Loading...
HomeMy WebLinkAboutSW6140102_HISTORICAL FILE_20140306STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW lT�lO DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD ft�W LETTER OF TRANSMITTAL ICKSON community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27 Division of Energy Mineral and TO: Land Resources Archdale Building 512 N. Salisbury Street Room 942S Raleieh, INC 27604 ATTENTION: Larry Wade 607 919.782.0495 tel. 919.782.9672 fax i DATE: March 6, 2014 RE: Town of Hope Mills Town Hall Drainage & BMP Retrofit Project Stormwater Permit Additional Information We are sending via: ®Overnight ❑ Regular Mail ❑ Pick-up ❑ Hand Delivered The following items: ❑ Correspondence ❑ Plans ❑ Specifications ® Other as listed below: COPIES DATE NO. DESCRIPTION 2 3/6/14 1 Topographic Ma 2 3/6/14 2 Revised Sheet showing maintenance access 2 3/6/14 3 Hydraulic calculations THESE ARE TRANSMITTED as checked below: ® For Approval ❑ As Requested ❑ Approved as Submitted ❑ Returned for Corrections ❑ For Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ Forward to Subcontractor REMARKS: COPY TO: 20120068.00.RA SIGNED: Tom M J MAR 0 7 Z014 Town Hall Proposed Design - 10-year storm EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.022) -------------------------------------------------------------- Town Hall Proposed Design - 10-year storm Preferred Alternative NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just On results from each reporting time step. Analysis Options Flow Units ............... CPS Process Models: Rainfall/Runoff ........ YES Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... CORVE_NOMBER Flow Routing Method ...... DYNWAVE Starting Date ............ JUN-01-2010 00:00:00 Ending Date .............. JUN-02-2010 00:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:15:00 Wet Time Step ............ 00:15:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 2.00 sec WARNING 04: minimum elevation drop used for Conduit 20-19 WARNING 02: maximum depth increased for Node "13 WARNING 02: maximum depth increased for Node '14 WARNING 02: maximum depth increased for Node +17 WARNING 02: maximum depth increased for Node +18 WARNING 02: maximum depth increased for Node +19 WARNING 02: maximum depth increased for Node +20 WARNING 02: maximum depth increased for Node *45 WARNING 02: maximum depth increased for Node +46 WARNING 02: maximum depth increased for Node -54 WARNING 02: maximum depth increased for Node +61 WARNING 02: maximum depth increased for Node *70 WARNING 02: maximum depth increased for Node +77 WARNING 02: maximum depth increased for Node +78 WARNING 02: maximum depth increased for Node *79 WARNING 02: maximum depth increased for Node 44 WARNING 02: maximum depth increased for Node 42 WARNING 02: maximum depth increased for Node 41 WARNING 02: maximum depth increased for Node 40 SWMM5 Page 1 Town Hall Proposed Design - 10-year storm Volume Depth Runoff Quantity Continuity acre-feet inches Total Precipitation ...... --------- 33.683 ------- 5.524 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 16.386 2.687 Surface Runoff ........... 16.085 2.638 Final Surface Storage .... 1.295 0.212 Continuity Error (8) ..... -0.246 Volume Volume Flow Routing Continuity x....... acre-feet 10^6 gal DryWeatherInflow 0.000 --------- 0.000 Wet Weather Inflow ....... 16.001 5.214 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 0.000 0.000 Internal Outflow ......... 0.044 0.014 Storage Losses ........... 11.702 3.813 Initial Stored Volume .... 0.003 0.001 Final Stored Volume ...... 4.289 1.398 Continuity Error (%) ..... -0.194 Highest Continuity Errors Node Pr_Hioretention (100.00%) Node *11_12 (69.37%) Node 10 (65.56%) Node *54 (7.40%) Node 42 (-3.43%) **************+************ Time -Step Critical Elements Link 94-93 (30.28%) Highest Flow Instability Indexes Link 72_71 (7) Link Golfview-C (6) Link *PondConnection (5) Link 73_72 (5) Link Golfview-E (5) Routing Time Step Summary Minimum Time Step 0.50 sec Average Time Step 1.85 sec Maximum Time Step 2.00 sec Percent in Steady State 0.00 Average Iterations per Step 2.38 Subcatchment Runoff Summary xx*.....*........x..*.**..* -------------------------------------------------------------------------------------------------------- Total Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Coeff Subcatchment in in in in in 10^6 gal CFS SWMM 5 Page 2 Town Hall Proposed Design - 10-year storm -------------------------------------------------------------------------------------------------------- Basin? 5.52 0.00 0.00 3.77 1.69 0.03 0.57 0.305 Basinl 5.52 0.00 0.00 2.66 2.58 1.42 14.44 0.467 Basing 5.52 0.00 0.00 2.66 2.71 0.78 9.65 0.491 Basins 5.52 0.00 0.00 2.73 2.50 0.64 4.93 0.452 Basin6 5.52 0.00 0.00 3.50 1.95 0.07 1.22 0.354 Basin4 5.52 0.00 0.00 2.32 3.12 0.51 8.63 0.564 Basin3 5.52 0.00 0.00 2.67 2.78 0.15 2.86 0.504 Basing 5.52 0.00 0.00 3.49 1.95 0.03 0.42 0.354 Basin9 5.52 0.00 0.00 2.44 2.97 0.11 1.62 0.537 Basin12 5.52 0.00 0.00 3.38 1.89 0.44 3.21 0.342 Basin13 5.52 0.00 0.00 2.16 3.26 0.49 7.52 0.590 Basin14 5.52 0.00 0.00 2.04 3.43 0.08 1.50 0.621 Basinll 5.52 0.00 0.00 2.45 3.02 0.01 0.29 0.547 Basin10 5.52 0.00 0.00 3.71 1.74 0.01 0.19 0.314 Basin15 5.52 0.00 0.00 2.35 3.09 0.06 1.06 0.559 Basin5A 5.52 0.00 0.00 2.89 2.56 0.05 0.91 0.464 Basin513-1 5.52 0.00 0.00 0.61 4.88 0.13 2.71 0.883 Basin5B-2 5.52 0.00 0.00 3.68 1.76 0.08 1.33 0.319 Basin5B-3 5.52 0.00 0.00 1.85 3.60 0.15 2.61 0.651 ****************** Node Depth Summary Average Maximum Maximum Time of Max Depth Depth HGL Occurrence Node Type Feet Feet Feet days hr:min --------------------------------------------------------------------- *13 JUNCTION 2.76 6.50 153.96 0 17:11 *14 JUNCTION 2.40 5.88 153.97 0 17:10 *16 JUNCTION 1.46 4.07 153.98 0 17:10 *17 JUNCTION 1.75 4.49 153.98 0 17:09 *18 JUNCTION 1.52 4.03 153.99 0 17:09 *19 JUNCTION 1.41 3.76 153.99 0 17:09 *20 JUNCTION 1.40 3.65 154.00 0 17:07 8967 JUNCTION 1.09 3.32 