Loading...
HomeMy WebLinkAboutSW6140101_APPROVED PLANS_20140131STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW (9�XIX9/ DOC TYPE ❑ CURRENT PERMIT IVAPPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE`���� YYYYMM DD $$SYSTIME$$ $$USERNAME$$ 0 C L 10 1 I 2 FOLIO - FOR OFFICIAL USE ONLY B 6' 10' 6' _ JJ DITCH TOP OF BANK A �• A' �3' 3' 2' 3' 3' IX1, I ryyFLOWUNE FLOWUNE ELEVATION POINT CONTROL POINT 4' THICK 3,000 PSI CONCRETE w/6x6 10/10 WWF 10' DITCH BRA B' SECTION B-B' TOP OF BANK (WIDTH VARIES) PLAN 22' 16' 3' 3' 10' 3' 3' TOP (coN1ROL ELEvnnoN) BTM 18' TURNDOWN, ALL AROUND (TYP) 3m SLOT (WEIR-DO1 ONLY) SECTION A -A' / 1 1 CONCRETE CHECK DAM ;P2,011C�P22 NTS IN Nf PLAN GRAVEL FOREBAY 20I C�22 NTS UNDERDRAIN ACCESS 14-1/4"x19-1/2"02" DEEP, PLASTIC WATER METER BOX WITH SOLID COVER. r SECTION A -A' 18- TURNDOWN. ALL AROUND (") SCREW TYPE PLUG W/CLEANOUT ADAPTER CLEARANCE 1" MIN.- 3" MAX. A 1- I I I COUPLING LIMIT OF FILTER MEDIA =III=I I NON -PERFORATED III=III-III-III=I I =I _ _ PVC PIPE FILTER MEDIA - - III- � PERFORATED HDPE PIPE I I LL END CAP FILTER MEDIA 6" MIN. TEE-WYE COUPLING NOTE: ALL PIPE AND FITTINGS TO MEET ASTM F758-82 SPECIFICATIONS. 300' MAXIMUM DiSTANCE BETWEEN CLEANOUTS UNDERDRAIN CLEANOUT DETAIL NTS C EDGE OF PAVEMENT 8" GRAVEL PRE-TREATMENT STRIP (BMP-2) VARIES VARIES REFER TO SHEET CG120 I----�- 100' MAX. 10" #57 STONE 4" WASHED SAND - SOD BOTTOM AND SIDES SEE NOTE 3 J 0 N GI 5 EDGE OF PAVEMENT 8" GRAVEL PRE-TREATMENT STRIP (BMP-2) - 4 UNDERDRAIN EXISTING/PROPOSED GRADE •� CLEANOUT TYP 2 CONTRIUKL \ - OL VARIES -1 I -= I I-i 1 `4- PERMEABLE FILTER FABRIC PERFORATED HDPE UNDERDRAIN. REFER TO PLANS FOR SIZE & LOCATION NOTES: 1. SOIL PROFILE IN THE BIORETENTION AREAS SHALL BE A HOMOGENEOUS SOIL MIX OF (85-88% BY VOLUME OF SAND USDA SOIL TEXTURAL CLASSIFICATION), 8-12% FINES. SILT CLAY) WILL BE AS SHOWN. THEN� PHOSPHORUS(SUCH INDEX OF THE SOILMOSS MEDASHALL RANGE MATERIAL THE MEDIA E BETWEEN 10 AND 30. 2. CONTRACTOR SHALL VERIFY THE COMPOSITION OF THE EXISTING SOIL AND COORDINATE WITH THE GEOTECHNICAL ENGINEER TO ENSURE SOIL MEDIA SPECIFICATION IS MET. 3. BIORETENTION AREA SHALL BE SODDED WITH KOREAN LAWNGRASS ZOYZIA (ZOYZIA JAPONICA 'ZENITH'). AVOID SOD THAT IS GROWN IN SOIL THAT HAS AN IMPERMEABLE LAYER SUCH AS CLAY. 4. FILTER FABRIC SHALL BE PERMEABLE NON -WOVEN GEOTEXTILE FABRIC SUCH AS MIRAFT N-SERIES OF APPROVED EQUAL 5. SEASONAL HIGH WATER TABLE (SHWT) ELEVATIONS TAKEN FROM GEOTECHNICAL REPORT BY ECS DATED APRIL 1, 2013, AND ADDITIONAL SHWT REPORT DATED APRIL 24, 2013. 6. BIORETENTION FACILITIES SHALL BE PROTECTED FROM SEDIMENT FROM UPSTREAM DRAINAGE AREAS WITH SILT FENCE OR OTHER ACCEPTABLE MEASURES UNTIL ENTIRE UPSTREAM AREA IS STABILIZED. SEE EROSION CONTROL PLANS FOR ADDITIONAL INFORMATION. BIORETENTION SURFACE AREA TOP OF PONDING TOP OF MEDIA BOTTOM OF SOIL MIXTURE BOTTOM OF STONE CLEARANCE TO SHWT UP DOWN UP DOWN UP DOWN EXG SHWT UP BMP-1A 3,875 251.00 250.00 250.00 248.00 248.00 246.83 246.83 253.00 244.00 2.83 BMP-1B 3,240 251.00 250.00 250.00 248.00 248.00 246.83 