Loading...
HomeMy WebLinkAboutSW6130802_HISTORICAL FILE_20140321STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW &&?j�`%,�(%� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATES YYYYMMDD ,('� �/ Stantec Consulting Services Inc. 5565 CenC 276 Drive Suite 107 Raleigh ) 8 1-191 06 Tel: (919) 851-1919 Stantec August 27, 2013 File: 140869.001: SOF Brigade Headquarters NCDENR — Water Quality Division 1617 Mail Service Center Raleigh, NC 27699 Reference: SOF Brigade Headquarters Facility (PN 69758) Stormwater Management Permit Review To Whom It May Concern, MAR 2 1 2014 Stantec is pleased to submit this Stormwater Management Permit application package for the above referenced project at Fort Bragg. This project proposes to construct a +/- 60,000 square foot two-story building with associated site improvements including a 238 vehicle parking lot. The site is located on Fort Bragg property within the limits of an old Ammunition Supply Point (ASP) south of Chicken Road. Enclosed please find the following: 1. Original and one (1) copy of the Stormwater Management Permit Application 2. One (1) check in the amount of $505.00 for the application fee 3. One (1) copy of the Drainage Analysis and Stormwater Management Plan that includes the Project Narrative, USGS Quad Map and other maps, drainage calculations and BMP modeling calculations 4. One (1) original of the applicable BMP supplement forms and O&M agreements for each BMP 5. Two (2) copies of construction drawings (G-001, C-001, C-103, C-104, CS101, CG107, CG108, CP201, CP202, CP207, CP208, C-519-C-521, C-601) 6. One (1) copy of the Geotechnical Report and subsequent Addendum reports prepared by ECS Consulting. Please let us know if you have any questions or need any additional information. Sincerely, STANTEC 16_w� �;natAhan A. Allen, PE Project Manager Attachment: Enclosures c. File Diuguid, Bill From: Allen, Jonathan Donathan.allen@stantec.coml Sent: Thursday, September 05. 2013 12:00 PM To: Diuguid, Bill Cc: david.a.heins.civ@mail.mil. lee.p.ward.civ@mail.mil Subject: RE: SOF Brigade Headquarters Facility PN 69758 Stormwater Permit Appl Attachments: 140869 - 95th Percentile Treatment Volumes.pdf, 140869 DRAINAGE NARRATIVE Section 4.0 Study Results.pdf M Thank you for your initial review and comment regarding the Brigade HQ project. This project is subject to EISA Section 438 since it is a Federal project exceeding 5,000 sf. Although not discussed in our design narrative to NCDENR, we are meeting the requirements of the EISA document. Further, we have worked closely with Fort Bragg Water Management Branch through our design process on our stormwater management approach to this site. Per the EISA document, there are 2 options for maintaining or restoring the pre -development hydrology of the site. Option 1 is managing the total volume of rainfall from the 951" percentile storm. Option 2 is managing the total volume as determined by the pre -development hydrology of the site. Your assumption was correct in that we do not have the volume available in all three BMP's to capture the stormwater design storm of 1.8 inches which is why Option 2 was chosen. As shown in the attached document, only BMP 1 captures this design volume and the total shortfall for the site is 633 cf. However, as shown in the second attached document, Section 4.0 Study Results, we have revised the narrative for clarity to show we are limiting the post -development flows in the 1-year, 2-year, 10-year and 100-year storm to pre -development conditions. Please let me know if you have any additional questions. Thanks, Jonathan MAR 2 1 2014 Jonathan Allen, PE, LEED AP Project Manager, Urban Development Stantec 5565 Centerview Drive Suite 107 Raleigh NC 27606-3563 Ph: (919) 325-4774 Cell: (919) 636-0617 i o n a t h a n. a l l e n (a)sta n to c. co m stantec.com The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately. (j Please consider the environment before printing this email, From: Diuguid, Bill [mailto:bill.diuguidC-Oncdenr.gov] Sent: Thursday, August 29, 2013 11:56 AM To: Allen, Jonathan Cc: david.a.heins.civ(cbmail.mil; Iee.o.ward.civ(&mail.mil Subject: SOF Brigade Headquarters Facility PN 69758 Stormwater Permit Appl Jonathan: There is no mention in your write up on this permit application as to whether the Fort Bragg site plan bmps are designed to handle the requirements of EISA 2007 Section 438. All of the previous site plans submitted for Fort Bragg have shown talcs that reflect a stormwater design storm of 1.8 inches (based on the above required std), rather than the one inch on your submitted Bioretention Supplements. It appears that your provided volumes in two of the three cells may have sufficient volume to handle the 1.8 inches anyway, but the data probably should reflect that requirment. The third cell may not meet this requirement. Can you tell me whether this project has this EISA 2007-438 requirement or not? Here is a partial pkg from another Bragg project that deals with that requirement. Thanks for checking into this. Bill D. Bill Diuguid, AICP, Planner Stormwater Permitting Land Quality Section Division of Energy, Mineral and Land Resources I