153.97 0 17:10 8970 JUNCTION 1.18 3.43 153.97 0 17:10 8975 JUNCTION 1.15 3.44 153.97 0 17:11 *45 JUNCTION 1.80 4.59 153.98 0 17:10 *46 JUNCTION 1.59 4.28 153.98 0 17:09 *54 JUNCTION 1.27 3.56 153.99 0 17:09 *61 JUNCTION 1.56 4.05 153.98 0 17:09 *70 JUNCTION 2.11 5.27 153.97 0 17:10 *72 JUNCTION 0.33 3.37 158.92 0 12:51 *73 JUNCTION 0.33 2.88 158.58 0 12:51 *74 JUNCTION 0.32 3.48 159.42 0 12:53 *75 JUNCTION 0.27 2.97 159.20 0 12:53 *76 JUNCTION 0.26 2.76 159.37 0 13:01 *77 JUNCTION 0.23 2.43 159.46 0 13:02 *78 JUNCTION 0.22 2.29 159.59 0 13:02 *79 JUNCTION 0.91 2.79 153.98 0 17:09 *80 JUNCTION 0.37 1.06 153.98 0 17:08 *90 JUNCTION 0.11 0.45 154.90 0 13:01 *91 JUNCTION 0.12 0.50 157.48 0 13:01 *92 JUNCTION 0.13 0.54 160.10 0 13:00 *93 JUNCTION 0.22 0.90 160.64 0 13:00 *94 JUNCTION 0.22 0.97 160.84 0 13:00 *95 JUNCTION 0.21 0.97 161.02 0 13:00 GolfView-Dn JUNCTION 0.30 5.54 162.14 0 12:32 GolfView-Pond JUNCTION 0.33 6.12 161.67 0 12:33 GolfView-Up JUNCTION 0.32 3.47 161.95 0 12:34 Library JUNCTION 0.44 2.78 161.81 0 12:31 NicoletDr-Dn JUNCTION 0.43 1.43 162.79 0 13:00 NicoletDr-Up JUNCTION 0.28 0.93 164.41 0 13:00 44 JUNCTION 2.64 6.31 153.96 0 17:11 42 JUNCTION 2.43 5.86 153.96 0 17:11 41 JUNCTION 2.38 5.74 153.96 0 17:11 40 JUNCTION 2.35 5.67 153.96 0 17:11 Rockfish-DN JUNCTION 0.85 2.71 153.99 0 17:09 SWMM 5 Page 3 Town Hall Proposed Design - 10-year storm 69 JUNCTION 0.55 1.94 153.94 0 17:09 '21 JUNCTION 0.12 0.30 154.68 0 13:00 Rockfish JUNCTION 0.20 0.57 155.57 0 13:00 Outfall OUTFALL 2.00 2.00 147.00 0 00:00 10 STORAGE 3.77 8.94 153.94 0 17:09 *11 12 STORAGE 3.42 7.94 153.94 0 17:10 Pr Bioretention STORAGE 0.00 0.00 155.40 0 13:14 Node Inflow Summary ------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Lateral Total Time of Max Inflow Inflow Inflow Inflow Occurrence Volume Volume Node Type CFS CFS days hr:min 10-6 gal 10^6 gal ------------------------------------------------------------------------------------- *13 JUNCTION 0.00 19.97 0 13:03 0.000 1.561 *14 JUNCTION 0.00 10.18 0 13:04 0.000 0.913 *16 JUNCTION 0.00 0.44 0 13:23 0.000 0.001 *17 JUNCTION 0.00 7.33 0 13:03 0.000 0.763 *18 JUNCTION 0.00 6.52 0 13:03 0.000 0.721 *19 JUNCTION 0.00 6.53 0 13:02 0.000 0.740 *20 JUNCTION 0.00 4.91 0 13:00 0.000 0.639 8967 JUNCTION 0.00 0.07 0 19:12 0.000 0.001 8970 JUNCTION 0.42 0.42 0 13:00 0.025 0.026 8975 JUNCTION 0.00 0.41 0 13:00 0.000 0.025 *45 JUNCTION 0.00 9.84 0 13:02 0.000 0.902 *46 JUNCTION 0.91 0.91 0 13:00 0.048 0.048 '54 JUNCTION 0.00 1.76 0 13:00 0.000 0.111 *61 JUNCTION 0.00 2.59 0 13:01 0.000 0.144 *70 JUNCTION 0.00 9.82 0 13:03 0.000 0.896 *72 JUNCTION 0.00 3.79 0 13:00 0.000 0.205 *73 JUNCTION 0.00 3.88 0 13:00 0.000 0.215 *74 JUNCTION 1.33 3.94 0 13:00 0.083 0.215 *75 JUNCTION 0.00 2.63 0 13:05 0.000 0.132 *76 JUNCTION 0.00 2.60 0 13:05 0.000 0.132 *77 JUNCTION 0.00 2.56 0 13:00 0.000 0.132 *78 JUNCTION 2.71 2.71 0 13:00 0.132 0.132 *79 JUNCTION 0.00 2.59 0 13:01 0.000 0.145 *80 JUNCTION 0.00 2.59 0 13:01 0.000 0.145 *90 JUNCTION 0.00 2.59 0 13:01 0.000 0.145 '91 JUNCTION 0.00 2.59 0 13:00 0.000 0.145 *92 JUNCTION 0.00 2.60 0 13:00 0.000 0.145 *93 JUNCTION 0.00 2.60 0 13:00 0.000 0.145 *94 JUNCTION 0.00 2.61 0 13:00 0.000 0.145 *95 JUNCTION 2.61 2.61 0 13:00 0.145 0.145 GolfView-Dn JUNCTION 2.86 29.82 0 12:36 0.151 0.930 GolfView-Pond JUNCTION 0.00 21.61 0 12:36 0.000 1.473 GolfView-Up JUNCTION 9.65 9.65 0 13:00 0.778 0.780 Library JUNCTION 0.00 15.46 0 13:00 0.000 1.474 NicoletDr-Dn JUNCTION 1.06 15.49 0 13:00 0.063 1.475 NicoletDr-Up JUNCTION 14.44 14.44 0 13:00 1.412 1.412 44 JUNCTION 0.19 10.59 0 13:00 0.010 0.662 42 JUNCTION 1.62 10.47 0 13:00 0.112 0.654 41 JUNCTION 0.29 8.89 0 13:00 0.014 0.544 40 JUNCTION 8.63 8.63 0 13:00 0.506 0.506 Rockfish-DN JUNCTION 1.80 1.80 0 13:00 0.096 0.096 69 JUNCTION 1.50 1.50 0 13:00 0.076 0.076 *21 JUNCTION 0.00 4.92 0 13:00 0.000 0.639 Rockfish JUNCTION 4.93 4.93 0 13:00 0.639 0.639 Outfall OUTFALL 0.00 0.00 0 00:00 0.000 0.000 10 STORAGE 7.52 88.17 0 12:36 0.485 3.339 *11 12 STORAGE 3.21 23.07 0 13:02 0.439 2.277 Pr Bioretention STORAGE 0.00 4.55 0 12:55 0.000 0.197 Node Surcharge Summary SWMM 5 Page 4 E Town Hall Proposed Design - 10-year storm Surcharging occurs when water rises above the top of the highest conduit Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet *16 _______________________________________________________ JUNCTION 10.27 2.569 1.471 *72 JUNCTION 0.73 1.870 0.000 *73 JUNCTION 0.67 1.380 0.000 '74 JUNCTION 0.60 1.984 0.546 *75 JUNCTION 0.61 1.720 0.000 '76 JUNCTION 0.53 1.507 1.133 ...*********..****.** Node Flooding Summary Flooding refers to all water that overflows a node, whether it ponds or not Total Maximum Maximum Time of Max Flood Ponded Hours Rate Occurrence Volume Depth Node Flooded CFS days hr:min 10^6 gal Feet __________________________________________________________________________ *72 0.25 2.31 0 12:57 0.006 3.37 '73 0.39 2.14 0 12:59 0.009 2.88 *75 0.01 0.09 0 13:13 0.000 2.97 *.****.*************** Storage Volume Summary -------------------------------------------------------------------------------------------- Average Avg E&I Maximum Max Time of Max Maximum Volume Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full Loss 1000 ft3 Full days hr:min CFS ____________________________________________________________________________________________ 10 63.291 29 65 150.220 69 0 17:09 5.17 *11 12 27.305 22 63 70.602 57 0 17:10 17.80 Pr Bioretention 0.001 0 100 0.005 0 0 13:14 0.00 Outfall Loading Summary Flow Avg. Max. Total Freq. Flow Flow Volume Outfall Node Pont. CFS CFS 10^6 gal ----------------------------------------------------------- Outfall 0.00 0.00 0.00 0.000 ___________________________________________________________ System 0.00 0.00 0.00 0.000 ***********.