HomeMy WebLinkAboutSW6140804_CURRENT PERMIT_20140825STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
AMA
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
August 25, 2014
Mr. David Heins
Environmental Division Chief
Directorate of Public Works
2175 Reilly Road Stop A
Fort Bragg, North Carolina 28310-5000
Subject: Stormwater Permit No. SW61400804
First Citizens Bank - Fort Bragg
Fort Bragg, North Carolina, Cumberland County
Dear Mr. Heins:
John E. Skvarla, III
Secretary
The Division of Energy, Mineral, and Land Resources (DELMR), received a complete Stormwater
Management Permit Application for the subject project on August 20, 2014. Staff review of the plans and
specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set
forth in Title 15A NCAC 2H.1000 and Session Law 2006-246. We are forwarding Permit No. SW6140804,
dated April 25, 2014, for the construction, operation and maintenance of the subject project and the
stormwater system.,This permit shall be effective from the date of issuance until August 24, 2022 and shall
be subject to the conditions and limitations as specified therein, and does not supersede any other agency
permit that may be required.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings
(OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes. Per
NCGS 143-215(e) the petition must be filed with the OAH within thirty (30) days of receipt of this permit.
You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the
details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-
431-3000, or visit their website at Www.NCOAH.cQm. Unless such demands are made this permit shall be
final and binding.
This project will be kept on file at the Fayetteville Regional Office. If you have any questions, or need
additional information concerning this matter, please contact Mike Randall at (919) 807-6374; or
mike.randall@ncdeur.gov. ,
Sincerely,
I SEP 2 6 2014
for Tracy E. Davis, PE, CPM, Director I
cc: SW6140804 File, Fayetteville Regional Office
ec: Peter Bishop, P.E., Kimley-Horn and Associates, Inc.
Division of Energy, Mineral, and Land Resources
Energy Section • Geological Survey Section • Land Quality Section
1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919-707-9200 / FAX: 919-715-8801
512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http://portal.ncdenr.org/web/Ir/
An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 10% Post Consumer Paper
State Stormwater Permit
Permit No. SW6140804
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
First Citizens Bank
Fort Bragg, North Carolina
Cumberland County
FOR THE
construction, operation and maintenance of a bio-retention basin in compliance with the
provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as
the "stormwater rules') and the approved stormwater management plans and
specifications and other supporting data as attached and on file with and approved by
the State and considered a part of this permit.
This permit shall be effective from the date of issuance until August 24, 2022, and shall
be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature. and volume of stormwater
described in the application and other supporting data.
2. The bio-retention basin is approved for the management of stormwater runoff as
described in the application documents and as shown on the approved plans.
3. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
4. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
5. The built -upon areas associated with this project shall be located at least 30 feet
landward of.all perennial and intermittent surface waters.
Page 1 of 4
State Stormwater Permit
Permit No. SW6140804
II. SCHEDULE OF COMPLIANCE
During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
2. The permittee shall at all time provide the operation and maintenance necessary
to assure the permitted bio-retention basin functions at optimum efficiency. The
approved Operation and Maintenance Plan must be followed in its entirety and
maintenance must occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of slopes and the filter strip.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans.
f. Debris removal and unclogging of all drainage structures, level spreader,
filter media, planting media, underdrains, catch basins and piping.
g. Access to the cell and outlet structure must be available at all times.
Records of maintenance activities must be kept for each permitted BMP. The
reports will indicate the date, activity, name of person performing the work and
what actions were taken.
4. The permittee shall submit an annual summary report of the maintenance and
inspection records for the bio-retention basin.. The report shall summarize the
inspection dates, results of the inspections, and the maintenance work
performed at each inspection.
5. The bib -retention basin shall be constructed in accordance with the approved
plans and specifications, the conditions of this permit, and with other supporting
data.
6. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the bio-retention basin certifying that the
permitted facility has been installed in accordance with this permit, the approved
plans and specifications, and other supporting documentation. Any deviations
from the approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
7. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
8. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership..
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval was sought.
f. Filling in, altering, or piping of any vegetative.conveyance shown on the
approved plan.
Page 2 of 4
State Stormwater Permit
Permit No. SW6140804
9. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of eight years from the date of the completion of
construction.
10. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
III. GENERAL CONDITIONS
1. This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a completed Name/Ownership Change form signed by both parties, to the
State, accompanied by the supporting documentation. The approval of this
request will be considered on its merits and may or may not be approved.
