Loading...
HomeMy WebLinkAboutSW6130102_APPROVED PLANS_20130124STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SWm_51_� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD 2042 2039 SITE 2083 ., 2oi G111)0-- 2031 COO �v XISTING UT, ATER 700 McKinney Parkway--- Lillington, North Carolina 27546 910-893-7575 Contact: Shane Cummings I Know what's below. Call before you dig. W' THE m Ae 2� 6 NORTH QD f ._` D INDE 0 0 OF DRY 409 Chicago Drive -.Suite 112 f, FaretttJlle. North Cardin 28306 w e s Phone (910) 426-6777 1 0 Faa (910) 426-5777 (_ir—r Number: C-2354 6OL_UTIiON6, INC f — .! .,mow ov, 4 ON/ PHASEkTWO 1 V 1jilmom I N Al I L"! V %moo 0 WART'S CRELK TOWNSHIP -y •. � z ,� � # ~ ,® Ir ONVI LLE, RTH., CAROM NA <J Q HARN ' z cc U— o � _` / s _ _-_- _ s PROJECT NAME \ \ \,11Y z KENLAN FARMS VINGS V - .. SUBDIVISION t PH S ,_�' .0 — SITE &_EFC)SION CONTROL , El"IL A E TWO ti C6.1 CO NTI L DETAILS\. TAX ID# 0555-43-1606.000 w \ : = .; WIRE ROAD ...... R D �- ^ DETAILS STEWART'S CREEK ` � . �, C6 2/ "AT E E AI TOWNSHIP OSION CONTROL-P ANC >. ! � STORMDETA S x NEARFONVILLE P HARNETT COUNTY NORTH CAROLINA C6 —STORM DETAIL' sf �\ CLIENT F \ M ABJ INVESTMENTS, LLC. 0 Fayetteville, Month Carolina 28306 Fayetteville, North Carolina 28312 Fayetteville, North C 910426-6777 910-485-5790 910-426-E Contact: Scott Brown, PE Contact: Brain Raynor Contact: Jimmy Hulral itv email: sbrown@4dsitesolutions.com email: braynor@highlandpaving.com email: jholland@4dsitesdtU TRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 48 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE ins 3curttenty. documents p: Jarahna : ducigner - `ooniYy w@h th, - e with the '(; ); e 3 oft a� r atk Ate P1[ .,/0:3 i Netl�nd� ,i TING, UTILITIES:LOCATED. 2031 Middle Road Fayetteville, North Carolina 28312 Phone: (910) 485-5790 Fax: (910)678-9988 PROJECT INFORMATION DESIGNED BY: BEN DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 294 DRAWING SCALE SEE SHEETS DATE RELEASED JANUARY 4, 2013 UTILITY NOTES WATER 1. THE FIRE MARSHAL'S OFFICE SHALL APPROVE ALL HYDRANT TYPES AND LOCATIONS IN NEW SUBDIVISIONS. HOWEVER, HARNETT COUNTY DEPARTMENT OF PUBLIC UTILITIES (HCDPU) PREFERS THE CONTRACTORS TO INSTALL ONE OF THE FOLLOWING FIRE HYDRANTS: 1. MUELLER - SUPER CENTURION 250 A-423 MODEL WITH A 514" MAIN VALVE OPENING THREE WAY (TWO HOSE NOZZLES AND ONE PUMPER NOZZLE); 2. AM.ERICAN DARLING - MARK B-84-B MODEL WITH A 5�/a" MAIN VALVE OPENING THREE WAY (TWO HOSE NOZZLES AND ONE PUMPER NOZZLE); 3. WATEROUS - PACER B-67-250 MODEL WITH A 5/a" MAIN VALVE OPENING THREE WAY (TWO HOSE NOZZLES AND ONE PUMPER NOZZLE) OR APPROVED EQUAL FOR STANDARDIZATION. 2. FIRE HYDRANTS ARE INSTALLED AT CERTAIN ELEVATIONS. ANY GRADE CHANGE IN THE VICINITY OF ANY FIRE HYDRANT WHICH IMPEDES ITS OPERATION SHALL BECOME THE RESPONSIBILITY OF THE UTILITY CONTRACTOR FOR CORRECTION. CORRECTIONS WILL BE MONITORED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR AND THE HARNETT COUNTY FIRE MARSHAL. 3. THE PROFESSIONAL ENGINEER (PE) SHALL OBTAIN AND PROVIDE THE NCDENR "AUTHORIZATION TO CONSTRUCT" PERMIT TO THE UTILITY CONTRACTOR BEFORE THE CONSTRUCTION OF THE WATER LINE SHALL BEGIN. THE UTILITY CONTRACTOR MUST POST A COPY OF THE NCDENR "AUTHORIZATION TO CONSTRUCT" PERMIT ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - DIVISION OF ENVIRONMENTAL HEALTH, PUBLIC WATER SUPPLY SECTION (NCDENR-DEH,PWSS) ON SITE PRIOR TO THE START OF CONSTRUCTION. THE PERMIT MUST BE MAINTAINED ON SITE THROUGHOUT THE ENTIRE CONSTRUCTION PROCESS OF THE PROPOSED WATER LINES THAT WILL SERVE THIS PROJECT. 4. THE UTILITY CONTRACTOR SHALL NOTIFY HARNETT COUNTY DEPARTMENT OF PUBLIC UTILITIES (HCDPU) AND THE PROFESSIONAL ENGINEER (PE) AT LEAST TWO DAYS PRIOR TO CONSTRUCTION COMMENCING. THE UTILITY CONTRACTOR MUST SCHEDULE A PRE -CONSTRUCTION CONFERENCE WITH MR. ALAN MOSS, HCDPU UTILITY CONSTRUCTION INSPECTOR AT LEAST TWO (2) DAYS BEFORE CONSTRUCTION WILL BEGIN AND THE UTILITY CONTRACTOR MUST COORDINATE WITH HCDPU FOR REGULAR INSPECTION VISITATIONS AND ACCEPTANCE OF THE WATER SYSTEM(S). CONSTRUCTION WORK SHALL BE PERFORMED ONLY DURING THE NORMAL WORKING HOURS OF HCDPU WHICH IS 8:00 AM - 5:00 PM MONDAY THROUGH FRIDAY. HOLIDAY AND WEEKEND WORK IS NOT PERMITTED BY HCDPU. 5. THE PROFESSIONAL ENGINEER (PE) SHALL PROVIDE HCDPU AND THE UTILITY CONTRACTOR WITH A SET OF NCDENR APPROVED PLANS MARKED 'RELEASED FOR CONSTRUCTION" AT LEAST TWO DAYS PRIOR TO CONSTRUCTION COMMENCING. THE REGISTERED LAND SURVEYOR (RLS) SHOULD STAKE OUT ALL LOT CORNERS AND THE GRADE STAKES FOR THE PROPOSED FINISH GRADE FOR EACH STREET BEFORE THE UTILITY CONTRACTOR BEGINS CONSTRUCTION OF THE WATER LINE(S). THE GRADE STAKES SHOULD BE SET WITH A CONSISTENT OFFSET FROM THE STREET CENTERLINE SO AS NOT TO INTERFERE WITH THE STREET GRADING AND UTILITY CONSTRUCTION. S. THE UTILITY CONTRACTOR SHALL PROVIDE THE HCDPU UTILITY CONSTRUCTION INSPECTOR WITH MATERIAL SUBMITTALS AND SHOP DRAWINGS FOR ALL PROJECT MATERIALS PRIOR TO THE CONSTRUCTION OF ANY WATER LINE EXTENSION(S), AND ASSOCIATED WATER SERVICES IN HARNETT COUNTY. THE MATERIALS TO BE USED ON THE PROJECT MUST MEET THE ESTABLISHED SPECIFICATIONS OF HCDPU AND BE APPROVED BY THE ENGINEER OF RECORD PRIOR TO CONSTRUCTION. ALL SUBSTANDARD MATERIALS OR MATERIALS NOT APPROVED FOR USE IN HARNETT COUNTY FOUND ON THE PROJECT SITE MUST BE REMOVED IMMEDIATELY WHEN NOTIFIED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR. 7. THE WATER MAIN(S), FIRE HYDRANTS, SERVICE LINES, METER SETTERS AND ALL ASSOCIATED APPURTENANCES SHALL BE CONSTRUCTED IN STRICT IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS OF THE HARNETT COUNTY DEPARTMENT OF PUBLIC UTILITIES (HCDPU). THE UTILITY CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE THE NEWLY INSTALLED WATER MAIN(S), WATER SERVICE LINES AND ALL ASSOCIATED METER SETTERS AND METER BOXES FOR OTHER UTILITY COMPANIES AND THEIR CONTRACTORS UNTIL THE NEW WATER MAIN(S) HAVE BEEN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - DIVISION OF ENVIRONMENTAL HEALTH, PUBLIC WATER SUPPLY SECTION (NCDENR-DEH, PWSS)AND ACCEPTED BY HCDPU. 8. PRIOR TO ACCEPTANCE, ALL SERVICES WILL BE INSPECTED TO INSURE THAT THEY ARE INSTALLED AT THE PROPER DEPTH. ALL METER BOXES MUST BE FLUSH WITH THE GROUND LEVEL AT FINISH GRADE AND THE METER SETTERS MUST BE A MINIMUM OF 8" BELOW THE METER BOX LID. METER SETTERS SHALL BE CENTERED IN THE METER BOX AND SUPPORTED BY BRICK, BLOCK OR STONE. 9. THE UTILITY CONTRACTOR SHALL PROVIDE THE PROFESSIONAL ENGINEER (PE) AND HCDPU UTILITY CONSTRUCTION INSPECTOR WITH A SET OF RED LINE DRAWINGS IDENTIFYING THE COMPLETE WATER SYSTEM INSTALLED FOR EACH PROJECT. THE RED LINE DRAWINGS SHOULD IDENTIFY THE MATERIALS, PIPE SIZES AND APPROXIMATE DEPTHS OF THE WATER LINES AS WELL AS THE GATE VALVES, FIRE HYDRANTS, METER SETTERS, BLOW OFF ASSEMBLIES AND ALL ASSOCIATED APPURTENANCES FOR ALL WATER LINES) CONSTRUCTED IN HARNETT COUNTY. THE RED LINE DRAWINGS SHOULD CLEARLY IDENTIFY ANY DEVIATIONS FROM THE NCDENR APPROVED PLANS. ALL CHANGE ORDERS MUST BE APPROVED BY HCDPU AND THE PROFESSIONAL ENGINEER (PE)IN WRITING AND PROPERLY DOCUMENTED IN THE RED LINE FIELD DRAWINGS. 10. POTABLE WATER MAINS CROSSING OTHER UTILITIES AND NON -POTABLE WATER LINES (SANITARY SEWER, STORM SEWER, RCP, ETC.) SHALL BE LAID TO PROVIDE A MINIMUM VERTiCAL DISTANCE OF TWENTY-FOUR (24") INCHES BETWEEN THE POTABLE WATER MAIN AND ALL OTHER UTILITIES. NCDOT REQUIRES THE NEW WATER MAINS TO BE INSTALLED UNDER THE STORM WATER LINES. THE POTABLE WATER MAIN SHALL BE INSTALLED WITH TWENTY-FOUR (24") INCHES OF VERTICAL SEPARATION AND WITH DUCTILE IRON PIPE WHEN DESIGNED TO BE PLACED UNDER A NON -POTABLE WATER LINE SUCH AS SANITARY SEWER OR STORM SEWER LINES. IF THESE SEPARATIONS CANNOT BE MAINTAINED THEN THE WATER MAIN SHALL BE INSTALLED WITH DUCTILE IRON PIPE. BOTH THE POTABLE WATER MAIN AND THE NON -POTABLE WATER LINE MUST BE CAST IRON OR DUCTILE IRON PIPE (DIP) IF THE STATE MINIMUM SEPARATIONS CANNOT BE MAINTAINED. THE DUCTILE IRON PIPE MUST BE LAID SO THE MECHANICAL JOINTS ARE AT LEAST (10') FEET FROM THE POINT WHERE THE POTABLE WATER MAIN CROSSES THE NON -POTABLE WATER LINE. 11. POTABLE WATER MAINS INSTALLED PARALLEL TO NON -POTABLE WATER LINES (SANITARY SEWER, STORM SEWER, RCP, ETC.) SHALL BE LAID TO PROVIDE A MINIMUM HORIZONTAL DISTANCE OF TEN (10') FEET BETWEEN THE POTABLE WATER MAIN AND SANITARY SEWER MAINS, SEWER LATERALS AND SERVICES. THE HORIZONTAL SEPARATION BETWEEN THE POTABLE WATER MAIN AND ANY OTHER UTILITY OR STORM SEWER SHALL NOT BE LESS THAN FIVE (5') FEET. THE POTABLE WATER MAIN MUST BE DUCTILE IRON PIPE IF THIS HORIZONTAL SEPARATION OF TEN (10') FEET CANNOT BE MAINTAINED. THE DUCTILE IRON PIPE SHALL EXTEND AT LEAST TEN (10') FEET BEYOND THE POINT WHERE THE MINIMUM REQUIRED HORIZONTAL SEPARATION OF TEN (10') FEET CAN BE RE-ESTABLISHED. 12. METER SETTERS SHALL BE INSTALLED IN PAIRS ON EVERY OTHER LOT LINE WHERE POSSIBLE TO LEAVE ADEQUATE SPACE FOR OTHER UTILITIES TO BE INSTALLED AT A LATER TIME. THE METER SETTERS SHALL BE INSTALLED AT LEAST ONE (1') FOOT INSIDE THE RIGHT-OF-WAY AND AT LEAST THREE (3') TO FIVE (5') FEET FROM THE PROPERTY LINE BETWEEN THE LOTS. 13. HCDPU REQUIRES THAT METER BOXES FOR -%" SERVICES SHALL BE 12" WIDE X 17" LONG ABS PLASTIC BOXES AT LEAST 18" IN HEIGHT WITH CAST IRON LIDS/COVERS. METER BOXES FOR 1" SERVICES SHALL BE 17" WIDE X 21" LONG ABS PLASTIC BOXES AT LEAST 18" IN HEIGHT WITH PLASTIC LIDS AND CAST IRON FLIP COVERS IN THE CENTER OF THE LIDS. METER BOXES FOR 2" SERVICES SHALL BE 20" WIDE X 32" LONG ABS PLASTIC BOXES AT LEAST 20" IN HEIGHT WITH PLASTIC LIDS AND CAST IRON FLIP COVERS IN THE CENTER OF THE LIDS. 14. MASTER METERS MUST BE INSTALLED IN CONCRETE VAULTS SIZED FOR THE METER ASSEMBLY AND ASSOCIATED APPURTENANCES SO AS TO PROVIDE AT LEAST EIGHTEEN (18")INCHES OF CLEARANCE BETWEEN THE BOTTOM OF THE CONCRETE VAULT AND THE BOTTOM OF THE METER SETTER. THE MASTER METER MUST BE PROVIDED TEST PORTS IF THE METER IS NOT EQUIPPED WITH TEST PORTS FROM THE MANUFACTURER IN ACCORDANCE WITH THE HCDPU ESTABLISHED STANDARD SPECIFICATIONS AND DETAILS. DUCTILE IRON PIPE MUST BE USED FOR THE MASTER METER VAULT PIPING AND VALVE VAULT PIPING. THE UTILITY CONTRACTOR MUST PROVIDE SHOP DRAWINGS FOR THE METER VAULTS TO HCDPU PRIOR TO ORDERING THE CONCRETE VAULTS. 15. THE UTILITY CONTRACTOR WILL INSTALL POLYETHYLENE SDR-9 WATER SERVICE LINES THAT CROSS UNDER THE PAVEMENT INSIDE A SCHEDULE 40 PVC CONDUIT TO ALLOW FOR REMOVAL AND REPLACEMENT IN THE FUTURE. TWO (2) INDEPENDENT m- WATER SERVICE LINES MAY BE INSTALLED INSIDE ONE (1) - TWO (2") INCH SCHEDULE 40 PVC CONDUIT OR TWO (2) INDEPENDENT 1" WATER SERVICE LINES MAY BE INSTALLED INSIDE ONE (1) - THREE (3") INCH SCHEDULE 40 PVC CONDUIT, BUT EACH WATER SERVICE SHALL. BE TAPPED DIRECTLY TO THE WATER MAIN. SPLIT SERVICES ARE NOT ALLOWED BY HCDPU. 16. THE WATER MAIN(S), FIRE HYDRANTS, GATE VALVES, SERVICE LINES, METER SETTERS AND ASSOCIATED APPURTENANCES MUST BE RATED FOR 200 PSI AND HYDROSTATICALLY PRESSURE TESTED TO 200 PSI. THE HYDROSTATIC PRESSURE TEST(S) MUST BE WITNESSED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR. THE UTILITY CONTRACTOR MUST NOTIFY HCDPU WHEN THEY ARE READY TO BEGIN FILLING IN LINES AND COORDINATE WITH HARNETT COUNTY TO WITNESS ALL PRESSURE TESTING. 