******** Link Flow Summary _____________________________________________________________________________ Maximum Time of Max Maximum Max/ Max/ IFlowl Occurrence Velocl Full Full Link Type CFS days hr:min ft/sec Flow Depth _____________________________________________________________________________ Nicolet CONDUIT 14.44 0 13:00 749 0.31 0.59 Nicolet-Over CONDUIT 0.00 0 00:00 0.00 0.00 0.00 Golfview-A CONDUIT 15.46 0 13:00 6.77 0.72 0.68 Golfview-A-Over CONDUIT 0.00 0 00:00 0.00 0.00 0.00 SWMM5 Page 5 Town Hall Proposed Design - 10-year storm Golfview-B CONDUIT 21.61 0 12:36 10.03 0.53 1.00 Golfview-B-Over CONDUIT 0.00 0 00:00 0.00 0.00 0.00 Golfview-C CONDUIT 38.55 0 12:36 22.44 0.18 0.59 Golfview-C-over CONDUIT 2.65 0 12:33 2.28 0.00 0.01 Golfview-D CONDUIT 28.75 0 12:36 11.23 0.77 1.00 Golfview-D-Over CONDUIT 0.00 0 00:00 0.00 0.00 0.14 Golfview-E CONDUIT 33.24 0 12:36 23.91 0.28 0.61 Golfview-E-Over CONDUIT 0.00 0 00:00 0.00 0.00 0.00 Library CONDUIT 1.50 0 13:00 5.98 0.07 1.00 Library -Over CONDUIT 0.00 0 00:00 0.00 0.00 0.07 40-41 CONDUIT 8.60 0 13:00 2.75 0.69 1.00 Police -A -Over CONDUIT 0.00 0 00:00 0.00 0.00 0.07 41-42 CONDUIT 8.85 0 13:00 2.87 0.72 1.00 Police-B-Over CONDUIT 1.89 0 19:00 0.22 0.00 0.09 42-44 CONDUIT 10.40 0 13:00 3.31 0.84 1.00 Police-C-Over CONDUIT 0.03 0 17:11 0.31 0.01 0.20 44-+13 CONDUIT 10.53 0 13:00 3.35 0.75 1.00 Main-E-Over CONDUIT 0.23 0 17:30 0.08 0.00 0.08 `PondConnection CONDUIT 17.80 0 12:37 8.09 0.44 1.00 Pond -Over -Spillway CONDUIT 0.00 0 00:00 0.00 0.00 0.00 Outfall Pipe CONDUIT 0.00 0 00:00 0.00 0.00 0.50 13-12 CONDUIT 19.89 0 13:02 5.01 0.90 1.00 Over_13-11_12 CONDUIT 0.00 0 00:00 0.00 0.00 0.50 14-13 CONDUIT 10.10 0 13:04 2.37 0.45 1.00 Over_14-13 CONDUIT 0.00 0 00:00 0.00 0.00 0.08 16-45 CONDUIT 0.44 0 13:23 0.33 0.04 1.00 17-45 CONDUIT 7.33 0 13:04 2.92 0.32 1.00 Over_17-45 CONDUIT 0.00 0 00:00 0.00 0.00 0.18 18-17 CONDUIT 6.51 0 13:04 2.89 0.29 1.00 19-18 CONDUIT 6.52 0 13:03 3.26 0.29 1.00 Over_19-18 CONDUIT 0.00 0 00:00 0.00 0.00 0.04 20-19 CONDUIT 4.91 0 13:00 2.89 4.23 1.00 Over_20-19 CONDUIT 0.00 0 00:00 0.00 0.00 0.11 21-20 CONDUIT 4.91 0 13:00 4.66 0.05 0.57 8967-8970 CONDUIT 0.07 0 19:12 0.17 0.01 1.00 Over_41-42 CONDUIT 0.00 0 00:00 0.00 0.00 0.00 8975-8970 CONDUIT 0.41 0 13:00 2.59 0.22 1.00 Over_42-44 CONDUIT 0.00 0 00:00 0.00 0.00 0.00 44-13 CONDUIT 0.41 0 13:01 0.47 0.02 1.00 Over_44-13 CONDUIT 0.00 0 00:00 0.00 0.00 0.00 45-70 CONDUIT 9.82 0 13:03 4.29 0.44 1.00 46-17 CONDUIT 0.87 0 13:00 0.83 0.00 0.24 Over_46-17 CONDUIT 0.00 0 00:00 0.00 0.00 0.00 54-19 CONDUIT 1.70 0 13:04 0.81 0.24 1.00 Over_54-19 CONDUIT 0.00 0 00:00 0.00 0.00 0.09 61-42 CONDUIT 2.65 0 13:23 3.30 0.15 1.00 62-61 CONDUIT 0.00 0 13:23 0.00 0.00 0.50 70-14 CONDUIT 9.79 0 13:04 3.21 0.43 1.00 Over_70-14 CONDUIT 0.00 0 00:00 0.00 0.00 0.00 7271 CONDUIT 4.55 0 12:55 9.67 0.79 0.50 73 72 CONDUIT 3.79 0 13:00 3.08 0.67 1.00 74-73 CONDUIT 3.88 0 13:00 2.65 0.67 1.00 75-74 CONDUIT 2.61 0 13:00 2.17 0.74 1.00 76-75 CONDUIT 2.63 0 13:05 2.49 0.75 1.00 77-76 - CONDUIT 2.60 0 13:05 2.76 0.64 1.00 78-77 CONDUIT 2.56 0 13:00 2.98 0.57 1.00 Over_78-77 CONDUIT 0.00 0 00:00 0.00 0.00 0.00 79-61 CONDUIT 2.59 0 13:01 4.19 0.14 1.00 Over_79-61 CONDUIT 0.00 0 00:00 0.00 0.00 0.00 80-79 CONDUIT 2.59 0 13:01 5.25 0.23 0.82 90-80 CONDUIT 2.59 0 13:01 4.48 0.17 0.39 91-90 CONDUIT 2.59 0 13:01 6.05 0.28 0.38 92-91 CONDUIT 2.59 0 13:00 5.32 0.35 0.42 93-92 CONDUIT 2.60 0 13:00 3.26 0.78 0.62 94-93 CONDUIT 2.60 0 13:00 2.79 0.74 0.71 95-94 CONDUIT 2.61 0 13:00 2.69 0.74 0.74 Rockfish5wale-21 CONDUIT 4.92 0 13:00 2.33 0.02 0.11 Rockfish5wale-54 CONDUIT 1.76 0 13:00 0.57 0.01 0.78 Flow Classification Summary SWMM 5 Page 6 Town Hall Proposed Design - 10-year storm ----------------------------------------------------------------------------------------- Adjusted --- Fraction of Time in Flow Class ---- Avg. Avg. /Actual Up Down Sub Sup Up Down Froude Flow Conduit Length Dry Dry Dry Crit Crit Crit Crit Number Change ----------------------------------------------------------------------------- Nicolet 1.00 0.04 0.00 0.00 0.01 0.95 0.00 0.00 1.63 0.0000 Nicolet-Over 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 Golfview-A 1.00 0.04 0.00 0.00 0.05 0.91 0.00 0.00 1.18 0.0000 Golfview-A-Over 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 Golfview-B 1.00 0.04 0.00 0.00 0.07 0.89 0.00 0.00 1.85 0.0000 Golfview-B-Over 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 Golfview-C 1.00 0.04 0.00 0.00 0.59 0.37 0.00 0.00 4.55 0.0006 Golfview-C-Over 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.0000 Golfview-D 1.00 0.04 0.00 0.00 0.07 0.89 0.00 0.00 2.41 0.0002 Golfview-D-Over 1.00 0.98 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 Golfview-E 1.00 0.04 0.00 0.00 0.52 0.44 0.00 0.00 5.22 0.0008 Golfview-E-Over 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 Library 1.00 0.04 0.00 0.00 0.42 0.01 0.00 0.53 1.27 0.0000 Library -Over 1.00 0.90 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 40-41 1.00 0.04 0.00 0.00 0.96 0.00 0.00 0.00 0.30 0.0001 Police -A -Over 1.00 0.81 0.19 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 41-42 1.00 0.04 0.00 0.00 0.96 0.00 0.00 0.00 0.29 0.0020 Police-B-Over 1.00 0.81 0.08 0.00 0.10 0.00 0.00 0.00 0.00 0.0000 42-44 1.00 0.04 0.00 0.00 0.96 0.00 0.00 0.00 0.33 0.0006 Police-C-Over 1.00 0.84 0.06 0.00 0.11 0.00 0.00 0.00 0.01 0.0000 44-*13 1.00 0.04 0.00 0.00 0.96 0.00 0.00 0.00 0.26 0.0001 Main-E-Over 1.00 0.84 0.05 0.00 0.11 0.00 0.00 0.00 0.00 0.0000 'PondConnection 1.00 0.04 0.00 0.00 0.66 0.30 0.00 0.00 0.84 0.0003 Pond -Over -Spillway 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 Outfall Pipe 1.