility before, rim or after the placement of the BSM. The BSM shall be laced in horizontal layers not to exceed 12 inches for the ac y be o e, during, p p y entire area of the bio-retention facility. The HEM shall be compacted by saturating the entire area of the bio-retention facility after each lift of BSM is placed until water flows from the under -drain. Water for saturation shall be applied by spraying or sprinkling. An appropriate n r device shall used to treat an edim nt-laden water discharged from the under -drain. If the SM becomes sediment control de ce s a be s e B 9 in - rim hconstruction of the focilit the on minuted material shall be removed and replaced with uncontaminated material ❑ contarr at�d during the y, e c tou t t h Administration. Final r in f the BSM shall beperformed alt r a 4-hour r settling period. Finalelevationsh II no additional cost totegrading o e 2 u e g p od shall he within 2 inches of elevations shown on the Contract Plans. The Bio-retention Soil Mixture (BSM) shall be a uniform mix, free of stones, stumps, roots or other similar objects larger than two inches. No other materials or substances shall be mixed or dumped within the bio-retention area that may be harmful to plant growth, or prove a hindrance to the planting or maintenance operations. Prior to placing the under -drain and the BSM, the bottom of the excavation shall be roto-tilled to a minimum depth of 6 inches to alleviate any compaction of the facility bottom. Any substitute method for rolo-tilling must be approved by the Engineer prior to use. Any ponded water shell be removed from the bottom of the facility and the soil sholl be friable before rolo-tilling. Once the BSM has been placed the entire go -retention area shall be sodded with grass that has been grown in sandy soils or that has the roots washed clean of any clay or other materials that could clog the function of the bio-retention system. OPERATION AND MAINTENANCE North Caroline storm water rules require annual inspections by the regulating agency of bio-retention areas as a minimum. More frequent Inspections by the land owner or system operator are strongly encouraged to ensure the proper operation of bio-retention areas. A Rainfall Event 1. Inspect the basin after every runoff -producing rainfall event- no- B s e Ir cti n o, o P 1. Inspect the basin month) Check top DIo re,en(n soon area sIapes,- remove fresh and repair eroded areas before the next rainfall event. 3 Check the vegetative and rock filters for sediment accumulation, erosion and proper operation of the flow spreader mechanism and r air as necessary. repair C Ouorterly Inspection 1. Inspect the collection system (i.e. catch basin, pipes and grass swales) for proper functioning. Clear accumulated trash from busin grates ans begin bottoms Check p ping for obstructions 2. Check pond Inlet pipes for undercutting, replace rip -rap and repair broken pipes. 