Loading...
HomeMy WebLinkAboutSW6130301_COMPLIANCE_20170322STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW Lal mo DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY March 28, 2017 Al Hill Farms, LLC Attn: Billy Horne, Owner P.O. Box 205 Fayetteville, NC 28302 Subject: Modified Compliance Evaluation Inspection State Stormwater Management Permit SW6130301 Front Street Lot 18 Cumberland County Dear Mr. Horne: ROY COOPER Governor MICHAEL S. REGAN Secretary TRACY DAVIS Director On March 22, 2017, I, Melissa Joyner from the Fayetteville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a Compliance Evaluation Inspection at the Front Street Lot 18 project located on Front Street in Cumberland County, North Carolina. The purpose of the inspection was to ensure compliance with State Stormwater Management Permit SW6130301 that was issued on March 19, 2013. A copy of the Compliance Inspection Report is enclosed for your review. As a result of the inspection and subsequent file review, it has been determined that the facility is Compliant with the conditions of the subject permit and approved plans. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. If you have any questions or this office can be of any assistance, please contact me at (910) 433-3384 or by e-mail at melissa.joyner@ncdenr.gov. Sincerely, Melissa Joyner Environmental Specialist DEMLR Enclosure: Compliance Evaluation Inspection Report cc: Scott Brown, PE - 4D Site Solutions, Inc. (via email) FRO — DEMLR, State Stormwater Files, SW6130301 State of Noah Carolina I Environmental Quality I Energy, Mineral and land Resources Fayetteville Regional Office 1225 Green Street, Suite 714 I Fayetteville, NC 29301 910433-3300 Compliance Inspection Report Permit: SW6130301 Effective: 03/19/13 Project: Front Street Lot 18 Owner: Al Hill Farms LLC County: Cumberland Region: Fayetteville Expiration: 03/19/21 Adress: 5290 Front St City/State/Zip: Stedman NC 28391 Contact Person: Billy D Horne Title: Phone: Directions to Project: turn rt at the intersection of clinton rd (hwy 24) and carol st and go approx .2 mi to the intersection of carol st and front st turn left onto front street and go approx 900 ft site is on your rt Type of Project: Stale Slormwaler- HD - Detention Pond Drain Areas: 001 - (Sandy Creek) (03-06-18) ( C;Sw) On -Site Representative(s): On -site representative Billy D Home Related Permits: Inspection Date: 03/22/2017 Entry Time: 09:OOAM Primary Inspector: Melissa A Joyner Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stonnwater Facility Status: Compliant ❑ Not Compliant Question Areas: 0 State Stormwater (See attachment summary) Exit Time: 09:20AM Phone: Inspection Type: Compliance Evaluation page: 1 Permit: SM130301 Owner - Project: Al Hill Fans LLC Inspection Date: 03/22/2017 Inspection Type Compliance Evaluation Reason for Visit: Routine Inspection Summary: Melissa Joyner met with Billy Horne, the current Project Owner of the site. The following were the observations made during the site inspection. The Wet Pond was not holding water at the time of the inspection. The site appeared to fulfill the Certification and approved state stormwater plan requirements except that the wetland plants were not installed in the Wet Pond. This does not appear to impede the performance of the structure as the intenour side slopes are well -vegetated. The site built upon area is constructed as per the permit and the approved plans. The site is in compliance. page: 2 Permit: SVV6130301 Owner - Project: Al Hill Farms LLC Inspection Date: 03/22/2017 Inspection Type Compliance Evaluation Reason for Visit: Routine File Review Yes No NA NE Is the permit active? E ❑ ❑ ❑ Signed copy of the Engineers certification is in the file? ❑ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? ® ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ❑ ❑ ❑ Comment: Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? 0 ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? EDO ❑ Is the BUA (as pennitted) graded such that the runoff drains to the system? ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? 0 ❑ ❑ ❑ Are the inlets located per the approved plans? 