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 13-12 1.00 0.04 0.00 0.00 0.49 0.00 0.00 0.47 0.40 0.0001 Over_13-11_12 1.00 0.55 0.45 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 14-13 1.00 0.04 0.00 0.00 0.95 0.00 0.00 0.00 0.18 0.0000 Over_14-13 1.00 0.89 0.11 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 16-45 1.00 0.31 0.17 0.00 0.51 0.00 0.00 0.00 0.00 0.0000 17-45 1.00 0.04 0.00 0.00 0.96 0.00 0.00 0.00 0.26 0.0001 Over_17-45 1.00 0.72 0.28 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 18-17 1.00 0.04 0.02 0.00 0.94 0.00 0.00 0.00 0.31 0.0000 19-18 1.00 0.06 0.00 0.00 0.94 0.00 0.00 0.00 0.34 0.0000 Over_19-18 1.00 0.81 0.19 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 20-19 1.00 0.06 0.00 0.00 0.50 0.00 0.00 0.44 0.27 0.0002 0ver_20-19 1.00 0.81 0.19 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 21-20 1.00 0.05 0.00 0.00 0.79 0.16 0.00 0.00 0.49 0.0000 8967-8970 1.00 0.04 0.35 0.00 0.61 0.00 0.00 0.00 0.00 0.0000 Over_41-42 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 8975-8970 1.00 0.04 0.00 0.00 0.90 0.06 0.00 0.00 0.25 0.0002 0ver_42-44 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 44-13 1.00 0.05 0.00 0.00 0.95 0.00 0.00 0.00 0.05 0.0000 0ver_44-13 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 45-70 1.00 0.04 0.00 0.00 0.48 0.00 0.00 0.48 0.41 0.0000 46-17 1.00 0.04 0.00 0.00 0.68 0.00 0.00 0.28 0.12 0.0000 Over_46-17 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 54-19 1.00 0.06 0.00 0.00 0.93 0.00 0.00 0.02 0.07 0.0001 Over_54-19 1.00 0.79 0.21 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 61-42 1.00 0.13 0.00 0.00 0.50 0.08 0.00 0.29 0.69 0.0001 62-61 1.00 0.08 0.62 0.00 0.30 0.00 0.00 0.00 0.00 0.0000 70-14 1.00 0.04 0.00 0.00 0.96 0.00 0.00 0.00 0.33 0.0000 0ver_70-14 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 72 71 1.00 0.05 0.00 0.00 0.09 0.86 0.00 0.00 2.25 0.0150 73 72 1.00 0.04 0.00 0.00 0.96 0.00 0.00 0.00 0.59 0.0037 74-73 1.00 0.04 0.00 0.00 0.96 0.00 0.00 0.00 0.60 0.0009 75-74 1.00 0.04 0.01 0.00 0.95 0.00 0.00 0.00 0.50 0.0005 76-75 1.00 0.04 0.00 0.00 0.96 0.00 0.00 0.00 0.60 0.0005 77-76 1.00 0.04 0.00 0.00 0.96 0.00 0.00 0.00 0.66 0.0003 78-77 1.00 0.04 0.00 0.00 0.96 0.00 0.00 0.00 0.75 0.0001 Over_78-77 1.00 0.99 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 79-61 1.00 0.08 0.00 0.00 0.86 0.06 0.00 0.00 0.23 0.0000 0ver_79-61 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000 80-79 1.00 0.08 0.00 0.00 0.42 0.50 0.00 0.00 0.77 0.0000 90-80 1.00 0.06 0.00 0.00 0.77 0.17 0.00 0.00 0.51 0.0000 SWMM 5 Page 7 Town Hall Proposed Design - 10-year storm 91-90 1.00 0.05 0.00 0.00 0.00 0.00 0.00 0.95 1.63 0.0000 92-91 1.00 0.05 0.00 0.00 0.00 0.00 0.00 0.95 1.35 0.0000 93-92 1.00 0.05 0.00 0.00 0.00 0.00 0.00 0.95 0.71 0.0000 94-93 1.00 0.04 0.00 0.00 0.13 0.00 0.00 0.83 0.73 0.0000 95-94 1.00 0.04 0.00 0.00 0.13 0.00 0.00 0.83 0.74 0.0000 RockfishSwale-21 1.00 0.04 0.00 0.00 0.96 0.00 0.00 0.00 0.45 0.0000 RockfishSwale-54 1.00 0.04 0.00 0.00 0.96 0.00 0.00 0.00 0.08 0.0000 Conduit Surcharge Summary --------- Hours Full -------- Conduit Both Ends Upstream Dnstream ----------------------------------------------------- Golfview-B 0.08 0.08 0.08 Golfview-D 0.51 0.51 0.51 Library 4.77 4.77 4.77 40-41 11.04 11.04 11.04 41-42 11.04 11.04 11.04 42-44 11.04 11.04 11.04 44-*13 11.06 11.06 11.06 *PondConnection 10.96 10.96 10.96 13-12 10.80 10.80 10.80 14-13 10.63 10.63 10.63 16-45 10.27 10.27 10.27 17-45 9.67 9.67 9.67 18-17 8.41 8.41 8.41 19-18 7.64 7.64 7.64 20-19 8.72 8.72 8.72 8967-8970 9.20 9.20 9.20 8975-8970 9.49 9.49 9.50 44-13 9.52 9.52 9.52 45-70 9.92 9.92 9.92 54-19 10.15 10.15 10.15 61-42 10.15 10.15 10.15 70-14 10.37 10.37 10.37 73_72 0.65 0.65 0.67 74-73 0.60 0.60 0.60 75-74 0.61 0.61 0.61 76-75 0.53 0.53 0.53 77-76 0.46 0.46 0.46 78-77 0.43 0.43 0.43 79-61 7.73 7.73 7.73 Analysis begun on: Thu Mar 06 14:45:48 2014 Analysis ended on: Thu Mar 06 14:45:52 2014 Total elapsed time: 00:00:04 Hours Hours Above Full Capacity Normal Flow Limited ---------------------- 01 01 01 15 29 01 08 01 01 01 01 01 01 01 04 01 01 01 01 01 01 01 24 09 03 03 03 01 01 SWMM 5 Page 8 ;a Town of Hope Mills Town Hall Drainage and BMP Retrofit Project Figure 2.2.1: Project Area Legend 1... : Town Hall Drainage Area —►— Proposed Conveyance — Existing Conveyance i.+ Proposed BMPs 1!! Proposed Parking lot O Manhole/Junction O Grate Inlet ® Curb Inlet a Catch Basin s Pipe End fl� 0 150 300 Feet 1 inch = 300 feet rD I�CKSON Wade, Larry From: Wade, Larry Sent: Wednesday, February 05, 2014 10:50 AM To: 'tmurray@wkdickson.com' Subject: Town of Hope Mills Drainage Improvements Mr. Murray, Based on our telephone discussion this morning- 1. Provide a topographic map to show the entire project area that clearly verifies the drainage calculations provoded include any off -site areas. 2. Show a access maintenance easement for the new bioretention basin. 3. Demonstrate the hydraulic design for the system will function properly for the increased flows to the two existing (improved) stormwater ponds. Thanks, Larry W. Wade PE Telephone: (919) 807-6375 Fax: (919) 807-6494 Stormwater Perm itting'Program North Carolina Department of Environment & Natural Resources Division of Energy Mineral and Land Resources 1612 Mail Service Raleigh, NC 27699-1612 Physical Address - 512 N. Salisbury St. Room 942S Raleigh, NC 27604 ************************This is a government E-mail address**************************** *********E-mails sent and received from this address can be disclosed to third parties************ Narrative Town Hall Drainage & BMP Retrofit Project Town of Hope Mills The Town of Hope Mills is requesting a Stormwater Management Permit from NCDENR-DEMLR for the paving of a parking lot associated with drainage improvements to a Town owned park. Typically the Town reviews and approves stormwater permit applications within its municipal limits, however since the Town is the Owner of the project, they are requesting a review and permit from NCDENR-DEMLR to avoid a conflict of interest. The Town Hall Drainage & BMP Retrofit Project will redirect and attenuate drainage to relieve flooding on the Town Hall Campus property and the adjacent Rockfish Road. The entire project will be located on Town owned property, which currently includes Town Hall, Police Department, the Parks and Recreation Center and a Town park with baseball fields, therefore no easements are