3. Reseed grossed awaits, including the vegetated filter if applicable, twice a year as necessary. Repair eroded areas immediately. D. Six Month Inspection 1. Remove accumulated sediment from the bottom of the outlet structure or other areas where accumulated sediment is noted. 2. Inspect the embankment taking note of any wet areas where water may be seeping through the soil. E. General Inspection L Maximum gross height is to be bin. S 9 9 2. No wood vegetation shall be allowed to row in the bin -retention area. Y 9 9 3. Debris shall be removed from blockingthe inlet and outlet structures and from areas of potential clogging. P 4 Periodic removal of dead vegetation shall be accompilshed. S All components of the leo-retention sYatem inust be kept in good working order BIO-RETENTION DETAILS N.T S. OVERFLOW OUTLET STRUCTURE. REFE: -0 CHART & DETAIL FOR STRUCTURE LENGTH VARIES -SEE PLANS ELEVATIONS & DIMENSIONS SHAPE OF 810-RETENTION AREA MAY BE IRREGULAR OUTLET PIPE .. _ . REFER TO GRADING PLAN - - CLEANOUT CLEANOUT , - - - CLEANOUT WITH THREADED LID o a e t e� o e� vast-o sae o o� o _ (AT 100 FEET MAX. HORIZ. SPACING) TOP OF EMBANKMENT EN1 REFER TO CHART FOR ELEVATION TOP OF EMBANKMENT ELEVATION = 446.D 2s FAR STORM ELEVATION = 445,87 IC YEAR STORM ELEVATION= 445.69 2 'EAR STORM ELEVATION - 445.14 SPILLWAY ELEVATION = 445.0 1 YEAR STORM ELEVATION = 444.87 1" STORM ELEVATION = 444.11 FILTER BED ELEVATION = 444.0 6° SCHEDULE 40 PVC, SDR35, OR SMOOTH WALL CORRUGATED PLASTIC PIPE WITH 3/8" GRASS SOD CLEANOUT WITH THREADED LID pERFERATI0N5 ® 6" ON CENTER (4 HOLES I10-RETENT10N AREA (AT 100 FEET MAX. HORIZ. (BERMUDA SOD) SPACING) PER ROW) PLAN VIEW REMOVABLE TRASH RACK BERMUDA SOD WITH 6" OPENING FROM }" ALUM( BARS. ANCHOR TO RISER PRECAST OUTLET STRUCTURE WITH STEPS v SOIL MIXTURE 4' WASHED SAND BO-OM OF SOIL MIXTURE = 442.0 1 PIPE DEPTH i I 1 < �, - - __ _ FILTER FABRIC AROUND VARIES F BOTTOM OF GRAVEL/UNDERDRAIN = 441.0 _______ '`r UNDERDRAIN GRAVEL BED (TOP, BOTTOM AND SIDES, TYP.) (NON -WOVEN GEOTEXTILE FABRIC EXISTING SURFACE ELEVEVATION=444.0 REFER TO PLAN VIEW WITH MIN. PERMITTIVITY RATE OF SEASONAL HIGH WATER TABLE DEPTH>5FT FOR INVERT ELEVATIONS 75 GAL/MIN/FT2) SEASONAL HIGH WATER TABLE ELEVATION=439 0 8°(MIN) UNDERDRAIN GRAVEL BED (I WASHED STONE) BID -RETENTION CONTROL STRUCTURE Top OF S7RUCTURF 445E W El R fL�'ATjON ` 4¢5.0 15. OUTLET PIPE /NV, 44/0 '""" "'"'( NOT SHOWN y OUTLET CONTROL STRUCTURE SCALE: N.T.S. CAP z Ew�N�01�.%66616 v7 w �a 6" SCHEDULE 40PV C OX' SDR35, OR SMOOTH BID -RETENTION / WALL CORRUGATED a SOIL MIXTURE PLASTIC PIPE (SOLID) Co CONNECTION WASHED SAND TO UNDERDRAIN PIPE UNDISTURBED SUBSOIL UNDERDRAIN GRAVEL CLEANOUT BED (#57 WASHED STONE) BIO-RETENTION CONSTRUCTION SEQUENCE: NOTE. Step 1. Construction of the biorelenlion area may only begin after the contributing drainage area has been A PERMEABILITY SOIL REPORT SHALL BE stabilized. It may be necessary to block certain curb or other inlets while the bioretention area is in stab y ry