246.83 251.00 242.00 4.83 BMP-2 1 4,300 251.50 250.00 250.001 248.00 248.001 246.83 246.83 252.00 243.00 3.83 BMP-3 19,530 245.00 245.00 244.00 243.00 242.00 241.83 240.83 247.00 238.00 3.83 POST-A02A 1,180 252.00 252.70 251.50 250.70 249.50 249.53 248.33 j 251.50 j 242.50 7.03 POST-A02B 1,580 251.50 251.50 250.50 249.50 248.50 248.33 247.33 252.00 243.00 5.33 PCST-A03A 1,180 249.60 250.50 249.10 248.50 247.10 247.33 245.93 250.00 241.00 6.33 POST-AO3B 850 248.60 249.10 248.10 247.10 246.10 245.93 244.93 249.50 240.50 5.43 POST-A03C 810 248.10 248.10 247.10 246.10 245.10 244.93 243.93 249.00 240.00 4.93 POST-AO3D 750 247.20 247.20 246.20 245.20 244.20 244.03 243.03 249.00 240.00 4.03 POST-AO4A 11950 245.70 245.80 244.70 243.80 242.70 242.63 241.53 249.00 234.67 7.96 POST-AO4B 1,700 244.80 244.80 243.80 242.80 241.80 241.63 240.63 248.90 234.57 7.06 POST-AO4C 1,850 243.90 243.90 242.90 241.90 240.90 240.73 239.73 248.40 234.07 6.66 POST-AO4D 1,800 243.00 243.00 242.00 241.00 240.00 239.83 238.83 248.30 233.97 5.86 POST-A05 1,040 240.40 242.00 239.90 240.00 237.90 238.83 236.73 243.20 225.70 13.13 POST-B01A 880 252.90 253.80 251.90 251.80 249.90 250.63 248.73 254.00 245.00 5.63 POST-B01B 920 251.90 251.90 250.90 249.90 248.90 248.73 247.73 252.60 243.60 5.13 POST-BO2A 720 250.60 250.40 249.60 248.40 247.60 247.23 246.43 251.00 242.00 POST-B02B 920 249.60 249.60 248.60 247.60 246.60 246.43 245.43 250.50 241.50 E43 BIORETENTION AREA CG' 1 IC:P22 NTS 12" PONDING DEPTH - III--� I I• EXISTING SUBGRADE SHWT (SEE CHART BELOW FOR ELEVATION) BIORETENTION SURFACE AREA TOP OF PONDING TOP OF MEDIA BOTTOM OF SOIL MIXTURE BOTTOM OF STONE CLEARANCE TO SHWT UP DOWN UP DOWN UP DOWN I EXG SHWT UP POST-B02C 800 248,20 248.70 247.70 246.70 245.70 245.53 244.53 250.20 241.20 4.33 POST-B03A 1,600 247.6U 247.70 246.60 245.70 244.60 244.53 243.43 249.40 240.40 4.13 POST-BO38 1 1,250 246.80 246.80 245.801 244.80 243.80 243.63 242.63 250.50 236.17 7.46 POST -BOW 1,300 246.00 246.00 245.00 244.00 243.00 242.83 241.83 250.40 236.07 6.76 POST-BO4A 1,960 244.601 244.70 243.60 242.70 241.60 241.53 240.43 249.60 232.10 9.43 POST-BO4B 1,150 244.00 244.00 243.00 242.00 241.00 240.83 239.83 250.00 232.50 8.33 POST-BO4C 1,130 243.40 243.40 242.40 241.40 240.40 240.23 239.23 249.75 232.25 7.98 POST-CO3A 600 245.50 245.50 244.50 243.50 242.50 242.33 241.33 245.30 236.301 6.03 POST-0O3B 1,200 244.50 244.50 243.50 242.50 241.50 241.33 240.33 243.20 226.20 15.13 POST-CO4B 770 245.50 245.50 244.50 243.50 242.50 242.33 241.33 246.00 237.00 5.33 POST-CO4C 1,600 244.50 244.50 243.50 242.50 241.50 241.33 240.33 245.10 228.10 13.23 POST-DO2 660 253.40 253.40 252.40 251.40 250.40 250.23 249.23 254.00 245.00 5.23 POST-D03A 2,000 251.50 252.10 251.00 250.10 249.00 248.93 247.83 252.901 243.90 5.03 POST-DO3B 2,050 250.50 251.10- 250.00 249.10 248.00 247.93 246.83 250.50 241.50 6.43 POST-DO5A 530 244.50 246.10 244.00 244.10 242.00 242.931 240.W 248.60 239.60 3.33 POST-DO5B 950 243.60 244.00 243.101 242.00 241.10 240.83 239.93 245.90 228.90 11.93 POST-DO6B 770 