required. The existing drainage infrastructure conveys drainage from Rockfish Road through an 18" pipe that is located between the Rec Center and Town Hall. Portions of the pipe have a negative slope. The negative slope coupled with blockages from tree roots significantly limits the functionality of the pipe and causes flooding along Rockfish Road and Park Boulevard. Drainage that is able to be conveyed through the 18" pipe flows north and west to an existing infiltration basin. This basin as well as an adjacent infiltration basin to the northeast collect runoff from the site and slowly infiltrates that runoff to the ground. There is no existing direct discharge to a receiving stream. A portion of the drainage area includes a dirt parking lot that currently results in significant sediment runoff during storm events that clogs the existing conveyance system and infiltration basins. As part of this project, the existing dirt parking lot approximatley 1-acre in size will be paved. This is the only portion of the project that results in an increase of impervious area. The runoff from the parking lot will be treated by a bioretention area along Park Boulevard. The required treatment volume for the parking lot is 4,662 cubic feet, however the bioretention area is 6,937 cubic feet which will treat runoff from 1.5" of rainfall. In addition to the bioretention area, both existing infiltration basins will be regraded and scarified to increase the infiltration rate of the basins, however these basins are not needed to provide the required water quality treatment from the parking lot. The infiltration basins will remain as the outfall of the drainage basin. There is no direct discharge to a stream or other waterbody. The soils throughout the project site have an infiltration rate of approximately 20 inches/hour as shown in the attached geotechnical report. The project meets requirements of the Town's NPDES Phase II permit (see Appendix E) by providing an opportunity for public education related to stormwater treatment by siting the bioretention area directly adjacent to a heavily traveled walking trail. The Town intends on adding educational signage next to the bioretention area describing stormwater treatment. E-1 Application Completeness Review d First Submittal ❑ Re -submittal Development/Project Name: Receiving stream name ?iver Basin: Gn.PG Fr=&A. Date Received: I - W 1q Date Reviewed: 1 .21- t't By Larry Classification: For post -construction requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-I, WS-II, WS-III, WS-IV, HQW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient Management Strategy. High Density Projects that require a 401/404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water Sheds): Latitude and Longitude: 3,4'S8' 21.-4" f`I-7$°S7' 2/.7" I j Jurisdiction FRo Project Address: e 1 Engineer name and firm: Ti /onAAS McJr2RpY " pis 1.L K. Di�KSo �1 two )mac Phone: 919 -782 oq+1 Email: n,urrns� Law c San.cew, Is the project confirmed to be in the State MSI Stormwater Permtjurisdiction? ❑'Yes or ❑ No ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets CiHigh Density ❑ Other ❑ 401/404 impacts to surface waters, wetlands, and buffers (add language to cover letter and/or add info letter) ei BUA 13.0 d Check for $505.00 included e Original signature (not photocopy) on application d' Legal signature (Corporation-VP/higher, Partnership -General Partner/higher, LLC-member/manager, Agent). Check spelling, capitalization, punctuation: http://www.secretary.state.nc.us/corporations/thepage.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. 1 Copy of property deed showing ownership or control ❑ For subdivided projects, a signed and notarized deed restriction statement dl'�/ Sealed, signed & dated calculations O Correct supplement and O&M provided for each BMP on site (check all that were provided & number of each) Er Bioretention ❑ Dry Detention Basin ❑ Filter Strip ❑ Grass Swale ❑ Infiltration Basin ❑ Infiltration Trench ❑ Level Spreader ❑ Permeable Pavement ❑ Restored Riparian Buffer ❑ Rooftop Runoff Management ❑ Sand Filter ❑ Stormwater Wetland ❑ Wet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Road ca'� Two sets of sealed, signed & dated layout & finish grading plans with appropriate details Z Narrative Description of stormwater management provided o' Soils report, geotech information provided ❑ Wetlands delineated or a note on the plans or in the accompanying documents that none exist on site and/or adjacent property [Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; 2'� Dimensions & slopes provided ❑ Drainage areas delineated ❑ Pervious and impervious reported for each ❑ Areas of high density 2"� BMP operation and maintenance agreements provided 2r'�Application complete ❑ Application Incomplete Returned: (Date) Comments Apnl 26, 2013 Revision, Bill Diuguid IF SL 2006-246 Section 9 Post Construction Requirements for Non -Coastal Counties Low -density oroiects ❑ No more than two dwelling units per acre or 24% built -upon area; o Vegetated conveyances to the maximum extent practicable; ❑ Built -upon areas at least 30 feet landward of perennial and intermittent surface waters; ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures. High density oroiects ❑ Control and treat runoff from the first one -inch of rain. ❑ Runoff volume drawdown time must be a minimum of 48 hours, but not more than 120 hours; ❑ Discharge the storage volume at a rate equal to or less than the predevelopment discharge rate for the one-year, 24-hour storm. ❑ Achieve 85% average annual removal of total suspended solids. ❑ For BMPs that require a separation from the seasonal high-water table (SHWT), the separation shall include at least 12 inches of naturally occurring soil above the SHWT. ❑ Stormwater management measures must comply with the General Engineering Design Criteria For All Projects requirements listed in 15A NCAC 2H .1008(c); ❑ All built -upon areas are at