17. THE UTILITY CONTRACTOR SHALL CONDUCT A PNEUMATIC PRESSURE TEST USING COMPRESSED AIR OR OTHER INERT GAS ON THE STAINLESS STEEL TAPPING SLEEVE(S) PRIOR TO MAKING THE TAP ON THE EXISTING WATER MAIN. THIS PNEUMATIC PRESSURE TEST MUST BE WITNESSED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR. THE UTILITY CONTRACTOR SHALL USE ROMAC BRAND STAINLESS STEEL TAPPING SLEEVE(S) OR APPROVED EQUAL FOR ALL TAPS MADE IN HARNETT COUNTY. ALL NEW WATER LINE EXTENSIONS MUST BEGIN WITH A RESILIENT WEDGE TYPE GATE VALVE SIZED EQUAL TO THE DIAMETER OF THE NEW WATER LINE EXTENSION IN ORDER TO PROVIDE A MEANS OF ISOLATION BETWEEN HARNETT COUNTY'S EXISTING WATER MAINS AND THE NEW WATER LINE EXTENSIONS UNDER CONSTRUCTION. 18. ALL WATER MAINS WILL BE CONSTRUCTED WITH SDR-21 PVC PIPE OR CLASS 50 DUCTILE IRON PIPE RATED FOR AT LEAST 200 PSI OR GREATER. ALL PIPES MUST BE PROTECTED DURING LOADING, TRANSPORT, UNLOADING, STAGING, AND INSTALLATION. PVC PIPE MUST BE PROTECTED FROM EXTENDED EXPOSURE TO SUNLIGHT PRIOR TO INSTALLATION. 19. ALL WATER MAINS WILL BE FLUSHED AND DISINFECTED IN STRICT ACCORDANCE WITH THE STANDARD SPECIFICATIONS OF THE HARNETT COUNTY DEPARTMENT OF PUBLIC UTILITIES. ALL WATER SAMPLES COLLECTED FOR BACTERIA TESTING WILL BE COLLECTED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR AND TESTED IN THE HCDPU LABORATORY. 20. ALL FITTINGS LARGER THAN TWO (2") INCHES DIAMETER SHALL BE DUCTILE IRON. HCDPU REQUIRES THAT MECHANICAL JOINTS BE ASSEMBLED WITH GRIP RINGS AS "MEGALUG" FITTINGS ARE NOT APPROVED BY HARNETT COUNTY FOR PIPE SIZES SMALLER THAN TWELVE INCHES (12") DIAMETER. PVC PIPE USED FOR WATER MAINS SHALL BE CONNECTED BY SLIP JOINT OR MECHANICAL JOINT WITH GRIP RINGS. GLUED PIPE JOINTS ARE NOT ALLOWED ON PVC PIPE USED FOR WATER MAINS IN HARNETT COUNTY. 21. HCDPU REQUIRES THAT THE UTILITY CONTRACTOR INSTALL TRACER WIRE IN THE TRENCH WITH ALL WATER LINES. THE TRACER WIRE SHALL BE 12 GA. INSULATED, SOLID COPPER CONDUCTOR AND IT SHALL BE TERMINATED AT THE TOP OF THE VALVE BOXES OR MANHOLES. NO SPLICED WIRE CONNECTIONS SHALL BE MADE UNDERGROUND ON TRACER WIRE INSTALLED IN HARNETT COUNTY. THE TRACER WIRE MAY BE SECURED WITH DUCT TAPE TO THE TOP OF THE PIPE BEFORE BACKFILLING. 22. THE UTILITY CONTRACTOR WILL PROVIDE PROFESSIONAL ENGINEER (PE) AND THE HCDPU UTILITY CONSTRUCTION INSPECTOR WITH A SET OF RED LINE FIELD DRAWINGS TO IDENTIFY THE INSTALLED LOCATIONS OF THE WATER LINE(S) AND ALL ASSOCIATED SERVICES. ALL CHANGE ORDERS MUST BE PRE -APPROVED BY HCDPU AND THE PROFESSIONAL ENGINEER (PE) IN WRITING AND PROPERLY DOCUMENTED IN THE RED LINE FIELD DRAWINGS. 23. THE UTILITY CONTRACTOR SHALL SPOT DIG TO EXPOSE EACH UTILITY PIPE OR LINE WHICH MAY CONFLICT WITH CONSTRUCTION OF PROPOSED WATER LINE EXTENSIONS WELL IN ADVANCE TO VERIFY LOCATIONS OF THE EXISTING UTILITIES. THE UTILITY CONTRACTOR SHALL PROVIDE BOTH HORIZONTAL AND VERTICAL CLEARANCES TO THE PROFESSIONAL ENGINEER (PE) TO ALLOW THE PE TO ADJUST THE WATER LINE DESIGN IN ORDER TO AVOID CONFLICTS WITH EXISTING UNDERGROUND UTILITIES. THE UTILITY CONTRACTOR SHALL COORDINATE WITH THE UTILITY OWNER AND BE RESPONSIBLE FOR TEMPORARY RELOCATION AND/OR SECURING EXISTING UTILITY POLES, PIPES, WIRES, CABLES, SIGNS AND/OR UTILITIES INCLUDING SERVICES IN ACCORDANCE WITH THE UTILITY OWNER REQUIREMENTS DURING WATER LINE INSTALLATION, GRADING AND STREET CONSTRUCTION. 24. PRIOR TO THE COMMENCEMENT OF ANY WORK WITHIN ESTABLISHED UTILITY EASEMENTS OR NCDOT RIGHT-OF-WAYS THE UTILITY CONTRACTOR IS REQUIRED TO HAVE A SIGNED NCDOT ENCROACHMENT AGREEMENT POSTED ON SITE AND NOTIFY ALL CONCERNED UTILITY COMPANIES IN ACCORDANCE WITH G.S. 87-102. THE UTILITY CONTRACTOR MUST CALL THE NC ONE CALL CENTER AT 811 OR (800) 632-4949 TO VERIFY THE LOCATION OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION. EXISTING UTILITIES SHOWN IN THESE PLANS ARE TAKEN FROM MAPS FURNISHED BY VARIOUS UTILITY COMPANIES AND HAVE NOT BEEN PHYSICALLY LOCATED OR VERIFIED BY THE P.E. (I.E. TELEPHONE, CABLE, WATER, SEWER, ELECTRICAL POWER, FIBER OPTIC, NATURAL GAS, ETC.). THE UTILITY CONTRACTOR WILL BE RESPONSIBLE TO REPAIR ANY AND ALL DAMAGES TO THE SATISFACTION OF THE RELATED UTILITY COMPANY. 25. THE UTILITY CONTRACTOR SHALL PROVIDE HCDPU WITH AT LEAST ONE (1) FIRE HYDRANT WRENCH AND ONE (1) BREAK -AWAY FLANGE KIT FOR EVERY SUBDIVISION WITH FIRE HYDRANTS DEVELOPED IN HARNETT COUNTY. THESE ITEMS MUST BE PROVIDED TO HCDPU BEFORE THE FINAL INSPECTION WILL BE SCHEDULED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR. IN ADDITION, THE UTILITY CONTRACTOR SHALL INSTALL A 4" X 4" CONCRETE VALVE MARKER AT THE EDGE OF THE RIGHT-OF-WAY TO IDENTIFY THE LOCATION OF EACH GATE VALVE INSTALLED IN THE NEW WATER SYSTEM WITH THE EXCEPTION OF THE FIRE HYDRANT ISOLATION VALVES. THE CONTRACTOR SHALL MEASURE THE DISTANCE FROM THE CENTER OF THE CONCRETE MARKER TO THE CENTER OF THE VALVE BOX. THIS DISTANCE (IN LINEAR FEET) SHALL BE STAMPED ON THE BRASS PLATE LOCATED ON THE TOP OF THE CONCRETE VALVE MARKER. IN LIEU OF INSTALLING THE CONCRETE VALVE MARKERS, THE UTILITY CONTRACTOR MAY PROVIDE AT LEAST TWO MEASUREMENTS FROM TWO INDEPENDENT PERMANENT ABOVE GROUND STRUCTURES TO THE PROFESSIONAL ENGINEER (PE) IN THE RED LINE DRAWINGS TO IDENTIFY THE VALVE LOCATIONS. THE PROFESSIONAL ENGINEER (PE) MUST INCLUDE THESE MEASUREMENTS IN THE AS -BUILT RECORD DRAWINGS SUBMITTED TO HCDPU. 26. THE UTILITY CONTRACTOR WILL BE RESPONSIBLE FOR ANY AND ALL REPAIRS DUE TO LEAKAGE DAMAGE FROM POOR WORKMANSHIP DURING THE ONE (1) YEAR WARRANTY PERIOD ONCE THE WATER SYSTEM IMPROVEMENTS HAVE BEEN ACCEPTED BY HARNETT COUNTY. HARNETT COUNTY WILL PROVIDE MAINTENANCE AND REPAIRS WHEN REQUESTED AND BILL THE DEVELOPER AND/OR UTILITY CONTRACTOR IF NECESSARY DUE TO LACK OF RESPONSE WITHIN 48 HOURS OF NOTIFICATION OF WARRANTY WORK. THE UTILITY CONTRACTOR WILL BE RESPONSIBLE FOR ANY AND ALL REPAIRS DUE TO DAMAGES RESULTING FROM FAILURE TO LOCATE THE NEW WATER LINES AND ASSOCIATED APPURTENANCES FOR OTHER UTILITIES AND THEIR CONTRACTORS UNTIL THE WATER LINES HAVE BEEN APPROVED BY'NCDENR AND ACCEPTED BY HCDPU. THE FINAL INSPECTION OF WATER SYSTEM IMPROVEMENTS CANNOT BE SCHEDULED WITH HCDPU UNTIL THE STREETS HAVE BEEN PAVED, THE RIGHTS -OF -WAY AND UTILITY EASEMENTS HAVE BEEN SEEDED AND STABILIZED WITH AN ADEQUATE STAND OF GRASS IN PLACE TO PREVENT EROSION ISSUES ON SITE. 27. THE ENGINEER OF RECORD IS RESPONSIBLE TO INSURE THAT CONSTRUCTION IS, AT ALL TIMES, IN COMPLIANCE WITH ACCEPTED SANITARY ENGINEERING PRACTICES AND APPROVED PLANS AND SPECIFICATIONS. NO FIELD CHANGES TO THE APPROVED PLANS ARE ALLOWED WITHOUT PRIOR WRITTEN APPROVAL BY HCDPU. A COPY OF EACH ENGINEER'S FIELD REPORT IS TO BE SUBMITTED TO HCDPU AS EACH SUCH INSPECTION IS MADE ON SYSTEM IMPROVEMENTS OR TESTING IS PERFORMED BY THE CONTRACTOR. WATER AND SEWER INFRASTRUCTURE MUST PASS ALL TESTS REQUIRED BY HCDPU SPECIFICATIONS AND THOSE OF ALL APPLICABLE REGULATORY AGENCIES. THESE TESTS INCLUDE, BUT ARE NOT LIMITED TO: AIR TEST, VACUUM TEST, MANDREL TEST, VISUAL TEST, PRESSURE TEST, BACTERIOLOGICAL TEST, ETC. A HCDPU INSPECTOR MUST BE PRESENT DURING TESTING AND ALL TEST RESULTS SHALL BE SUBMITTED TO HCDPU. ALL TESTS MUST BE SATISFIED BEFORE THE FINAL INSPECTION WILL BE SCHEDULED WITH THE HCDPU INSPECTOR. THE ENGINEER OF RECORD MUST REQUEST IN WRITING TO SCHEDULE THE FINAL INSPECTION ONCE ALL CONSTRUCTION IS COMPLETE. THE DEVELOPER'S ENGINEER OF RECORD AND THE HCDPU UTILITY CONSTRUCTION INSPECTOR SHALL PREPARE A WRITTEN PUNCH LIST OF ANY DEFECTS OR DEFICIENCIES NOTED DURING THE FINAL INSPECTION, SHOULD ANY EXIST. UPON COMPLETION OF THE PUNCH LIST, THE DEVELOPER'S ENGINEER OF RECORD WILL SCHEDULE ANOTHER INSPECTION. IN THE EVENT THE NUMBER OF INSPECTIONS PERFORMED BY THE HCDPU EXCEEDS TWO, ADDITIONAL FEES MAY BE ACCESSED TO THE DEVELOPER. SANITARY SEWER 1. THE PROFESSIONAL ENGINEER (PE) SHALL OBTAIN AND SUPPLY A COPY OF THE SEWER PERMIT FOR THE CONSTRUCTION AND OPERATION OF THE WASTEWATER COLLECTION SYSTEM TO THE UTILITY CONTRACTOR BEFORE THE CONSTRUCTION OF THE SANITARY SEWER LINE, SEWER LIFT STATION AND ASSOCIATED FORCE MAIN SHALL BEGIN. THE UTILITY CONTRACTOR MUST POST A COPY OF THE SEWER PERMIT ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - DIVISION OF WATER QUALITY (NCDENR-DWQ) ON SITE PRIOR TO THE START OF CONSTRUCTION. THE PERMIT MUST BE MAINTAINED ON SITE DURING THE CONSTRUCTION OF THE SEWER SYSTEM IMPROVEMENTS. 2. THE UTILITY CONTRACTOR SHALL NOTIFY HARNETT COUNTY DEPARTMENT OF PUBLIC UTILITIES (HCDPU) AND THE PROFESSIONAL ENGINEER (PE) AT LEAST TWO DAYS PRIOR TO CONSTRUCTION COMMENCING. THE UTILITY CONTRACTOR MUST SCHEDULE A PRE -CONSTRUCTION CONFERENCE WITH MR. ALAN MOSS, HCDPU UTILITY CONSTRUCTION INSPECTOR AT LEAST TWO (2) DAYS BEFORE CONSTRUCTION WILL BEGIN AND THE UTILITY CONTRACTOR MUST COORDINATE WITH HCDPU FOR REGULAR INSPECTION VISITATIONS AND ACCEPTANCE OF THE WASTEWATER SYSTEM(S). CONSTRUCTION WORK SHALL BE PERFORMED ONLY DURING THE NORMAL WORKING HOURS OF HCDPU WHICH IS 8:00 AM - 5:00 PM MONDAY THROUGH FRIDAY. HOLIDAY AND WEEKEND WORK IS NOT PERMITTED BY HCDPU. 3. THE PROFESSIONAL ENGINEER (PE) SHALL PROVIDE HCDPU WITH A SET OF NCDENR APPROVED PLANS MARKED 'RELEASED FOR CONSTRUCTION" AT LEAST TWO DAYS PRIOR TO CONSTRUCTION COMMENCING. HCDPU WILL STAMP THE APPROVED PLANS AS ,RELEASED FOR CONSTRUCTION" AND PROVIDE COPIES TO THE UTILITY CONTRACTOR. THE REGISTERED LAND SURVEYOR (RLS) SHALL STAKE OUT ALL LOT CORNERS AND ESTABLISH GRADE STAKES FOR THE PROPOSED FINISH GRADE FOR EACH STREET AND SEWER LINE BEFORE THE UTILITY CONTRACTOR BEGINS CONSTRUCTION OR INSTALLATION OF THE MANHOLES, SANITARY SEWER GRAVITY LINE(S), SEWER LIFT STATIONS AND/OR SANITARY SEWER FORCE MAIN(S). THE GRADE STAKES SHOULD BE SET WITH A CONSISTENT OFFSET FROM THE STREET CENTERLINE SO AS NOT TO INTERFERE WITH THE STREET GRADING OR UTILITY CONSTRUCTION. 4. THE UTILITY CONTRACTOR SHALL PROVIDE THE HCDPU UTILITY CONSTRUCTION INSPECTOR WITH MATERIAL SUBMITTALS AND SHOP DRAWINGS FOR ALL PROJECT MATERIALS PRIOR TO THE CONSTRUCTION OF ANY GRAVITY SEWER LINE(S), MANHOLE(S), SEWER LIFT STATION(S) AND ASSOCIATED FORCE MAIN(S) IN HARNETT COUNTY. THE MATERIALS TO BE USED ON THE PROJECT MUST MEET THE ESTABLISHED SPECIFICATIONS OF HCDPU AND BE APPROVED BY THE ENGINEER OF RECORD PRIOR TO CONSTRUCTION. ALL SUBSTANDARD MATERIALS OR MATERIALS NOT APPROVED FOR USE IN HARNETT COUNTY FOUND ON THE PROJECT SITE MUST BE REMOVED IMMEDIATELY WHEN NOTIFIED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR. 5. THE SANITARY SEWER LATERAL CONNECTIONS SHOULD BE INSTALLED 90' (PERPENDICULAR) TO THE SANITARY SEWER GRAVITY LINES WITH SCHEDULE 40 PVC PIPE. HCDPU REQUIRES THE UTILITY CONTRACTOR TO PROVIDE THE PROFESSIONAL ENGINEER (PE) WITH ACCURATE MEASUREMENTS FOR LOCATiNG SANITARY SEWER SERVICE LATERAL AND ASSOCIATED EACH SANITARY SEWER CLEAN -OUT. THESE MEASUREMENTS SHOULD BE TAKEN FROM THE NEAREST DOWNSTREAM MANHOLE UP ALONG THE SANITARY SEWER MAIN TO THE IN -LINE WYE FITTING (OR TAPPING SADDLE) AND THEN ANOTHER MEASUREMENT FROM THE IN -LINE WYE FITTING (OR TAPPING SADDLE) TO THE 4" X 4" LONG SWEEP COMBINATION WYE FITTING AT THE BOTTOM OF THE SEWER CLEAN -OUT STACK. THESE FIELD MEASUREMENTS MUST BE PROVIDED TO THE PROFESSIONAL ENGINEER (PE) IN THE RED LINE DRAWINGS FROM THE UTILITY CONTRACTOR FOR PER DOCUMENTATION IN THE AS -BUILT RECORD DRAWINGS SUBMITTED TO HCDPU. 6. THE UTILITY CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE THE NEWLY INSTALLED SANITARY SEWER GRAVITY LINE(S), SANITARY SEWER FORCE MAIN(S), SANITARY SEWER SERVICE LATERAL(S) AND ALL ASSOCIATED SEWER CLEAN -OUTS) IN THE PROPOSED SANITARY SEWER SYSTEM FOR OTHER UTILITY COMPANIES AND THEIR CONTRACTORS UNTIL THE NEW SANITARY SEWER LINE(S) AND ASSOCIATED APPURTENANCES HAVE BEEN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - DIVISION OF WATER QUALITY (NCDENR-DWQ) AND ACCEPTED BY HCDPU. ALL NEW SANITARY SEWER LINES MUST HAVE AT LEAST THREE (3 FT. ) FEET OF COVER AND EXTEND UNDER ALL EXISTING WATER MAIN AND STORM WATER LINES WITH A LEAST 24" OF VERTICAL CLEARANCE BELOW THE BOTTOM OF THE EXISTING WATER MAIN AND STORM WATER LINES. 