being PROVIDED AFTER BID-ftETEN710N SOIL The proposed site should be checked far existing utilities nor t anexcavation, constructed.e p opo O d c ec d e g D o y MIXTURE 15 IN PUCE - REFER TO STORMWATER MANAGEMENT NOTES FOR Step 2. Temporary E&S controls are needed during construction of the bioretention area to divert slormwater REQUIREMENTS. erosion control measures r place until away from the bioretention area until If is completed. Mailomeasures biorelenlion area has been completed. Special protection measures such as erosion control fabrics may be needed to protect vulnerable side slopes from erosion during the construction process. Step 3 Excavators or backhoes should work from the sides to excavate the Morel ntion area to is appropriate pri ateNOTES: design depth and dimensions. Excavating equipmentshould have scoops with adequate reach so they do not I. ALL BID -RETENTION SHALL HAVE AN ACCESS EASEMENT have to sit inside the footprint of the bioretention area. Contractors should use a cell construction approach in CONNECTING TO A DEDICATED PUBLIC RIGHT OF WAY. larger bioretention basins, whereby the basin is split into 5DO to 1,000 sq. ft. temporary cells with a 10-15 foot earth bridge in between, so that cells can be excavated from the side. 2. ALL DRAINAGE AREAS TO A 610-RETENTION N FACILITY ARE 0 CL E TO BE STABILIZED PRIOR i0 INSTALLATION OF SOILS OR Step 4. It may be necessary to rip the bottom soils to o depth of 6 to 12 inches to promote greater GRASS SOD. infiltration. 3. WRAP PERFORATED NDER RAIN WITH FILTER F I U DFABRIC Ste 5. Place eotextile fabric on the sides of the bioretention area with a 6-inch overlapon the sides. Place p 9 PRIOR TO BACKFlWNG, the appropriate depth of stone on the bottom, install the perforated underdrain pipe, place stone above the underdrain pipe, and odd sand layer between the underdrain and the soil media layer 4. UNDERDRAIN PIP H HAVE ° PERFORATIONS E S QUID VE SPACED A7 6" CENTERS, MIN. 4 HOLES PER ROW. MAX HOLES Step 6. Deliver the soil media from on approved vendor, and store it on an adjacent impervious area or plastic SPACING OF UNDERDRAIN PIPE IS IO FEET ON CENTER. sheeting. Apply the media in 12-inch lifts until the desired top elevation of the bioretention area is achieved. Wait a few days to check for settlement, and add additional media, as needed, to achieve the design elevation. 5. UNDERDRAIN CLEANOUTS MUST EXTEND A MIN. OF 6 INCHES ABOVE TOP SURFACE OF GRASS LAYER, Step 7. Install the vegetation, and water accordingly. PREFERABLY TO THE TOP OF DESIGN MAXIMUM FUNDING DEPTH IN THE BIO-RETENTION BASIN. Step 8. Coordinate with inspector and engineer to conduct the final construction inspection. Upon completion of bioretention facility remove temporary erosion control measures and complete final stabilization of the project. SOD ON SIDE SLOPES (REQ'D FOR FIRST PLANTING YEAR) SCARIFY NATIVE SOIL NO COMPACTION REFER TO CHART FOR OVERFLOW OUTLET TOP OF BERM ELEVATION