least 30 feet landward of perennial and intermittent surface waters; ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures ❑ Provide a mechanism to require long-term operation and maintenance of Best Management Practices Goose Creek, Six Mile Creek and Waxhaw Creek Watersheds Buffer Requirements ❑ Undisturbed riparian buffers within 200 feet of water bodies within the 100-Year Floodplain and within 100 feet of water bodies that are not within the 100-Year Floodplain. Exceptions to the undisturbed buffer requirements are set forth in 15A NCAC 02B .0607 Stormwater Controls as required by 15A NCAC 02B .0602 ❑ Control and treat the difference between the pre -development and post -development conditions for the one- year, 24-hour storm with structural controls. ❑ Development and redevelopment shall implement stormwater management measures that promote infiltration of flows and ground water recharge for the purpose of maintaining stream base flow. ❑ 85% average annual removal of total suspended solids. ❑ Draw down the treatment volume no faster than 48 hours, but no slower than 120 hours, for detention ponds. ❑ Discharge the storage volume at a rate equal or less than the pre -development discharge rate for the one- year, 24-hour storm. ❑ Meet design or stormwater management measures set forth in 15A NCAC 2H .1008. High Density Projects that require a 401/404 within an NSW ❑ 85% TSS a 30% TN ❑ 30% TP April 26, 2013 Revision, Bill Diuguid Town Hall Drainage and BMP Retrofit Project Design Calculations January 8, 2014 ? C.hnre n r G3i"5i Bio-Retention Area Sizing Project: Town Hall Location: Hope Mills NC Completed by: TLM Dale: 12/5/2013 Drainage Propperties Drainage Area, (DA) _ Impervious Area c= Pervious Area c= 0.35 Cc= Intensity(10)= . Q10= % Impervious = Temporary Water Quality Pool Design Storm Rainfall Runoff Coeff. (Rv = 0.05 + 0.009 (% Imperv.)) _ Required Volume (design rainfall)(Rv)(DA) = Elevation of Vegetation: Depth of Storage= Surface Area Req.= Surface Area Provided= Storage Volume Provided = Is storage Volume Sufficient? Draw Down of Water Quality Volume (Darcy's Law) Q=-KiA K: Hydraulic conductivity is Hydraulic gradient((Pb-Pa)/L) A: Area of Media Pb: Pressure Head at top of Pond Pa: Pressure Head at bottom of media L: Length (depth of media) For Water Quality Volume (WQV) 2.78 a _1.27 ac 1.51 ac 0.62 7.18 12.47 46 % 1.00 in (Typically 1-in) 0.46 aclac 4,662 cf 155.40 ft 12 in 4,662 sf [-7,490 sf 6.945 cf t'IX.9 Maximum Water surface elevation in the BR for WQV: 156.4 ft Surface Elevation of BR: Depth of Pool: 1 ft Hydralic gradient: 1 ft (Pb-Pa)/L Area: 6•,�945 sf '— Hydraulic Conductivity:(K):_J in/hr Hydraulic Conductivity:(K) 2.3148E-05 ft/sec Peak Flow IQ): 0.161 cfs Volume of Ponding Water: 6945.00 cf Peak Flow (Q): 0.161 cfs Ponded Water Draw Down Time: 12.00 hours Draw Down into first 24" of media: 36 hours Underdrain Sizing D=16'[(Q"n)/(s-0.5)]A(3/8) D: Diameter of single pipe Q: flow rate times safety factor of 2 to 10 n: roughness factor (recommended to be 0.011) s: internal slope (0.5% minimum) Adjusted flow Q: 0.16076 cfs' 3 = 0.48229167 cfs Roughness factor n: 0.011 Internal slope s: 0.005 Diameter of single pipe D: 4.012 (Surface Area of Pond at P deep) (From Darcy Law) Formed Volume/Peak Flow) (Hydraulic Conductivitiyl depth of media) Hydrograph Report Hydratlow Hydrographs Extension for AutoCAD® Civil 3D®2012 by Autodesk, Inc. v9 Tuesday, 12110 12013 Hyd. No. 2 bio Hydrograph type = Reservoir Peak discharge = 1.705 cfs Storm frequency = 10 yrs Time to peak = 18 min Time interval = 1 min Hyd. volume = 1,418 cuft Inflow hyd. No. = 1 - parkinglot Max. Elevation = 156.60 ft Reservoir name = bioretention Max. Storage = 5,832 cuft Storage Indication method used. Q (cfs 12.00 10.00 Gi OD] M 4.00 2.00 1LT61 bio Hyd. No. 2 -- 10 Year 0 10 20 30 40 50 60 70 Hyd No. 2 — Hyd No. 1 T _—j Total storage used = 5,832 cult Q (cfs) 12.00 fNl[HI: 4.00 2.00 a 80. Time (min) LLP "Setting ihe-Standard for Service" June-12,2012, Mr. Tom Murray,;P..E. WNk Dickson & Company'. Inc. 720 Corporate Center-Dri4e - Raleigh, North Carolina 27607 Reference: Reportof Infiltration'Testing Town Hall Drainage Improvement Project Town of Hope Mills Rockfish ROad,and GolfviewAoad Hope,,Mills,, North Carolina- ECS Project Number 332005 Dear Mr: Murray:. ECS Carolinas, LLP (ECS) recently, conducted Infltration,testing for the proposed'-BMP's at the Hope Mills Town Hall. The site is,located at the intersection of -Rockfish :Road and GoIfview Road, in .Hope .Mills, North Carolina. The purposee, of"this exploration, is to obtain subsurface information -of, the in -place soils for the proposed BMP's. This letter, with attachments, is the report of ourtesting. FleldTesting 'On :June 7; 2012, ECS conducted an exploration of the subsurface soil and groundwater conditions at the proposed stormwater BMP areas by advancing three hand auger borings (1-1 through 174into the existing ground surface. The app�oximate'hand auger boring.locations are shown -on -the attached Boring: Location Diagram,(Figure 2): The subsurface soils encountered in the hand auger borings were visually classified'in the field. ECS also" 'recorded the ground water.'level 'and the seasonal high water table.(SHWT) observed in each of the hand auger, borings,at'the'time of drilling; The. attached Infiltration Testing'Form provides -a summary of the " subsurface conditions encountered,at-the; hand auger boring, locations. The groundwater level=and'SHWT below existing grade elevation were:estimated;at the boring locations. The findings are listed below: Location Water Level SHWT, 1-1 Greater Than'108`inches 84.inches 1-2 Greater Than 108.inches 82 inches 1-3 Greater Than 108.inches 95inches ECS also conducted three (3) infiltration tests utilizing a compact head permeameter near the hand auger borings to estimate the infiltration rate for the subsurface`soils. Infiltration tests are typically conducted at two feet below the SHWT. If the SHWT is.less than three feet, the tests are conductedat ten inches below the surface elevation. 