NCDENR 1617 Mail Service Center (Mail) 512 N. Salisbury St, Raleigh, NC 27604 1 90, Floor (Location & Parcels) Raleigh North Carolina 27699-1617 Phone: 919-807-6369 1 Fax: 919-807-6494 Website: htti)://portal,ncdenr.org/web/wq/ws/su E-mail correspondence to and from this address maybe subject to the North Carolina Public Records Law and maybe disclosed to third parties. f, 1jwv/ Wes° 1 4.0 STUDY RESULTS 0J 4.1 Detention Requirements Detention is planned for the project site. This detention will compensate for the increase in runoff. The pond requirements and control structures are detailed in Section III - Drainage Calculations. Three scenarios are presented below. The first two analyze the overall Pre vs Post Developed Primary Basins for Flows and volume, and the third analyzes the individual Pre vs Post -Developed Individual BMP sub basin for flows. Table 4.1, Table 4.2 and Table 4.3 summarizes the flows for the Boundary after Detention. Table 4-1: Flows for Primary Basin Development after Detention Storm Event Allowable Flows Pre -developed (cfs) Developed Flows Post -developed (cfs). Detention Net Flows (cfs) BNDY A 1-YEAR 1.870 0.361 -1.509 BNDY A 2-YEAR 3.353 1.136 -2.217 BNDY A l0-YEAR 8.465 7.165 -1.300 BNDY A 100-YEAR 18.315 22.261 3.946* BNDY B 1-YEAR 4.863 0.520 -4.343 BNDY B 2-YEAR 8.198 1.383 -6.815 BNDY B 10-YEAR 19.248 8.620 -10.628 BNDY B 100-YEAR 40.217 26.723 -13.494* *Net 100-YEAR Rate is -9.548 cfs Table 4-2: Volume for Primary Basin Development after Detention at 24 hours Storm Event Allowable Flows Pre -developed- (acre-feet), . Developed Flows Post -developed (acre-feet) Detention Net Flows (acre-feet) BNDY A I -YEAR 0.232 0.122 -0.110 BNDY A 2-YEAR 0.373 0.262 -0.111 BNDY A 10-YEAR 0.843 0.826 -0.017 BNDY A 100-YEAR 1.752 1.887 0.135* BNDY B 1-YEAR 0.474 0.255 -0.219 BNDY B 2-YEAR 0.743 0.518 -0.225 BNDY B 10-YEAR 1.620 1.345 -0.275 BNDY B 100-YEAR 3.286 2.867 -0.419* *Net 100-YEAR Volume is -0.284 acre-feet Table 4-3: Flows for Individual BMP Basins Development after Detention Storm Event Allowable Flows Pre -developed (CIS) . Developed Flows Post -developed (cfs) Detention Net Flows (efs) BMP-I — I YEAR 0.421 0.000 -0.421 BMP-2— I YEAR 0.753 0.187 -0.566 BMP-3 — I YEAR 2.547 0.306 -2.241 4.2 Summary This Drainage Analysis and Stormwater Management Plan study shows that sufficient detention has been provided to reduce the developed release rate and volume to that of the existing flow. The amount of extra detention provided has been determined during design. A reduction of the developed flows for the overall site has been achieved. Greenhorne & O'Mara, Inc General Ciel Transportation Envonmental ..g-and-o.. Project Name: SOF Brigade HID Facility Designer: MEL Project No: 140869 Date: 9/4/2013 Required Treatment Volume(TV)-North Carolina Simple Method - Rd (in) = 1.80 Rd = Design Storm Rainfall Depth (inch) Rv=0.05+0.91a Rv= Runoff Coef, unitless V = 363ORdRvA = Iq = Impervious Fraction (Imp Area/Total Area) - A= Watershed Area Pre -Developed PRE SUB- Impervious Area Treatment Volume BASIN NAMES Total Area (Acre) (Acre) Rv IRS) BMP-1a 0.80 0.00 0.05 261.36 BMP-1D 0.68 0.00 0.05 222.16 BMP-2 1.54 0.09 0.10 1032.37 BMP-3 5.21 0.15 0.08 2584.20 Post Developed Pre -Developed Excess Provided POST SUB- Impervious Area Treatment Volume Treatment Volume Required Design Treatment Treatment Volume BASIN NAMES Total Area )Acre) )Acre) Rv (113) (R3) Treatment )R3) Volume (R3) )R3) BMP-ia 0.80 0.38 0.48 2495.99 26U6 2234.63 3938.00 1703.37 BMP-lb 0.68 0.40 0.58 2574.40 222.16 2352.24 3226.00 873.76 BMP-2 1.54 1.07 0.68 6795.36 1032.37 5762.99 3686.75 -2076.24 BMP-3 5.21 2.91 0.55 18814.65 2584.20 16230.46 15096.75 -1133.71 -632.81 .1a=13 g00241408691CaWSOF B,peea 14e4eunara S000130830 D-e..1,- SOF B1101110869SOF 8M S9a 0mw9a CBk4.g4Ei5 9516 Smpk melhl 1oll Diuguid, Bill From: Derek Westfall (Derek.Westfall@edtinc.net] Sent: Friday, October 25, 2013 12:20 PM To: Diuguid, Bill Subject: Revised plans for Fort Bragg Projects I am fedexing you out today the revised information for the Fort Bragg Group HQ and the Fort Bragg Battalion Ops projects we have discussed about on the phone. Let me know if you have any questions or need any additional information. Thanks for your assistance. Derek Westfall, P.E. Engineering Manager Engineering Design Technologies, Inc. 1705 Enterprise Way I Suite 200 Marietta, GA 30067 Office: 770.988.0400 x 1102 1 Fax: 770.988.0300 derek.westfall@edtinc.net MAR 21 2014 S�gu �i; Ch;.aiy CELEBRA LNO :0 1*E.1RS Or C\CELLIUNCE NOTICE - This communication may contain confidential and privileged information that is for the sole use of the intended recipient. Any viewing, copying or distribution of, or reliance on this message by unintended recipients is strictly prohibited. If you have received this message in error, please notify us immediately by replying to the message and deleting it from your computer. SW6/3 b $02 Application Completeness Review M'�/First Submittal ❑ Re -submittal Date Received: 8 Zi J3 Date Reviewed: 8 �8 FSBy Bill Diuguid6)A Development/Project Name:5o,. $Ri GADE III BaQu,a ry r F r Y — I>AI/.9y58 Receiving stream name O ogrf_s Cie«/t Classification: G Liver Basin: CAPE FE4J2 S4-t T iidrtc /8 —.3/— zf/ — Z For post -construction requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-I, WS-II, WS-III, WS-IV, HQW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient Management Strategy. High Density Projects that require a 4011404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Latitude and Longitude:" dA 4e Project Address: CHlckc_.J ]z0e Engineer name and firm: 9-ouA-r14A or Six Mile Creek Water Sheds): N1t% — 74f o r 4 Y W Jurisdiction 1—'a aT Sje& CC Is the project confirmed to be in the State MSI Stormwater Permit jurisdiction? tYFes or ❑ No ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets 5rqTZ ensit ❑ Other ..