0 ❑ ❑ ❑ Are the outlet structures located per the approved plans? _ ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? E ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ DWQ upon request? Comment: Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? 0 ❑ ❑ ❑ Comment: Other WQ Issues Yes No NA NE Is the site compliant with other water quality issues as noted during the inspection? M ❑ ❑ ❑ Comment: page: 3 Y Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY March 28, 2017 Al Hill Farms, LLC Attn: Billy Horne, Owner P.O. Box 205 Fayetteville, NC 23302 Subject: Modified Compliance Evaluation Inspection State Stormwater Management Permit SW6130301 Front Street Lot 18 Cumberland County Dear Mr. Horne: ROY COOPER Ga.mor MICHAEL S. REGAN Secroary TRACY DAVIS Director On March 22, 2D17, I, Melissa Joyner from the Fayetteville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a Compliance Evaluation Inspection at the Front Street Lot 18 project located on Front Street in Cumberland County, North Carolina. The purpose of the inspection was to ensure compliance with State Stormwater Management Permit SW6130301 that was issued on March 19, 2013. A copy of the Compliance Inspection Report is enclosed for your review. As a result of the inspection and subsequent file review, it has been determined that the facility is Compliant with the conditions of the subject permit and approved plans. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. If you have any questions or this office can be of any assistance, please contact me at (910) 433-3384 or by e-mail at melissa.joyner@ncdenr.gov. Sincerely, Melissa Joyner Environmental Specialist DEMLR Enclosure: Compliance Evaluation Inspection Report cc: Scott Brown, PE - 4D Site Solutions, Inc. (via email) FRO — DEMLR, State Stormwater Files, SW6130301 RECEIVED NOV 1 2017 DSO-�A`'E TTE!IILLE REGIOtJAL OFFICE State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street, Suite 714 1 Fayetteville, NC 28301 910-033-3300 Permit: SW6130301 Project: Front Street Lot 18 Owner: Al Hill Farms LLC County: Cumberland Region: Fayetteville Compliance Inspection Report Effective: 03/19/13 Expiration: 03/19121 Adress: 5290 Front St City/StatelZip: Stedman NC 28391 Contact Person: Billy D Horne - Title: Phone: Directions to Project: . turn rt at the intersection of clinton rd (hwy24) and carol st and go approx .2 mi to the intersection of carol st and front at turn left onto front street and go approx 900 ft site is on your rt Type of Project: State Stonnwaler - HD - Detention Pond Drain Areas: 001 - (Sandy Creek) (03-06-18) ( C;Sw) On -Site Reprosentative(s): On -site representative Billy D Home Related Permits: Inspection Date: 03/22/2017 Entry Time: 09:OOAM Primary Inspector: Melissa AJoyner Secondary Inspector(s): Reason for Inspectlon: Routine Permit Inspection Type; State Slormwater Facility Status: ® Compliant ❑ Not Compliant Question Areas: ® State Stormwater . (See attachment summary) Exit Time: 09:20AM Phone: Inspection Type: Compliance Evaluation page: 1 Permit: SW6130301 owner - Project: Al Hill Farms LLC Inspection Date: 03/22/2017 Inspection Type Compliance Evaluatiop Reason for Visit: Routine Inspection Summary: Melissa Joyner met with Billy Horne, the current Project Owner of the site. The following were the observations made during the site inspection. The Wet Pond was not holding water at the time of the inspection. The site appeared to fulfill the Certification and approved state stormwater plan requirements except that the wetland plants were not installed in the Wet Pond. This does not appear to impede the performance of the structure as the interiour side slopes are well -vegetated. The site built upon area is constructed as per the permit and the approved plans. The site is in compliance. page: 2 Permit: SW6130301 Owner -Project: Al Hill Fans LLC Inspection Dale: 03/2212017 Inspection Type Compliance Evaluation Reason for Visit: Routine File Review Yes No NA NE Is the permit active? ■ ❑ ❑ ❑ Signed copy of the Engineers certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: Built Upon Area Is the site BUA constructed as per the permit and approval plans? Is the drainage area as per the permit and approved plans? Is the BUA (as permitted) graded such that the runoff drains to the system? Comment. SW Measures Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Comment: Operation and Maintenance Are the SW measures being maintained and operated as per the permit requirements? Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ upon request? Comment: Other Permit Conditions Is the site compliantwith otherconditions of the permit? Comment: Other WQ Issues . Is the site compliant with other.water quality issues as noted during the inspection? Comment: 0 ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes. No NA NE ® 1111 ❑ Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ® ❑ ❑ ❑ Yes No NA NE ® 1111 ❑ ■ ■ ■ 1N Yes No NA NE U ❑ ❑ ❑ Yes No NA NE ■ ❑❑❑ page: 3 Permit: SW6130301 Owner - Project: At Hill Farms LLC - Inspection Date: 03/22/2017 Inspection Type Compliance Evaluation Reason for Visit: Routine File Review Yes No NA NE is the peril active? - ® ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ® ❑ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? -. ❑ ❑ ❑ Copy of the recorded deed restrictions is in the fie? ® ❑ ❑ ❑ Comment: Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? to ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ® ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? ® ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ® ❑ ❑ ❑ Are the inlets located per the approved plans? ® ❑ ❑ ❑ Are the outlet structures located per the approved plans? ® ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ® ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ DWQ upon request? Comment: Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? ® ❑ ❑ ❑ Comment: Other WQ Issues Yes No NA NE Is the site compliant with other.water quality issues as noted during the inspection? ■ ❑ ❑ ❑ Comment: page: 3 Permit: SVv0130301 Owner - Project: Al Hill Farms LLC Inspection Date: 0312212017 Inspection Type compliance Evaluation Reason for Visit: Routine Inspection Summary: Melissa Joyner met with Billy Horne, the current Project Owner of the site. The following were the observations made during the site inspection. The Wet Pond was not holding water at the time of the inspection. The site appeared to fulfill the Certification and approved state stormwater plan requirements except that the wetland plants were not installed in the Wet Pond. This does not appear to impede the performance of the structure as the interiour side slopes are well -vegetated. The site built upon area is constructed as per the permit and the approved plans. The site is in compliance. page: 2 North Carolina Department of Environmental Quality Land Quality Section: 225 Green St, Suite 714 Fayetteville, NC 28301, Phone: 910-433-3300 COUNTY: Cumberland PROJECT: Front Street 18 RIVER BASIN: CAPE FEAR PERSON FINANCIALLY RESPONSIBLE: Billy Horne, PROJECT # CUMBE-2013-152 ADDRESS: P.O. Box 205 Fayetteville NC 28302 CASE # 1. PROJECT LOCATION: Front Street Stedman NC Pictures: YES Video: Digital: 2. Weather and Soil Conditions: SUNNY, WORKABLE First Inspection:NO 3. Is site currently under Notice of Violation? NO 4. Is the site in compliance with S.P.C.A. and rules? YES 5. Violations: 6. Is the site in compliance with NPDES Permit NCG 010000?: YES 7. Has Sedimentation Damage occurred since last innections? NO Lake/natural watercourse on the tract: Lakeinatural watercourse off the tract: Other Property: Description: Degree of Damage: Stormwater Discharge Outfall with high turbidity or sedimentation loss: 8. Contact Made with (name): BILLY HORNE Title: SITE MANAGER Inspection Report: SENT TO PERSON FINANCIALLY RESPONSIBLE 9. Corrective Actions Needed: 10. COMMENTS: . Date Given/Sent: MAR 24, 2017 Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released and coverage under NPDES General Stormwater Permit for Construction Activities is terminated. Report By: Melissa Joyner Others Present: Date of Inspection: MAR 22, 2017 Time Arriving on Site: 9:00 AM Time Leaving Site: 9:20 AM cc; Revision Date 10/16/2015 Page 1 of 1