246.001 246.00 245.00 244.00 243.00 242.83 241.83 244.80 235.80 7.03 POST-DO6C 1,450 245.001 245.00 244.001 243.00 242.00 241.83 240.83 243.60 234.60 7.23 &I*oLOI � C-522 100% STORMWATER (ROADWAY) SUBMITTAL FOR PERMITTING ONLY FOLIO - FOR OFFICIAL USE ONLY L/31/201j- I *3/zoL3 US ARMY CORPS OF ENGINEERS WILMINGTON J Q U Z LL JO H U cn W j it 0z ULI O 0 v~i 0 Qm (.9� Ix co O LL LL O PLATE REFERENCE NUMBER C-522 JSHIEET 6262 $$DGNSPEC$$ $$SYSTIME$$ $$USERNAPIE$$ 1 FOLIO - FOR OFFICIAL USE ONLY 2 R, !n 5 L �7 C SEE NOTE 4 1D 2" WEEP HOLES Y --� PLAN WITH GRATE & FRAME REMOVED TOP ELEVATION - STD 840.16 FRAME & GRATE BRICK COPING _ (INCIDENTAL) 5'1 A 16 DOWEL (SEE QCP+T1r1Al N/ vo NOTE 4) DOWEL MAX PIPE THIS SIDE - 18" SECTION Y-Y' NOTES: 1. USE CLASS 'B ' CONCRETE THROUGHOUT. 2. PROVIDE ALL DROP INLETS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH NCDOT STD DRAWING 840.66. 3. OPTIONAL CONSTRUCTION - MONOLITHIC POUR 2" KEYWAY OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. 4. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. 5. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON NCDOT STD NO 804.00. 6. CONSTRUCT WITH PIPE CROWNS MATCHING. 7. SEE NCDOT STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN. 8. INSTALL 2" WEEP HOLES AS DIRECTED BY THE ENGINEER. 9. INSATLL STONE DRAINS, OF A MINIMUM OF 1 CUBIC FOOT OF NO 78M STONE IN A POURUS FABRIC BAG OR WRAP, AT EACH WEEP HOLE OR AS DIRECTED BY THE ENGINEER. 10. CHAMFER ALL EXPOSED CORNERS 1". 11. DRAWING NOT TO SCALE. DIMENSIONS AND QUANTITIES FOR DROP INLET (BASED ON MIN HEIGHT, H) DIMENSIONS OF BOX & PIPE CUBIC YARDS CONCRETE IN BOX DEDUCTIONS FOR ONE PIPE PIPE SPAN WIDTH MIN HEIGHT BOTTOM SLAB WALL PER FT HT TOTAL CONCRETE FOR MINIMUM HEIGHT, H CM RC D A B H 12" 3'-0" 2'-0" 2'-0" 0.222 0.222 0.592 0.015 0.026 15" 3'-0" 2'-0" 2'-3" 0.222 0.222 0.648 0.023 0.036 18" 3'-0" 2'-0" 2'-6" 0.222 0.222 0.703 0.033 0.049 24" 3'-0" 2'-0" 3'-0" 0.222 0.222 0.814 0.059 0.085 30" 3'-0" 2'-0" 3'-6" 0.2221 0.222 0.920 0.092 0.127 e U Of w DROP INLET NTS U WEIR 'B' WEIR 'A' PLAN WITH GRATE & FRAME REMOVED WEIR 'B' WEIR 'A' W1 (FT.) ELEVATION W2 (FT.) D 6" NOTES: • THIS PRECAST ENDWALL MAY BE USED FOR THE FOLLOWING STANDARDS: 838,01, 838.11, 838.21, 838.27, 838.33, 838.39, 838.51, 838.57, 838.63 AND 838.69. • INSTALL PRECAST ENDWALLS WITH WINGS AND PAY FOR IN ACCORDANCE WITH SPECIFICATION SECTION 838. • USE 4000 PSI CONCRETE. • PROVIDE ALL REINFRCING STEEL WHICH MEETS ASTM A615 FOR GRADE 60 AND ALL WELDED WIRE FABRIC CONFORMING N TO ASTM A185 WITH 2" MIN CLEARANCE. _ • PLACE LIFT HOLES OR PINS IN ACCORDANCE WITH OSHA STANDARD 1926.704. • PIPE TO BE GROUTED INTO HEADWALL AT JOB SITE BY CONTRACTOR. • ALLELEMENTS PRECAAST TO MEET ASTM C913. • WELDED WIRE FABRIC MAY BE SUBSTITUTED FOR REBAR AS LONG AS THE SAME AREA OF STEEL IS PROVIDED. • CHAMFER ALL CORNERS 1" OR HAVE A RADIUS OF 1". NOTE: THE MINIMUM BAR SIZE SHALL BE #5 B1RS AT 8" CTS. THE CONTRACTOR WILL HAVE THE OPTION TO INCREASE THIS BAR SIZE AS NEEDED. ENDWALL DIMENSIONS FT MINIMUM