=5=401/404 impacts to surface waters, wetlands, and buffers (add language to cover letter and/or add info letter) c✓BUA 57 °f. Check for $505.00 included &'�'Original signature (not photocopy) on application AJAtV;,0 Dr ✓- C y izF G✓Legal signature (Corporation-VP/higher, Partnership -General Partner/higher, LLC-member/manager; Agent). Check spelling, capitalization,'punctuation: http://www.secretary,state.nc.us/corporations/thepage.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. --e- Copy of property deed showing ownership or control /yMi¢ivrrr y ;5qs a •a— or subdivided projects, a signed and notarized deed restriction statement m Sealed, signed & dated calculations ;_"Correct supplement and O&M provided for each BMP on site (check all that were provided & number of each) e Bioretention W ❑ Dry Detention Basin ❑ Filter Strip ❑ Grass Swale ❑ Infiltration Basin ❑ Infiltration Trench ❑ Level Spreader ❑ Permeable Pavement ❑ Restored Riparian Buffer ❑ Rooftop Runoff Management ❑ Sand Filter ❑ Stormwater Wetland ❑ Wet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Road r( Two sets of sealed, signed & dated layout & finish grading plans with appropriate details V Narrative Description of stormwater management provided Soils report, geotech information provided V� Wetlands delineated or a note on the plans or in the accompanying documents that none exist on site and/or /adjacent property d.Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; a' Dimensions & slopes provided Drainage areas delineated ❑ Pervious and impervious reported for each ❑ Areas of high density a� BMP operation and maintenance agreements provided ❑ Application complete ❑ Application Incomplete Returned: (Date) M. April 26, 2013 Revision, Bill Diuguid v l'i'1 � c� i TA -le � � F}S� s r✓ �,�. v�-A � p E F � G+V-s7'Ds' SOF Battalion Operations Facility W912HN-11-D-0002-DQOI Fort Bragg, North Carolina FYI - PN 76364 SECTION 6 SITE/UTILITIES DESIGN ANALYSIS MAR 2 1 2014 I 6 SOF Battalion Operations Facility W912FIN-11-D-0002-DQ01 Fort Bragg North Carolina FYI - PN 76364 TABLE OF CONTENTS s Part I Site/Utilities Design Narrative ............................................................3 Part 2 Site/Utilities Calculations ........................................ .... ......... ........... I I Appendix A Hydrology and EISA Summary ......................................12 Appendix B CN and Time of Concentration Calculations ....... :............... 16 Appendix C Drainage Area Maps...................................................24 Appendix D Skimmer Sediment Basin Calculations ............................27 Appendix E Pond Calculations......................................................31 Appendix F Stormwater Drainage Calculations..................................38 Appendix G Hydrology Software Model Output.................................42 Appendix H., ' . Soil Science and Infiltration Report ...............................102 Appendix I Outlet Stabilization Structure Calculations .......................142 SOF Battalion Operations Facility Fort Bragg, North Carolina PART I v W 9121I N-1 I-D-0002-DQO 1 FYI 2 - PN 76364 SITE/UTILITIES DESIGN NARRATIVE SOF Battalion Operations Facility Fort Bragg, North Carolina W 912HN- l l-D-0002-DQO 1 FYI - PN 76364 SITE/UTILITIES DEVELOPMENT NARRATIVE 1. DESIGN CRITERIA The following criteria references shall be used in the design of this project: • Solicitation Number W91214N-09-X-5914, Request for Proposal, SOF Battalion Operations Facility — PN 76364 Fort Bragg, NC • AASHTO Roadside Design Guide • ADA Standards for Accessible Design, 28 CFR Part 36 • FHWA MUTCD • NFPA 24 Standard for the Installation of Private Fire Service Mains and Their Appurtenances • General NPDES Permits for Storm Water Discharge from Construction Activi- ties • UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings,9 February 2012 • AR 190-11; Physical Security of Weapons, Ammunition and Explosives, 28 June 2011; • Tri-Service A/E/C CADD Standards, Release 4.0 dated July 2009. • Unified Facilities Guide Specifications (UFGS) • UFC 3-210-06A Site Planning and Design. 