7. THE SANITARY SEWER GRAVITY LINE(S), MANHOLE(S), SANITARY SEWER SERVICE LATERAL(S) AND ASSOCIATED CLEAN-OUT(S) SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE STANDARD SPECIFICATIONS OF THE HARNETT COUNTY DEPARTMENT OF PUBLIC UTILITIES. THE SANITARY SEWER GRAVITY LINE(S) MUST , PNEUMATICALLY PRESSURE TESTED WITH COMPRESSED AIR AT 5 PSI AND THE SANITARY SEWER FORCE MAIN(S) MUST HYDROSTATICALLY PRESSURE TESTED WITH WATER OR AIR AT 200 PSI AND WITNESSED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR. 8. PRIOR TO ACCEPTANCE, ALL SEWER SERVICE LATERALS WILL BE INSPECTED TO INSURE THAT THEY ARE INSTALLED AT THE PROPER DEPTH. ALL SEWER CLEAN -OUTS MUST BE INSTALLED SO THE 4" X 4" LONG SWEEP COMBINATION WYE IS AT LEAST THREE (3') FEET BUT NO MORE THAN FOUR (4') FEET BELOW THE FINISH GRADE UNLESS OTHERWISE APPROVED IN WRITING BY HCDPU. THE SEWER CLEANOUTS SHALL HAVE A FOUR (4") SCHEDULE 40 PVC PIPE STUBBED UP FROM BOTH ENDS OF THE 4" X 4" LONG SWEEP COMBINATION WYE TO BE AT LEAST TWO (2') FEET ABOVE THE FINISH GRADE AND COVER EACH END WITH A FOUR (4") INCH TEMPORARY CAP TO KEEP OUT DIRT, SAND, ROCKS, WATER AND CONSTRUCTION DEBRIS. THE VERTICAL STACK ON EACH CLEAN -OUT MUST BE PROVIDED WITH A CONCRETE DONUT FOR PROTECTION. 9. ONCE THE SANITARY SEWER GRAVITY LINE(S) HAVE BEEN INSTALLED, PNEUMATICALLY PRESSURE TESTED AND IN PLACE FOR AT LEAST 30 DAYS, THE UTILITY CONTRACTOR MUST CONTACT THE HCDPU UTILITY CONSTRUCTION INSPECTOR TO WITNESS THE MANDREL TEST ON EACH PVC SANITARY SEWER GRAVITY LINE. THE UTILITY CONTRACTOR WILL NOTIFY HCDPU TO SCHEDULE THE MANDREL TESTING. THE MANDREL AND PROVING RING MUST BE SUPPLIED BY THE UTILITY CONTRACTOR. CLOSED CIRCUIT VIDEO CAMERA INSPECTIONS (AT THE UTILITY CONTRACTOR'S EXPENSE) MAY BE REQUIRED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR IF THE MANDREL TESTING CANNOT BE COMPLETED WITH SATISFACTORY RESULTS. THE SANITARY SEWER LINES SHOULD BE FLUSHED CLEAN USING A SEWER BALL OF THE PROPER DIAMETER BEFORE ANY MANDREL TESTING CAN BE PERFORMED. THE UTILITY CONTRACTOR IS RESPONSIBLE TO REMOVE ALL DIRT, SAND, SILT, GRAVEL, MUD AND DEBRIS FROM THE NEWLY CONSTRUCTED SEWER LINES EXERCISING CARE TO KEEP THE HARNETT COUNTY'S EXISTING SANITARY SEWER SYSTEMS CLEAN. SANITARY SEWER FORCE MAIN(S) SHALL BE PRESSURE TESTED TO 200 PSI FOR AT LEAST 2 HOURS LIKE WATER LINES. 10. THE UTILITY CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE THE NEWLY INSTALLED SANITARY SEWER SYSTEM(S) FOR OTHER UTILITY COMPANIES AND THEIR CONTRACTORS UNTIL THE NEW SANITARY SEWER SYSTEM(S) HAVE BEEN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - DIVISION OF WATER QUALITY (NCDENR-DWQ)AND ACCEPTED BY HCDPU. 11. HCDPU REQUIRES THAT THE UTILITY CONTRACTOR INSTALL TRACER WIRE IN THE TRENCH WITH ALL SANITARY SEWER FORCE MAINS. THE TRACER WIRE SHALL BE 12 GA. INSULATED, SOLID COPPER CONDUCTOR AND IT SHALL BE TERMINATED AT THE TOP OF THE VALVE BOXES OR MANHOLES. NO SPLICED WIRE CONNECTIONS SHALL BE MADE UNDERGROUND ON TRACER WIRE INSTALLED IN HARNETT COUNTY. THE TRACER WIRE MAY BE SECURED WITH DUCT TAPE TO THE TOP OF THE PIPE BEFORE BACKFILLING. THE TRACER WIRE IS NOT REQUIRED FOR THE GRAVITY SEWER LINE(S) BETWEEN MANHOLES. 12. THE UTILITY CONTRACTOR SHALL PROVIDE THE PROFESSIONAL ENGINEER (PE) AND HCDPU UTILITY CONSTRUCTION INSPECTOR WITH A SET OF RED LINE DRAWINGS IDENTIFYING THE COMPLETE SEWER SYSTEM INSTALLED FOR EACH PROJECT. THE RED LINE DRAWINGS SHOULD IDENTIFY THE MATERIALS, PIPE SIZES AND APPROXIMATE DEPTHS OF THE SEWER LINES AS WELL AS THE INSTALLED LOCATIONS OF THE MANHOLE(S), SANITARY SEWER GRAVITY LINE(S), SANITARY SEWER SERVICE LATERALS, CLEAN -OUTS, SEWER LIFT STATION(S) AND ASSOCIATED FORCE MAIN(S). THE RED LINE DRAWINGS SHOULD CLEARLY IDENTIFY ANY DEVIATIONS FROM THE NCDENR APPROVED PLANS. ALL CHANGE ORDERS MUST BE APPROVED BY HCDPU AND THE PROFESSIONAL ENGINEER (PE) IN WRITING AND PROPERLY DOCUMENTED IN THE RED LINE FIELD DRAWINGS. 13. PRIOR TO THE COMMENCEMENT OF ANY WORK WITHIN ESTABLISHED UTILITY EASEMENTS OR NCDOT RIGHT-OF-WAYS THE UTILITY CONTRACTOR IS REQUIRED TO NOTIFY ALL CONCERNED UTILITY COMPANIES IN ACCORDANCE WITH G.S. 87-102. THE UTILITY CONTRACTOR MUST CALL THE NC ONE CALL CENTER AT 811 OR (800) 632-4949 TO VERIFY THE LOCATION OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION. EXISTING UTILITIES SHOWN IN THESE PLANS ARE TAKEN FROM MAPS FURNISHED BY VARIOUS UTILITY COMPANIES AND HAVE NOT BEEN PHYSICALLY LOCATED BY THE P.E. (I.E. TELEPHONE, CABLE, WATER, SEWER, ELECTRICAL POWER, FIBER OPTIC, NATURAL GAS, ETC.). 14, THE UTILITY CONTRACTOR SHALL SPOT DIG TO EXPOSE EACH EXISTING UTILITY PIPE OR LINE WHICH MAY CONFLICT WITH CONSTRUCTION OF PROPOSED SANITARY SEWER LINE EXTENSIONS WELL IN ADVANCE TO VERIFY LOCATIONS OF THE EXISTING UTILITIES. THE UTILITY CONTRACTOR SHALL PROVIDE BOTH HORIZONTAL AND VERTICAL CLEARANCES TO THE PROFESSIONAL ENGINEER (PE) TO ALLOW THE PE TO ADJUST THE SANITARY SEWER LINE DESIGN IN ORDER TO AVOID CONFLICTS WITH EXISTING UNDERGROUND UTILITIES. THE UTILITY CONTRACTOR SHALL COORDINATE WITH THE UTILITY OWNER AND BE RESPONSIBLE FOR TEMPORARY RELOCATION OF EXISTING UTILITIES AND/OR SECURING EXISTING UTILITY POLES, PIPES, WIRES, CABLES, SIGNS AND/OR UTILITIES INCLUDING SERVICES IN ACCORDANCE WITH THE UTILITY OWNER'S REQUIREMENTS DURING SANITARY SEWER LINE INSTALLATION, GRADING AND STREET CONSTRUCTION. 15. WHEN MAKING A TAP ON AN EXISTING SEWER FORCE MAIN, THE UTILITY CONTRACTOR MUST HAVE A PERMIT FROM THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - DIVISION OF WATER QUALITY (NCDENR-DWQ) PRIOR TO BEGIN HE TAP WORK. THE UTILITY CONTRACTOR SHALL CONDUCT A PNEUMATIC PRESSURE TEST USING COMPRESSED AIR OR OTHER INERT GAS ON THE STAINLESS STEEL TAPPING SLEEVE AND GATE VALVE PRIOR TO MAKING THE TAP ON AN EXISTING SANITARY SEWER FORCE MAIN. THIS PNEUMATIC PRESSURE TEST MUST BE WITNESSED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR. THE UTILITY CONTRACTOR SHALL USE ROMAC BRAND STAINLESS STEEL TAPPING SLEEVE(S) OR APPROVED EQUAL FOR ALL TAPS MADE ON SANITARY SEWER FORCE MAINS IN HARNETT COUNTY. THE UTILITY CONTRACTOR SHALL USE ROMAC BRAND STYLE "CB" SEWER SADDLES WITH STAINLESS STEEL BANDS OR APPROVED EQUAL FOR ALL TAPS MADE ON EXISTING SANITARY SEWER GRAVITY LINES IN HARNETT COUNTY. 16.THE UTILITY CONTRACTOR SHALL PROVIDE A GREASE TRAP FOR EACH SANITARY SEWER SERVICE LATERAL THAT WILL BE CONNECTED TO A RESTAURANT, FOOD PROCESSING FACILITY AND ANY OTHER COMMERCIAL OR INDUSTRIAL FACILITY AS REQUIRED BY THE HARNETT COUNTY FAT, OIL & GREASE ORDINANCE. THE GREASE TRAP MUST BE RATED FOR A MINIMUM CAPACITY OF AT LEAST 1,000 GALLONS UNLESS OTHERWISE APPROVED IN WRITING BY THE HCDPU PRE-TREATMENT COORDINATOR. GARBAGE DISPOSALS SHOULD NOT BE INSTALLED IN HOMES AND BUSINESSES THAT DISCHARGE WASTEWATER TO THE HARNETT COUNTY SANITARY SEWER SYSTEM AS THEY ARE NOT APPROVED BY HCDPU. 17. EACH SEWER LIFT STATION MUST BE PROVIDED WITH THREE PHASE POWER (AT LEAST 480 VOLTS) AND CONSTRUCTED TO MEET THE MINIMUM REQUIREMENTS OF THE LATEST VERSION OF THE NATIONAL ELECTRICAL CODE (NEC) AND HARNETT COUNTY STANDARD SPECIFICATIONS AND DETAILS. IF THREE PHASE POWER IS NOT AVAILABLE FROM THE POWER COMPANY OTHER ARRANGEMENTS MUST BE APPROVED BY HCDPU ENGINEERING PRIOR TO THE START OF CONSTRUCTION. 18. WHERE A NEW SANITARY SEWER FORCE MAIN IS CONNECTED TO AN EXISTING MANHOLE IN THE HARNETT COUNTY SEWER COLLECTIONS SYSTEM, THE UTILITY CONTRACTOR MUST PROVIDE A PROTECTIVE COATING (COAL TAR EPDXY ) FOR THE INTERIOR SURFACES OF THE MANHOLE TO PROTECT IT AGAINST CORROSION, EROSION AND DETERIORATION FROM THE RELEASE OF SEWER GASES SUCH AS METHANE AND HYDROGEN SULFIDE. 19. THE SEWER LIFT STATION DESIGN AND ASSOCIATED EQUIPMENT MUST MEET OR EXCEED THE MINIMUM REQUIREMENTS FOR HARNETT COUNTY SEWER LIFT STATIONS 2009 EDITION. EACH SANITARY SEWER LIFT STATION MUST BE CONSTRUCTED WITH AN ALL-WEATHER ACCESS ROAD THAT IS AT LEAST 20 FEET WIDE. THE LIFT STATION SITE MUST BE COVERED WITH WEED BLOCKING MATERIAL AND AT LEAST SIX (6") INCHES OF # 57 STONE (CRUSH AND RUN). 20. ONCE A SEWER LIFT STATION HAS BEEN INSTALLED, THE UTILITY CONTRACTOR IS RESPONSIBLE TO SCHEDULE A DRAW DOWN TEST WITH HCDPU ENGINEERING AND COLLECTIONS STAFF, THE PROFESSIONAL ENGINEER (PE), THE ELECTRICIAN, THE ORIGINAL EQUIPMENT MANUFACTURER'S (OEM) REPRESENTATIVES [FOR BOTH THE PUMPS AND THE GENERATOR]. THIS DRAW DOWN TEST MUST BE COMPLETED WITH POWER SUPPLIED FROM THE ELECTRICAL UTILITY COMPANY AND WITH POWER SUPPLIED BY THE EMERGENCY GENERATOR WITH SATISFACTORY RESULTS BEFORE FINAL INSPECTIONS ARE CONDUCTED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR. 21. ONCE THE UTILITY CONTRACTOR COMPLETES THE INSTALLATION OF A SEWER LIFT STATION, THE PROFESSIONAL ENGINEER (PE) MUST SUBMIT THE SEWER PERMIT CERTIFICATION AND AS -BUILT RECORD DRAWINGS TO THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - DIVISION OF WATER QUALITY (NCDENR-DWQ) AND HCDPU FOR FINAL APPROVAL. THE UTILITY CONTRACTOR MUST SUPPLY HCDPU ENGINEERING STAFF WITH THREE ORIGINAL OPERATION & MAINTENANCE (0&M) MANUALS ALONG WITH THE ASSOCIATED PUMP CURVES AND ELECTRICAL SCHEMATICS FOR THE ASSOCIATED SEWER LIFT STATION EQUIPMENT INCLUDING ALL WARRANTY INFORMATION AND DOCUMENTATION. 22. ONCE THE UTILITY CONTRACTOR COMPLETES THE INSTALLATION OF A SEWER LIFT STATION, THE DEVELOPER MUST PAY HCDPU THE ESTABLISHED SYSTEM CONTROL AND DATA ACQUISITION (SCADA) FEES BEFORE THE SCADA SYSTEM WILL BE INSTALLED AT THE NEW SEWER LIFT STATION. THE SCADA SYSTEM MUST BE INSTALLED AND OPERATIONAL BEFORE THE UTILITIES MAY BE ACCEPTED BY HCDPU AND PLACED INTO OPERATION. 23. HCDPU REQUIRES THE UTILITY CONTRACTOR TO PROVIDE ALL NECESSARY EQUIPMENT AND DEVICES FOR THE TESTING AND INSPECTION OF THE SANITARY SEWER SYSTEM. THE EQUIPMENT AND DEVICES MAY INCLUDE BUT NOT LIMITED TO MIRRORS, MANDRELS, SEWER BALLS, PLUGS, AIR COMPRESSORS AND ASSOCIATED COMPRESSED AIR LINES. IF THE HCDPU UTILITY CONSTRUCTION INSPECTOR DEEMS THAT A CLOSED CIRCUIT VIDEO CAMERA INSPECTION OF THE NEWLY CONSTRUCTED SEWER SYSTEM IS NECESSARY, THEN ALL COSTS FOR THE CLOSED CIRCUIT CAMERA INSPECTION WILL BE THE RESPONSIBILITY OF THE UTILITY CONTRACTOR. ALL CLOSED CIRCUIT VIDEO CAMERA INSPECTIONS MUST BE RECORDED ON VHS TAPES THAT WILL RELEASED TO HCDPU fOR RECORD KEEPING, REVIEW AND APPROVAL OF THE SEWER SYSTEM. 24. ANY USE OF SEWER PLUGS TO TEMPORARILY BLOCK HARNETT COUNTY'S EXISTING SANITARY SEWER LINES MUST BE COORDINATED WITH THE HCDPU COLLECTIONS SUPERVISOR AT LEAST TWO (2) DAYS IN ADVANCE OF INSTALLING THE PLUGS. THE SEWER PLUGS MUST BE REMOVED AS SOON AS POSSIBLE ONCE THE NEW SANITARY SEWER LINES HAVE BEEN INSPECTED, PRESSURE TESTED, MANDREL TESTED, APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - DIVISION OF WATER QUALITY (NCDENR-DWQ) AND ACCEPTED BY HCDPU TO ALLOW THE SEWER TO FLOW AS DESIGNED IN HARNETT COUNTY'S EXISTING SANITARY SEWER LINES OR WHEN SO ORDERED BY THE HCDPU COLLECTIONS SUPERVISOR TO LIMIT INTERRUPTIONS TO THE NORMAL FLOW OF THE SANITARY SEWER COLLECTION SYSTEM(S). THE UTILITY CONTRACTOR MUST PROVIDE THE PUMPS HOSES AND NECESSARY CONNECTORS FOR A TEMPORARY PUMP AROUND SETUP IF REQUIRED BY THE HCDPU COLLECTIONS SUPERVISOR. MR. CURTIS SPEARS, HCDPU COLLECTIONS SUPERVISOR MAY BE CONTACTED BETWEEN 8:00 AM AND 5:00 PM MONDAY THROUGH FRIDAY AT (910) 893-7575 EXTENSION 3243. 