MIN./MAX. MIN./MAX. MIN./MAX. MIN./MAX. MIN./MAX. PIPE DIA. BAR SIZE H1 (FT.) H2 (FT.) D (FT.) W1 W2 1.00 #5 ® 8" 1.25/2.00 2.00/3.75 1.25/1.75 3.00/3.75 5.50/6.00 1.25 #5 0 8" 1.25/2.00 3.00/3.75 1.25/2.00 3.50/3.75 6.50/6.75 1.50 #5 0 8" 1.25/2.00 3.00/4.25 1.50/2.50 3.50/3.75 6.50/6.75 2.00 #5 ® 8" 1.50/2.50 4.00/4.75 1.75/2.50 4.00/4.25 7.50/8.25 2.50 #5 0 8" 2.50/3.50 4.00/6.00 2.00/3.00 4.50/5.50 10.00/11.50 3.00 #5 @ 8" 3.00/3.50 5.00/6.00 2.75/3.50 5.25/5.75 11.50/11.75 3.50 #5 0 8" 3.25/4.50 6.00/6.75 3.25/3.50 6.00/6.75 12.00/13.25 4.00 #5 ® 8" 3.50/4.50 6.50/7.00 3.25/3.50 6.50/6.75 13.00/13.25 4.50 #5 ® 8" 4.00/5.00 6.50/8.50 3.25/4.00 7.00/9.25 13.50/15.75 5.00 #5 ®8" 4.50/5.00 7.00/8.50 3.25/4.00 7.25/9.25 13.75/15.75 5.50 #5 0 8" 4.50/5.00 7.50/8.50 3.25/4.00 7.25/9.25 14.00/15.75 6.001 #5 0 8" 4.50/5.00 - 7.50/8.50 3.25/4.00 7.75/9.25 14.75/16.75 PRECAST CONCRETE ENDWALL C-6O1 C-52O NTS NOTE: ALL PRECAST CONCRETE ENDWALLS SHALL BE IN ACCORDANCE WITH NCDOT 838.80, LATEST EDITION, AND INSTALLED PER NCDOT STANDARDS AND SPECIFICATIONS. NOTE: ALL DROP INLETS SHALL BE IN ACCORDANCE WITH NCDOT 840.14, LATEST EDITION, AND INSTALLED PER NCDOT STANDARDS AND SPECIFICATIONS. NOTES: CONTROL STRUCTURE DIMENSIONS 1. CONTROL STRUCTURE IS A MODIFIED CONCRETE DROP INLET. REFER TO DETAIL 1 /C519. 2. INLETS WITH WEIRS GREATER THAN 6" DEEP SHALL BE CONSTRUCTED WITH HORIZONTAL BARS AT A MAXIMUM VERTICAL SPACING OF 6". 1" DIA GALVANIZED PIPE EMBEDED IN PRECAST STRUCTURE OR OTHER APPROVED METHOD. GRATE EL WEIR 'A' ELEVATION WEIR 'B' ELEVATION SIDE VIEW CONTROLSTRUCTURE NTS WEIR 'C' END VIEW 'C' ELEVATION BMP NO STRUCTURE NO GRATE EL WEIR 'A' WEIR 'B' WEIR 'C' (x2) WIDTH ELEVATION WIDTH ELEVATION WIDTH ELEVATION BMP-1B DS-BMP1 252.00 24" 251.00 - - 12" 251.00 BMP-2 DS-BMP2 253.00 24" 251.50 - - 12" 251.50 BMP-3 DS-BMP3 247.00 4" 245.50 - - - - POND-01 DS-01 250.50 24" 248.00 - - 12" 248.00 DITCH-AO5 DS-A05 242.00 36" 240.40 - - 24" 240.40 DITCH-BO2CIDS-BO2C 1 250.00 36" 248.20 - - 24" 248.20 DITCH-B03CIDS-BO3C 1 247.60 36" 246.00 - - 24" 246.00 PLAN WITH GRATE & FRAME REMOVED ,W, NOTES: 1. DITCH BOTTOM INLET IS A MODIFIED CONCRETE DROP INLET. REFER TO DETAIL 1 /C519. 2. INLETS WITH WEIRS GREATER THAN 6" DEEP SHALL BE CONSTRUCTED WITH HORIZONTAL BARS AT A MAXIMUM VERTICAL SPACING OF 6". 1" DIA GALVANIZED PIPE EMBEDED IN PRECAST STRUCTURE OR OTHER APPROVED METHOD. FINISHED GRADE (DITCH BOTTOM) FRONT * REFER TO SHEET C-601 FOR STRUCTURE DIMENSIONS DITCH BOTTOM INLET 1 IC-520 SCALE: 1/2" = 1'-0"-1-1-XREF ' L' SIDE x2 100% STORMWATER (ROADWAY) SUBMITTAL FOR PERMITTING ONLY FOUO - FOR OFFICIAL USE ONLY $$DGNSPEC$$ - $$SYSTIME$$ $$USERNAME$$ V31J7ZI4- 1�f3/zoJ3 US ARMY CORPS OF ENGINEERS WILMINGTON IIIIIII� 1111111� U cm o zx ZO O M aN 0 °o Z6 > o PUZpop0 Nwooao w UN J� z� ~� 0 U)2 0U U� wz m � U m VO x m OJT o w K ui a¢ a N yaN m Z inJ z N O to LL lcnc3 tl K ;a W O ml :l ii` u J ¢ U z cf) 0 w it WU W jIx 0z w w O vi am wo mw w 0 m PLATE REFERENCE NUMBER C-520 SHEET 60 2 E? 5 L�7 C L 3 0 a A a a 1 FOLIO - FOR OFFICIAL USE ONLY CONSTRUCTION 136' 44' PAVEMENT NATURAL 2' PAVED 2' PAVED SHOULDER SHOULDER GRADE 18.5' 1 1,9 5' 54' 12' 16' 12' 2.pq 2' WALK LANE LANE LANE J.