REFER TO DETAIL FOR GRASS SOD ELEVATIONS & DIMENSIONS (BERMUDA SOD) REFER TO CHART BOTTOM ELEVATION - yx �12" WOV BONDING 10' MIN 2FT MINIMUM BIORETENTION SOIL DEPTH - BIORETENTION SOIL MIXTURE BID -RETENTION CROSS-SECTION TOP OF EMBANKMENT ELEV=446.0 -INLET PIPE WITH \ RIP -RAP APRON STORMWATER MANAGEMENT DATA INFR BASIN: CAPE FEAR RIVER ZECENING STREAM NAME', UT TO SUCKHORN CREEK INDEX ,} 18-7-(2) :LASS B 310-RETENTION POND: )RAINAGE AREA= 1,05 AC (45,74CSF) MPERVIOUS AREA= (L77 AC (33,426SF) NATER QUALITY VOLUME REQUIRED= 2,706CF NATER QUALITY VOLUME PROVIDED= 2,750CF CLEANOUT AJ\ RIM-444.7 INV=441.65 6" UNDERDRAN 436 445 eewe t�cNr I x l0 I 444 - EASEME\T I I I t SAY x Ilk! cip x I• INLET PIPE WITH RIP -RAP APRON \ STORMWATER v MANAGEMENT ACCESS all I °•I .•,.,� \ EASEMENT I I ', I I I I I �•. 1 1 I x L I x I I 4_ I i 1 I I I » O I I I I 10 I- \ I I I I I \ I \ x I _ I� I I I I I I /II Ixl I -� III I II0 i t � II I I L I 4 I I 1ST1NG 1 II 11° _I 1/LDING I I x l� 1 I I I �\ x I I sit PROPOSED DG PAr i 65,517 SF I \III I x I ( II II 1.504 AC IIPOLLAR x � I � I I I - A&".W I EXISTING LD SEPTIC t I TO VOT USED; I I I I x I I 1 1 I I I'r 6 I I r I a4h I I I I I I I I I o I I I I x I I I I I 11 1 I I ` I I C) I I 1 � � > $ rn I 11 � III I I I I ER STORMWATER MANAGEMENT NOTES: L THE DEVELOPER OR HIS AGENT SHALL CONTACT THE ENGINEER WHEN THE BEST MANAGEMENT PRACTICE(S) ARE CONSTRUCTED AND ABOUT TO BECOME OPERATIONAL 50 A FINAL INSPECTION CAN BE PERFORMED l0 DETERMINE COMPLIANCE WITH THE APPROVED PUN CAN BE PERFORMED. 2. PRIOR TO CONSTRUCTION, A SOIL TEST OF THE BID -RETENTION FILTER MEDIA SHALL BE RENEWED AND APPROVED BY THE ENGINEER OF RECORD WITH A COPY SENT TO THE ENGINEER. THE TEST SHALL CONSIST OF BOTH THE STANDARD SOIL TEST FOR PH, PHOSPHORUS, MAGNESIUM, AND POTASSIUM AND ADDITIONAL TESTS OF ORGANIC MATTER, AND SOLUBLE SALTS. ALL TESTNO RESULTS SHALL COME FROM THE SAME TESTING FACILITY. THE NO DEPARTMENT OF AGRICULTURE (Ni LAB IS THE PREFERRED TESTING FACILITY SHOULD THE PH FALL OUT OF THE ACCEPTABLE RANGE, IT MAY BE MODIFIED (HIGHER) WITH LIME OR (LOWER) WITH IRON SULFATE PLUS SULFUR OR AS DIRECTED BY THE Ni OR ENGINEER, J. PRIOR TO CONSTRUCTION A COMPOSITION TEST OF THE BIO-RETENTION FILTER MEDIA SHALL BE REVIEWED AND APPROVED BY THE ENGINEER OF RECORD WITH A COPY SENT TO THE ENGINEER. FILTER MEDIA SHALL CONFORM TO THE FOLLOWING: 85-887 SAND (USDA TEXTURAL CLASSIFICATION), 8-11% FINES (SILT AND CLAY), AND J-5R ORGANIC MATTER (PEATMOSS OR PINE BARK) BY VOLUM 4. PERFORM A DOUBLE RING INFILTRATION TEST (MINIMUM OF J TESTS OR I PER 500 SF OF FILTER MEDIA WHICHEVER IS GREATER) AT THE COMPLETION OF THE 610-RETENTION BMP. INFILTRATION RATE OF THE CONSTRUCTED 010-RETENTION MEDIA SHALL BE BETWEEN I-6 IN/HR. PROVIDE A COPY OF THE RESULTS TO THE ENGINEER. 