2. The permittee is responsible for compliance with all permit conditions until such
time as the Division approves a request to transfer the permit.
3. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the State, in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
4. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
5. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
6. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
7. The permit issued shall continue in force and effect until revoked or terminated.
The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and re -issuance or
termination does not stay any permit condition. .
8. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
9. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit,
Page 3 of 4
State Stormwater Permit
Permit No. SW6140804
10. The issuance of this permit does not prohibit the Director from reopening and
modifying the permit, revoking and reissuing the.permit, or terminating the permit
as allowed by the laws, rules and regulations contained in Session Law 2006-
246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al.
11. The permittee shall notify the Division in writing of any name, ownership or
mailing address changes at least 30 days prior to making such changes.
12. The permittee shall submit a renewal request with all required forms and
documentation at least 180 days prior to the expiration date of this permit.
Permit issued this the 25`h day of August, 2014.
Director Division of Energy, Mineral, and Land Resources
Page 4 of 4
State Stormwater Permit
Permit No. SW6140804
First Citizens Bank
Fort Bragg, North Carolina
Cumberland Countv
Designer's Certification
I, , as a duly registered in the
State of North Carolina, having been authorized to observe (periodically/ weekly/
full time) the construction of the project,
(Project Name)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
cc: NCDENR-DEMLR Regional Office
Page 1 of 1.
State Stormwater Permit
Permit No. SW6140804
First Citizens Bank
Fort Bragg, North Carolina
Cumberland Countv
Designer's Certification
I, Peter A.. Bishop , as a duly registered Professional Engineerin the
State of North Carolina, having been authorized to observe 4eriodica weekly/
full time) the construction of the project,
First Citizens Bank, Ft. Bragg
(Project Name)
for First Citizens Bank (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used In the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
Noted deviations from approved plans and specification:
SEAL
Signature
Registration Number 15598 4 �/()
c,
Daten465;4.�1
}4
SEAL
15548
A
cc: NCDENR-DEMLR Regional Office
PtEICEIVED
AUG 10 2615
DENR-FAYETTEVILLE REGIONAL OFFICE
Page 1 of.1
Fort Bragg, NC CUMBERLAND County
Peter Bishop, PE, Kimley-Horn and Associates, Inc.
First Citizens Bank - Fort Bragg ��A
Fort Bragg, NC CUMBERLAND County /� ��Ls',ID
Peter Bishop, PE, Kimley-Horn and Associates, Inc. NC®ENR
Application
Type of application: New Permit
Only complete application packages will be accepted and reviewed. A complete package includes all of the items in the checklist
Wow. Add any comments, and Indicate the page or plan sheet number where the following information can be found. Please
indicate that you have provided the following required information by initialing in the space provided next to each item.
Part I: Submittal Checklist
Item
Notes/Comments Initials
1 Original and one copy of this application farm (all worksheets) and the permit
application fee. For applications submitted to the DEMLR regular permitting
program, the fee is $505 payable to NCDENR. For Express Review, click on the
link below for information and fee schedule. Contact the appropriate regional
office Express Review Coordinator to schedule the required pre -application
meetinq.
SEP 2 b 2014
Click here for Exoress Permitting info
2 A USGS map identifying the site location. If the receiving stream is reported as
Stormwater Impact Analysis
class SA or the receiving stream drains to and is within 1/2 mile of SA waters,
then include the 1/2 mile radius on the map.
3 A copy of the most current property deed.
N/A - Military Base
4 Two copies of additional calculations (as needed). Sealed, signed and dated.
Stormwater Impact Analysis
5 Two sets of sealed, signed, & dated full-sized plans of the entire site at a
readable scale, including:
a. Project name, engineer and firm, revision number and dates.
C0.00 Cover Sheet
b. Location map with street names and SR numbers, legend, north arrow,
C0.00 Cover Sheet
scale.
c. Dimensioned property/project boundary with bearings & distances.
C1.00 Existing Conditions and
d. The boundaries of all surface waters, regulatory flood zones, and protected
C1.00 Existing Conditions and
riparian buffers or a note on the plans that none exist.
Demolition Plan
e. The boundaries of all vegetated or protected riparian buffers.
N/A
I. Site layout showing all built -upon areas, drainage features, stormwater
C4.00 Grading and Drainage
collection systems (inlets, outlets, swales, pipe elevations, slopes and
Plan
diameters), and BMPs at ultimate build -out.
g. Existing contours, proposed contours, spot elevations, and finished floor
C4.00 Grading and Drainage
elevations.