726 Ramsey Street, Suite 3, Fayetteville, NC 28301 , T. 910-1401-3288 • .F: 910-323-0539 • www.ecslimited.com ECS Carolinas, LLP • ECS Florida, LLC • EC5Mitlwest, LLC • ECS Mid -Atlantic, LLC •. ECS.Southeast, LLG. ECSTexas, LLP Report of Infiltration Testing Town.Hall Drainage Improvement Project r Town of Hope. Mills Hope Mills; North Carolina ECS Project Number 33:2006 June 11,2012 - Field Test Results A summaryof the infiltration tests are listed below. Location.. ' Description '' - . _ '_Depth ' „' inches/hour:-` 1-1 Orange fine to medium 60 inches 22.5 SAND I-2 Tan/orange fine to medium 58 inches 18.5 SAND 1-3 Tan fine to medium SAND 72 inches 21.6 Infiltration rates and SHWT may _vary within the proposed site due to changes in elevation and subsurface conditions. Closure The activities and evaluative approaches used in this assessment are consistent with those normally employed inassessments of this type. ECS's testing of the site conditions have -been based on our understanding of the project information and the data obtained during our field activities. ECS appreciates the opportunity to provide our services -to you on this project. Should.you have any questions or if we could be of further assistance, please do not hesitate to contact us at (910) 401-3288. Respectfully Submitted, ECS CAROLINA% LLP_ Firm License No. F-1078 Thomas B. Baird, P.E. Senior Geotechnical Engineer NC PE License No. 016244 Attachments: Figure 1 — Site Location Map Figure 2 - Boring Location Diagram Infiltration Testing Form �vvv cott'Dowell, P.E. Branch Manager NC PE License No. 037387 Infiltration Testing Form Town Hall.Drainage'Improvement Project Town of Hope Mills ECS Project No. 33:2005 June 7, 2012 Location Depth Soil Description l=1 0.-10" Gray silty SAND 10"-48" Tan fine SAND 48"-86" Orange fine to medium SAND 86"7108" Tan/orange clayey SAND Seasonal High. Water Table was estimated to be at 84.0 inches below the existing grade elevation. Infiltration Rate: 22.5 inches per hour Test was conducted at 60.0 inches below existing grade elevation Groundwater > 108.0-inches below existing grade elevation Location Depth Soil Description I-2 0-6" Gray silty SAND 6"-50" Tan/orange fine SAND w/ silt 50"-98" Tan/orange fine to medium SAND 98" A 08" Tan/orange clayey SAND Seasonal High Water Table was estimated to be at 82.0 inches below the existing grade. elevation. Infiltration Rate: 18.5 inches per hour Tesfwassconducted at 58.0 inches below existing grade elevation Groundwater > 108.0 inches below existing grade elevation Location Depth Soil Description 1-3 0-12" Orange fine to coarse clayey SAND 121140" Tan/orange fine SAND w/ silt 40"-108" Tan fine to medium SAND Seasonal High Water Table was estimated to be at 95.0 inches below the existing grade elevation. Infiltration Rate: 21.6 inches per hour Test was conducted at 71.0 inches below existing grade elevation Groundwater > 108.0 inches below existing grade elevation �8IC KSON community infrastructure consultants January 8, 2014 Mr. Mike Randall North Carolina Division of Environment and Natural Resources North Carolina Division of Energy, Mineral and Land Resources Land Quality Section 512 N. Salisbury Street — Archdale Building 9`h Floor Raleigh, North Carolina 27604 RE: Stormwater Permit Town Hall Drainage and BMP Retrofit Project WK Dickson #20120068.00.RA Dear Mr. Randall: The Town of Hope Mills has contracted with W.K. Dickson & Co., Inc. for design of storm drainage improvements including a paved parking lot which requires stormwater treatment. Typically the Town would review stormwater permits required by the Town's NPDES Phase II permit, however the Town is the Owner of the project. Therefore, the Town would like to request NCDENR to review the enclosed stormwater permit Enclosed for your approval are the following as required in the permit application: • Original and one copy of the permit application • Supplement form D @�� O&M agreement t,1n • Application fee of $505.00 V • Narrative JAN • USGS map 1 +2014 • Design calculations wo NR • Two (2) sets of sealed plans deg • Geotechnical Report ere • NRCS soils map • Deed All land disturbing activity will be performed on Town of Hope Mills property and NCDOT right-of- way. 720 Corporate Center Drive Raleigh, NC 27607 Tel. 919.782.0495 Fax 919.782.9672 www.wkdickson.cont Transportation • Water Resources • Urban Development • Geomatics Please advise us if you need any additional information for our request to be considered and accepted. If any steps can be taken to expedite the processing of this application, or if you have any questions or concerns, please do not hesitate to call us at (919) 782-0495. Sincerely, W.K. on & Co Inc. V ` � DickssI Tom Murray, PE Project Manager Enclosures cc: Elisabeth Brown — Town of Hope Mills Stormwater Administrator 20120068.00.RA File 4368 275 -435a 0275 STATE 01 ,ReapF.itei... IC 1029 ctlea Tn $18.00 BX4368PGO275 RECEIVED 95 SEP -8 Pit 1105 GEORGE E. TATUM REGISTER OF DEEDS CUMRERLAW) CO., WC � . ttmr. soot w F.A. Tax lot NA.. ..... ..._.. .._............. ......... __ ........... P.m.I Identifier No. .............. ......... ..... ....... ................. Verified b1... ........... . .. ....,......... County on the .. . _..... day of ...... . __...,.... ..... ip. b1.............. .... _.. ... .. .. ..._.... .. ....._.... ............ ...... __ ............... Mall Attar recordist to William R. Davie P.O. Box 566 Hope ,Mills, NC 28348-0566 .............._...... ....... ................._......._........... ...._.................................. .._........ _.........._.......__...... Th4 instrument ... preMrod by ., Nlliam.. R.._Davie, .Attorney.. at..LaW...... Brief description for the Index NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED We this ...28th day of ......_JulY.. ................. .... .. 