5, THE OWNER IS RESPONSIBLE FOR MAINTAINING THE STORMWATER BMP. ANNUAL MAINTENANCE INSPECTION AND REPORT REQUIRED - THE OWNER OF A PERMITTED STRUCTURAL STORMWATER BMP/CONTROL SHALL ANNUALLY SUBMIT A MAINTENANCE AND INSPECTION REPORT FOR EACH BMP TO THE STORMWATER ADMINISTRATOR ANNUAL INSPECTIONS SHALL BEGIN WITHIN ONE YEAR OF THE RECORDATION OF ANY OEEO(S) SHOWING STORMWATER BMPs/CONTROL STRUCTURES. 5. UPON COMPLETION OF THE PROJECT, AND BEFORE A CERTIFICATE OF OCCUPANCY SHALL BE GRANTED, THE ENGINEER OF RECORD SHALL CERTIFY THAT THE COMPLETED PROJECT IS IN ACCORDANCE WITH THE APPROVED STORMWATER MANAGEMENT PUNS AND DESIGNS. 7. A FINAL INSPECTION OF THE SITE AND STORMWATER MANAGEMENT BMP/CONTROLS TO BE SCHEDULED WITH AND COMPLETED BY THE ENGINEER & INSPECTOR. 8. THE 'AS -BUILT" PLANS SHALL SHOW THE FINALSPECIFICATIONS DESIGN fCG S ICA710N5 FOR AL L STORMWATER MANAGEMENT FACILITIES AND PRACTICES AND THE FIELD LOCATION, SIZE, DEPTH, AND PUNTED VEGETATION OF ALL MEASURES, CONTROLS AND DEVICES, AS INSTALLED, THE AS -BUILT SHALL ALSO INCLUDE STORM DRAINAGE PIPE SYSTEMS. THE ENGINEER OF RECORD FOR THE STORMWATER MANAGEMENT MEASURES AND PLANS SHALL CERTIFY, UNDER SEAL, THAT THE AS -BUILT STORMWATER MEASURES, CONTROLS AND DEVICES ARE IN COMPLIAAOCCUPANCY, APPROVED STORMWATER MANAGEMENT PUNS AND DESIGNS AND REQUIREMENTS OF THE MUNICIPALITY 9. THE ENGINEER'S CERTIFICATION OF COMPLETION WILL BE REQUIREHE FINAL PUT OR CERTIFICATE OF OCCUPANCY THE STORMWATER C BE INSPECTED TO ENSURE IT IS FUNCTIONING AS DESIGNED AND DESIGN VOLUME PRIOR TO ISSUANCE OF THE FINAL CERTIFICATE . BIO-RETENTION STAGE STORAGE TABLE STAGE ELEVATION CONTOUR INCREMENTAL TOTAL (FT) (FT) AREA (SF) STORAGE (CF) STORAGE (CF) 0.0 444.0 2750 0 0 0.5 444.5 J2J5 1494 1494 1.0 445.0 3765 1748 J24J 1.5 445.5 4305 2016 5258 2.0 441 4850 2290 7548 CLEANOUT OUTLET CONTROL STRUCTURE 22'-15"HDPE RIM=444.7 REFER TO DETAIL THIS SHEET ® 2.27% INV=441.15 & GRADING PLAN (WATER -TIGHT) 1 IN1V=441.0 IT It � y ,fir I1 al//\\ V C f FES IT WV 440.5IT 1/ zi� / / \ 1 910-RETENTION POND vv / LAT=35"33"49"N LONG=7B•52'07'w f / I I 1 z r / T \\\ / if I I ll l I/ IT / 1 I 1 / I I y"'Rrt /l / h � I I / a 3 / / if Qi / 5 �1 Q O �� 1 _ r I I 1 I I E 0 r;' I I C c F I 1 mm"IE l 1 t BIO-RETENTION BASIN - PLAN VIEW I "=20' i TRIANC W SITE DESI(-'`' I CONSULTANT. Triangle Site Design, PLLC 4006 Barrett Drive Suite 203 Raleigh, NC 27609 919 553-6570 mlowder@Lrianglesitedesjgn.corr. NC LICENSE yP-061g SEAL: i = W - ..0 i T CD All C-)J � 1 OWNER/DEVELOPER: GLANDON FOREST EQUITY, LLC 3900 Merton Drive Suite 210 Raleigh, NC 27609 919-459-2601 919-459-2604 fx gbarnesCvanguardpg.com REVISIONS: Approv n er ,ni; Documents is C'MILFUaicn r_ dance w•th these documenu required by the stormwa er -- rules requWut that the storrnwater system designer Inspect during construction, rer•_ify conformity with the lqns d specs! and certify compliance with the Permit( rule�s (t Permittts �- V�--Dat�- C Virsamonn of �6�LR Sheet It_.... e LAYOUT COORD: PLANNING MDR. DRAWING BY: IEL DATE' 9 16; 14 JOB NUMBER_ 00l�x, `_, TITLE: STOR,MWATER MANAGEMENT DETAI' SHEET NUMBER: COMMENTS: EXISTING WIRES IJYHitAls'I�11fa�I1L7 o � I O AhG iNLfT TOP 4 6.oa' I INV, (N): 4„ 3.49' I o INV.