- '1� - -2.0%-----2-0% MIN 2.0% 2.0% 2.0% i DITCH (TRAPEZOIDAL -REFER TO CONCRETE SIDEWALK (TYP), REFER TYPICAL SECTION, THIS SHEEP) TO DETAIL ON SHEET C-506 NOTE: VERIFY PAVEMENT THICKNESS WITH GEOTECHNICAL ENGINEER PRIOR TO INSTALLATION. ASPHALT PAVEMENT TO BE IN ACCORDANCE WITH NCDOT STANDARDS AND SPECIFICATIONS. NEW DAWN DRIVE: STA 12+90 - STA 28+04, STA 33+33 - STA 36+50 CHAOS LANE: STA 10+62 - 25+18 S,gSTYPICAL ROADWAY SECTION 46' �C-3011 SCALE: 1 " = 10' 46' NATURAL GRADE 4' 5' 18.5' 18.5' WALK 2' 2 MP 2.0% MIN 2.0%_ _ _ _ _ _2.0% �.� DITCH (TRAPEZOIDAL - REFER TO TYPICAL SECTION, THIS SHEET) \ �12" COMPACTED SUBGRADE 3" SF9.5 ASPHALTIC CONCRETE PAVEMENT 9" COMPACTED CRUSHED STONE BASE MATERIAL CONSTRUCTION 109' 19' 44' PAVEMENT 2' PAVED 2' PAVED RETAINING WALL 10 LANE LANE LANE SHOULDER SHOULDER w/GUARDRAIL, REFER TO 5' 5' 5' 4' 12' 16' 12' DETAIL ON SHEEP C-526 WALK 2.0% 2.0% I 2.0% EXISTING GRADE — I _ 2' �I CONCRETE SIDEWALK (TYP), DITCH (VEE - REFER TO REFER TO DETAIL ON TYPICAL SECTION, THIS SHEET) SHEEP C-506 NOTE: VERIFY PAVEMENT THICKNESS WITH GEOTECHNICAL ENGINEER PRIOR TO INSTALLATION. ASPHALT PAVEMENT TO BE IN ACCORDANCE WITH NCDOT STANDARDS AND SPECIFICATIONS. NEW DAWN DRIVE: STA 10+60 - 12+90 TYPICAL ROADWAY SECTION - RETAINING WALL SCALE: 1 " = 10' 212' 46' 28' 2" PAVED NATURAL SHOULDER GRADE 18.5' 18.5' 5' 4' 12' — '09" 2' WALK LANE 3� ---- ----- MIN i DITCH (TRAPEZOIDAL - REFER TO CONCRETE SIDEWALK (TYP), TYPICAL SECTION, THIS SHEET) REFER TO DETAIL ON SHEET C-506 NOTE: VERIFY PAVEMENT THICKNESS WITH GEOTECHNICAL ENGINEER PRIOR TO INSTALLATION. ASPHAL7 PAVEMENT TO BE IN ACCORDANCE WITH NCDOT STANDARDS AND SPECIFICATIONS. TYPICAL ROADWAY SECTION - ROUNDABOUT SCALE: 1 " = 10' DESIGN SPEED: 40 MPH 46' NATURAL 37' 2 GRADE 4' 5' 18.5' 18.5' WALK 2' M\ M 2.0% MIN 2.0%-----_2.0% 3:1 DITCH (TRAPEZOIDAL - REFER TO TYPICAL SECTION, THIS SHEET) \ \-12" COMPACTED SUBGRADE 3" SF9.5 ASPHALTIC CONCRETE PAVEMENT 9" COMPACTED CRUSHED STONE BASE MATERIAL CONSTRUCTION 144' 2' PAVED SHOULDER 12' 2' LANE SOD CENTER OF ROUNDABOUT \-12" COMPACTED SUBGRADE 3 SF9.5 ASPHALTIC CONCRETE PAVEMENT 9" COMPACTED CRUSHED STONE BASE MATERIAL DESIGN SPEED: 40 MPH DESIGN SPEED: 25 MPH 4 DITCH PROFILE POINT PERMEABLE FILTER FABRIC-` 24" FILL SOIL 4" WASHED SAND 10" #57 STONE - h�TYPICAL DITCH SE -30V SCALE: 1" = 5' CV `--DITCH PROFILE POINT NOTE: REFER TO SOD SPECIFICATION AND INSTALLATION DETAIL ON SHEET C-505 TYPICAL DITCH SECTION - TRAPEZOIDAL SCALE: 1 = 5' 2' SOD CV BOTTOM WIDTH VARIES i- q DITCH WIDTH VARIES REFER TO PLANS TYPICAL DITCH SECTIO SCALE: 1" = 5' 2' SOD 4" CONCRETE DITCH PAVEMENT OR APPROVED ALTERNATIVE DITCH PROFILE POINT N - TRAPEZOIDAL (PAVED) � SWALE WIDTH VARIES I SOD .ALL SIDE SLOPES 2.0% I NOTE: REFER TO SOD SPECIFICATION AND INSTALLATION DETAIL ON SHEET C-505 DITCH PROFILE POINT TYPICAL DITCH SECTION - VEE BOTTOM C-30 SCALE: 1 °" = 5' EXISTING GRADE WIDTH VARIES SOD N NOTE: REFER TO SOD SPECIFICATION AND INSTALLATION DETAIL ON SHEET C-505 � � DITCH /WIDTH VARIES SOD ALL SIDE SLOPES 10' `—REFER TO DETAIL 3, SHEET C-522 FOR ADDITIONAL NOTES ON FILTER MEDIA. 