2. GENERAL Project Location: The SOF Battalion Operations Facility building will be centrally located on the eastern side of the new Patriot Point redevelopment area located just south of Chicken Road in the southwest portion of the Ft. Bragg cantonment area. The new building site will be located in an existing area of ammunition storage bunk- ers which will be removed by others prior to the beginning of construction. The improvements generally consist of a single building, sidewalks, pavement parking and access drive, concrete hardstands, grass, and stormwater bio-retention and wet detention pond areas. The existing site is mostly cleared. The existing slope of the land is 3% to 15%. The site has two main drainage basins. The western basin generally runs from the north to south. The eastern basin drains from the northern and southern boundary lines toward the center of the basin, at which point drains due east. Existing am- munition bunkers are located on site, which are to be removed by base personnel prior to any construction. No utilities exist on site. There are no existing wetlands on the site and the site does not reside in a flood plain. 3. DEMOLITION AND REMOVALS A portion of the site has an existing roadway and four ammunition bunkers with the balance undeveloped land containing storm and utility structures. Any exist- SOF Battalion Operations Facility Fort Bragg, North Carolina w91211N-1 I-D-0002-DQ01 FYI 2 - PN 76364 ing abandoned in place improvements will be removed from within all limits of r construction activities. Any electrical demolition and relocation with be the re- sponsibility of Sandhills Utilities Services. Close coordination with DPW and NEC will be performed prior to any demolition operations. There are reportedly no water or sewer utilities in the area. All existing trees will be saved where feas- ible. The project requires the demolition of a portion of the existing north -south "A" Street. Demolition and removal of existing storage bunkers will be per- formed by others. 4. ABESTOS ABATEMENT There is no asbestos evident on site. 5. HAULING ROUTE All trucks hauling equipment, waste or material to and from the site shall enter and exit through Fort Bragg Access Control Point # 1. 6. SITE GEOMETRY The existing site ranges fiom relatively flat to steep. Emergency and military personnel will have access around the complete perime- ter. Pavement will be designed to emergency vehicular traffic. Force protection will be in accordance with Unified Facilities Criteria (UFC 4-010-01) DoD Min- imum Antiterrorism Standards for Buildings dated 9 February 2012. Force protec- tion standoff distances will begin at a minimum of 82 feet from building exterior walls. The buildings will be located on the site in accordance with the DoD Anti- terrm-ism/Force Protection Construction Standards Access Driveways, Parking and Sidewalks All pavement and radii dimensions indicated are from face of club to face of curb, unless otherwise noted. The design has considered all types of vehicles including but not limited to: emergency vehicles, garbage vehicles, fire trucks, military ve- hicles, and utility vehicles. Traffic control signs and pavement markings will be provided Finished grades will provide positive drainage without ponding. Pave- ment structure has been designed for actual vehicle loadings and frequencies. The pavement thicknesses will be taken from the recommendations made in the Geo- technical Report. Pedestrian circulation between all buildings and their parking areas will be pro- vided utilizing a diverse system of primary and secondary walkways to connect parking areas to the main building entrance way as well as to adjacent areas. Si- dewalks along travel lanes will be offset as much as practical for comfort and safety of the pedestrian instead of lying directly adjacent to the vehicular travel way. Normal pedestrian sidewalk width will be between 5 to 10 feet wide de- pending on the anticipated amounts of usage. Top of any proposed curbs will not be calculated into the minimum sidewalk width of 5' and all building entrances SOF Battalion Operations Facility Fort Bragg, North Carolina W 912HN- I I-D-0002-DQO I FYI 2 - PN 76364 will have a,minimum 6' width and widened as necessary to meet building en- trance and exit way needs in order to properly connect to sidewalks associated with any adjacent uses. Concrete landing pads will be placed at all other building exits that serve only as emergency egress points. Normal pedestrian sidewalks will be wire mesh reinforced concrete with a minimum nominal thickness of 4 inches and a maximum longitudinal slope of 5% and cross slopes not to exceed 2 percent. Asphalt Pavement and Concrete Pavement. Concrete pavement will be used in pavement areas used by emergency vehicles, dumpster trucks, fire trucks, and military vehicles. Pavement life will be 25 years. Concrete pavement will be reinforced. Joints will be minimized by using the greatest joint spacing, which will effectively control cracking. Joint sealant will be performed on compression seal. See geotechnical report for pavement de- sign calculations. 