25. THE UTILITY CONTRACTOR WILL BE RESPONSIBLE FOR ANY AND ALL REPAIRS DUE TO LEAKAGE OR DAMAGE RESULTING FROM POOR WORKMANSHIP DURING THE ONE (1) YEAR WARRANTY PERIOD ONCE THE SEWER SYSTEM IMPROVEMENTS HAVE BEEN APPROVED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - DIVISION OF WATER QUALITY (NCDENR-DWQ) AND ACCEPTED BY HCDPU. THE UTILITY CONTRACTOR WILL BE RESPONSIBLE FOR ANY AND ALL REPAIRS DUE TO DAMAGES RESULTING FROM FAILURE TO LOCATE THE NEW SANITARY SEWER LINES AND ASSOCIATED APPURTENANCES FOR OTHER UTILITIES AND THEIR CONTRACTORS UNTIL THE SANITARY SEWER LINES HAVE BEEN APPROVED BY NCDENR AND ACCEPTED BY HCDPU. HCDPU WILL PROVIDE MAINTENANCE AND WARRANTY REPAIRS IF NECESSARY DUE TO LACK OF RESPONSE WITHIN 48 HOURS OF NOTIFICATION OF WARRANTY WORK. HCDPU WILL INVOICE THE DEVELOPER AND/OR UTILITY CONTRACTOR FOR MATERIALS AND LABOR IN SUCH CASES. 26.IN DEVELOPMENTS AND PROJECTS THAT REQUIRE UTILITY EASEMENTS TO BE ESTABLISHED FOR FUTURE HCDPU RIGHT-OF-WAY, THE REGISTERED LAND SURVEYOR (RLS) MUST PROVIDE THE HCDPU RIGHT--OF-WAY AGENT WITH AN OFFICIAL COPY OF THE RECORDED PLAT AND LEGAL DESCRIPTION OF THE SAID EASEMENT AS RECORDED WITH THE HARNETT COUNTY REGISTER OF DEEDS. THE RECORDED DOCUMENTS MUST BE PROVIDED TO THE HCDPU RIGHT-OF-WAY AGENT BEFORE THE UTILITY IMPROVEMENTS WITHIN THE SAID EASEMENT CAN BE PLACED INTO OPERATION. ANY AND ALL EASEMENTS THAT MUST BE OBTAINED FROM ADJOINING PROPERTY OWNERS MUST BE PROVIDED TO HCDPU BY THE DEVELOPER AT NO COST TO HARNETT COUNTY. THE FINAL INSPECTION OF ALL SANITARY SEWER SYSTEM IMPROVEMENTS CANNOT BE SCHEDULED WITH HCDPU UNTIL THE STREETS HAVE BEEN PAVED, THE RIGHTS -OF -WAY AND UTILITY EASEMENTS HAVE BEEN SEEDED AND STABILIZED WITH AN ADEQUATE STAND OF GRASS IN PLACE TO PREVENT EROSION ISSUES ON SITE. 27. THE ENGINEER OF RECORD IS RESPONSIBLE TO INSURE THAT CONSTRUCTION IS, AT ALL TIMES, IN COMPLIANCE WITH ACCEPTED SANITARY ENGINEERING PRACTICES AND APPROVED PLANS AND SPECIFICATIONS. NO FIELD CHANGES TO THE APPROVED PLANS ARE ALLOWED WITHOUT PRIOR WRITTEN APPROVAL BY HCDPU. A COPY OF EACH ENGINEER'S FIELD REPORT IS TO BE SUBMITTED TO HCDPU AS EACH SUCH INSPECTION IS MADE ON SYSTEM IMPROVEMENTS OR TESTING IS PERFORMED BY THE CONTRACTOR. WATER AND SEWER INFRASTRUCTURE MUST PASS ALL TESTS REQUIRED BY HCDPU SPECIFICATIONS AND THOSE OF ALL APPLICABLE REGULATORY AGENCIES. THESE TESTS INCLUDE, BUT ARE NOT LIMITED TO: AIR TEST, VACUUM TEST, MANDREL TEST, VISUAL TEST, PRESSURE TEST, BACTERIOLOGICAL TEST, ETC. A HCDPU INSPECTOR MUST BE PRESENT DURING TESTING AND ALL TEST RESULTS SHALL BE SUBMITTED TO HCDPU. ALL TESTS MUST BE SATISFIED BEFORE THE FINAL INSPECTION WILL BE SCHEDULED WITH THE HCDPU INSPECTOR. THE ENGINEER OF RECORD MUST REQUEST IN WRITING TO SCHEDULE THE FINAL INSPECTION ONCE ALL CONSTRUCTION IS COMPLETE. THE DEVELOPER'S ENGINEER OF RECORD AND THE HCDPU UTILITY CONSTRUCTION INSPECTOR SHALL PREPARE A WRITTEN PUNCH LIST OF ANY DEFECTS OR DEFICIENCIES NOTED DURING THE FINAL INSPECTION, SHOULD ANY EXIST. UPON COMPLETION OF THE PUNCH LIST, THE DEVELOPER'S ENGINEER OF RECORD WILL SCHEDULE ANOTHER INSPECTION. IN THE EVENT THE NUMBER OF INSPECTIONS PERFORMED BY THE HCDPU EXCEEDS TWO, ADDITIONAL FEES MAY BE ACCESSED TO THE DEVELOPER. Allpicl ,,4 ' .z t F.'st'c, il:nil pir 'uSlrJr,,Ipf a 1_ r Sv is ,..ra1� ea + :e. , u �eota ,,, Ire th_ .., _i k lq & I, 11 "! .3r�lm_ ran_ r ' n e ,. .�fE :_ s,5n 1. -1P• -z ,- , ,I n11y with n. + a "n CP..V !h sW6170/UL 4 D?- oaq(j , 'E I aN�3 / ` ', .> 409 Chicago Drive -.'Suite 112 Fayekfev9le. Norlh Carolina 28306 Phone (910) 426-6777 \\ Fax (910) 426-5777 \ License Number C-235A 1 t)oLUTION6r INC A-&-­A-�­-qAt--Aearbmeuma+urourA U 1- U'j-13 REVISIONS (D O V Z0 D z QZ O tr O 0LL 0 0 J w Q w J ZW M PROJECT NAME KENLAN FARMS SUBDIVISION PHASE TWO PROJECT NOTES CLIENT ABJ INVESTMENTS, LLC. 2031 Middle Road Fayetteville, North Carolina 28312 Phone: (910) 485-5790 Fax: (910)678-9988 PROJECT INFORMATION DESIGNED BY: BEN DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 294 DRAWING SCALE SEE SHEETS DATE RELEASED JANUARY 4, 2013 SHEET NUMBER G-1 mO 2042 2031 SITE 2083 / G� NORTH VICINITY MAP NOT TO SCALE N/F LEE JUNIOR DUNN LEGEND: DB 847, PG 808 EIP 0 EIP-EXISTING IRON PIPE / ERKO EPK-EXISTING PK NAIL I ERBO ERB-EXISTING REBAR / ExISTIM GP o CP-COMPUTED POINT ' - ANGLEIRON N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PVC - POLYVINYL CHLORIDE RCP -REINFORCED CONCRETE PIPE PROPERTY LINE — ADJACENT PROPERTY LINE a — TIE LINE — — — RIGHT—OF—WAY ' s0 STORM DRAINAGE C110 WATER LINE _-3/4` OVERHEAD UILITY ' ERB X FENCE LINE - - - - CREEK ' - - — WETLANDS TREE LINE ' BENCHMARK N/F CAROLYN DENT ® SIGN ' DB 2180, PG 904 PP• UTILITY POLE C GUY WIRE I ❑T TELEPHONE PEDESTAL D4 WATER VALVE FIRE HYDRANT ASPHALT I Q WETLANDS t\ ' a / EIP N582345PINCH 11E •E 211 8' OF UNE N5871'57• i' / TIE �j E7987 EIN N/F KENNETH WAYNE LONG AND WIFE, GALE PATRICIA S. LONG / DB 707, PG 318 io SOIL Zb n s a 3 / ROAD 5/8v O RB W U� / ZW N/F o / AUGUST G. SNYDER I DB 841, PG 576 h w\ N EIP I, SEAN R. SEEVER, CERTIFY THAT THIS SURVEY IS OF AN EXISTIN CREA A Wt�FklORCMAAWIfff(f T. NOT RELEASED FOR CONSTRUCTION I, SEAN R. SEEVER, CERTIFY THAT THIS MAP WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION (DEED DESCRIPTION RECORDED IN BOOK ___, PAGE __ OR OTHER REFERENCE SOURCE THAT THE BOUNDARIES NOT SURVEYED ARE INDICATED AS DRAWN FROM INFORMATION IN BOOK ___, PAGE OR OTHER REFERENCE SOURCE _ THAT THE RATIO OF PRECISION OR POSITIONAL ACCURACY IS 1:10,000+; AND THAT THIS MAP MEETS THE REQUIREMENTS OF THE STANDARDS OF PRACTICE FOR LAND SURVEYING IN NORTH CAR( AUM' .. - MY HAND NDC�'FY�1s t}y6 r DR°ti A FIG NOT RELEASED FOR CONSTRUCTION — L'. EXISTING/ (BENT)EIP 540' FENCE E-UNE 9.95 POST / I- r.0000 r�` EIP \ / N44'38'27'E 716.28' TIE 41 �� I � \ 3 n h � ♦ 1 � � - g bs \ � � T. GERALDLD HOWELL 130 129 - N/F VIRGINIA CHANCE DB_392, PG 315 132 131 128 TBM: 4D NAIL #6-%. N: 553,323.161 E: 2,053,722.002 - .. ELEV: 127.86 WOODED 128 NC GRID NAD 83� AREA \ (NSRS 2007) ' -�.!. 126 . \ NAVD 88 26.E 818 a2, DB 2322, PG 722 ` - - i • \ PB 2, PG 208 ♦ EIP 53 l 131 129 AREA / 5/8" ' 5/8• 5/8,--..,.,y 12.8 J wvvuc ERB ERB ERB AREA / 129 — N/F 130 KENLAN FARMS / PHASE I, SECTION 3 I1 131 `\/ I PB 2012, PG 575 s/e' s/s" ERB ERB 5/8-� ERB _\ 1.NO ALL DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCES UNLESS OTHERWISE NOTED. 2. COMBINED SCALE FACTOR: 0.99987206 LOCALIZATION POINT N: 552,010.637 E: 2,054,136.474 3. LINES NOT SURVEYED ARE SHOWN AS DASHED LINES FROM INFORMATION REFERENCED ON THE FACE OF THIS MAP. 4. NONCONFORMING STRUCTURES HAVE NOT BEEN CREATED BY THIS SURVEY. 5. THIS SURVEY WAS DONE WITHOUT BENEFIT OF A TITLE SEARCH AND IS BASED ON REFERENCED INFORMATION SHOWN HERE ON. OTHER DOCUMENTS OF RECORD MAY EXIST WHICH COULD AFFECT THIS PROPERTY. NO RESPONSIBILITY IS ASSUMED BY THIS SURVEYOR FOR ANY CONDITIONS WHICH MAY PRESENTLY EXIST BUT ARE UNKNOWN OR REFERENCED HERE ON, SUCH AS BUT NOT LIMITED TO HAZARDOUS WASTE MATERIALS, EASEMENTS, CEMETERIES, AND FLOOD AREAS. 6. LOCATIONS OF ALL UNDERGROUND UTILITIES LYING WATHIN THIS MAPPED AREA MAY NOT BE SHOWN ON THIS PLAN. DEVELOPERS OR CONTRACTORS SHOULD NOT ONLY MAKE SUBSURFACE INVESTIGATIONS BUT SHOULD ALSO ALLOW FOR CONTINGENCIES WHICH MIGHT ARISE BY REASON OF ENCOUNTERING UNRECORDED LINES OR OF LINES BEING IN DIFFERENT LOCATIONS THAN INDICATED ON THIS SURVEY. 7 THIS PROPERTY DOES NOT LIE WITHIN A FLOOD ZONE !v I -bL+ - I �j ACCORDING TO MAP# 3720054400K OF THE FLOOD INSURANCE tJ 4 RATE, DATED JANUARY 5, 2007. 8. THE UTILITY INFORMATION SHOWN HEREON IS FROM THE I, SEAN R. SEEVER, CERTIFY THAT THE CONTROL FOR THIS HARNETT COUNTY DEPARTMENT OF PUBLIC UTILITIES AND MUST SURVEY WAS ESTABLISHED FROM AN ACTUAL CPS SURVEY BE FIELD VERIFIED. UNDER MY SUPERVISION. THIS CPS SURVEY WAS PERFORMED 9. THE TOPOGRAPHIC SURVEY WAS PROVIDED BY: TO C-211 FGCC SPECIFICATIONS RTK CPS WITH VRS FIELD GEODATA CORP - DIGITAL MAPPING SERVICES PROCEDURES WERE USED. THE COORDINATES WERE OBTAINED 104 EAST HORTON STREET THROUGH A GRID TO GROUND ADJUSTMENT USING THE ZEBULON, NORTH CAROLINA 27597 COMB Y WAS PHONE: 919-269-5744 PERF KMILU UN NUVLMULK Iwu HKII BLE 5700 FAX: 919-269-0413 RECE 'FINAL 10. THE WETLANDS DELINEATION WAS PROVIDED BY: DRAWING ENVIROMENTAL SERVICES, INC. NOT RELEASED FOR CONSTRUCTION 3661 ALAMANCE ROAD BURLINGTON, NORTH CAROLINA 27215 PHONE: 336-570-3002 �2l 72 / NO DEED FOUND /AT TIME OF SURVEY • • ,y2s�0Z1 ExisnNG / 1 1/2- �....9\`♦ ` FENCE 1 ' i ♦ "WETLANDS POST , _AREA ♦ \ CREEK PER• ♦ - - / • — - `/ \ -�3 W GEODATA ♦� , ♦ O 1 � 1 I �'�3 •`gyp, � , N/F V m ABJ INVESTMENTS, LLC WETLANDS i^ - DB 2379, PG 637 AREA PB 99. PG 236 ♦. I \` ®` \ 1Z6 ` 5/ ERBB" \ ERB as AREA: (BY COORDINATE COMPUTATION) \ 1,282,757 SF (29.45 AC) PIN NO, 0555-43-1606.000 ZONING: RA-20R 35' FRONT 120 10' SIDE 20' SIDE CORNER LOT 25' REAR REFERENCES: SHOWN HEREON 1 N/F KENLAN FARMS PHASE I, SECTION 2\ PB 2012, PG 472 \ 7 GRAPHIC SCALE 0 60 120 240 ( IN FEET ) 1 inch = 120 ft. 480 2" EIP ♦ y N/F t EIP o / � B 570, PG 85.-\\ W.C. COLEMAN(DIS7uReE0 / i 119.12 119.06 119.26 409 Chicago Drive - Suite 112 FayetteJDe. North Carolimu 28306 Ff(90)426-5777 \\\\\ Lirmse Number C-2354 4D �5IT11 �5oLUTION�5, INC �cNpNcuuNG � wevtnNc � 4>'S � co,L�7eucTloN uvaur REVISIONS bl•b�-13 �R Z LJ _-- Z0 U ¢ E- V7 4Z Ir IL 0 ILL QLLI Q LU1 Z� L O PROJECT NAME KENLAN FARMS SUBDIVISION PHASE TWO G EXISTING EIP CONDITIONS INCH TOP (BENT) 1" EIP \ \ p; INCH TOP �♦' •�ry9ry 8 ^-jIV: 123.15 \ M N\DS ` �-O N F AWE r�1 RICHARD E. THOMAS AND WIFE, `s..� • 1 . ARE ` 1 INY. 123.36 EFFEY MAY THOMAS \ EIP \ DB 762, PG 134 1 �P N/F CLIENT RICHARD THOMAS AND WIFE, 2" EIP EFFEY MAE MITCHELL THOMAS DISTURBED) DB 2301, PG 77 \ ABJ INVESTMENTS, N. 12398 \ • R Q \ BOBBY LE N/F \ \ LLC" OQO ryp, \ DB , PG \ Q- rp_pl R 32896135 PINCHEI829303 A TOP DB 829, PG 303 dot;,* IN : i23.78 \ P1 J0J SOt'229, pp 5" 2� 2p� JOHNNY RAY BLAKE AND WIFE, WN 124.58 KARI ELIZABETH BLAKE 2031 Middle Road : INV. 124.48 DB 1216. PG 631 Fayetteville, North Carolina 28312 Phone: (910) 485-5790 06. /�ti EIP Fax: (910) 678-9988 cp SHIRLEY C. ALLEN \ \ \ DB 1421, PG 618 \ \ PROJECT INFORMATION N \ ROBERT WADDELL DB 1556, PG 251 `O \ to \ SURVEYED BY: BOBBY DRAWN BY: SEAN CHECKED BY: JIMMY PROJECT NUMBER: 294 \ \ QGm 4 rr o s9,; \ ;apo DRAWING SCALE 90 HORIZONTAL:1"=120' `A F 01. c' DATE SURVEYED `k SEPTEMBER 4, 2012 \ SHEET NUMBER 1/2` ERB C-1 ■ O 2042 2031 G"' �R�PNO CO�nTy\/ NO 'r M VICINITY MAP NOT TO SCALE CURVE TABLE CURVE LENGTH RADIUS BEARING CHORD C1 154.37 625.00 N53-19'01"W 153.98 C2 9.82 625.00 N4547'27"W 9.82 C3 147.51 405.00 N55'46'29"W 146.69 C4 147.51 405.00 N7638'33"W 146.69 C5 147.51 405.00 S82'29'22"W 146.69 C6 162.16 405.00 S60'35'05"W 161.08 C7 39.27 25.00 SO4'06'50"W 35.36 C8 30.77 25.00 S76'09'01"E 28.87 C9 61.55 50.00 S76'09'0i "E 57.74 C10 62.41 50.00 S05'07'45"E 58.43 C11 52.45 50.00 S60'40'37"W 50.07 C12 42.23 50.00 N65'04'48"W 40.98 C13 39.27 25.00 N85'53'10"W 35.36 C14 101.65 205.00 S34'54'32"W 100.61 C15 24.68 25.00 S07'34'51"E 23.69 C16 15.06 50.00 N27-14-19"W 15.00 C17 43.32 50.00 S06'12'39"W 41.98 C18 45.07 50.00 S56'51'20"W 43.56 C19 41.15 50.00 N73'44'40"W 40.00 C20 41.15 50.00 N26'35'17"W 40.00 C21 54.76 50.00 N28'21'47"E 52.06 C22 18.40 25.00 N3838'53"E 17.99 C23 13.19 255.00 S19-02-30"W 13.19 C24 34.78 25.00 N19'19'59"W 32.04 C25 30.77 25.00 S85'32'45"W 28.87 C26 51.71 50.00 S79'54'33"W 49.44 C27 39.10 50.00 N48'03'47"W 38.11 C28 39.40 50.00 NO3-05-26"W 38.39 C29 43.18 50.00 N44'13'17"E 41.85 C30 45.25 50.00 S85'06'52"E 43.72 C31 34.78 25.00 N80'57'13"E 32.04 C32 35.68 255.00 S45'06'20"W 35.65 C33 39.27 25.00 N04'06'50"E 35.36 C34 37.86 395.00 N38'08'23"W 37.85 C35 90.20 395.00 N28'51'07"W 90.00 C36 90.20 395.00 N15'46'08"W 90.00 C37 90.20 395.00 NO2'41'09"W 90.00 C38 43.85 395.00 N07'02'09"E 43.82 C39 21.43 50.00 N22'29'44"E 21.27 C40 41.15 50.00 N58'21'13"E 40.00 C41 41.15 50.00 S74'29'25"E 40.00 C42 41.15 50.00 S27'20'02"E 40.00 C43 68.51 50.00 S35'29'52"W 63.28 C44 33.49 25.00 S36'22'31"W 31.04 C45 57.89 345.00 S06'48'27"E 57.82 C46 156.33 345.00 S2435'45"E 155.00 C47 19.92 345.00 S39'13'54"E 19.92 C48 39.27 25.00 S85'53'10"E 35.36 C49 100.20 455.00 N55'25'23"E 100.00 C50 100.20 455.00 N68'02'27"E 100.00 C51 93.70 455.00 N80'14'58"E 93.53 C52 36.66 25.00 N44'08'19"E 33.46 C53 21.03 25.00 N21'5800"W 20.41 C54 41.69 50.00 N22'10'26"W 40.49 C55 59.73 50.00 N35'56'06"E 56.24 C56 49.04 50.00 S81'44'49"E 47.10 C57 49.04 50.00 S25'33'13"E 47.10 C58 41.69 50.00 S26'25'50"W 40.49 C59 21.03 25.00 S26'13'23"W 20.41 C60 36.66 25.00 S39'52'56"E 33.46 C61 93.70 455.00 S75'59'35"E 93.53 C62 125.40 455.00 S62-11-53"E 125.00 C63 71.17 455.00 S49'49'18"E 71.10 C64 32.10 575.00 S46'56'24"E 32.10 C65 118.96 575.00 S54'27'58"E 118.74 EXISTING , / SITE NOTES w. r ANGLE IRON 1. EXISTING UNDERGROUND UTILITIES ARE SHOWN ONLY WHERE EVIDENCE COULI 4 FOUND TO VERIFY LOCATION. PRIOR TO CONSTRUCTION OR EXCAVATION OF ' ♦ • SITE, THE GENERAL CONTRACTOR SHALL VERIFY ALL UTILITY COMPANIES TO VERIFY THE LOCATION OF THEIR RESPECTIVE UTILITIES. ALL DAMAGE INCUR[ # • a TO EXISTING UTILITIES DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE. 2. ASPHALT AND BASE TYPE SHALL BE PER THE DETAILS. 