Plan
h. Existing drainage (including off -site), drainage easements, pipe sizes,
C1.00, X1
runoff calculations.
i. Drainage area boundaries (included in the main set of plans, not as a
X2 Post Development Drainage
separate document).
Area
I. Existing and proposed maintenance access routes, utility easements,
N/A - Private property
drainage easements, public rights -of -way etc.
k. A construction sequence that shows how the BMPs will be protected from
C5.00 Erosion Control Plan
sediment until the entire drainage area is stabilized.
6 Two sets of sealed, signed, & dated full-sized plan details of each BMP (or
typical if appropriate) in both plan view and cross-section at a scale of 1"= 30'
or larger, including:
a. Dimensions, side slopes, length to width ratios and elevations with a
C11.00 Stormwater Details
benchmark for clean -out if appropriate.
b. All applicable conveyance devices, including: bypass structure,
C4.00 Grading and Drainage
pretreatment area, flow distribution device, underdrains, outlet device, outlet
Plan, C11.00 Stormwater Details
dissipater and level spreader.
c. A table of elevations, incremental volumes and accumulated volumes (if
C11.00 Stormwater Details
applicable).
d. Specifications for applicable materials, such as planting media, aggregate,
C0.01 General Notes, C11,00
sod, underdrains, outlet devices, etc.
Stormwater Details
STORM-EZ 7/10/2014
Version 1.2 Application Page 1 of 5
Fort Bragg, NC CUMBERLAND County
Peter Bishop, PE, Kimley-Horn and Associates, Inc.
7 Two sealed, signed, & dated planting plans for each BMP (or typical) at a scale
of 1' = 20' or larger, as applicable, including:
a. The locations of each species and a planting detail.
1-1.00, L2.00
b. A table summarizing the size, spacing and total quantity of each plant
L2.00 Landscape Details
species that should be used.
c. The source nursery for the plants.
L7.00 Landscape Plan
d. A one-time fertilizer specification to establish plants if necessary.
1-1.00 Landscape Plan
9 A soils report based on field evaluation indicating the SHWT elevations within
Stormwater Impact Analysis
the footprints of the proposed BMP(s). Provide a map of the boring locations
with the existing elevations and boring logs. For infiltration BMPs, the report
shall include the soil type, infiltration rate and method for determining the
infiltration rate. Soils information shall be signed and sealed by a licensed soil
9 A copy of the signed and notarized operation and maintenance (O & M)
agreement.
10 A copy of the proposed deed restrictions protecting the BMPs and limiting the
N/A
built -upon area so that it does not exceed the capacity of the BMP(s) or the high
density threshold (as applicable).
NCDENR Deed Restriction Forms
11 For corporations and limited liability corporations (LLC): Documentation from
the NC Secretary of State or other official documentation, which supports the
titles and positions held by the persons listed in the Contact Information section.
The corporation or LLC must be listed as an active corporation in good standing
with the NC Secretary of State, otherwise the application will be returned.
NC Dept. of the Secretary of State
12 A copy of the lease agreement or pending sales agreement if applicable.
SEP 2 b 2014
STORM-EZ
72
Version 1.2 Application Pagege of 5 2 0l 5
j Part II: General Project and. Applicant,lnforrnation ,> „ .. �;: • +; _..
Project Name: First Citizens Bank - Fort Bragg Date:RNOO
Project Street Address: 2569 Reilly Road Lat:City: Fort Bragg Zip: 28310 Long:Directions to Project: Travel north from the intersection of Bastonge St and Reilly Rd approximately County:(from nearest intersection) 0.1 miles. Site is on the west side of Reilly Road.
Project Applicant: First Citizens Bank - Rob Tessar
(Identify the corporation, organization, property owner, designated
government official, etc. which owns the project.)
Owner / Signing Offical's Name:
Title:
Address:
City:
State:
Zip:
Phone:
Fax:
Email:
Status of applicant:
/er Basin: Caoe Fear
Receiving Strea
Stream Clas:
Directorate of Public Works DPW / Dave Heins
DPWIWater Management Branch
2175 Reilly Road Stop A
Fort Bragg
North Carolina
28310-5000
910 396-5286
llee.p.ward.civ@mail.mil
Lessee Attach a copy of the lease agreement and complete contact Information
for property owner below.