7. SITE GRADING The site area will be graded to fit within the elevation and drainage constraints es- tablished by the adjacent features while ensuring proper and positive drainage away from facilities and parking areas. The disturbed area impacted at the site will be limited to only that necessary for the completion of the project. The site will slope away from the building in all directions. Grass swales will be utilized to initially capture the storm water runoff. From these areas the water will travel via a storm sewer pipe system to the detention/infiltration and bioretention areas. Storm drainage components will be upgraded as necessary to ensure proper routing of runoff at non -erosive flow velocities. Positive drainage will be maintained throughout each portion of the site. The finish floor- elevation (FFE) will be at least 6 inches above adjacent finished grade. Finished grades of areas adjacent to the building will slope at least 5 per- cent away from the building. Any need for borrow material is unanticipated but if required it will be selected to meet the requirements and conditions of the particu- lar fill or embankment for which it is to be used. EDT will be responsible for hauling any borrow material and placing it on the project site but it is our desire to balance this site. Each layer of fill will be placed in layers no greater than 8 inch- es thick . 8. STORM DRAINAGE DESIGN All disturbed areas of the project site shall be graded and/or paved to drain to the new storm drainage pipelines, swales, channels and ponds. The storm drainage system for the site shall at a minimum be designed for a 10-year, 24-hour storm event and safely pass higher event storms without damage to structures. Pipe ve- locity will not be less than 2.0 FPS or more than 12 FPS at the 100 yr. design SOF Battalion Operations Facility Fort Bragg, North Carolina W 912HN- I I-D-0002-DQO l FYI - PN 76364 Type 'YP', Yard Inlet in Grassed Area (5.5" x 2* weir x4) = 3.66 SF The storm drainage system design will be checked for the 100-year return event to ensure no flooding or adverse impaug downstream. Minimum pipe sizes for an open pipe system are 12 inches and 12 inches for a closed system, unless other- wise noted. Pipe joints will be water tight with rubber gaskets. Concrete inlets and catch ba- sins will be poured in -place concrete, precast concrete, or brick. All manholes and inlet grates will be bicycle safe, cast iron and traffic rated. Storm drainpipes will be grouted into the concrete structures so as to provide a watertight connec- tion. The new storm drainage system will be sized to handle flow drainage from off site as well as runoff from the project site. 9. PAVEMENT DESIGN The concrete pavement shall be composed of 4000 PSI concrete and be a mini- mum of six (6) inches thick with six (6) inches of crushed aggregate base, NCDOT 520. The pavement joint spacing shall not exceed fifteen (20) feet in width. The length to width ratio shall not exceed 1.25%. The "Light Duty' as- phalt pavement will be a minimum of 2" Asphalt Concrete Surface Course, NCDOT Type SF-9.5A and 6" of Aggregate Base Course; NCDOT 520. The "Heavy Duty" asphalt pavement will be a minimum of I" Asphalt Concrete Sur- face Course, NCDOT Type SF-9.5A, 2" Asphalt Concrete Intermediate Course, NCDOT Type I-19.013 and 8" of Aggregate Base Course, NCDOT 520. See the Geotechnical Report for detailed calculations. The values in the Geotechnical re- port were based on a 25'year life expectancy. The pavement section for the pro- posed new road will match that provided as part of the Patriot Point development plan. 10. EROSION CONTROL General Permit for Discharges of Storm Water from Construction Activities was utilized for erosion control design. The approved plan will be kept onsite at all times for inspection by the EPA, State of North Carolina and Fort Bragg envi- ronmental personnel. Any violation to such permits will result in the immediate shutdown of work until corrective measures have been taken. All erosion control devices will be maintained in accordance with the plan. No sediment will leave the site during construction. Sedimentation of adjacent sites or downstream ditches will not be permitted. All requirements of the Fort Bragg Soil Erosion and Sedimentation Control Policy and NCDENR will also be met. Two tempo- rary skimmer sediment basins will be used along with other BMPs. 11. WATER SUPPLY, SANITARY SEWER AND NATURAL GAS SOF Battalion Operations Facility Fort Bragg. North Carolina W912HN-11-D-0002-DQOI FYI 2 - PN 76364 storm for all new pipelines. All swales and channels will be designed for non - erosive flow conditions. A new interconnected storm drain system is developed to collect the runoff from the new building, roadways and parking areas utilizing grass swales, inlets, and pipes as necessary to drain the runoff -to the lower portions of the site. All storm drainage flows will ultimately flow into two wet detention ponds and one biore- tention pond. Run-off contribution: The following values were used to determine rainfall run- off rates: Min. time of concentration = 5 minutes — all areas (conservative est.) Run-off Curve Numbers: 98 - impervious areas 76 - gravel areas 49 — "fair" open areas The SCS Method was used to compute the runoff of each drainage basin. Structures:. Formulas for calculating hydraulic capacities will be as follows: Weir Formula: Q = CLH 3/2, for grate inlets, where: Q = capacity of grate or grates C = constant = 3.0 L = length of throat opening H = depth of water opening (a value of 0.5 feet will be used) Min. Factor of Safety (FS) = 2.0 in grassed = 1.5 in paved areas Pipe: Pipe will be sized using the Manning Formula. Min Size: Collectors = Roof Drains = Roughness Coefficient: PVC: Inlet open flow equivalent areas: 12 in. diameter (closed system) and 12 in for open systems 6 in. diameter Concrete Pipe: n = 0.013 n = 0.010 (Roof Drains) Type "DI", Drop Inlet in Paved Area (1' x 2') = 2.0 SF Type "DG", Drop Grate in Grassed Area (1' x 2') = 2.0 SF SOF Battalion Operations Facility Fort Bragg, North Carolina W 912HN-1 I-D-0002-DQO 1 FYI 2 - PN 76364 vided for the first five feet outside sidewalks, pine straw will be placed within ten ,l feet of the building and grass seed will be placed in remaining areas. 