(f): 432.99" O s� / c� LOT 33 I l RP ONE, LLC I l O D6 1466, PG 81 ! PB 2007, PG 273 i2`CPP IN, 441.47'-- ; 1 72` r,r iNl i, 4 3,,f / PIN, 0636-80-8239 {! � 7 / o IND S 88'15'29' E 249.15' e / -.4. LOT 14 \ nrrRrzE RP ONE LLC o DB 1492, PG 205 PB 2007, PC 273 PIN. 06 90-3252 o 3 IND I e / I c \ l h I I l O BALANCE OF PARCEL I O r --�- L YA,D INLET 24,783 SF / I / TOP- T 04' 0,569 AC Llkca. Jam^,.. NV (S O,. 436. i q' p f1\ \ amtnE• I I e PrV,(N): 436.09' O INS, 1 DISTURBED AREAS NOT NOTED�- FOR SOD TO BE SEEDED PER REFER TO SHEET C-10 10'x70' SIGHT o I PROJECT SEEDING SPECIFICATIONS \ FOR SOD REQUIREMENTS TRIANGLE (TYP) WITH 810-RETENTION POND I I F MULCH PLANTING Bp �s� AB l �Il I I BED S89'27'05' 1.21 EPE h o 1iJFT %YP v4FLr= / /a I x �W W W Y'� W W W W W W W W W .✓ W W W W W .1' • �� y 21 \Z O C W W W W W W W W W W W W W W W W Off• f• • I-) ' <S I I L x O _ \ HATCHING DENOTES _ I • R / I /l LOT 15 RP ONE, LLC IDO 1492, PG 205 x(;€ \ _ 13 MULCH PLANTING l I PB 2007, PG 273 o „ \ BH , BED / PIN: 0636-90-2096 IND SEE SHEET c-B „r � �� F C' -�B3o 'o / F•:,;•'•---• I •. l I j�El / / -�ts14 .�'. .-. / t ELIZABETH A. BAKER c ; �- ; - ; - • - ; - - `. DB 464, PG 32 I E�i�-MULCH ISLAND I - - I x C PIN, 0636-80-8053- RA-20M61 O •�-••••.•. •. -I'• �.�1 / ��TJI I -- EXISTING o I- BH BUILDING I 33 I I x 0 p, IV L w $ �I xo �- ----,n ROPO�fO1D�P GELAB / II 5 / 1.504 AS 38 OLD SEPTIC ('NOT USED) /MULCH PLANTING `� h BED z�, MULCH PLANTING ,j I O MULCH ISLAND MULCH PLANTING ti O of le 1 BEDp� BED �� 00000c ©o 'x � o / I ti / o r c HENRY B � WELL LOCATION x I ELIZABETH A. BAKER 2 HC xC •' B .. • " / �� I 1 O, 63 89 88 HATCHING DENOTES I o L6 PIN: 0635-89-8802 RA-20M SOD / N II I N- EXISTING / BUILDING CONTROL CORNER I \ •I • _ r N. 659,742.70 E 2, 08,865 39 0 - - - - -•- ---- • {-a•- .1 " ^.--. xc 5OFT STREE7YARD BUFFER , • ,' , • '" ' " • LOT •1 '��, ` • `F 147245 S.F. I 108 AC • • . . . ,��• {f� hYBIIE I %! o ' J N 8927 05 = 120.67_ GRAVEL I LAE -)2OIL-------- uo= ou 7. o - -455� L---2U- OU- OU- Ou- EDGE OFPAVEMENT 4" MIN, SECTION TYPICAL TREE PLANTING/STAKING DETAIL (FOR 6'-12' TREE HEIGHTS AT PLANTING) NOT TO SCALE I- I � I I ISIGHT / CURVE TABLE ( TRIANGANG LE (TYP) TRIANGLE CURVE LENGTH RADIUS I BEARING I CHORD C1 49.58 955.15 S 13'3436" W 49.57 C2 34.53 25.00 S 50'56'33" W 31.85 TIE 58. 945.00 E C4 TIE 44.04 S 39'Ot'10" 38.56 LINE TABLE / EXISTING TREES TO i LINE LENGTH BEARING REMAIN L1 TIE 10.08 S 00.15,35" E L2 50.00 I N 00'917' W j- OU- OU- OU- e OUOU OU OU Ou- _3TIE 69.38 N 59'3306' E _4(TIE) 51.31 S 65'02'20' E _ '�l5 RCP lNV: 45,380' - -�- - - 0 Ot TREE STRAP O TREE GUY WIRE - ADD TURNBUCKLES IF NECESSARY TO STABILIZE TREE O TREE GUYING STAKE 4O WARNING FLAG SO TRUNK FLARE AND TOP OF ROOT BALL SHOULD BE AT GRADE IN WELL DRAINED SOIL, UP TO 4" ABOVE GRADE IN POORLY DRAINED SOILS. O6 EARTHEN SAUCER O 3" MULCH LAYER MULCH SHALL