19 9_5_., by and between GRANTOR GRANTEE HOPE MILLS YOUTH ASSOCIATION, INC. I ,TOWN OF HOPE MILLS, a North Carolina municipality, 3701 South Main Street Hope Mills, NC 28348 Aa° At emeerale Weed, ti same eery: s a., was , an, u .ywnw.as. swat a mutt, w..wsareu.s se The dealtnaties Grantor ad Crests As used harols shall Include said pectin, their helm, auccesson, and entire , and Abell Ieelud. I.Vlae, ptotal, masculine, feminina or rector a required by ...test. WITNESBETH, that the Gmntoq for s valuable consideration Daid by the Gretna. the receipt of which is hereby AemowladrM, has And by than protests don part barrel , sell and convey unto the Grantee In fm simple, all that certsi. lot or p&mAl of land Aitu.ted in the City of Rope .Mills _„ Rockfish,.. ... ... T.wrahip, .. Cumberland ,. County, North Carolina and more particularly described a follows SEE EXHIBIT "A" ATTACKED HERETO. KC.w.,vowra.>o 1176,14aeaamn-..,.a..mb.�...w i"rwi�a. mr r w 436E 276 -4368 1. . 0276 BK4368PG0276 The p.P.Iy b.wlnabov. deecrlbed wee u,W.d by Greeter by ine,o..t recorded m....................._........._....._.._...... _...... Hook 4289, Page 605, Cumberland County Registry_of .Deeds.,, ._.... .. .. ....._.... ... ......._ ... ....... ......._ . .. A map rberl., the abor. deacdbad progrb la reeolded In Plat Hook .. _...... _.......... .......... ➢aye..._............,...... TO HAVE AND TO HOLD the afareaaid lot or Motel of lud and all privilege and APPUMthencee thereto beloaglay he the Grmbee in fee Meept. And the Grantor covenabbe wIth the Gastae, that Grantor is "load of the Premiaes In fee simple, has the rlabt to rnave the ease, In fee dmple, that title la searbmble and free end clear of atl ...u.bnucn, and that Gnntor will ..at sad defend Me UW against Me lawful elalma of all peraons whoamwr exce➢t for Me enceptton. bereinafter crated. Title to the Pneparty henlnabow described b aobjct to the following aaceptloe: Subject -to -easements, restrictions and rights -of -way appearing of record in the Cumberland County Registry of Deeds. LN wRMYr wnaaor W 01. W N W 1.n .+.N jNY NM.r� N M WYe Yu4 Wa 41Y py uW1W n N, b 1n1 Y M YnW YI4N ., ..n 61 . W Nn YNYA W ue rr -xore_n_;FLs.-xQu's'N.-ttHSQCznTxOH,...zttca _...--- (CUW.Y M.ra i V --- --- ----('L-ci�i'Y1.-....------ m w,vwv 'A aMrx ruaouaa....-_.._----------_----------.-c....r. rYY..a. ... .... ......------- — --------- ' -'-- ----- --------------------- SEAL e•f i A FeuWb .aF.n, ..I«. w aY W .N N.uv1.yN W nn.J.. J ae I.nIYa1 YnameM w.Wu.V •�- i Wa Y. .111JIWY u.n. W. ... Yr .l ....... ........ te. .1 N.a ..rnn:-------------- ---------------- ---- ------------- .---- ..-------------- awn rNo, an. 4 a. ------------- omar. (�/� 4. NM..y )seed N a. Ce .O —a a— a1N...N. pout) WI t.1.JY.A1rY+. .-.. ..................... rwYV a .- F. t' !ti_it� .A �.�. .-t.• i. 1.. a XN fi.W. «rrm[u.. Ya WL.1 NawIV aalr en1. W r e. ut .t w ..,Y1aty W cuea+V .W.... au W W r e. . ..Y j r,r.M.e W1N rN In .NFnY .W u1 YM-tYapFge� I �- - - -serer. R..... ..Q - -I..L 1aA1Z ------.- The h/alq%,e&d an be omma. TW Wwa.mtmddb v.dOnrerr dWf rN•m.W a Itrdw.d li.and in me aookand Pepr.ban aaa dr M, fee land. 080Y08 . TANY I REGISTLDI OF DUDS FOR CUMBERIAI81 COUNTY, dAI /l. a+.J Deem)/Ap", - R.01. d Denh r Xce. nr.. rn. w.,ai.,.. saran ,_....-.Y....,• .... ..........�.. 4360 277 4368 . 0277 SK43680®0271 TRACT 1; BEGINNING at an iron stake said stake being the Southeast corner of Lot tl, Block 6 of Oak Crest Subdivision as recorded in Plat Book 11, Page 13, Cumberland County Registry and being located where the Northern margin of Rockfish Avenue intersects with the Western margin of Fayetteville Street (which is now withdrawn from dedication) and mooing thence with the Northern margin of Rockfish Avenue North 75 degrees 06 minutes West 100.00 feet to en iron stake, the Southwest comer of Lot i2 of foresaid subdivision; thence with the Western line of said Lot #2 North 14 degrees 56 minutes Bast 130.00 feet to a concrete monument the Northwest corner of said Lot 02; thence South 75 degrees 06 minutes Bast 100.00 feet to an iron stake the Northeast comer of foressid Lot 11 thence with the Eastern line of said Lot it South 14 degrees 56 minutes West 130.00 feet to the BEGINNING, and being all of Lots tl i 02, Block 6, Oak Crest Subdivision, an recorded in Book of Plats 11, Page 13, Cumberland County Registry. BEGINNING At a concrete monument in the Northern margin of Rockfish Avenue said monument being the Southeast corner of Lot t5, Block 6 of Oak Crest Subdivision, as recorded in Book of Plate 11, Page 13, Cumberland County Registry, said monument being located North 75 degrees 04 minutes West 200.00 feet from where the Northern margin of Rockfish Avenue intersect. with the Eastern margin of Fayetteville Street (now withdrawn from dedication) and running thence with Northern margin of said Rockfish Avenue North 75 degrees 04 minutes West 50.00 feet to a concrete monument the Southwest corner of said Lot 15; thence with the Western line of Lot 15 North is degrees 56 minutes East 130.00 feet to a concrete monument, the Northwest corner of said Lot #5; thence with the Northern line of said Lot #5 South 75 degrees 06 minutes Bast 50.00 feet to a concrete monument the Northeast corner of said Lot i5; thence with the Eastern line of said Lot f5 South 16 degrees 56 minutes West 130.00 feet to the BEGINNING, and being all of Lot }5, Block 6, Oak Crest Subdivision, as recorded in Book of Plate 11, Page 13, Cumberland County Registry. L3 m L73 S J5b5'33. E w 99.90' ' U4 o I / + TRUSTEES OF z b' S 75 42 9' E LEBANON LODGE #391 TOWN OF HOPE MILLS 149.97' DEED BOOK 2849, PACE 803 DUO BOOK 4368. PACE 275 I e ec �� �c• C tl9 RS' / / / / / / / ra L / 1 \ / z / COUNTY OF CUMBERLAND o OB. 3440, PG. 748 I 5 m I / N I / � — J 9 'B' O 28.75 ACRES N 8020'42' W 60.42' U 3 a b H o n ^1 TOWN OF HOPE MILL b DEED BOOK 2572, PAGE 4 CONTR CORNER RICHARDSON k SON / CONSTRUCTION, INC. PLAT BOOK 59. PAGE `21 `1