13. PERMITS The contractor will coordinate with Fort Bragg DPW Water Management Branch to obtain permits for stormwater and erosion control from State of North Carolina. Constructors will be responsible for paying any permitting and review fees. The contractor will obtain any other permits necessary to complete the project. 14. OUTLINE SPECIFICATIONS The following Masterspecs specifications are used for this project: 12 9300 Site Furnishings 31 2000 Earth Moving 31 31 16 Termite Control 32 12 16 Asphalt Paving 32 13 13 Concrete Paving 32 13 73 Concrete Paving Joint Sealants 32 9200 Turf and Grasses 33 05 00 Common Work Results for Utilities 33 41 00 Storm Drainage Piping 15. ADDITIONAL INFORMATION The following is a list of site development information needed to complete final design: a) The design for the surrounding infrastructure projects that our site will tie into is still under development by the DPW. Information will be needed in regards to the chilled water lines, water and sewer from ONUS, the new road grades and pave- ment design, etc. Since these plans are still being developed we have completed our 100% design with the information provided in the master plan and any up- dated designs provided to date. ----------End of Section ---------- SOF Battalion Operations Facility Fort Bragg, North Carolina W 912HN- I I-D-0002-DQO 1 FYI 2 - PN 76364 There are no nearby existing site utilities that can be connected for Water supply (domestic and fire protection), sanitary sewer and natural gas. These utilities will be brought to the area by Ft. Bragg's privatized utility companies and/or others under separate contracts. Old North Utility Service (ONUS) will be responsible for the design, permitting, and construction of all water and sanitary sewer mains, services and appurtenances for the project. As pail of the building construction the water utility will be taken to the five (5) foot demarcation line outside the building and the sewer will be taken to the ten (10) foot demarcation line outside the building. Sewer: Old North Utilities Services, Inc. (ONUS) will be responsible for all de- sign and installation of the sanitary sewer service lines up to a distance of 10 feet. outside the building footprint under a separate contract with the Government. ONUS is responsible for the relocation or abandonment of any existing sanitary sewer lines. EDT will closely work with ONUS as required to ensure to ensure proper coordination of utility components and services. including line sizing and location of connection points. Water: All domestic water and fire mains and installation 5' outside of the build- ing footprint will be provided by ONUS. This includes vaults, meters, BFP, and PN components. The relocation of any existing mains, hydrants, meter, service lines will also be the responsibility of ONUS. EDT will closely work with ONUS as required to ensure to ensure proper coordination of utility components and ser- vices, including line sizing and location of connection points. Natural Gas: Any necessary gas work will be coordinated with the DPW Civil Engineer. EDT will be responsible for all necessary work, fees, and permits to connect to a new gas main installed by others along the new frontage roadway as well as provide a 60 psig capable gas meter. Cathodic protection will be provided for all underground ferrous piping if required by site conditions. 12. LANDSCAPE DESIGN The conceptual landscape plan provided is only intended to indicate locations of conceptual tree types. Existing trees will be protected with temporary fencing and retained to the fullest extent possible. The EDT design team will preserve all ex- isting trees that fall outside of the 33' clear zone of the proposed new building footprint where feasible as well as any mature deciduous trees that exist which can be saved without significant impact to the site functionality. Trees will be added to parking areas to reduce heat island effects. Additional shrubbery con- templated will be limited to the building entrance, pathways and access drive as needed to achieve LEED credits. No permanent irrigation is planned. A tempo- rary irrigation system may be used for a period not to exceed one year to supporl turf establishment. Contractor will be responsible for establishing and maintain- ing plant growth during the contractor warranty period following construction. Turf will be provided