75'77(2) 6" PERFORATED HDPE UNDERDRAIN CTION - BIORETENTION AREA DITCH WIDTH VARIES SOD ALL SIDE SLOPES BOTTOM WIDTH VARIES REFER TO PLANS 16' DITCH WIDTH VARIES �� 5 l0 I 1�31�2o tq cl_- o0 SOD l— �- CONCRETE DITCH PAVEMENT OR APPROVED ALTERNATIVE DITCH PROFILE POINT O w14 1TYPICAL DITCH SECTION - OUTFALL DITCH 0 SCALE: 1 " = 5' 100% STORMWATER (ROADWAY) SUBMITTAL FOR PERMITTING ONLY FOUO - FOR OFFICIAL USE ONLY US ARMY CORPS OF ENGINEERS WILMINGTON �1111119 J Q U Z wQ O 0 O ai OZ J U_ m0 w a mm mO m U- U- co PLATE REFERENCE NUMBER C-301 SHEET 78 $$DGNSPEC$$ $$SYSTIME$$ $$USERNAME$$ $$SYSTIME$$ $$USERNAME$$ 1 2 3 4 0001 ' \ tFOJ 'FFICIAL� NLY \\ , ��,\ /� / / �r\ i i �_ i I / I sf \ I �� /f / 1 > > `_ �: / /' \_, i i / DRAINAGE BASINS 5 DRAINAGE BASINS \ / / TC PATH J / / TC PATH \( l r > 1 ! BASIN ID 100 LF SHEET FLOW ( 1 t // 100 LF SHEET FLOW \ � / i / 1.90% SLOPE I / 1.30% SLOPE \ i �l 11 t s j ,� __/_J� ' � (( /\-'•���( / / � BMP-1A \�� ( / TC PATH � / ( 1 /1 / 693 LF SHALLOW BMP-1B TC PATH i! CONCENTRATED FLOW 1 I �\ / I BMP-2 672 LF SHALLOW 1.90% SLOPE t ` />� l \ \ \ \ ,\`` 1 f i I ( / CONCENTRATED FLOW / ` �' ) / \\ / \ / _ - �/ / J BMP-3 \ \ \ �� /ll Jib \ t 1 i 0.80% SLOPE \ \ \`\� 1Y� TC PATH \�\`,// ///I f111 / li OFF-AO2 \ l I t ' \' \ , 300 LF SHEET FLOW / / / `, I I 1 \ \ r I 1 _ ( t r OFF-AO3 •� \ ) r \ ! \ 3.00% SLOPE OFF-AO4 TC PATH 150 LF SHEET FLOW \ 1 t ` \ / ` ( \ ' 11(1 1 t I OFF / 1 ` / 1 / \ \ \ / I i I /� 1 5 t v ) �� A v ! 1.00% SLOPE \ OFF-A07 (ll OFF B03 TC PATH-�\} \ �_ - \ 1 \ \ ' OFF- 2 \ \ } t I I % \ OFF-B05 939 LF CHANNEL FLOW I/t r _ _ TC PATH \ / \ \" 1 330% SLOPE )>i1 i-�( 433 LF SHALLOW '��_ \ \\rl \�\\�^-� I 1 ` TC PATH 1, 281 LF SHALLOW \ t 1 \ )Il \\ I I / / / �dl CONCENTRATED FLOW `\ `OFF-A04 OFF-A03 1 _ ` - / \ \ OFF-B06 ( \ ( } ti, \ �� I CONCENTRATED FLOW - l ) \\ �' - �) { \ J f� Iih 2.30% SLOPE `\ \ \ \ / `� " /- / \ ` 11 i I 1) _ / / 1 POST-A07 \ I t II c t - \ - \ \ \ \ f r y \ 1 ' o OFF -B07 J K \ }?I _1/-_)iI{l }t }II( \\ \` \ \ \ \ \ \1l / �_ ` 1.80% SLOPE `_ s OFF-CO4 ) > t / / �I^ POND-02 \ = ! / IIIII \l l��-� = �_ _ _ _ ) t \ ` ; �r i l t l IIIN�/� � i / `rr , _ � � ® OUT-A01 \� / �--` ��J t I i 1\ / OFF-005 //! 11111) }� / i/ POST-A05 / ~ !� 1 1\ POST-A02 � \ (� 1 ) } OFF--DO1 ^'I OUT-A07 J j �r _ l \ "r I/ / POST-D02 OFF-D02 POST-AO6 POST-AO4 POST-A03 t / BASIN 'A' - NEW DAWN DRIVE �- me � � BASIN BASIN 'B' - CHAO$ LANE J POST-B02 I ' t ` TC PATH slt OFF-D04 /Ii 1 r/ - POST-B06 POST-805 POST-B04 POST-B03 ) \ POST-B07 ' '�' OFF-DO1 La 100 LF SHEET FLOW 'OFF-DO5 OFF-B04 l OFF-603 \ 0 POST-B01 - - ftm 1.30% SLOPE OFF-D06 - OFF-6OFF-D02 05 \ BMP-16 ` a � � OFF-607 / -�- ` ` i- �'�' J _ - �I� I �� POND-01 _ TC PATH \ \ OUT-01 TC PATH OFF-606 _ r ✓~ `'�r \� =�� \\�L�� _ / 332 LF SHALLOW CONCENTRATED FLOW OUT-02 87 LF SHEET FLOW �� � Y TC PATH _ ��_-_� _ �� BMP-1A ~` / OFF-D03 ' 0.70% SLOPE 0.39% SLOPE \ TC PATH ` 137 LF SHALLOW BASIN 'A' / / �f / i POST-D03 'C ! TC PATH OUT --"� 100 LF SHEET FLOW } CONCENTRATED FLOW ' y r BMP-2 �1 /_ / \ ` TC PATH 1.20% SLOPE \ 1.90% SLOPE BASIN B I\ \ / ' I \ �, } 300 LF SHEET FLOW1.00% SLOPE OUT-A07 98 LF SHEET FLOW ( / 1 l t _ TC PATH , 1 I \ ) r / \ \ 1.20% SLOPE \ ( r \ t 11 ) ) OUT-01 I 100 LF1SHEET SLOPE \`� ! / \ / 1 OFF-D04- �' / 7 l \ \ \ ) 1 I I 1 / TC PATH / \ ✓ / _ _ - - _ _ TC PATH \ \ I i - POST-001 -<- 100 LF SHEET FLOW \ \ f I / i I 44 LF SHALLOW \ TC PATH \ U \t CONCENTRATED FLOW / 100 LF SHEET FLOW 2.00% SLOPE 1 POST-0O2 �f POST-D04 lr 4.30% SLOPE 2.70% SLOPE r rr \ /------- /�� TC PATH \ \) \ t 1 1 1 t \ \ 1 f J ) - - i ` mo-� wmft � 40ft ^ 573 LF SHALLOW BASIN AREA (Ac) WEIGHTED CURVE NO BASIN ID BASIN AREA (Ac) WEIGHTED CURVE NO 0.79 74 OUT-CO5 0.03 98 0.68 76 POND-01 0.21 42 1.54 85 POND-02 0.18 81 5.24 78 POST-AO2 1.07 68 2.61 69 POST-AO3 0.86 66 6.12 62 POST-AO4 1.28 70 4.07 60 POST-A05 0.17 72 23.20 64 POST-AO6 0.34 75 1.31 56 POST-AO7 0.32 92 1.18 66 POST-601 0.92 75 0.15 66 POST-BO2 0.93 66 0.33 85 POST-BO3 0.77 63 0.22 66 POST-BO4 0.92 73 0.76 45 POST-1305 0.21 72 0.42 45 POST-BO6 0.61 71 0.96 56 POST-1307 0.74 67 0.17 51 POST-001 0.13 74 3.80 50 POST-0O2 0.34 82 3.21 64 POST-CO3 0.60 77 3.15 59 POST-CO4 1.03 61 2.38 53 POST-DO2 0.45 71 0.99 66 POST-DO3 0.84 73 1.20 69 POST-DO4 0.33 76 0.29 78 POST-DO5 0.43 72 0.12 94 POST-DO6 1.10 64 N� \ ) \ TC Pcm 0 0 ATH I 0 00 ``-� 7 NOTES: 1 I } I I J ! 1 I / \ \ \ \ \ \ /� / \ / \ ` \ CONCENTRATED FLOW 160 LF SHALLOW CONCENTRATED FLOW � Cry � \ 1.90% SLOPE \ �\ 0.50% SLOPE 1. THE LANDS SHOWN HEREON LIE WITHIN FLOOD ZONE 'X' AS DEPICTED %J /�/ / / �' ` \ t /� _ \ }__ �� \! �\ ON THE FLOOD INSURANCE RATE MAP (FIRM) COMMUNITY NUMBER \ \ BMP-3 \ \ \ POST-DO)5 - \ -\ i /� 370076, PANEL NUMBERS 9488 & 9498, SUFFIX J AND COMMUNITY i \ J TC PATH t I t / ! )t NUMBER 370077, PANEL NUMBERS 9488 & 9498, SUFFIX J DATED 300 LF SHEET FLOW /� /) \ \ \ ' �/ /14 > z,,. \ _ moo ��OST-0O3 ^ \ ) \ TC PATH J 1 JANUARY 5, 2007. 1.0% SLOPE - \ \ l \. _ \ \ 100 LF SHEET FLOW- J TC PATH - - \ \ ` 2.30% SLOPE �' r ! i 2. THE EXISTING TOPOGRAPHIC CONTOURS DEPICTED ON THIS PLAN ARE r / OFF-D05 \ 1 DERIVED FROM LIDAR DATA OBTAINED FROM USGS. 264 LF SHALLOW CONCENTRATED FLOW \ C� 1 - - /� 0.20% SLOPE - - \ \} i t 1 TC PATH f / 373 LF SHALLOW CONCENTRATED FLOW (r 1 / - i �,� ` 1 }III\I \ \ \ I I 1.90% SLOPE r \ \ I '(r `�iJ/ r i I� ( \ \ OUT-02 \ �� ( \ I LEGEND TC- rl v lr Ir PATH 100 LF SHEET FLOW r TC PATH / / �J % DRAINAGE / l r / - _ ✓ I I \ _ \ \ I - _ \ . OFF-D06 I \ I 1 J / r / I ( \ _ \ 2.2% SLOPE ' 100 LF SHEET FLOW ! / I \ SURFACE CONTOUR (EXISTING GRADE) 246 - - - - - F-004 2.40% SLOPE �/.