SEP 2 b 2014
Click here to update
forms >>
Surface Water Area act :� Coastal wetland area (ac):
Total property area (ac): 1.14 Total project area (ac): 1.45
Goals/characteristics: YES Volume Matching (LID) Drains to an offsite stornwater system
NO Low Density Within 575' of Saltwater ORW
YES High Density Within 5 miles of a public airport
Briefly summarize how the stormwater runoff will be treated:
One bioretention basin will treat the additional impervious surface area. The portion of the site that does not drain to the
bioretention basin is less impervious in the post development condition than in the pre -development condition.
Part III: Permit Information.
Status of construction: Not Started
Other permits needed: YES Sedimentation & erosion control 404 Permit / 401 Certification
IECAMA Major Permit Isolated Wetlands Permit
Threatened & Endangered Species fE NPDES Industrial Stormwater Permit
If an application for this project has been previously returned, provide the original project number and previous name of the project:
N/A
Provide the permit type, number and issue date for
obtained for this
If claiming vested rights, then identify (and attach) the supporting documents and approval dates: �l
Approval of a site -specific development plan or PUD Approval dale:
Validb
Valid building permit Issue date:
Other Date:
Not Started
Point of Contact:
Phone number:
STORM-EZ 8/7/2014
Version 1.4 Application Page 3 of 4
Fort Bragg, NC CUMBERLAND County
Peter Bishop, PE, Kimley-Horn and Associates, Inc.
Part IV: Additional Contact Information
Property Owner/Orge
Signing Officie
Street
City, S
Phone nu
(Optional) Additional Contact
Person / Oreinization
Signing Official & Title:
Street address:
City, State, Zip:
Phone number(s):
(Note: Person/Organization noted above may be contacted for additional project information if applicant
cannot be reached.)
Part V: Consultant Information
Complete this section if you wish to designate authority to another individual or firm so that they may provide information on your
behalf for this project (such as addressing requests for additional information).
Consultant'
Firm:
Street address:
City, State, Zip:
Phone number(s):
Email:
Peter Bishop, PE
Kimley-Horn and Associates, Inc.
333 Fayetteville Street, Suite 600
Raleigh, INC 27601
919-677-2164
geter.bishoo®kimlev-horn.com
SEP 2 ° 2014
STORM-EZ Version 1.2 7/10/2014
Application Page 4 of 5
Fort Bragg, NC CUMBERLAND County
Peter Bishop, PE, Kimley-Horn and Associates, Inc.
Part VI: Property Owner Authorization
I, (the Property Owner listed above), , certify that I own the property identified
in this permit application and thus give permission to (the Applicant),
to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with this
submittal, which indicates the party responsible for the operation and maintenance of the stormwater system.
As the legal property owner, I acknowledge, understand and agree by my signature below, that if my designated agent (listed as the Applicant
above) dissolves his/her company or cancels/defaults on his/her lease agreement or pending sale, responsibility for compliance with the
DEMLR stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to contact DEMLR immediately
and submit a completed Name/Ownership Change Form within 30 days; otherwise, I will be oeprating a stormater treatment facility without a
valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statute 143-
215.1 and may result in appropriate enforcement action including the assessment of civil penalties up to $25,000 per day, pursuant to NCGS
143-215.6.
Signature:
Date:
, a Notary Public for the Slate of
County of , do hearby certify that
personally appeared before me this _ day of _
and acknowledge the due execution of the application for a stormwater permit.
Witness my hand and official seal,
SEP 2 ° 2014
commission expires
Seal
PartrtlVII: Applicant's Certification
I, (the Applicant listed above), 6fsr L'T/ze7L x a9NK-/fp�S `G,SS.gL certify that the information included
on this permit applicant form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved
plans, that the required deed restrictusion and protective covenants will be recorded, and that the proposed project complies with the
requirements of the applicable state stormwater rulpsand requirements.
Signature:
Date: 7 / H/ZC/y
I,_ )LnUA IJ, ZalrCh ,a Notary uP blicfortheStateof 4,9,-4h (a
County of , do hearby certify that ✓i cl �.e<SR
personally appeared before me this day of .JU 14 , .2o 1 H
and acknowledge the due execution of t application fora ormwer,Permit.
Witness my hand and official seal,—/7�.Iir
Seal
�QT AF?
My Comm. Expires
may 11,2019
LL pUBl,\o U=
rrunrl
commission expires
STORM-EZ
7/10/2014
Version 1.2 Application Page 5 of 5