in all high traffic troop congested areas. Sod will be pro- SOF Battalion Operations Facility Fort Bragg, North Carolina v PART 2 W 912HN-11-D-0002-DQO 1 FYI - PN 76364 SITE/UTILITIES DESIGN CALCULATIONS r SOF Battalion Operations Facility W912HN-1 I-D-0002-DQOI Fort Bragg, North Carolina FYI 2 - PN 76364 APPENDIX A Hydrology and EISA Summary SOF Battalion Operations Facility For Bragg, North Carolina EISA Compliance W 9121 IN- I 1-D-0002-DQO I FYI 2 - PN 76364 Per the EISA Section 438, any development of federal facilities that exceed a 5,000 sf footprint shall use site planning, design, construction and maintenance strategies for the property to maintain or restore to the maximum extent technical- ly feasible. the predevelopment hydrology of the property with regard to tempera- ture, rate. volume, and duration of flow. The site area for Basin A is 15.62 acres. The calculation of onsite post developed impervious area versus pre -developed impervious area determined that there was a net increase of 11.42 acres of impervious area for Basin A. The site area for Basin B is 5.96.acres. The calculation of onsite post developed impervious area versus pre -developed impervious area determined that there was a net increase of 3.88 acres of impervious area for Basin B. The site area for Basin C is 2.2 acres. The calculation of onsite post developed impervious area versus pre -developed impervious area detenuined that there was a net increase of 0.49 acres of imper- vious area for Basin C. Since the site's proposed development has a larger area of impervious surface, it was deemed Low Impact Development (LID) measures were necessary to meet the EISA requirements. Using the UFC 3-210-10 guideline for Low Impact Development it was deter- mined by the Designer of Record that two wet detention ponds and a bioretention pond were the best suited measures for the site to meet EISA requirements. An infiltration report was performed. See Appendix H for the report. For the two wet detention pond areas the infiltration rates in the existing soils are above that which is allowed for infiltration design, so infiltration is not technically feasible in these areas. In an attempt to meet the LID concept the volume required by EISA for the two wet detention ponds will be held in the pond and evaporated or slowly infiltrated. The rainfall design storm is the 95% rain event and a value of 1.81" taken from the RFP. This is larger than the 1" required per North Carolina guidelines, so 1.81" was used for the design.. The wet detention basins and the bioretention ba- sin were then designed using the criteria provided in the NCDENR, Stormwater Best Management Practices Manual (July, 2007). The volume was determined to be 72,660.95 cubic feet for Basin #A; 24,901.44 cubic feet for Basin #B and 3,620.24 cubic feet for Basin #C. See appendix E for the calculations. SOF Battalion Operations Facility W912HN-11-D-0002-DQOI Fort Bragg, North Carolina . FYI 2 - PN 76364 Predevelopment Conditions The existing 28acre site is currently sparsely vegetated and grassed. The site was previously home to ammunition bunkers which have been demolished. Slopes are flat to gently slopiifg with grades ranging from I to 6%. The site drains form a west to east direction and eventually flows to an unnamed tributary of Stewart Creek. Currently the site drains to an existing ditch which then flows offsite. The pre- existing site condition is to be taken as undeveloped and wooded for the purposes of hydrological analysis. Developed Conditions The proposed redevelopment will consist of a new Battalion Operations Facility and associated parking areas as shown on the site plan. Both quantity and quality of stormwater runoff will be addressed within the redevelopment through the use of two wet ponds and one bioretention basin. All offsite areas are combined with on - site areas and retained and routed through the pond areas. Pre-existing condition of all offsite areas are to be taken as their current state of development. Hydrologic Analysis The hydrologic, stormwater and pond routing analysis was performed using Hydraf- low Hydrographs 2012. The 24 hour SCS unit hydrograph was used to perform all runoff calculation for pond requirements. As per NCDENR requirements, the first one inch runoff volume was looked at, however, in this analysis the stormwater management system was designed to meet the requirements of the Energy Indepen- dence and Security Act (EISA) of 2007, Section 438 (Stormwater Management for Federal Facilities). This Section requires the prevention of discharge of stormwater from all rainfall events less than or equal to the 95rh percentile rainfall event. Based on data from the National Oceanic and Atmospheric Administration (NOAA), this rainfall depth is equivalent to 1.8 inches for the Fort Bragg, North Carolina area. As per NCDENR requirements, the post -developed runoff rates do not exceed the pre -development rates for the 1-year, 24- hour storm. Two wet detention basins and one biorentention basin are utilized to accomplish this goal. The site and contributing offsite areas are divided into three basins (refer to post - development