�/ SURFACE FLOW DIRECTION t � l / / / ^ - i \ J , 1 / TC PATH 1 lh / r / / / / \ - _ \ TC PATH / r - \ POST -DEVELOPMENT DRAINAGE BASIN I 196 LF SHALLOW CONCENTRATED FLOW \ 166 LF SHALLOW CONCENTRATED FLOW I I i\I TIME OF CONCENTRATION (TC) PATH 110% SLOPE f 2.10% SLOPE > r �OSTrA=C04 OST-D06 j \->- / OFF-CO5 \ I \J/\I } \ \ \� \\J �I \� I �� \` \\ I \_� /�/ </ TC PATH i l , (\ / t \ i 33 LF SHEET FLOW 0.40% SLOPE ' 100 200 \ �S� tyj�14�t01 I�31%2oi¢ G-[o4-[04• 12/13/20 L3 100% STORMWATER (ROADWAY) SUBMITTAL FOR PERMITTING ONLY FOUO - FOR OFFICIAL USE ONLY US ARMY CORPS OF ENGINEERS WILMINGTON mmi M O 0 co zto tD ..4 W cn 6io O zx oo �6 o > �N oF- po c gzUzpopO �N Iyj �- 5 J z Wco ~� Jao O 0W� 0U � wm m 0J LLJ U� m U)X ro 0 0 w Iii a¢ z y > m G g a z N y Z m w w V (o LL U)o a a x i/ u: z UQ a < Z w o 0 Lu z_ U 0 0z w _ 0 w LU LU ¢ co Uix w 0 Of co 0 FL � � IL REFERENCE NUMBER C-104 IEET - $$DGNSPEC$$ $$SYSTIME$$ $$USERNAME$$ 1 1 2 3 5 A L rT� VICINITY MAP C-001 N.T.S. w d z N F w Z a) W ww� S s / gg 2�� OVERALL SITE MAP C-001 N.T.S. Ara 5.40 I OI 1/31/20i4' � I21*2013 G-ool 100% STORMWATER 1 yy (ROADWAY) SUBMITTAL It FOR PERMITTING ONLY 2 FOLIO - FOR OFFICIAL USE ONLY �JrJrrJYuaH�� US ARMY CORPS OF ENGINEERS WILMINGTON Y m w 0 0 a Q U U w 0 J O m 0 cD co w N Z; O O w� U 00 ZO O ON CN 0 FZ �Z 0� 00 Ijj UN HN W p d0 O,e Z� O cA�U�U� wZ m Z �2 m Oww ON�(� Ili N �Q W O z > ¢4 0 m ZU in w WQ 9cc JQ N o�ooin LLaotnO e>I >;gig so - �_ UZ d U)0 ww WU m 0z O W Q clm Z m0 U LL O PLATE ll REFERENCE NUMBER C-001 SHEET 1 E 3 5 r C SOF BRIGADE HEADQUARTERS FACILITY FORT BRAGG, NORTH CAROLINA FY 12 LI 69758 SOLICITATION NO. W912HN—O9—X-5614 CONTRACT NO. W912HN-10—D-0063, DQ01 100% STORMWATER SUBMITTAL a (ROADWAY PACKAGE) FOR PERMITTING ONLY STATUS: I " I 1' DATE: 11211 US Army Corps of Engineers W U W � Wilmington District Z,nW REGULATORY REVIEW DECEMBER 13, 2013 SHEETINDEX SHEET # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 PLATE # DESCRIPTION G-001 COVER C-001 VICINITY MAP & OVERALL SITE MAP C-103 PRE -DEVELOPMENT DRAINAGE PLAN C-104 POST -DEVELOPMENT DRAINAGE PLAN CG100 OVERALL GRADING PLAN CG122 BIORETENTION AREA PLANS - NEW DAWN DRIVE CG123 BIORETENTION AREA PLANS - NEW DAWN DRIVE CG124 BIORETENTION AREA PLANS - CHAOS LANE CG125 BIORETENTION AREA PLANS - CHAOS LANE CP201 PLAN & PROFILE - NEW DAWN DRIVE CP202 PLAN & PROFILE - NEW DAWN DRIVE CP203 PLAN & PROFILE - NEW DAWN DRIVE CP204 PLAN & PROFILE - CHAOS LANE CP205 PLAN & PROFILE - CHAOS LANE CP206 PLAN & PROFILE - ROUNDABOUT CP207 PLAN & PROFILE - OUTFALL DITCH CP208 PLAN & PROFILE - UNDERDRAIN COLLECTION OUTFALL CF209 STORM SEWER PROFILES CF210 STORM SEWER PROFILES CF211 STORM SEWER PROFILES C-301 TYPICAL SECTIONS C-519 STORM DETAILS C-520 STORM DETAILS 5w�t4otot I//zcl9 C-521 STORM DETAILS U`oo Jz/L3/Z6I3 C-522 STORM DETAILS C-601 STORM SEWER STRUCTURE TABULATION 100% STORMWATER (ROADWAY) SUBMITTAL FOR PERMITTING ONLY FOLIO - FOR OFFICIAL USE ONLY , US ARMY CORPS OF ENGINEERS WILMINGTON m w 0 z O a w w 0 J O m C3 M (b o �� w N zLC? 0 W O O 0 Ode zo o pl- O ¢Z v� �a F"O gazo, o w nN ZN w� a� 0M z1 o c)3: 8 � w Z m 00 Z w_ o0N 0 w uio aQ k Z� .. Q z� M� wQ 3d' D2 JO N 0- 00 fAa LLm (40 O_ t tl a K r% u. J UZQ LLo WW I- V W 2 W (30 0z _� O wQ U 0 m ca0 mLL LL co REFERENCE NUMBER G-001 IEET 01 $$OGNSPEC$$ $$SYSTIME$$ 5/24/2013 10:16:25 AM $$USERNAME$$