3. ALL DIMENSIONS ARE TO THE BACK OF CURB UNLESS OTHERWISE NOTED. 4. ALL RADII ARE 5' UNLESS OTHERWISE NOTED. 5. ALL WASTE MATERIAL SHALL BE DISPOSED OF OFF -SITE IN ACCORDANCE WI STATE AND LOCAL LAWS AND REGULATIONS. 6. ALL SITE IMPROVEMENTS SHALL BE INSTALLED PER HARNETT COUNTY AND REGULATIONS. s/8" ERB N/F VIRGINIA CHANCE DB 392, PG 315 3/4" ERB N ° ♦ ` r• ✓ 14 �ry ♦_i�.� N62p , .3 ' • ` '�.� 526E519.60, p A i ♦ � � � . ` .0,,. TOTAL. w�- . s • • 04 ERB / I ZI y., i77 . / Igo / / / EASEMENT ��* ` . warty* R 'Iti tp 1p5 / / I � /'.`�� per/ / ` \ / at i ♦ s '� 'S i 3o,884ACF o A o 23,546 SF L / 69,468 SF m ; / O 0.54 AC /� / \ \ «. � ♦ 1.59 AC G 423.29' 143.90� of ; 99 \ 0 \C \ - - _ . - _ N41'3156- _ _ y y I r� / \ 20,932 SF 279 / / r t F, �0 /\ \ 0.48 AC _ _ .39'. it 100 N6221.12"E 33 0 10TOTAL / \ 230.10- ERB \ y pp \ / o \ % / \ Z ��_\ 28,495 SF 0.65 AC / N I y�\. \ 0. l \ S67- / \ 41, c' /. 0.N \ \ �.\ \ �/ 10 .oN\moo \ 24,274 SF 0.56 AC \ 092 \ / 20,788 SF r 0 20.947 SF 39,478 SF \� \/ J / 0.48 AC \ \ 0.48 AC 0.91 AC \ \ r U BID / C2900 13"k,•2o - 1%' S54'36'23rW 127.40' I Z M I o o- Z \ 95 27,661 SF t-3 \ NO tno. Io I 00.64 AC / % .p .t i \ 25,300 SF o I w C2 t,,� 0.58 AC 63 0pG \ Iy`�i nI 21,013 SF of o o IZ �. I 0.48 AC o L- N ,rn I of a VARIABLE DRAINAGE I n EASEMENT 24 ! \ \ 20,140 SF \ 1 h SITE DATA OWNER ABJ INVESTMENTS, LLC MAILING ADRESS 2031 MIDDLE ROAD CITY, STATE FAYETTEVILLE, NORTH CAROLINA PIN NUMBER 0555-43-1606 TOWNSHIP STEWART'S CREEK TOTAL SITE ACREAGE 29.45 ACRES ACREAGE TO BE DEVELOPED 29.45 ACRES ZONING RA-20R EXISTING USE UNDEVELOPED GENERAL BUILDING USE RESIDENTIAL DISTURBED/DENUDED AREA 5.9 ACRES TOTAL LOT COUNT 37 SETBACKS REQUIRED: FRONT 35 FT SIDE 10 FT CORNER SIDE 20 FT REAR 25 FT / I ■ C44 31,477 SF i C43 0.72 AC yX / ems), F IN. \ IN. 30,536 SF IN. \'\ / ^h, / / \ S'9� `.., ♦ 1 • w u / 105 IN ern / 20,591 SF IN. / �Q = �Ch N. rn i 0.47 AC / N \ . IN/ o• / . y�4'�ru /2 ^'�/ ♦ \ ` y OU m V a / } � i ^�o �o/� � IN. 7269 CREEK PER •®\ � -� \/ 1 GEODATA N52'21"E - / \ '2567.691 SF * t ■ / � 1.55 AC dJ 16s.00' / \ \ \ / 9D 54,541 SF y I °= y w 01-0 25 AC a 21,356 SF /f o 107 /� 55\ ■ ■( to I 0.49 AC 25,823 SF11 0.59 AC /= ryo"/ \ > \ �5, \'� _ . 2,y,T. 108 U r o W 0.46 AC 1 3, C32 60.59' _ 100.00_ \ 8.14' C49 I ! 6 S49'06'50"W 160.59' TOTAL S49'06'50"W ./ 26,097 SF l �"� n ♦ t m i 0.60 AC / p`V 24" ASPHALT CSO 89 \ \ N./ G�y"S WEDGE CURB (TYP) 21 C22 J 9 36,095 SF t• 28,324 St \ G S49'06'50"W 160.59' TOTAL S49'O6'S0"W \ / { .F. G�� G�5 58 ( 0.83 AC / y EtP i 0.65 AC / / eC14-55.59'-105.00' _ -C,S 1 8.14' C6 M 24' - \ O��'1 /. / \ 3j ? G /,y0y� / •1 i VARIABLE DRAINAGE 1 W VARIABLE DRAINAGE C52 'LSS• c�\. F.Q t / , 'EASEMENT 0187.73' S9EASEMENT \/ . / '� ♦ ( ,. oA65.18' Co w o n o' 0 1- I ®5 \ 26,097 SF�I /44 21,316 SF 23,944 SF \21,596 SF 0.55 AC0.60 AC C18 0.50 AC 0.49 AC .\ � NI 'i t s ,a19� / I S07'19'22"E \ � \SS 3y; I ( p Lu J ' \ . y / ✓ N/F ♦ ., 1 . E- 79.04' rp tp� dS, F\ I a F / \ \ 0 / ABJ INVESTMENTS, LLC ■ /) \Y` \ \ \ I I to Q \� C9 \ / 80 \ O \ / _�ps� / / DPB2379 P6 2637 M / w my IN�._._. L_.-._._. _. _.J mail �._. _. _.36 v 0 _0/ 20,220 SF /' \ K it \ \ 0.46 AC �\ / / ♦ • / 62,278 SF \ \ 55.38' 130.00' 40 R N49'06'50"E�- 3' N 1.43 AC I l _ S49'06'50"W 185.38'_ 84.72'_ I n i 00 88 I 21,971 SF I I \ Cl p i \ \ ./Spry ,g1/ \ \ 113 / ^ s/e' • * • Z �" 20,689 SF Iw I 0.50 AC Iw I \ G / \ \ / / \ \ \ 62,460 SF / ERB aI 0.47 AC I oI I� i ®\ C1,_ /\\ ,'/ // 79\ \\ 1.43 AC / �P io / v v / �O n I < 'OI I a0 20,582 SF / \ / 22,684 SF O . J m I ,M NI 0.47 AC .4 /\. C� 0.52 AC � �rn p4)\ ERB (_._._._._._.J L ._._._._ / po° 30,212 SF stir \ \ \ i Y1 / \ 41 / / 0.69 AC \ \ /Z,Sp'I'29 'N327�.2�'' 265.82' ERB 113.00' 119.19' / to, \ \ / / S 2 9/ \ K' J" 00' yn 95.2 83 S50'12'04"W 593.01' TOTAL - 5/e" 0o0 uj LA 22.869 Sc .+ o\ \ �" / / / \ C I Z ` / I ERB S89 \ 0.53 AC \. r^. \ / . / \ eg I I I I 0 2e, \.\ \ \ \ 78 \ I 0� O o u , o \ \ 22,725 SF m n 24,895 SF \ W / 02 \ \ \ ?020.52 AC \ I N A) 0.57 AC / Nw I / I N/F I I 2l �-_._. _. _. _.� �._._._._. _. _. _., �._._._._._._._. °T KSE 1, FARMS "91 120.00' 165.00, 5/8" PHASE I, SECTION 3 202.16' PB 2012, PG 575 5/8. s/e" ERB LEGEND: EtP Oo EIP-EXISTING IRON PIPE EPKO EPK-EXISTING PK NAIL ERBO ERB-EXISTING REBAR CP c CP-COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PVC - POLYVINYL CHLORIDE RCP - REINFORCED CONCRETE PIPE �-� PROPERTY LINE ADJACENT PROPERTY LINE TIE LINE RIGHT-OF-WAY ---- -SETBACK LINE sD STORM DRAINAGE wt WATER LINE OVERHEAD UILITY X FENCE LINE - ---CREEK WETLANDS TREE LINE BENCHMARK ® SIGN pp UTILITY POLE C GUY WIRE ❑7� TELEPHONE PEDESTAL qD-V 4� WATER VALVE FIRE HYDRANT ASPHALT WETLANDS 5/8" S5012 04 W 487.16 TOTAL ERB I ERB I I I I I GRAPHIC SCALE 60 0 30 ( IN FEET ) 1 inch = 60 ft. 5/8' ' ERB I 240 0 5/8" > ERB S41'27' 38 5/8' I ERB I I\ \ s/ ERB 5/8' Zg'3626 ERB 5 ERB �3 409 Chicago Drive - .Suite I12 fweHev111e. North Carolina 28306 Last (9 4265777 \\\\ Lireree Number: C-2354 4d �51TL J50LUTION�5, iNc AL-KtNG Nc A�vtnK AG9 AC bT¢uc""YourA REVISIONS bl-o+'13 v Z 0 Z� t- m MM< Z {.ice Cr QLL O 0 0 w Cl) 4¢ -1 LU _ZW I- O Z PROJECT NAME KENLAN FARMS SUBDIVISION PHASE TWO SITE PLAN CLIENT ABJ INVESTMENTS, I.I.C. 2031 Middle Road Fayetteville, North Carolina 28312 Phone: (910) 485-5790 Fax: (910)678-9988 PROJECT INFORMATION DESIGNED BY: BEN DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 20A DRAWING SCALE HORIZONTAL:1 "=60' DATE RELEASED JANUARY 4, 2013 SHEET NUMBER C-200 2042 2031 SITE lj_?�fl�o (�o ON lalz� C1\NOFlTH VICINITY MAP NOT TO SCALE LEGEND: EIP 0 EIP-EXISTING IRON PIPE EPK 0 EPK-EXISTING PK NAIL ERB 0 ERB-EXISTING REBAR Cp o CP-COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PVC - POLYVINYL CHLORIDE RCP - REINFORCED CONCRETE PIPE PROPERTY LINE ADJACENT PROPERTY LINE -TIE LINE RIGHT-OF-WAY . . . . . . _. -SETBACK LINE m -STORM DRAINAGE WATER LINE -OVERHEAD UILITY X FENCE LINE CREEK WETLANDS -Loc-Loc-UMITS OF CONSTRUCTION - w - sF - SILT FENCE LINE -Div - mv - DIVERSION BERM TREE LINE BENCHMARK (n] SIGN PPS UTILITY POLE C- GUY WIRE M TELEPHONE PEDESTAL N WATER VALVE FIRE HYDRANT ASPHALT WETLANDS Know what's below. Call before you dig. 409 Chicago Drive - --mite 112 FayeHeviLle. Worth Carolina 28506 W woo* Phone, (910) 426-6777 0000 "1 Fax (910),d26 -5777 10 Lx Number, C-2-,55,d EROSION CONTROL NOTES 4 GRADING NOTES CONSTRUCTION SEQUENCE 1. ALL SPOT ELEVATIONS ARE TO THE EDGE OF PAVEMENT, UNLESS OTHERWISE 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD PRE ... 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR MAINTENANCE AND 50LU TION�5, INC NOTED. CONSTRUCTION CONFERENCE. N FAILURE EACH ACTIVE DAY ON SITE. SEDIMENT WILL BE REMOVED FROM THE 2. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND DISTURBING 2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT FENCE AND 44. 46 ------ SEDIMENT TRAP AND INLET PROTECTION DEVICES WHEN THE STORAGE CAPACITY A-14qwc K A-v,-K A<- A­Tz­""­ A ACTIVITIES AND ENSURE COMPLIANCE WITH THE APPROVED EROSION AND DIVERSION BERMS WERE SPECIFIED. .7 HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE CLEANED OR REPLACED SEDIMENTATION CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND MAINTAIN 3. CONSTRUCT PERMANENT WET POND TO BE USED AS A TEMPORARY SEDIMENT WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. SEDIMENT WILL BE ALL EROSION CONTROL DEVICES AND CLEAR ANY DEBRIS LEAVING THE SITE ON BASIN AS SHOWN. REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' NEIGHBORING ROADS. 4. CLEAR AND GRUB THE SITE AS NEEDED. DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO 5/8 10 I 3. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL BE 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO AREAS REMAIN VOO MAINTAIN A PROPER BARRIER. ti CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS MATERIALS; GRASSED. 12, -2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT FACILITIES NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND HAS 6. INSTALL UTILITIES. EASEMENT A SEP77C •INTENDED TO CONTROL EROSION OF AND EARTH DISTURBANCE OPERATION SHALL BEEN COMPLETED 7. INSTALL INLET PROTECTION ON ALL NEW STORM WATER INLETS. BE INSTALLED BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE OR .... I .. .... AT THE EARLIEST POSSIBLE POINT DURING CONSTRUCTION. 4. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE OWNER 8. PERFORM FINE GRADING. 7' TO PROTECT ADJACENT PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING 9. INSTALL AND PREPARE BASE COURSE. V/ 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL BE OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR THE UNDERGROUND 10. PAVE ROADWAYS. SSI f CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE CONSTRUCTED IN *% UTILITY PIPES, CONDUITS, OR STRUCTURES, WHETHER SHOWN OR NOT ON THE 11. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. 20 N ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL r . !z PLAN 12. UPON SITE STABILIZATION, SEEK NCDENR APPROVAL TO REMOVE ALL TEMPORARY Z m PLANNING AND DESIGN MANUAL SEAV-% 5. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF MEASURES. 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDENR OFFICE A MINIMUM 02 ALL UTILITIES OR STRUCTURES ABOVE AND BELOW GROUND, SHOWN OR NOT 13. AFTER THE SITE HAS BEEN STABILIZED, REMOVE SEDIMENT FROM PERMANENT . .......... WET POND TO THE BOTTOM ELEVATION OF THE POND AND CONVERT TO DESIGN OF 48 HOURS PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES. SHOWN ON THESE PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE 910-433-3300 %* 9 TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS OPERATION. DIMENSIONS. THE WET POND SHALL BE RESTORED TO THE DESIGN DIMENSIONS. 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED ONTO will- 6. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND AFTER AS OUTLINED IN THE PRIVATE PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS 007-1 14. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED ... ....... 102 PUBLIC AND P r-sto NVSO GRADING BY THE CONTRACTOR TO DETERMINE IF ANY SLOPE STABILITY DETAILS WITHIN THE PLANS AND ACCORDING TO THE NCDENR EROSION CONTROL WHEN TRACKING OCCURS. PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A SLOPE STABILITY MANUAL. 6. LOCATE SOIL STOCKPILES NO LESS THAN TWENTY-FIVE (25) FEET FROM ANY PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. PUBLIC OR PRIVATE ROADWAY OR DRAINAGE CHANNEL IF REMAINING FOR MORE 7. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SHOULD BE GRADED WITH . ..... 000'- 307 THAN SEVEN DAYS, STABILIZE THE STOCKPILES BY VEGETATIVE COVER, TARPS, 3:1 SLOPES AND SURROUNDED BY SILT FENCE. NOTE: ALL PIPE JOINTS BELOW THE STORM WATER -POND HIGH WATER OR OTHER MEANS. CONTROL EROSION FROM ALL STOCKPILES BY PLACING SILT 8. APPROVED COPIES OF THE GRADING AND EROSION CONTROL PLANS SHALL BE ELEVATION SHALL HAVE RUBBER GASKET JOINTS THAT CONFORM ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. TO ASTM C 443 ------ BARRIERS AROUND THE PILES. TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES MUST BE NO LESS THAN FIVE FEET FROM THE DRAINAGE GUTTER 9. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE SHALL REMAIN IN A LINE AND SHALL BE COVERED IF LEFT MORE THAN 24 HOURS. CONDITION SUCH THAT THEY CAN TRANSPORT THE NATURAL DRAINAGE UNTIL 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES IN PLACE FACILITIES TO HANDLE THE STORM WATER ARE CONSTRUCTED. THE CONTRACTOR UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT REVISIONS SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND DRAINAGE PATTERNS. ......... HP REPLACE DETERIORATED, DAMAGED, OR ROTTED EROSION CONTROL DEVICES 10. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE REPORTED TO IMMEDIATELY. THE ENGINEER OF RECORD PRIOR TO IMPLEMENTATION OF THE CHANGE. 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED AREAS WHICH HAVE -0 BEEN FINISH GRADED, AND ALL DENUDED AREAS IN WHICH GRADING OR SITE ... .... ....... BUILDING CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY AGAINST 5/8 z 0- EROSION DUE TO RAIN, WIND AND RUNNING WATER WITHIN 14 DAYS. USE ERB 0 SEEDING AND MULCHING, EROSION CONTROL MATTING, AND/OR SODDING AND >. \ �- VV LOC STAKING IN GREEN SPACE AREAS AND OTHERWISE APPROPRIATE MEASURES. USE z . ......... ..... ......... .. . ...... EARLY APPLICATION OF GRAVEL BASE ON AREAS TO BE PAVED. . . 9. DO NOT REANY AND SEDIENT CONTROL DEES AFTER EE ........ PROTECTEDMOVE AREA HASEROSION UNDERGONE FINALMSTABILIZATION AND PERMANENTTHE VEGETATION HAS BEEN ESTABLISHED. IT IS RECOMMENDED THAT NCDENR z ........ APPROVE THE ACTION PRIOR TO REMOVAL < 0 ... ... .......... ...... 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED CONCURRENTLY WITH THE . ....... INITIATION OF ACTIVITY. 11. THE INSTALLATION OFCONSTRUCTION EROSION CONTROL MEASURES SHALL TAKE PRECEDENCE 0 ILL OVER ALL OTHER CONSTRUCTION ACTIVITIES. Q 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS AND LU (D _j (0 PER OF ANY OTHER PARTIES PERFORMING WORK ON THIS PROJECT. < 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR LU STABILITY AND OPERATON FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT z CC . ....... IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS LL 0 SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY z C) 105 / STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR V) CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR 07 Ir In W OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES ...... ..... . . . ........ . OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 0 0 0 in r 0 113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RETAIN 5 EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 14 LU WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING HIP COMPLETION OF CONSTRUCTION DEVELOPMENT. tz PROJECT NAME 0 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION CONTROL MEASURES 0 0 it L) SEDIMENT 0 SHOWN AND ANY ADDITIONAL MEASURES REQUIRED TO CONTROL THE DURING THE COURSE OF CONSTRUCTION. 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE DETAILS HEREIN. 1p 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT ARISE ON SITE IS 0 0 0 0 '0 U BRIAN RAYNOR. CONTACT 910-485-5790. f KENLAN 0 . ....... _100 cs� - ...... ;5 1 i FARMS 4 101 Ln 129 ... .... . 0 DRAINAGE 0 S VARIABLE 44.50 LF 0 UBDIVISION HP t 9,42% 0 �4 RCP� 0.56% 18" RCP DRA CI-43 45.15 LF 0 Q 0.44% 24" RCP PHASE TWO (DOUBLE)� CI-42 001- 1 bol 001 CI-00.1 -001 001- 40, TEMPORARY INLET (DOUBLE) PROTECTION TYP ')U.:)V r 0 VEGETATE 0 LF 0 30.00 LF 0 30 D 0.50% 18" RCP 001 .47% 24" Sp 44.50 LF 0 BUFFER /'O.10 H A 36" R 220.77 126 LF 00-40% 42- RCP 127.26 LF 0 0.40% 36" RCP 3 - Up", 36 WI.- -- - ----- 1-1 - ... I., . I—- a I- GRADING AND R Azo .(DOUBLE) _1ft Lm C LOC-' L Dn -00-RIP RAP ENERGY DISSIPATOR �2 • EROSION J_ VAR I IABLE VARIABLE L 32', W. 12' & 36' 31 Fi J_ C11- DRAINAGE .-Do ... DRAINAGE i?n. 1/9 . ........ THICKNESS: 225 D50, 10 EASEMENT 0 EASEMENT 65.63 LF 0 VO� CONTROL PLAN 'SEE SHEET C-5.2 0 r- 0 CLASS 1 STONE r1q 0 R DETAILED CROSS 7 0 0.40% 18" RCP ON HP 400. 11 SECTION OF POND LIMITS OF CONSTRUCTION //Acli 1-32 5.9 ACRES �DOUBUE CO ... .... r- 0 zi 0 UO 30.00 LF 10' VEGETATED-0.40% 24' RCP SHELF OI TEMPORARY SILT k FENCE (TYP) 7-16 N/F CLIENT 0 ABJ INVESTMENTS, LLC PERMANENT WET POND e701 DB 2379 PG 637 WATER SURFACE: 123.50 PB99 PG1 HIGH 70' Ira WATER: D:'214�6.50�1 YR) 0 TOP OF 1 -1 ABJ INVESTMENTS INVERT OF POND: 116.00 SHWT: 124.00' TOP OF PERMANENT POND IS TO BIE'USED AS 87 0 . ..... . LLC. SHELF- 124.00' A TEMPORARY SEDIMENT BASIN THROUGH RIP RAP 20' SPILLWAY CONSTRUCTION THEN CONVERTED TO A WET 5/8 ER BOTTOM M OF BAFFLE WITH ABC STONE POND UPON STABILIZATION OF THE SITE. B Z'MILLF: 123.00' ELEV: 124... TBM: 4D NAIL #6 ALL PONDS SLOPES MUST BE SEEDED 84 N: 553,323.161 WITHIN SEVEN DAYS. E: 2,053 722.002 LOc 3S 51.42 LF 0 116 ELEV: �27.86 2031 Middle Road 1.06% 30" RCP - Fayetteville, North Carolina 28312 ATTACH A 4.0* FAIRCLOTH SKIMMER NC GRID NAD 83 0, 5/8' -5790 (OR EQUAL) WITH A 2.9- ORIFICE TO (NSRS 2007) ERB G> Oc, Phone: (910) 485 RI-12 FOR DEWATERING THE SEDIMENT NAVD 88 ANTI -SEEP 126- 127 BASIN DURING CONSTRUCTION. REMOVE THE Fax: (910) 678-9988 SKIMMER AFTER CONSTRUCTION IS COMPLETE. 0� U COLLAR LOC� LOC 0 5/8" 1 ...... B-46 LOC7,_-'LO 5/8' ...... C_ . ..... ERB . ..... . ERB) 7. DRAINAGE MkTCH LINE SEE SAME SHEET EASEMENT 0 PROJECT INFORMATION 7,,�7 C) 0 GROUND STABILIZATION CHART 'p DESIGNED BY: BEN SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HOW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED 7-DAYS FOR SLOPES SLOPES 3:1 OR 14 DAYS GREATER THAN 50 FEET FLATTER IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HOW ZONES) 0 1 7 ERB DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 294 5/8- ERB J 5/8- ERB 5/8-1 ERB. 0ra "1;1 'j'' III, of ., ERB In, -, 1, , ­-­ ERB ....... Ov wifI, DRAWING SCALE 'n, 0 HORIZONTAL: 1u=60' 3 C, %L ) TEMPORARY GRAPHIC SCALE 60 0 30 60 120 240 < 0 IN FEET 5 8* ERB 1 inch = 60 ft. J' ' E CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 48 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED M r R (A-1mu Vk DATE RELEASED JANUARY 21, 2013 SHEET NUMBER C-10 2042 2031 2039 SITE 1 2083 -�_ iiiiiiiii 11111111111111 00'" 111111111111111 4og chicw Prive - Nite 112 '01 fayetWliLe. North Carobna 281+3o6 00 0 WOOO Phone (940) A26-6777 .,000♦ ....... Fax (910) 426-5777 L� 14.mbc C-2554 EXISTING ANGLE ....... ..... ..... . 4P SITIL IRON % '00, loor 67LUTION INC ....... 4000 010 ------ 41 .......... . ...... *% •ERB E'000, 4r .. . ... el 46 0 %%J11111111/z ------ ........ .... 4p ONy, CARON, S 46 CO(JAI VIRG392, PG 315 INIA CHANCE 0 02 SEA DB• 102 ....... --- ------- .. .... . ....... ERB (GD .......... .. . ....... VICINITY MAP_ - \ . F U j'r1z11113 NOT TO SCALE 3/4 1 ERB ........... ......... REVISIONS .. ........ 7, LEGEND: EIP @ EIP-EXISTING IRON PIPE EPK (D EPK-EXISTING PK NAIL ERB 0 ERB-EXISTING REBAR GP o CP-COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PVC - POLYVINYL CHLORIDE RCP - REINFORCED CONCRETE PIPE ,PROPERTY LINE ADJACENT PROPERTY —TIE LINE RIGHT-OF-WAY -SETBACK LINE — STORM DRAINAGE — WATER LINE — OVERHEAD UILITY X — FENCE LINE CREEK WETLANDS — Loc— Lw— LIMITS OF CONSTRUCT! — sF — sF — SILT FENCE LINE — mv — In — DIVERSION BERM TREE LINE BENCHMARK FFISIGN pp 0 UTILITY POLE C- GUY WIRE M TELEPHONE PEDESTAL M WATER VALVE 1-f- FIRE HYDRANT ASPHALT WETLANDS Know what's below. Call before you dig. ON DRAINAGE 0 CREEK PE AREA rEODATA ... LU % 7egz� Ill N1.1 I I PROJECT NAME U) 110 _13 Z X KENLAN li 1- 0 CO) ...... FARMS U) .......... SUBDIVISION .. ........ PHASE TWO . . . ........ i 30' VEGETATED BUFFER- J27 26 j E pDRAINA T/ ... GE AREA MAP J....... O112 0 10' VEGET TED 716 SHELF m a- ------ 4 LU N/F le ABJ INVESTMENTS, LLC CLIENTC85) I DB 2379 PG 637 m 4K 11 1 Il m 0: FB 99. PG 236 0 ABJ INVESTMENTS *N LI.C. TOP OF SHELF: 124.00' 5/8' RIP RAP 20' SPILLWAY ERB BOTTOM OF BAFFLE NTH ABC STONE TB 4D NAIL #6 SHELF: 123.00'ELEV 124. 84 N�: 5 53323.161 79 116 Im Z,UJ0172' 2031 Middle Road ELEV., 127.86 NC GRID NAD 83 124 (NSRS 2007) Fayetteville, North Carolina 28312 126 NAVD 88 ERB Phone: (910) 485-5790 ANTI -SEEP 12? Fax: (910) 678-9988 5/8- COLLAR 5/8 CL ERB ERB 83 5/8 ERB PROJECT INFORMATION DESIGNED BY: BEN DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 294 ERB 5/8- ERB ERB ERB " 5/8YrDRAWING I ERB SCALE nH r th p HORIZONTAL: 1"=60' Ell 1 3C) GRAPHIC SCALE DATE RELEASED 60 0 I 30 60 120 I I I I 240 5/8. . ERB / / j JANUARY 21, 2013 Ell— ( IN FEET ) 5/8- SHEET NUMBER 1 inch = 60 ft. ERB THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A C31 MINIMUM OF 48 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED N 2042 ,j - o\A" 00�16`� IIIIINDFITH VICINITY MAP NOT TO SCALE LEGEND: EIP @ EIP-EXISTING IRON PIPE EPK 0 EPK-EXISTING PK NAIL ERB 0 ERB EXISTING REBAR GP o CP-COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PVC - POLYVINYL CHLORIDE RCP - REINFORCED CONCRETE PIPE PROPERTY LINE ADJACENT PROPERTY LINE TIE LINE RIGHT-OF-WAY -SETBACK LINE — STORM DRAINAGE — WATER LINE — OVERHEAD UILITY X — FENCE LINE CREEK WETLANDS TREE LINE BENCHMARK [n] SIGN PPO UTILITY POLE C- GUY WIRE M TELEPHONE PEDESTAL X WATER VALVE FIRE HYDRANT Y� ,�PROPOSED FIRE HYDRANT i PROPOSED WATER METER H PROPOSED WATER VALVE 0 PROPOSED BLOW OFF FTAPROPOSED TEE ASPHALT WETLANDS SNYDER PG 576 409 Chicago Drive - N '12 *40p fa�etWl_Le. North Carolina24 ?,o6 -677 Phone (940) 426 . ......... 00"00� 0000 fax (910),d26-5777 L Number c-2.35A 10 EXISTING 1 A�GLE -7 Z IRON J4p �51TL 50LUTIONA), INC V 0/-2/-13 REVISIONS + ... . .... . ...... ......... . .... — . ....... 2' GV ..... ..... I ........ 5/8' ........ . . ...... 7+60.8 8 ER Q— .......... 2' 80 0" ....... ...... . ......... N/F ... ... _YN DENT 0 10, PG 904 ......... . ....... ........ - - 0 ----- 2' GV 5+24.9 N 5+15.4 FH/PUUG & TAP 2" . . ....... 9 00 0 . . .... .. ..... T� I Ld ti . ..... . .......... CREEK PE G 0- EODATA PROJECT NAME 2+' 91 2+24.9110 2* GV 2+174 KENLAN 0 2" B0 0 . ....... - ---- - ---- V_- 0 1+99.7 2+09.6 r" Ln 6 FARMS LA 2 GV ... ..... ... ti SUBDIVISION 90 r 9+21.6 2+85.4 9.5 FH 6* GV V Cl 9+10.2 43 - - ------ V, DOUBLE) 11+49.5 - GV 6"X6* CROSS 0 9+30.2 PHASE'WO 6 \C ...... 4 -40 cl- FIH _I 1�0 . _-1pl, - I / I mr2 W (DOUBLE) GI-44 W6 W5 14i2.3 7� ;WW Gv .....55 4 ........ 