NOT BE IN CONTACT WITH TREE TRUNK ® EXCAVATE PLANTING PIT TO 3 TIMES THE WIDTH OF ROOTBALL (8' MIN.) FLARING SIDES OF PIT AS SHOWN. SCARIFY SIDES OF PIT SO THAT THE SIDES ARE NOT SMOOTH OR GLAZED. O BACKFILL WITH SOIL PER SPECIFICATIONS 10 REMOVE TOP 1/2 OF WIRE ROOT BALL BASKET OR ROOTBALL STRAPS. REMOVE ALL SYNTHETIC STRAP MATERIAL FROM ENTIRE ROOT BALL. 11 REMOVE TOP 3/4 OF BURLAP ROOT BALL COVERING. REMOVE ALL SYNTHETIC COVERING FROM ENTIRE ROOTBALL. 12 PLACE ROOTBALL ON SOLID SUBGRADE - NOT LOOSE BACKFILL MATERIAL 13 UNDISTURBED SUBGRADE NOTES 1. REFERENCE SPECIFICATIONS FOR ALL SOIL PROCEDURES IN CONSTRUCTION DWGS. 2. SITE SOILS ARE GENERALLY SANDY, SILTY CLAYS AND SANDY, CLAYEY SILTS. GENERAL LANDSCAPE NOTES 1. ANY DISTURBED AREAS NOT SCHEDULED FOR HARDSCAPE, PLANTINGS, OR MULCH SHALL BE SEEDED LAWN. 2. NO PLANT SUBSTITUTIONS ARE PERMITTED WITHOUT WRITTEN APPROVAL OF THE OWNERS REPRESENTATIVE. 3. ALL PLANT AND BED LINE LOCATIONS SHALL BE STAKED IN THE FIELD AND APPROVED BY THE THE OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION. 4. ALL PLANTINGS SHALL BE INSTALLED WITH THE SPECIFIED LAYER OF MULCH, REFERENCE DETAILS AND SPECIFICATIONS FOR DEPTH AND TYPE OF MULCH. ALL TREES AND SHRUBS SHALL BE PLANTED IN MULCH BEDS AND SHALL BE SEPARATED FROM TURF GRASS AREAS. 5. GRASS COVERAGE TO EXTEND FROM PROPERTY LINES TO BACK OF CITY SIDEWALKS AND/OR CURBS. 6. MINIMUM TREE SIZE AT PLANTING IS 2" CAUPER (FOR SINGLE STEM TREES). ALL MULTI -STEM PLANTS MUST BE TREE FORM, MAXIMUM 3 TO 5 TRUNKS, AND MINIMUM 8 FEET TALL. 7. ALL STRAPPING AND TOP 2/3 OF WIRE BASKET MUST BE CUT AWAY AND REMOVED FROM ROOT BALL PRIOR TO BACKHLUNG PLANTING PIT. REMOVE TOP 1/3 OF THE BURLAP FROM ROOT BALL. 8. FOR NEW PLANTING AREAS, REMOVE ALL PAVEMENT, GRAVEL SUB -BASE AND CONSTRUCTION DEBRIS; REMOVE COMPACTED SOIL AND ADD 18" NEW TOPSOIL, OR TILL AND AMEND THE TOP 18" OF EXISTING SOIL TO MEET TOPSOIL/PLANTING MIX STANDARDS FOR TREES, 9. LARGE MATURING TREES MAY NOT BE PLANTED WHERE THERE ARE OVERHEAD DISTRIBUTION OR TRANSMISSION LINES. IF TREES CONFLICT WITH POWER LINES OR SIGNS, CALL URBAN FORESTER TO RESOLVE BEFORE PLANTING, 10, ADJUST TREE PLANTING LOCATIONS TO AVOID UNDERGROUND UTILITIES. PLANT 15' FROM ALL UNDERGROUND UTILITIES (SEWER AND STORM DRAINAGE, GAS, WATER, PHONE, AND ELECTRICAL UNES.) 11. ATTENTION LANDSCAPER: NOTIFY OWNER OF ANY SIGN, POWER LINE, OR OTHER CONFLICTS BEFORE PLANTING NEW TREES. LANDSCAPING NOTES: 1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING ALL REQUIRED LANDSCAPING FOR THE ENTIRE SITE, TO INCLUDE BUT NOT LIMITED TO: SODDED/SEEDED AREAS, SHRUB BEDS, PARKING LOT ISLANDS, ROADSIDE SIGN BASE(S) AND MONUMENT PUNTERS, 2. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES REGARDING LANDSCAPING. 3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ESTABLISH A HEALTHY STAND OF GRASS ON ALL SEEDED AREAS. 4, IN THE EVENT THAT PLANTING BEDS AND MULCH ARE REQUIRED, THE CONTRACTOR SHALL INSTALL BLACK FABRIC WEED BLOCK LANDSCAPE MESH UNDER THE MULCH TO PREVENT WEED GROWTH. 