drainage area map). Basin A drains to a proposed wet detention pond labeled Pond A on the east side of the site. Basin A also has a by-pass area that drains from a fill slope and off the east side of the site. Basin B drains to a pro- posed wet detention pond labeled Pond B and then is piped past Pond A where it is combined with the outflow from Pond A, Pond C and basin A by-pass. Basin C drains to a proposed bioretention pond on the southeast side of the site. Basin D is a by-pass area from the proposed new road. This drainage will be picked up and treated in the proposed future road infrastructure project. SOF Battalion Operations Facility W912HN-1 I -D-0002-DQO I Fort Bragg, North Carolina FYI - PN 76364 SUMMARY TABLES Basin #A STORM Existing Developed at Study Pond A Volume YR (CFS) pt. Elev, let) (CFS) (ft.) (Routed Basin A + Basin A BP + Routed Basin B + Routed Basin C 1 0.07 0.02 238.35 87,271 2 0.34 0.34 239.44 121,595 10 9.08 4.88 242.07 214,247 100 46.49 38.63 242.55 233,327 EISA 0.00 0.00 236.29 30,350 1.8" Basin #B STORM Existing Developed Pond B Volume YR (CFS) (CFS) Elev, (cf) (Basin B (ft.) Routed 1 0.04 0.00 249.63 28,683 2 0.18 0.30 249.77 32,449 10 4.64 4.21 249.97 38,044 100 23.79 24.89 250.48 53,621 EISA 0.00 0.00 248.95 10,287 Basin #C STORM Existing Developed Pond C Volume YR (CFS) (CFS) Elev, (ct) (Part of (Basin C (ft.) Existing Routed) Basin A 1 N/A 0.00 239.42 2,659 2 N/A 0.00 239.75 4,676 10 N/A 0.26 240.04 6,570 100 N/A 7.16 240.42 9,228 EISA N/A 0.00 239.04 238 1.8" Permit No. (to be provided by D W0) � AA NCDENR Project name Contact person Phone number Date Drainage area number 820E W A Te h T � r o STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM 1p WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Pad III) must be printed, filled out and submitted along with all of the required information. Site Characteristics Drainage area Impervious area, post -development % impervious Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1 5' mnoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided 1117/2013 258,618 n2 169,013 g2 65,35 % 1.8 in 27,802 n3 80,846 n3 OK, volume provided is equal to or in excess of volume required. Peak Flow Calculations Is the prelposl control of the lyr 24hr storm peak now required? Y (Y or N) 1-yr. 24-hr rainfall depth 3.1 in Rational C, pre -development 45.00 (unilless) Rational C, post -development 72.00 (unitless) Rainfall intensity: 1-yr, 24-hr storm 0.13 inihr OK Pre -development 1-yr, 24-hr peak flow 0.04 n3lsec Post -development 1-yr, 24-hr peak now 10.56 n3lsec PrelPost 1-yr, 24-hr peak flow control 10.52 113lsec Elevations Temporary pool elevation 249.55 fmsl Permanent pool elevation 248.50 fmsl SHWT elevation (approx. at the perm. pool elevation) 248.10 fnesl Top of 1Off vegetated shelf elevation 249.00 fmst Bottom of 10n vegetated shelf elevation 248.00 first Sediment cleancul, top elevation (bottom of pond) 244.50 fmsl Sediment cleanout, bottom elevation .243.50 fmsl Sediment storage provided 1.00 n Is there additional volume stored above the state -required temp. pool? Y (Y or N) Elevation of the top of the additional volume 249.6 fmsl OK D A,9 ."// 2.� O� a �S AL . ,p• INE WESS�`���� G A-70 Form SW401-Wet Detention Basin-Rev.94fled2 Parts t & 11. Design Summary. Page 1 of 2 Permit No. (ro be provided by OWO) Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, Ape„ pip, Area, bottom of 10ft vegetated shelf, Abp, mui Area, sediment cleanout, top elevation (bodom of pond), Ab , . Volumes Volume, temporary pool Volume, permanent pool, Vpe,,, p,a Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? - MopntaiNPiedmonl SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vpe„_,j Area provided, permanent pool, Aa,,,_p,,, 28,298 ft' 10,345 If 4.00 (unitless) 20,174 ft' OK 16,267 8r 3,810 ft` 9 80,846 ft' 52,380 ft' 19,461 ft' 37.2% % 90 % N (Y or N) Y (Y or N) 4.00 (unitless) N (Y or N) 52,380 ft' 20,174 It' OK Insufficient forebay volume. Average depth calculated It Need 3 it min. Average depth used in SAIDA, it,,, (Round to nearest 0.5n) It Calculation option 2 used? (See Figure 10-21b) Y (Y or N) Area provided, permanent pool, Ape„_pay 20174 ft' Area, bottom of 10fl vegetated shelf, Abo, men 16,267 ft' Area, sediment cleanout, lop elevation (bottom of pond), Avoi pp,d 3,810 ft 2 'Depth" (distance blw bottom of 1Oft shelf and top of sediment) 3.50 n Average depth calculated 3.01 it Average depth used in SAIDA, d,,, (Round to down to nearest 0.5f1) _ 3.0 It Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Co) Driving head (H,) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overnow 8 orifice? Freeboard provided Vegetated filler provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: N (Y or N) in in' (unitless) If Y (Y or N) Broad Crested (unitless) 3.33 (unitless) 12 If 0.7 If 0.04 ff3lsec 10.56 ft'Isec 0.00 ft'Isec 2.00 days 3 :1 10 :1 10.0 it 7 :1 5.0 :1 Y (Y or N) 1.0 ft N (Y or N) N (Y or N) Y (Y or N) OK OK OK, draws down in 2.5 days. OK OK OK OK OK OK OK OK Insufficient. Recorded drainage easement required. OK Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. 81t. Design Summary. Page 2 of 2