2' GV 111 30' VEGETATED BUFFER,, 9+DO ----- 00 -- ------- UTILITY PLAN EIP Cl-3 6 CI-3 1-34 CI-33 ... . ..... .. . ..... . . . . . . . . . . 11+63.1 --6"X2" TS. PLUG& + Ar TAP MATH 2' C 111 39 2yy( a _H I Ar B 12+83,2 2" 80 0 G+39.9-" CI_ CI-30 2' GV 4, 0 ju DOUt;Lt ... ..... --- 4+96.9 6"X2* TS - - - ------- 10' VEGETATED--,'. 12+95.6 4+ SHELF 2' GV LU 62.6 N/F 6' GV CLIENT ABJ INVESTMENTS. LLC j STMEN PO ILL 3: Z) J;1111 i1.1'11-1�1� .11 i�+:, I p 4 -� 1, 0 DB 2379. PG 637 1�4 41 PB 99, PG 236 0+30.6 ABJ INVESTMENTS, 2" BO ki I C871 LLC. TOP OF I I i 1 0+22-1 SHELF- 124 00' 2' GV 5/8 RIP RAP 20 SPILLWAY ... IL ERB eh BOTTOM OF BAFFLE WITH ABC STONE ... . .... R 5 ........ SHELF- 123 00' ELEV- 124 50' 1 oex: 2031 Middle Road L Fayetteville, North Carolina 28312 5/8 ... ........BE..ERB Phone: (910) 485-5790 Fax: (910) 678-9988 ANTI —SEEP .. ......... 1 5/8- JB_46 COLLAR ........ RB 5/8. ... .... ERB-, ....... ... .... E 5/6 PROJECT INFORMATION f . ... . ... (C 15141 (C7 8 10 OMI`rl�r �th V equi, � -,f,fmjty Witt, !I no n, mmog ,..lance with the C U -ARMS i5t + rate 2,J1 _CTION 3 �G 575 ERB Dater 0"al ERB 5/8" 5 5/8- ERB 5/8 ERB 5/8' ERB ERB ERB 5/8 DESIGNED BY: BEN DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 294 ERB .. ...... DRAWING SCALE HORIZONTAL: 1"=60' EIP 1. A� O V, GRAPHIC SCALE DATE RELEASED NOTE: ALL PIPE JOINTS BELOW THE STORM WATER POND HIGH WATER 60 0 30 60 120 240 JANUARY 21, 2013 Know what's below. ELEVATION SHALL HAVE RUBBER GASKET JOINTS THAT CONFORM TO ASTM C 443 I I I ERB mmmm� Call before you dig. 5/8- IN FEET ERB \ y SHEET NUMBER I inch = 60 ft. REMOVE PLUG & BLOWOFF AND TIE TO EXISTING C-400 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 48 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED N 130 125 120 115 I WET POND STORM DRAIN -0+50 TO 3+00 m O N N Off^ 0 a HIGH WATER (10YR) 125.29' l V7 HIGH WATER (1YR) 124.70 EXISTING GROUND — I —7T0P OF POND: 126.50' NORMAL POOL: 123 50 '� ILI VEGETATED 0--� SHELF op BOTTOM OF SHELF: 123.00' 61.42 LF 1.06% 30" R SPILLWAY: 122.50' 'D m10 0 n 0 0 ^ p 0+00 1+00 2+00 130 125 120 115 NO .OFR S WACE (, YIQ � ' \ S& 12LW NOOK mm Sum 117 MY 1Ir 1EQrA1m s1L1F "1ECEM SW ND ROM /RUE 11E PBIMIEIR POOL BEM ON MU ME A IMIM OF G 10ISOE. MOM SITYL BE fMl M 10 ACCOW FOR Amu OF TQ`SOL N TH3 ARDS SIEN 1W RE nPMM SI MI /RUE ARE 1011E FIMM 6MOE IF RE MF.%L NTS WET POND X-SECTION WITH EARTH BERM �MAS14 RACK A RISER ' PVC SCREW /\FINISFIED/ 4 TYPE PLUG 1 4' Pr STUBBED IMO Box 4' PVC TEE /-� � TE1lORRARf POOL _D PERMANENT POOL B 1/4 PER IT 12- 4* �� wrrH 2HOLE SEC110N A -A TYPICAL ORFICE OLn1EF CONFIGURATION NOTES 1. WEEP HOLES SHALL BE EVENLY DISTRIBUTED AMONG SIRI=XIE A B C 0 14016 THE THREE RECEIVING SIDES. 2 MI MLIM SEPARATION OF 1.5 TIMES THE DIAMETER OF M-10 I 124.73 I 120.fI 1 4.0 1 1 at I THE WEEP HOLE SHALL BE MAINTAINED BETWEEN THE WEEP HOLES 3. OUTSIDE RISER DIMENSIONS. L-4'. R-.ri RIME RISER DIMENSIONS: L-S. W-2'2- NTS STORM BASIN RISER WITH ORIFICE DETAIL LIFTING LUG—\ 3/4"x3/4" ALUMINUM BAR—\ e 0 NTS TRASH RACK 20 0 O05 V�CiiCl t O(, ,':Y.ii t r,rlj= .des require thai thr: 'nspect dun 14 Flans and ;n =�`%ntonnily wit-,, , 'r `.varer nce with he 2 13o/oz _te 2 F Y '-'te � �3 GRAPHIC SCALE 10 20 40 Ho ( IN FEET ) 1 inch = 20 ft. 409 CMcayo Drive - .suite 112 FayeHW L e. North Carolina 28506 Fax (9 09 426-5777 \`\\ License Number: C-235A 4 D t.5 ITL t50LUTIION,5. INC ACH,IHCCP.MS A SuevtnNG ANs A l bW>ZIIC""Your A v l "zi-13 REVISIONS Qz V O Z I- U cc QO z it O 0 0 0 J"' a W J ZIX Q 0 �- z PROJECT NAME KENLAN FARMS SUBDIVISION PHASE TWO STORM PROFILES CLIENT ABJ INVESTMENTS, LLC. 2031 Middle Road Fayetteville, North Carolina 28312 Phone: (910) 485-5790 Fax: (910)678-9988 PROJECT INFORMATION DESIGNED BY: BEN DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 294 DRAWING SCALE HORIZONTAL: 1"=20' VERTICAL: 1"=2' DATE RELEASED JANUARY 21, 2013 SHEET NUMBER C-502 m 1 NTS 24" ASPHALT WEDGE CURB 12' 12' 2' 10' 10' 1 2' 3% 2" SF9.5A 3% 6" CABC K W W Z Z J U FINISH GRADE /— SF9.5A \_COMPACTED SUBGRADE CARRY BASE COURSE 6" BEYOND SURFACE COURSE AT LOCATIONS WITHOUT CURB AND GUTTER PAVEMENT SECTION Tm 1. SECTION SHOWN TO DEPICT TYPICAL CUT §FlLL CONDITIONS ONLY. GRADING PLAN SHOWS WHETHER SECTTN 6 IN CUT, ALL OR BOTH 2 STREETS INCLUDED ARE: BARKER COURT, TATE COURT, WNSON COURT, MELVN COURT 6"COMPACTED ABC NTS NTS K, SIHUCIURE A B D D THOUS Po-10 I 12CM I IMZI 4.0 I2 1 1 10' +1 4% p_..._ _. _.1 - e -1-! 1- i-1 15' 15' 2 13' 13' 1 2' 3%, 2" SF9.SA 3q, f f 6" CABC w IAI Z J mm 1. SECTION SHOWN TO DEPICT TYPIGI. CUT A: RL CONDITIONS ONLY. GRADING RAN SHOWS WEW SECTION IS IN CUT, ALL OR BOTH ROADWAY TYPICAL SECTION RASH RAC( RISER 4• PVC SCION TYPE PLUG 4• PVCINTO SLABBED INTO e\ox^ {\\` ^4• PVC TEE TEMPORARY POOL rL - PERMANENT POOL 2- 4• PVC CAP WITH 2.25• DRILLED HOLE T WCA ORINE OUBEE COWIGURATION IND.lg 1. WEEP HOLES SHALL BE EVENLY DISTRIBUTED AMONG THE THREE RECEIVING SIDES 2. MINIMUM SEPARATION OF 1.5 TRIES THE DIAMETER OF THE NEED HOLE SHALL BE MAINTARIED BETWEEN THE WEEP HOLES 3. OUTSIDE RISER ORIENSIONSI L-4', W-YY R/SDE RISER DIMENSIONS L-3', W-2'2' NTS 3/4"x3/4" ALUA LIFTING LUG NTS NTS 4 ROADWAY TYPICAL SECTION 5 STORM BASIN RISER WITH ORIFICE DETAIL 6 TRASH RACK i I c T ans an • . -- - .cr.nitt/ YYBI-. ,. C- S . o 4o9 Chicago Drive - Suite 112 faretteJUe. North Carolina 28306 fF- (910)4265777 ��\\ License Number: C-235A 6oLUTIION6, INc �CN41Nf:GR1N� ��lIfV4YRIS /1�G>"� � CaNSTQUCTWI LaYODT 027 cINE. r COrT I Iil18R �C 01-2I-13 REVISIONS LL ° Z PROJECT NAME KENLAN FARMS SUBDIVISION PHASE TWO SITE & EROSION CONTROL DETAILS CLIENT ABJ INVESTMENTS, LLC. 2031 Middle Road Fayetteville, North Carolina 28312 Phone: (910) 485-5790 Fax: (910)678-9988 PROJECT INFORMATION DESIGNED BY: BEN DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 294 DRAWING SCALE NOT TO SCALE DATE RELEASED JANUARY 21, 2013 SHEET NUMBER C-6mO m Sm" Sm a (f ITN) V•VEIVATED %W AND RJOPLS MOVE THE PUE41IDO POOL aB%TDN SHOL HIVE A IMM OF C TOPSOL SLBGPIDE SHNL BE "SU TO ADDOW FOR AMU OF TOPSOIL N THM AM SOOT TMT THE FJBYATDNS STONN ABOVE ARE TO TIE FMM GRM OF THE TOPSOL NTS 1 WET POND X-SECTION WITH EARTH BERM DAM CROSS SECTION CONSTRUCTION SPECIFICATIONS 1 CLEAR, GRUB A STRIP TOPSOIL FROM AREAS UNDER THE EMBANKMENT TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL. DELAY CLEARING THE POOL AREA UNTIL THE DAM !S COMPLETE AND THEN REMOVE BRUSH, TREES, AND OTHER OWECTICNABLE MATERIALS TO FACIUTATE SEDIMENTCLEANOUT. STOCKPILE ALL TOPSOIL OR BOIL CONTAINING ORGANIC MATTER FOR USE ON THE OUTER SHELL OF THE EMBANKMENT TO FACIUTATE VEGETATIVE ESTABLISHMENT. PLACE TEMPORARY SEDIMENT CONTROLS BELOW THE BASIN AS NEEDED. 2. EXCAVATE CUT-OFF TRENCH ALONG THE CENTER LINE OF THE EARTH FILL EMBANKMENT. CUT THE TRENCH TO STABLE SOIL MATERIAL, BUT IN NO CASE MAKE IT LESS THAN 2 FEET DEEP. THE CUT-OFF TRENCH MUST EXTEND INTO BOTH ABUTMENTS TO AT LEAST THE ELEVATION OF THE RISER CREST. MAKE THE MINIMUM BOTTOM WIDTH WOE ENOUGH TO PERMIT OPERATION OF EXCAVATION AND COMPACTION EQUIPMENT, BUT IN NO CASE LESS THAN 2 FEET. MAKE SIDE SLOPES OF THE TRENCH NO STEEPER THAN 1.1. COMPACTION REQUIREMENTS ARE THE SAME AS THOSE FOR THE EMBANKMENT. KEEP THE TRENCH DRY DURING BACKFILLING AND COMPACTION OPERATIONS. 3. EMBANKMENT -TAKE FILL MATERIAL FROM THE APPROVED AREAS SHOWN ON THE PLANS. IT SHOULD BE CLEAN MINERAL SOIL, FREE OF ROOTS, WOODY VEGETATION, ROCKS, AND OTHER OBJECTIONABLE MATERIAL SCARIFY AREAS ON WHICH FILL IS TO BE PIACEO BEFORE PLACING FILL. THE FILL MATERIAL MUST CONTAIN SUFFICIENT MOISTURE SO IT CAN BE FORMED BY HAND INTO A BALL WITHOUT CRUMBLING. IF WATER CAN BE SQUEEZED OUT OF THE BALL. IT IS TOO WET FOR PROPER COMPACTION. PLACE FILL MATERIAL IN 6 TO 81NCH CONTINUOUS LAYERS OVER THE ENTIRE LENGTH OF THE FILL AREA AND COMPACT IT. COMPACTION MAY BE OBTAINED BY ROUTING THE CONSTRUCTION HAULING EQUIPMENT OVER THE FILL SO THAT THE ENTIRE SURFACE OF EACH LAYER IS TRAVERSED BY AT LEAST ONE WHEEL OR TREAD TRACK OF HEAVY EQUIPMENT, OR A COMPACTOR MAY BE USED. CONSTRUCT THE EMBANKMENT TO AN ELEVATION 10% HIGHER THAN THE DESIGN HEIGHT TO ALLOW FOR SETTLING. 4. SECURELY ATTACH THE RISER TO THE BARREL OR BARREL STUB TO MAKE A WATERTIGHT STRUCTURAL CONNECTION. SECURE ALL CONNECTIONS BETWEEN BARREL SECTIONS BY APPROVED WATERTIGHT ASSEMBLIES. PLACE THE BARREL AND RISER ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. DO NOT USE PERVIOUS MATERIAL SUCH AS SAND, GRAVEL OR CRUSHED STONE AS BACKFILL AROUND THE PIPE OR ANTISEEP COLLARS. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 41NCH LAYERS, AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE GAME DENSITY AS THE ADJACENT EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE PIPE FROM FIRM CONTACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE HAUNCHES. PLACE A MINIMUM DEPTH OF 2 FEET OF COMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT. ANCHOR THE RISER IN PLACE BY CONCRETEOR OTHER SATISFACTORY MEANS TO PREVENT FLOTATION. IN NO CASE SHOULD THE PIPE CONDUIT BE INSTALLED BY CUTTING A TRENCH THROUCH THE DAM AFTER THE EMBANKMENT IS COMPLETE. MAINTENANCE 5. INSTALL THE EMERGENCY SPILLWAY IN UNDISTURBED SOIL. THE ACHIEVEMENT OFEXITC AN ELEVATIONS,SLOPES AREC CRITICAL TO THEWIDTH.AND INSPECTTEMPORARYROTARY SEDIMENT BASINSSEDIMENT WEEKLY RESTOND RE EREACH ITS PERIOD OF ENTRANCE OF EXIT CHANNEL SLOPES ARE CRITICAL TO THE SUCCESSFUL SIGNIFICANT RAINFALL SEDIVE MENT HAS ACCUMULATED O TRAP TOITHE DE NAL IGN OPERATION OF THE EMERGENCY SPILLWAY . DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN AN AREA WITH B. D SCHARGE THE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. SEDIMENT CONTROLS. USE DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT -LADEN WA -ER TO THE UPPER END OF THE POOL AREA TO IMPROVE TRAP EFFICIENCY. CHECK THE EMBANKMENT SPILLWAYS, AND OUTLET FOR EROSION DAMAGE AND INSPECT THE EMBANKMENT FOR 7. C DNSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY REMOVE DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL AREA. SON 40 RC 'ISMDER CM B: RMISm FROM A.Y. FARODTH ! SA W. 19E SMDEN OEM SOUL IE EOUIL TO X FMIU M 90MER. SKIMMER EMBANKMENT BEFORE THE AREA IS CLEARED. 8. INSTALL POROUS BAFFLES AS SPECIFIED. 9. A'JOID STEEP SIDE SLOPES, AND FENCE AND MARK BASINS WITH WARNING NTS SIGNS IF TRESPASSING IS LIKELY. FOLLOW ALL STATE AND COCA! RECUIREMENTS. 5 TEMPORARY SEDIMENT BASIN 1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK. 2. THE CONTRACTOR SHALL NOTIFY PLAN APPROVING AUTHORITY ONE WEEK PRIOR TO THE PRECONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO FINAL INSPECTION. 3. IF POSSIBLE ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF -SITE BORROW OR WASTE AREAS, STAGING OR STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND TO NCDENR REGIONAL OFFICE FOR APPROVAL. CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER A COPY OF THE AMENDED PERMIT. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY EITHER NCDENR OR THE ENGINEER. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. ALL AREAS DISTURBED BY CONSTRUCTION UNLESS OTHERWISE IMPROVED SHALL BE SODDED OR SEEDED AS INDICATED AND STABILIZED. 9. DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECEIVING OUTLET. 10. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES WEEKLY AND AFTER EACH RUNOFF -PRODUCING EVENT ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 11. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED BY CONTRACTOR ONCE STABILIZATION OR A SUFFICIENT GROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY THE ENGINEER. NCDENR'S FINAL APPROVAL IS REQUIRED. 12. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND ALL CONSTRUCTION ACCESS LOCATIONS INTO NON -PAVED AREA. 13. WHEN CROSSING CREEK OR DRAINAGE -WAY, THE CONTRACTOR SHALL RIP -RAP WITH FABRIC DISTURBED BANKS AND CHANNEL AND RESTORE SLOPES TO ORIGINAL CONTOURS, BUT NOT STEEPER THAN 21 MAXIMUM. DISTURBED CREEK AREA SHALL BE STABILIZED IMMEDIATELY. 8 GENERAL EROSION AND SEDIMENT CONTROL NOTES K DRIVE STEEL POSTS IV INTO THE GROUND ATTACH WIRE FENCE TO POSTS AND EXTEND NOTES. L4AXIMUM W O.C. AND EXCAVATE A 4' X T TRENCH UPHILL ALONG THE LINE OF THE BOTTOM OF THE FENCE IF INTO THE EXCAVATED TRENCH AND TURNED OUT POSTS. 4' IN THE TRENCH. 1. WIRE SHALL BE A MINIMUM OF 321WHES IN WDTH AND TOP d BOTTOM STRAND SHALL HAVE A MINIMUM OF 6 WIRES WITH IT STAY SPACING. MIN. 10 CA, WIPE 2. FILTER FABRIC SHALL SEA MINIMUM OF 3V IN VADTH AND STEEL POSTS STAY WIRES SHALL BE FASTENED ADEQUATELY TO THE WARE WITH Y9 WIRE MIN. 12 -12 GA STAPLES 1-1? LONG. FABRIC THAT DETERIORATES TO SUCH EXTENT THAT ITS EFFECTIVENESS IS REDUCED SHALL BE LINE WIRES REPLACED BY CONTRACTOR AT CONTRACTOR'S EXPENSE. MIN 12-IQ GA. 3. STEEL POSTS SHALL BE A MIN. OF 5' HEIGHT AND SHALL BE THE SELF FASTENER ANGLE STEEL TYPE. 4. CONTRACTOR SHALL REVIEW SILT FENCE ONCE PER WEEK ANDAFTEREACHRAINFALLOCCURRENCE. ANYNECESSARY REPAIRS OR CLEAN-UP TO MAINTAIN THE EFFECTIVENESS OF -.a THE DEVICE SHALL BE MADE IMMEDIATELY. 5. REMOVE DEPOSITED SEDIMENTALOW THE FENCE TO y PROVIDE ADEQUATE STORAGE VOLUME AND TO REDUCE PRESSURE ON THE FENCE AS NEEDED. STEP 1 STEP 2 _ 5. TEMPORARY MEASURE SRALL NOT BE REMOVED BY THE CONTRACTOR UNTIL THIS ACTION IS APPROVED BY AN NCDENR ATTACH THE FILTER FABRIC TO THE WARE FENCE. BACKrvILL THE AND COMPACT THE SOIL REPRESENTATIVE. THE ACTION WILL BE APPROVED MEN THE EXTENOTHEBOTTOMOFTIEFABRICCINTOTHE FIRMLY TO ANCHOR THE BOTTOM OF THE SILT CONTRIBUTING DRAINAGE AREA IS STABLE. TRENCH AND TURNED OUT C IN THE TRENCH. FENCE. BURIED FABRIC SHALL NOT BE VISIBLE. POSTS MAX B' O c. HARE FENCE'HOG WIRE' 0;! Y1 "" - A m FILTERFABRIC (L dti.. vt ... �ia�`.-,. o .... S �W9 HARE STAPLE51-1r1'LONG BELOW STEEL POST DRIVEN N' HMO GROUND STEP 3 STEP 4 SECTION A -A MAINTENANCE 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR. DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 0. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRACE AND STABILIZE AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED AND NCDENR APPROVES REMOVAL. PIPE OUTEE WELL-DEFINED SILT FENCE PIPE OUTLET TO FIAT AREA - NO WELL-DEFINED CHANNEL GRAVEL OR FABRIC SECTION A -A PLAN GRAVEL OR FABRIC SECTION A -A NOTES 1. LA IS THE LENGTH OF THE RIPRAP APRON. 2. D - 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6. 3. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6' ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER FABRIC OR BLANKET SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT a INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE, OR IF STONES HAVE BEEN DISLODGED. IMMEDATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. NTS NTS 6 TYPICAL RIP RAP APRON DESIGN CRITERIA AGGREGATE SIZE - USE 2-3 INCH WASHED STONE DIMENSION OF GRAVEL PAD GRAVEL ENTRANCE SHALL BE W FEET THICKNESS fi INCHES MINIMUM IN LENGTH AND 12 FEET IN WIDTH - WITH 2O FOOT RADIUS AT EXISTING WIDTH- 12 FT. MINIMUM OR FULL WIDTH AT ACCESS ROADWAY POINTS OF THE VEHICULAR ENTRANCE AND EXIT 36'-0'MIN 4'-0' 10'-0' AREA, WHICHEVER IS GREATER 8-� LENGTH- 50FT. MINIMUM. LOCATION LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL FILTER FABRIC �y-3'yyggHED CONSTRUCTION VEHICLES. AVOID STEEP GRADES STONE AND ENTRANCES AT CURVES IN PUBLIC ROADS. CONTRACTOR SHALL INSTALL ADDITIONAL GRAVEL GRAVEL CONSTRUCTION ENTRANCE CONSTRUCTION ENTRANCES NOT INDICATED ON THE PLANS REQUIRED FOR STAGING AND/OR BORROW AREAS AND MAINTAIN AT NO ADDITIONAL EXPENSE TO THE OWNER. CONTRACTOR SHALL SUPPLEMENT AND MAINTAIN GRAVEL CONSTRUCTION ENTRANCES AT HIS EXPENSE UNTIL FINAL ACCEPTANCE. OpO X c, MAINTENANCE {- 0 QJ MAINTAIN THE GRAVEL PAD INBA CONDITION TO PREVENT MUD OR LATER LEAVING THE CONSTRUCTION SITETHISHAY SEDIMENT FROM LEA G SQ' REQUIRE PERIODIC WITH STONE. AFTER EACH 1010, ANYTOPIDRESSINGSTRUCTURE USED TRAP AND D TO Y SARY RAINFALL, INSPECTOUT h - - - ASNEC IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED OR TRACKED ONTO NABLE NECESSARY.ILLEDIWASHE ORTRAK OBJECTIONABLE PUBLIC ROADWAYS. AGGREGATE 6" MIN. THICKNESS 2-3" COURSE NTS 9 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE STANDARD METAL POSTS 2'-0' IN GROUND 19 Gm wag am (1/4 MEN 4 -. - �. _ L N ..... 4O i'K sT se-01,4 ci K .... .. L' m 1 1ti�T 2:1 SLOPE GRAVEL FILTER + 9 SM SWIE AA® W A IEMO OF IS- YMYM MBE TOP Of BM I. MMMLY WADE A SK A OM M ORD= X MET L TIME S-W SIR TESS 2 FEET MD X Mn sMa6wi LIE MB. SAUS KGIS BUD AIMW X FONDER IT BE MB, A IMMIa IN 4 FEET 111aM. 3 SNMM OE PAS MM TIE WM NYgEE DAL WX X ME MSI M THE SEB F118T5 a THE TOP, WOLE AD IUML R/OD A 2 LOOT RAP Or X 4X MSI WEST X QM IM NDI MD 611=10111111. t RAM WA WAR QmOI (tit M 155E MEq M A LI SINE 991AHMOF16MMWnXIMaDWill 10AN BEN WADE 5 AIDE X maBMD 3969AE aEA WS BN SVM®, BIBS Acuum mm MD E90am Ra W1A6 L mwa X ms p1mm aD SOa1E E aM aMAaoaL NLNIBMWE xsRcr xEls AT IF/ST WEear ND NTBi Far SONMIM nW AITN M MFA1Bq MAEIu B'BIT.OFIAlIE16XMEa Nn0aR8MOnaimmsro R9MIE .W Fp.N1E RAW TOR SIp�OBII MNS T,VO: fllE IqT To oMPC-E Gi IA(FRyT 11EWREL4S1 pll4GTE8®ABAEa3gMLRW/CESIOEMIJ�BI. NTS 3 HARDWARE CLOTH & GRAVEL INLET PROTECTION BELOW WATER SURFACE 7_ 4 0 4 0 EDGE OF N0 0 0 _1AL P00 AL AL AL AL UPLANDS (ABOVE WATER SURFACE) SHALLOW WATER PLANTS SHALLOW LAND PLANTS COMMON NAME FOXTAIL BOTANICAL NAME ALOPERCURUS HOWEWI COMMON NAME JOE PYE WEED BOTANICAL NAME EUPATORIUM FISTULOSUM P!CKERELWEED PONTEDERIA CORDATA RED CHOKEBERRY ARONIA ARBUTIFOLIA SIT AAiLS LIZARD TAIL SAURURUS CERNUUS ��t(wA''' ?05 ELDERBERRY SAMBUCUS CANADENSIS BULLTONGUE SAGITTARIA LANCIFOLIA SILKY DOGWOOD CORNUS AMOMUM CI TRENCH F 7 PLAN VIEW TRENCH WDTHH n � Yp� fl<IT llIl4 UUNE - �Y�! (DIAMETER 1 - T^ I VARIES) ANTI -SEEP COLLAR.' CLASS B CONCRETE ANTI -SEEP COLLAR COMMON NAME SIZE SPACING FOXTAIL 4 IN CONTAINER 24' O.C. MAXIMUM PICKERELWEED 4 IN CONTAINER 24' O.C. MAXIMUM LIZARD TAIL 4 IN CONTAINER 24* O.C. MAXIMUM BULLTONGUE 4 IN CONTAINER 24" O.C. MAXIMUM BLUE FLAG IRIS 4 IN CONTAINER 24' O.C. MAXIMUM JOE PYE WEED 4 IN CONTAINER 24" O.C. MAXIMUM RED CHOKEBERRY 1 GAL CONTAINER 48' O.C. MAXIMUM ELDERBERRY T GAL CONTAINER 48' O.C. MAXIMUM SILKY DOGWOOD 1 GAL CONTAINER 48' O.C. MAXIMUM SWAMP MILKWEED 4 IN CONTAINER 24' O.C. MAXIMUM SECTION A -A * BLUE FLAG IRIS IRIS ARGINICA • SWAMP MILKWEED ASCLEPIAS INCARNATA PLANT SUPPLIERS NOTES • ALTERNATE PLANTS CAROLINA GREENERY, WEST END, NC 910-947-3150 MELLOW MARSH FARM, PITTSBORO, NC 919-742-1200 1. PLANT SPACINGS SHALL BE A MAXIMUM OF 24 INCHES ON CENTER. PLANT DELIGHTS NURSERY, RALEIGH, NC 919-772-4794 2. PLANTS CAN AND SHOULD BE MIXED MATCHED DURING THE PLANTING PROCESS. - CILL IDE NATIVE PLANT NURSERY, RALEIGH. NC 877-479-2673 SHALLOW LAND PLANTS AND SHALLOW WATER PLANTS CANNOT BE MIXED TOGETHER. 3. SOIL SAMPLE SHOULD BE TAKEN PRIOR TO SAMPLING AND FERTILIZE AT RECOMMENDATION FROM SOILS ANALYSIS. "VEGETATED SHELF AND SLOPES ABOVE THE PERMANENT POOL ELEVATION SHALL HAVE A MINIMUM 4. ALL SLOPES AND AREAS ADJACENT TO THE WET POND SHALL BE SEEDED WITH BERMUDA OF 6" TOPSOIL SUBGRADE SHALL BE ADJUSTED TO ACCOUNT FOR ADDITION OF TOPSOIL IN THESE GRASS FOR A PERMANENT GROUNDCOVER. AREAS SUCH THAT THE ELEVATIONS SHOWN ABOVE ARE TO THE FINISHED GRADE OF THE TOPSOIL. 5, ALL INSTALLATIONS SHALL BE FROM A QUALIFIED PROFESSIONAL 7 10 VEGETATED SHELF PLANTING DETAIL TEMPORARY SEEDINGIMULCHING SPECIFICATIONS (FOR LATE WINTER AND EARLY SPRING) SEEDING MIXTURE: SPECIES RATE(LBJACREI RYE (GRAIN) 120 ANNUAL KOBE LESPEDEZA 50 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT EXTEND BEYOND JUNE- SEEDING DATES: JANUARY 1 - MAY 1 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LBJACRE GROUND AGRICULTURAL LIMESTONE AND 750 LBJACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LBJACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR SUMMER) SEEDING MIXTURE: SPECIES RATE (LBJACRE) GERMAN MILLET 40 A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB./ACRE. SEEDING DATES: MAY 1 - AUGUST 15 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB /ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LE/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR FALL) SEEDING MIXTURE: SPECIES RATE(LBJACRE) RYE (GRAIN) 120 SEEDING DATES: AUGUST I5-DECEMBER 30 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB /ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB /ACRE STRAW ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LS /ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB./ACRE KOBE LESPEDEZA IN LATE OR EARLY MARCH. TEMPORARY SEEDING SPECIFICATIONS SEEDING MU(TURES: SPECIES RATE(LBSJACRE TALLFESCUE 80 PENSACOLA BAHIAGRASS 50 SERICEA LESPEDEZA 30 KOBE LESPEDEZA 10 SEEDING NOTES: 1. FROM SEPT. 1 TO MAR. 1 USE UNSCARIFIED SERICEA SEED. 2. ON POORLY DRAINED SITES OMIT SERICEA AND INCREASE KOBE TO 30 LBJACRE. 3. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND INCREASE KOBE TO 40 LB./ACRE. NURSE PLANTS: BETWEEN APRIL 15 AND AUG. 15, ADD 10 LB./ACRE OF GERMAN MILLET OR 15 LB./ACRE SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG. 15, ADD 25 LBJACRE RYE (GRAIN). SEEDING DATES: BEST POSSIBLE EARLY SPRING: FEB. 15-MAR. 20 FEB. 15-APR. 30 FALL: SEPT. 1 - SEPT. 30 SEPT. 1 - OCT. 31 SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 - 5,OGO LB./ACRE GROUND AGRICULTURAL LIMESTONE (USE THE LOWER RATE ON SANDY SOILS) AND 1,000 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LBJACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL - MAINTENANCE: IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILIZE IN THE SECOND YEAR, ACCORDING TO THE SOIL TESTS OR TOP DRESS WITH 500 LB /ACRE 10.10-10 FERTILIZER. MOW AS NEEDED WHEN SERICEA IS OMITTED FROM THE MIXTURE. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. NTS NTS SEEDING MIXTURE: SPECIES RATE(LBJACREI COMMON BERMUDAGRASS 40-80(1-2 LB11,000 FTO SEEDING DATES: COASTAL PLAIN: APR.-JULY SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 500 LB./ACRE 10-10-10 FERTILIZER. MULCH: USE JUTE, EXCELSIOR MATTING, OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF CHANNELS AND DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW, ON CHANNEL SIDE SLOPES ABOVE THIS HEIGHT, AND IN DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4,000 LBJACRE GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP. MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPES WHERE THEY CAN CLOG DRAINAGE DEVICES. MAINTENANCE: A MINIMUM OF 3 WEEKS IS REQUIRED FOR ESTABLISHMENT. INSPECTION AND REPAIR MULCH FREQUENTLY. REFERTILIZE THE FOLLOWING APR. WITH 50 LB /ACRE NITROGEN. g� n "x c1 �6 I ;13 11 PERMANENT SEEDING SPECIFICATIONS 409 Chicar , Drive - Suite 112 Fayette'A1e. North Carding 285o6 Phone o) 42&6777 fat (9101d2G5777\\\ or L icenSe Number: C-2554 XN 5o�i UTIION15. INC �GNAI11GGRg1G/II VL-14A,;­ AwNUTR11," LAYoUTA A F........ CY 4 SEAI, I _ U 1-�l-l3 REVISIONS 0 Z V 0 Z� 0 EL Q Z O 0 UL Q W LU Q _ U1 ZW 2 F- LL O Z PROJECT NAME KENLAN FARMS SUBDIVISION PHASE TWO EROSION CONTROL DETAILS CLIENT ABJ INVESTMENTS, LLC. 2031 Middle Road Fayetteville, North Carolina 28312 Phone: (910) 485-5790 Fax: (910)678-9988 PROJECT INFORMATION DESIGNED BY: BEN DRAWN BY: BEN CHECKED BY: SCOTT PROJECT NUMBER: 294 DRAWING SCALE NOT TO SCALE DATE RELEASED JANUARY 21, 2013 SHEET NUMBER C-6ml