5, CONTRACTOR SHALL PROVIDE NATURAL TOPSOIL THAT IS FERTILE, FRIABLE, WITHOUT MIXTURE OF SUBSOIL MATERIALS, AND OBTAINED FROM A WELL DRAINED, AVAILABLE SITE, IT SHALL NOT CONTAIN SUBSTANCES WHICH MAY BE HARMFUL TO PLANT GROWTH. TOPSOIL SHALL BE SCREENED AND FREE FROM CLAY, LUMPS STONES, ROOTS, PUNTS, OR SIMILAR SUBSTANCES 1' OR MORE IN DIAMETER, RI R OTHER OBJECTS WHICH MIGHT A HIN RAN TO PLANTING OPERATIONS TOPSOIL SHALL CONTAIN AT T 4 69 DEBRIS, 0 0 HE OBJ G 8E DE CE LF1S ORGANIC MATTER BY WEIGHT AND HAVE A PH RANGE OF 55 TO 70 6 CONTRACTOR SHALL BE RESPONSIBLE FOR THE WATERING AND THE MAINTENANCE OF ALL LANDSCAPED AREAS UNTIL THE LATER OF (a) THIRTY (30) DAYS FOLLOWING THE PLANTING OF THE GRASS AND SHRUBS, OR IS) THE DATE THAT DOLLAR GENERAL OPENS FOR BUSINESS TO THE PUBLIC, 7. GENERAL CONTRACTOR IS TO CLEAN ENTIRE SITE OF ALL CONSTRUCTION DEBRIS AND RAKE ALL GRASS AREAS. 8. PROVIDE LANDSCAPE PLANS TO DOLLAR GENERAL AND AS REQUIRED BY LOCAL JURISDICTION TO THE BLDG. DEPT. FOR REVIEW AND APPROVAL PRIOR TO START OF WORK. 9. ALL LANDSCAPING, TRESS, SHRUBS, ETC. SHALL NOT INTERFERE WITH THE VISIBILITY OF DOLLAR GENERAL SIGNAGE 10. CONTRACTOR TO VERIFY QUANTITIES PRIOR TO COMMENCING WORK. 11. OPEN AREAS WITHIN PLANTING BEDS SHALL BE MULCHED. 30 GRAPHIC SCALE 15 30 60 1 INCH = 30 FEET LMASTER PLANT LIST - TYPE SYM./KEY BOTANICAL NAME COMMON NAME SPECIFICATION - - - - - - - - gyp` CALIPER HEIGHT ROOT SPACING OTHER w_�.Vy,�,�w�� w•-_w-�-w-��.-0--__---.----�__----- _ _ __ __-------- O tn' - - - - - - - - - TREES AB Acer buergerianum Trident Maple 2" 8' MIN. B&B 30' MAX w--- w_,_ w__ w-:. � w- w� w_ w._ v� w- w- w�,.__ �llf+E-1JE �YF.ddEO� w- w- w- w OIL- Ou- OU- OU- Ou OU- Ou ou OU- OU OU- OU- OU- OU- OU-- Ou- OU- dl OL LG Magnolia grandiflora 'LITTLE GEM' Little Gem Southern Magnolia 2'" 8' MIN. B&B 30' MAX CCCC������'"' Ut1�9--�} OUP-+ IOU- ou Ou OU- OU OU Ou Ou OU Ou \ NC HI SHWA Y 42 VARIABLE WIDTH PUBLIC R/W 42 SHRUBS BH Ilex comuta 'BURFORD NANA' Dwarf Burford Holly - 24" 3 GAL 4'-6' IV Ilex vomitoria 'NANA' Dwarf Youpon Holly - 24" 3 GAL 4'-6' 120 TRIANGLE SITE DESIGN CONSULTANT: Triangle Site Design, PLLC 4006 Barrett Drive Suite 203 Raleigh, NC 27609 (919)553-6570 mlowder®trianglesitedesign.com NC LICENSE #P-0619 SEAL: W c-, :6 v ti0 C c", I c>3 QJ OWNER/DEVELOPER: GLANDON FOREST EQUITY, LLC 3900 Merton Drive Suite 210 Raleigh, NC 27609 919-459-2601 919-459-2604 fx gbarnes@vanguardpg com REVISIONS: 6pprov cs 3ter sLtlC u�nan'� On6 IJC 1 [>b�D_II required by the stormwatef pprm,E North Carollrw rules require IJW the starmwater system designer Inspect during Construction; cenlfy confor lih with the- pans an spe swunwater rules. (15A NCAC 2H 1098 0 )) Permit k-5Wl� �-D le_Date d IF A n'vision of Sheet #,ev;sion D:.'e LAYOUT COORD: 1'1TL PLANNING MGR. I [ L DRAWING BY: DATE: `':6 JOB NUMBER: 004087 TITLE LANDSCAPE PLAN SHEET NUMBER: II COMMENTS: