Loading...
HomeMy WebLinkAboutSW6121201_HISTORICAL FILE_20130313 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW�� l� i DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD February 1, 2013 KCI Associates of North Carolina, PA Landmark Center II, Suite 220 4601 Six Forks Road Raleigh, North Carolina 27609 Attn: Mr. Chris Aycock, PE Irerracon RECEIVED MAR 13 2013 DENR 4AYaTEWLLE REGIONAL OFROE Re: Supplement to Geotechnical Engineering Report C-130 Flight Simulator Facility Surveyor Street and Titan Street Pope Army Airfield at Fort Bragg, North Carolina Terracon Project No. 70125113 Dear Mr. Aycock, 12 @ Lrg-"LI V FEB 0 5 2013 Please consider this letter a supplement to our Geotechnical Engineering Report for the above referenced project dated August 22, 2012. During a phone conversation on January 29, 2013 additional information was requested regarding the seasonal high water table at the site. Mr. Clay Hankinson of KCI informed us in an email on January 31, 2013 that the proposed bottom of the stormwater pond at the site will be at elevation 180 feet msl. At your request, we have reviewed the site plan provided to us during the preparation of our report and dated April 6, 2012, the existing and proposed topography of the site, and the soil test borings performed at the site. Based on this information, we anticipate the seasonal high water table elevation to be greater than 2 feet below the proposed bottom of the stormwater pond elevation. We appreciate the opportunity to be of service to you on this project. If you have concerning this letter, or if we may be of further service, please contact us. Sincerely, rQ Terraco Consultat nc. SEAL 034749 %EE d Mat ew aymon L. " evi" De nton,'fl;'PL''� Geotechnical Staff Professional Senior Associate NC Registered 034749 Terracon Consultants, Inc. 5240 Green's Dairy Road Raleigh, NC 27616 P 19191 873 2211 F 19191 873 9555 terracon.com -4� mmmmra� KCI TECHNOLOGIES February 4, 2013 ENGINEERS • PLANNERS • SCIENTISTS • CON STR UCTIONMANAGERS 936 RIDGEeROOK ROAD . SPARKS, MD 21152 . 41G-316-7800 • (FAX)410-316-7853 RECEIVED North Carolina Department of Environment and Natural Resources Division of Water Quality Wetlands and Stormwater Branch 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Attn: Mr. Robert D. Patterson, PE Sediment and Stormwater Plan Review Division Re: C-130 Flight Simulator Facility Stormwater Project Number SW6121201 Dear Mr. Patterson: 14AR 13 2013 DENR-FAYETTEVILLE REGIONAL OFFICE FEB 0 5 2013 We received comments from your office dated January 23, 2013. Responses to comments are in bold below. I. The SHWT elevation determination must be based on soil boring(s) within the footprint of the proposed BMP(s). The second geotechnical report provided still does not include this information. Per the definitions [15A NCAC 02H .1002(15)], the SHWT is determined based on mottling of the soil that results from mineral leaching. The soils reports provided only speak to where the water table was at the time of the boring, and not specifically what the estimated SHWT elevation is. Included with this submission is a letter from the geotechnical engineer stating that the seasonal high water table is greater than two feet below the bottom of the facility. 2. The bioretention detail shows conflicting information for the planting layer. If sod is intended since it is not a 3' media depth, then the 3" mulch layer is not needed. Also, references to mulch are shown in the notes on CG-I04. Please revise. Sections on Sheet C-103 have been updated to show sod. On Sheet C-104, Bioretention General Notes, references to mulch have been deleted. 3. The rules require a 30' vegetated setback from surface waters. Please revise from the 25' currently shown. The vegetated setback has been revised to 30 feet. 4. The media mixture note on CG-104 appears to be missing the language "washed sand" as the 85-88% part. Please revise. The missing text has been added per Chapter 12.3.4 to state the following: KCI Technologies www.kci.com mp oyee- une mce Z - S -Lo 12 c 13o Fc16fT' 5jeAuLAToe- S wP•on P-E5t,6H15S16^' (4,vjs 4ycdLk- Kl m C-130 Flight Simulator Facility Stormwater Project Number SW6121201 February 4, 2013 Page 2 PLANTING MEDIA SOIL MIX SHALL BE A HOMOGENOUS SOIL MIX OF 85-88 PERCENT BY VOLUME WASHED SAND AND (USDA SOIL TEXTURAL CLASSIFICATION), 8 TO 12 PERCENT FINES (SILT AND CLAY), AND 3 TO 5 PERCENT ORGANIC MATTER (SUCH AS PEAT MOSS) SHALL BE USED. 5. The construction sequence needs to clearly state that the bioretention media shall not be installed until the DA is stabilized. Otherwise, there is a high potential for clogging. Sheet CG-501, Sequence of Construction, Step 15 has been modified to state: CONSTRUCT STORMWATER MANAGEMENT FACILITY. BIORETENTION MEDIA SHALL NOT BE INSTALLED UNTIL THE CONTRIBUTING DRAINAGE AREA IS STABILIZED. Should you have any questions or comments regarding any of the information please call me at (410) 316-0808. Sincerely, Clay Han inson, PE, LEED AP BD+C Associate — Project Manager Land Development Practice KCI Technologies, Inc. Cc: File KCI Technologies, Inc. www.kci.com Employee -Owned Since 7988 w' Qr NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P.E. John E. Skvarla, III Governor Director RECEIVED Secretary January 23, 2013 MAR 1 3 2013 Mr. Charles Tuck KCI Associates of NC DENR-FAYEf1EWLLEREGIONAL OFFICE 4601 Six Forks Rd., Ste. 220 Raleigh, NC 27609 Subject: Request for Additional Information Stormwater Project No. SW6121201 C-130 Flight Simulator Facility Cumberland County Dear Mr. Tuck: The Division of Water Quality Central Office received a Stormwater Management Permit Application for the subject project on December 11, 2012, with additional information including full-size plans on January 14, 2013. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. The SHWT elevation determination must be based on soil boring(s) within the footprint of the proposed BMP(s). The second geotechnical report provided still does not include this information. Per the definitions [15A NCAC 02H .1002(15)], the SHWT is determined based on mottling of the soil that results from mineral leaching. The soils reports provided only speak to where the water table was at the time of the boring, and not specifically what the estimated SHWT elevation is. 2. The bioretention detail shows conflicting information for the planting layer. if sod is intended since it is not a T media depth, then the 3" mulch layer is not needed. Also, references to mulch are shown in the notes on CG-104. Please revise. 3. The rules require a 30' vegetated setback from surface waters. Please revise from the 25' currently shown. 4. The media mixture note on CG-104 appears to be missing the language "washed sand" as the 85- 88% part. Please revise. S. The construction sequence needs to clearly state that the bioretention media shall not be installed until the DA is stabilized. Otherwise, there is a high potential for clogging. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to February 6, 2013, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, Nohh Carolina 27604 Phone: 919807-63001 FAX: 919807-6494 Internet: caw .ncwaterquality.org An Equal Opportunity t All Action Ennpint er NorthiCarolina Naturally Mr. Charles Tuck SW6121201 - C-130 Flight Sim Facility January 23, 2013 If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. All revised original signed documents must be returned or new originals must be provided. Copies are not acceptable. Any revised calculations or plans must be sealed, signed, and dated. Please reference the State assigned permit number SW6121201 on all correspondence. If you have any questions concerning this matter please feel free to call me at (919) 807-6375, or at robert.patterson@ncdenr.gov. Sincerely, Robert D. Patterson, PE Environmental Engineer Stormwater Permitting Unit cc: SW6121201 File ec: James Hankinson, PE - KCI Technologies David Heins - Fort Bragg DPW Lee Ward - Fort Bragg DPW-WMB Mike Lawyer - Fayetteville Regional Office Page 2 of 2 mmmmmr*� mmmmmla� MMMW4� KCI TECHNOLOGIES January 14, 2013 ENGINEERS • PLANNERS . SCISNTIS'r5 . CONSTRUCTION MANAGERS 936 RIDGEBRoOK ROAD . SPARKS, MD 21152 . 410-316-7800 . (FAX) 410-316-7853 North Carolina Department of Environment and Natural Resources Division of Water Quality Wetlands and Stormwater Branch 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Attn: Mr. Robert D. Patterson, PE Sediment and Stormwater Plan Review Division Re: C-130 Flight Simulator Facility Stormwater Project Number SW6121201 Dear Mr. Patterson: RECEIVED 14AR 13 2013 OENR-FAYETTEVILLE REGIONAL OFFICE We received comments from your office dated December 27, 2012. Responses to comments are in bold below. I. Please provide two full-size sets of plans. Two full size sets of plans are included with this submission. 2. The table in IV.10 on SWU-101 should be based on the DA to each BMP, not the whole site. Please revise. The table has been updated to be based on the proposed BMP. 3. Please provide supporting calculations for the underdrains. Underdrain design calculations are provided in the updated SWM report. 4. The SHWT elevation determination must be based on soil boring(s) within the footprint of the proposed BMP(s). The geotechnical report provided does not include this information. Additional geotechnical information is provided with this submission. Boring B-8 is within the boundary of the proposed BMP. The boring terminated at 10 feet below grade, at the approximate elevation of 177. Water was not encountered by the boring. If the water level was at elevation 177, that would give 3.75 feet of clearance between the water table and the bottom of the facility, which is greater than the required minimum of 2 feet per Chapter 12. Based on other boring around the site, the water level is 18.5 feet or more below existing grade. Therefore the proposed BMP provides sufficient separation between the bottom of the facility and the SHWT. KCI TLrhnotogies www.kci.com C-130 Flight Simulator Facility Stormwater Project Number S W6121201 January 14, 2013 Page 2 5. The I" design volume, based on the Simple Method, must be stored in the "bowl" of the cell. Void volume in the media cannot be counted toward this minimum storage volume. Please revise to provide for storage of the 1" design volume. The ponding elevation may be up to 12" instead of the 6" proposed. The Bioretention facility has been revised to treat and store the initial I" rainfall event in the "bowl" of the facility. Raising the overflow inlet from 6" to 12" allowed for the required volume to be stored in the "bowl'. The revised stormwater management computations and drawings reflect the changes. 6. Please be sure any revisions are consistently shown on all plans, calculations, and forms. Revisions have been coordinated. Should you have any questions or comments regarding any of the information please call me at (410) 3 16-0808. Sincerely, Clay Han -inson, PE, LEED AP BD+C Associate — Project Manager Land Development Practice KCI Technologies, Inc. Cc: File KCI Technologies, Inc. www.kci.com Employee -Owned Since 1988 PWA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakjld, P.E. Dee Freeman Governor Director RECEIVED Secretary December 27, 2012 14AR 13 2013 Mr. Charles Tuck KCI Associates of NC DENR -FAYE rTEALLE REGIONAL OFFICE 4601 Six Forks Rd., Ste. 220 Raleigh, NC 27609 Subject: Request for Additional Information Stormwater Project No. SW6121201 C-130 Flight Simulator Facility Cumberland County Dear Mr. Tuck: The Division of Water Quality Central Office received a Stormwater Management Permit Application for the subject project on December 11, 2012. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please provide two full-size sets of plans. 2. The table in IV.10 on SWU-101 should be based on the DA to each BMP, not the whole site. Please revise. 3. Please provide supporting calculations for the underdrains. 4. The SHWT elevation determination must be based on soil boring(s) within the footprint of the proposed BMP(s). The geotechnical report provided does not include this information. S. The 1" design volume, based on the Simple Method, must be stored in the "bowl" of the cell. Void volume in the media cannot be counted toward this minimum storage volume. Please revise to provide for storage of the 1" design volume. The ponding elevation may be up to 12" instead of the 6" proposed. 6. Please be sure any revisions are consistently shown on all plans, calculations, and forms. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to January 26, 2012, or the application will be,returned as incomplete. The return of a project will necessitate resubmittal of all required items, including -the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919807-63001 FAX: 919-807-6494 ,, Internet w .ncvvaterquality.org An Equal Opportunity 1 Affirmative Action Employer NorthCarolina. )Naturally Mr. Charles Tuck SW6121201- C-130 Flight Sim Facility December 27, 2012 which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. All revised original signed documents must be returned or new originals must be provided. Copies are not acceptable. Any revised calculations or plans must be sealed, signed, and dated. Please reference the State assigned permit number SW6121201 on all correspondence. If you have any questions concerning this matter please feel free to call me at (919) 807-6375, or at robert.patterson@ncdenr.gov. Sincerely, Robert D. Patterson, PE Environmental Engineer Stormwater Permitting Unit cc: (SW6121201 File ) ec: David Heins - Fort Bragg DPW Lee Ward - Fort Bragg DPW-WMB Mike Lawyer- Fayetteville Regional Office Page 2 of 2 R,G f U'ew qa Ro6cef f'A lH Application Completeness Review p�First Submittal ❑ Re -submittal Date Received: I/ It Date Reviewed DevelopmenUProject Name: Receiving stream name LowEe L,' v .2 J.. lassit River Basin: ('r ., Zi Y A For post -construction requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-I, WS-II, WS-III, WS-IV, HOW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient High Density Projects that require a 401/404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water Sheds): /V//v Latitude and Longitude. 35 /a 29,c/ —79 a/ 2 o tn/ Jurisdiction F,Ic f Project Address: Su.e✓«mR Sfec�f r'oRr aRA6W C0nJ3ore L.A c, i91 Engineer name and firm: C/tnt' Tito- {!CS Assoc,:4,-s 0f.yc. 4/40, s, Is the project confirmed to be in the State MSI Stormwater Permit jurisdiction? fJNes or ❑ No ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets C.7.14igh Density ❑ Other E3 -4 1/404 impacts to surface waters, wetlands, and buffers (add language to cover letter and/or add info letter) BUA 5-4 �;b ul Check for $505.00 included riginal signature (not photocopy) on application Legal signature (Corporation-VP/higher, Partnership -General Partner/higher, LLC-member/manager, Agent). Check spelling, capitalization, punctuation: http://www.secretary.state.nc.us/corporations/thepage.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. a -•For subdivided projects, a signed and notarized deed restriction statement :ealed, signed & dated calculations ✓ Correctsupplementand O&M provided for each BMP on site (check all that were provided & number of each) �' Bioretention ❑ Rooftop Runoff Management ❑ Dry Detention Basin ❑ Sand Filter ❑ Filter Strip ❑ Stormwater Wetland RECEIVEDLiGrass Swale ❑ Wet Detention Basin ❑ Infiltration Basin ❑ Low Density ❑ Infiltration Trench ❑ Curb Outlet 14AR 13 2013 ❑ Level Spreader ❑ Off -Site ❑ Permeable Pavement ❑ NCDOT Linear Road DENR-FAYEfTEVILLEREGIDNALOFFICE Li Restored Riparian Buffer RTwo sets of sealed, signed & dated layout & finish grading plans with appropriate details arrative Description of stormwater management provided Soils report, geotech information provided -a^ Wetlands delineated or a note on the plans or in the accompanying documents that none exist on site and/or adjacent property a/' Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; a-"�Dimensions & slopes provided . ram ainage areas delineate*1, ❑ Pervious and impervious reported for each ❑ Areas of high density rr/ BMP operation and maintenance agreements provided Application complete ❑ Application Incomplete Returned: (Date) Comments Oct 29 2012 Revision, Bill Dinguid DECEIVED 12 0 �� ®ENR-FRO MAR 13 2013 DEC 0 6 2012 DWQ DENR-FAYETTEVILLE REGIONAL OFFICE KCIENGINEERS • SCIENTISTS • SURVEYORS . CONSTRUCTION MANAGERS ASSOCIATES OF NORTH CAROUNA, PA Landmark Center 11, Suite 220 4601 Six Forks Road Raleigh, NC 27609 (919) 783-9214 (919) 783-9266 Fax Date: 3-December-2012 Company: NCDENR—DWQ 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 Phone (910) 433-3300 Contact: Mr. Mike Lawyer Subject: SWPPP — Permit Application Submission — C-130 Simulator Facility r l 'Description Check #011887 — Permit Fee: $505.00 2 Stormwater Permit Applications l BMP Supplement Form 1, SWPPP — Calculations and Narrative 1 USGS Quadrangle Location Map 2 Civil Drawing Sets ❑ In accordance with your request ❑ For your review ® For processing ❑ Plans reviewed and accepted ❑ Plans reviewed and accepted as noted ❑ For revision by you ® . For your use/files ❑ Please call when ready ❑ Please return to this office ® Approval requested ❑ Conference requested Comments: Please accept this submission for SWPPP permit for the above referenced project at Fort Bragg. Should there be any questions or comments please call 919-278-2471 Charles Tuck, RCDD, KCI Associates of NC KCI ASSOCIATES OF NORTH CAROLINA, P.A. DEC 1 1 2012 Employce-Owned Since 1988 /W - i ` J Q —_ it It It \\ _� Ali - \\ 1l 11 l/� 05 ,1 \ yam• // It II 0 1 / If=coo o=c p v P L1✓ 1, /1p 11 , 11 U • ' 11 11 r 0. m C �d •\ko •' r 04\- It l � Q .1 ti \ L� ,'' ♦ ® .ice ^ °� \\ • r� 0J • G I1�11I� 11 1.7 Mt. TO N.C. e7 (MANCHESTER) MANCH S 5254 111 NW RECEIVED MAR 13 2013 DEN -FAYE ILLE REGIONAL FHCE KCI Associates of North Caroiina, E , US ARMY CORPS OF ENGINEERS Engineers . Planners . Scientists -Construction Managers 4601 Six Forks Road, Landmark Center 11, Suite 220 C-130 FLIGHT SIMULATOR FACILITY Raleigh, NC 27609-5210 KCIPhone (919) 783-9214 POPE ARMY AIRFIELD, NORTH CAROLINA Fax (919) 783-9266 ASSOCIATES OF hit2://www.kci.com NORTH CAROLINA, PA USGS QUADRANGLE MAP Geotechnical Engineering Report C-130 Flight Simulator Facility Surveyor Street and Titan Street Pope Army Air Field at Fort Bragg, North Carolina August 22, 2012 DECEIVED Project No. 70125113 LIAR 131013 DENR -FAYETTEVILLE REGIZAL OFFICE Prepared for: KCI Associates of North Carolina, PA Raleigh, North Carolina Prepared by: Terracon Consultants, Inc. Raleigh, North Carolina August 22, 2012 KCI Associates of North Carolina, PA Landmark Center II, Suite 220 4601 Six Forks Road Raleigh, North Carolina 27609 Attn: Mr. Charles Tuck, RCDD, LEED AP P: 919-278-2471 F: 919-783-9266 Email: Chalres.Tuck@kci.com Re: Geotechnical Engineering Report C-130 Flight Simulator Facility Surveyor Street and Titan Street Pope Army Air Field at Fort Bragg, North Carolina Terracon Project No. 70125113 Dear Mr. Tuck, lfi6teacon Terracon Consultants, Inc. (Terracon) has completed the geotechnical engineering service's for the proposed C-130 Flight Simulator Facility project. This study was performed in general accordance with our proposal number P7012031 1 -revised, dated July 25, 2012. Terracon was also provided a report previously prepared for the site by AMEC dated October 14, 2011. This report presents the findings of our subsurface exploration and provides geotechnical recommendations concerning earthwork and the design of pavements and foundations for the proposed flight simulator facility. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we may be of further service, please contact us.�jr �CAq Sincerely, Terracon Consultants, Inc. 40W Matthew J. Alexander, El Geotechnical Staff Professional �P . Z `=i? �FESSip ;/4, QP 9C SEAL 034749 1- DIE , Ra Amond. " evi" Denton, II, PE Senior Associate NC Registered 034749 ` Terracon Consultants, Inc. 5240 Green's Dairy Road Raleigh, North'Carolina 27616 ' P 19191 873 2211 F 19191 873 9555 Terracon.com TABLE OF CONTENTS 2_LH= EXECUTIVESUMMARY................................................................................................. i 1.0 INTRODUCTION...................................................................................................1 2.0 PROJECT INFORMATION...................................................................................1 2.1 Project Description..................................................................................:......................1 2.2 Site Location and Description.........................................................................................2 3.0 SUBSURFACE CONDITIONS..............................................................................3 3.1 Site Geology...................................................................................................................3 3.2 Typical Subsurface Profile..............................................................................................3 3.3 Groundwater ................ :.................................................................................................. 4 3.4 Geophysical Methods.....................................................................................................4 3.4.1 Shear Wave Velocity Testing..................................................................................4 3.4.2 Field Electrical Resistivity Testing...........................................................................4 3.5 Seismic Considerations..................................................................................................5 4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION ........................... 6 4.1 Geotechnical Considerations..........................................................................................6 4.2 Earthwork.......................................................................................................................7 4.2.1 Compaction Requirements......................................................................................9 4.2.2 Grading and Drainage.............................................................................................9 4.2.3 Excavations...........................................................................................................10 4.2.4 Slopes...................................................................................................................10 4.2.5 Construction Considerations.................................................................................11 4.3 Foundation Recommendations.....................................................................................11 4.4 Dynamic Soil Properties...............................................................................................13 4.5 Retaining Wall Considerations.....................................................................................13 4.6 Slabs on Grade.............................................................................................................14 4.7 Pavements....................................................................................................................15 4.8 Underground Utilities (Corrosion Considerations)........................................................17 5.0 GENERAL COMMENTS.....................................................................................17 APPENDIX A — FIELD EXPLORATION AND LABORATORY TESTING Exhibit A-1 Site Vicinity Diagram Exhibit A-2 Boring Location Diagram Exhibit A-3 Shear Wave Velocity Profile Boring Logs Borings B-1 through B-6 Exhibit A-5 Field Exploration Description and Laboratory Testing Laboratory Testing Results APPENDIX B — SUPPORTING DOCUMENTS Exhibit B-1 General Notes Exhibit B-2 Unified Soil Classification System Responsive u Resourceful o Reliable Geotechnical Engineering Report l��rracon C-130 Flight Simulator Facility a Fort Bragg, North Carolina August 22, 2012 c Terracon Project No. 70125113 EXECUTIVE SUMMARY A geotechnicai exploration has been performed for the proposed C-130 Flight Simulator Facility to be located north of the intersection of Surveyor Street and Titan Street at Pope Air Field in Fort Bragg, North Carolina. Terracon's geotechnical scope of work included advancing six soil test borings to approximate depths of 10 to 30 feet below existing site grades, performing field electrical resistivity measurements using the Wenner four -pin method, and performing MASW testing. The site appears suitable for the proposed construction based upon geotechnical conditions encountered during our exploration and our understanding of the proposed project. The following geotechnical considerations were identified: a The proposed structure is expected to consist of a single -story cast -in -place concrete structure with a slab -on -grade floor. We anticipate that minor grading (cut and fill depths less than 3 feet) will be utilized to achieve finished grades across the site. o The portion of the site along Surveyor Street is currently being used as a parking lot. The remainder of the site is undeveloped and covered in brush, kudzu, and undergrowth. o If necessary, the existing monitoring wells at the northeast comer of the site should be abandoned in accordance with NCDENR guidelines. a Existing fill was encountered in borings B-2, B-3, B-4, B-5, and B-6 extending to depths ranging from 2.5 to 5.5 feet below the existing ground surface. Deeper zones of existing fill may exist between the borings. The existing fill consists of loose to dense silty and clayey sands. o Highly plastic soils were encountered within 5 feet of the existing ground surface in borings B-3 and B-5. These soils are not desirable at or near subgrades because of their potential to shrink and swell due to changes in moisture content. These soils should not be used within 2 feet of the design subgrade elevations and should be covered by a separation zone of low to moderate plasticity soil. The separation zone and control of surface drainage is intended to reduce moisture fluctuation and associated shrink/swell behavior in the highly plastic clays. a The soils at the site are moderately moisture -sensitive. The exposed subgrade soils need to be protected during construction from excessive moisture exposure. Earthwork should be performed during drier times of the year if practical. o In our opinion, the soils at the site are suitable for support of shallow foundations in conjunction with some remedial work. The existing soils should be evaluated carefully at Responsive o Resourceful o Reliable Geotechnical Engineering Report 1F�rracon C-130 Flight Simulator Facility m Fort Bragg, North Carolina August 22, 2012 ■ Terracon Project No. 70125113 the time of construction in order to allow the proposed structure to be supported on shallow foundations. A representative of the geotechnical engineer should use a combination of hand auger borings and dynamic cone penetrometer (DCP) testing to determine the suitability of the bearing materials for the design bearing pressure. Soft, wet, or otherwise unsuitable soils, where encountered, should be addressed through localized overexcavation (undercutting) and replacement with compacted fill, compacted crushed stone base course, or lean concrete. o Even with the recommended construction testing, the owner still carries an inherent risk that unsuitable material may be discovered beneath or within the existing fill. This risk of unforeseen conditions cannot be eliminated without completely removing and replacing the existing fill. However, based on our exploration we anticipate this risk to be relatively low. This summary should be used in conjunction with the entire report for design purposes. It should be recognized that details were not included or fully developed in this section, and the report must be read in its entirety for a comprehensive understanding of the items contained herein. The section titled GENERAL COMMENTS should be read for an understanding of the report limitations. Responsive a Resourceful o Reliable GEOTECHNICAL ENGINEERING REPORT C-130 FLIGHT SIMULATOR FACILITY SURVEYOR STREET AND TITAN STREET POPE ARMY AIR FIELD AT FORT BRAGG, NORTH CAROLINA Project No. 70125113 August 22, 2012 1.0 INTRODUCTION We have completed the geotechnical engineering report for the proposed C-130 Flight Simulator Facility to be located at the intersection of Surveyor Street and Titan Street in Fort Bragg, North Carolina. Six borings were performed to depths ranging from approximately 10 to 30 feet below the existing ground surface at the approximate locations indicated on the Boring Location Diagram. In addition to our soil test borings, we performed multi -channel analysis of surface waves (MASW) and in -situ field electrical resistivity testing at the approximate locations indicated on the Boring Location Diagram. Logs of the borings, a shear wave velocity profile, a site vicinity diagram, and a boring location diagram are included in Appendix A of this report. The purpose of these services is to provide information and geotechnical engineering recommendations relative to: c subsurface soil conditions o groundwater conditions o earthwork o pavement design and construction 2.0 PROJECT INFORMATION 2.1 Project Description o foundation design and construction o seismic considerations o floor slab design and construction The project information tabulated in this section is based on a site plan provided by KCI Associates of North Carolina, PA (KCI); our conversations with Mr. Charles Tuck; and our experience with similar projects. We were also provided Foundation and Geotechnical Design Specifications within the project RFP. Responsive o Resourceful c Reliable 1 Geotechnical Engineering Report lf�rracon C-130 Flight Simulator Facility ■ Fort Bragg, North Carolina August 22, 2012 s Terracon Project No. 70125113 Item Description An approximate 9,000 square foot. single -story building. The Proposed Construction building will be constructed as a cast -in -place concrete structure. Construction will also include the associated driveways and parking areas for the simulator facility. Finished floor elevation Not provided. Anticipated to be within 3 feet of existing site grades. Not provided. Assume maximum column loads of 75 kips. Maximum loads Assume maximum wall loads of 1.5 kips per linear foot for the administration portion of the building. Assume maximum walls loads of 3.5 kips per linear foot for the simulator bay portion of the building. Maximum allowable settlement Assumed to be 1 inch total,'/2 inch differential between columns or in 40 feet along walls. Grading Final grading plans were not provided at the time of our exploration, however, cut and fill depths less than 3 feet are anticipated. Cut and fill slopes Assumed to be no steeper than 3H:1 V (Horizontal to Vertical). A segmental retaining wall is planned adjacent to the northwest Retaining walls corner of the proposed building. The maximum wall height will be 6 feet. 2.2 Site Location and Description Item Description Location The site is located north of the intersection of Surveyor Street and Titan Street at Pope Army Air Field in Fort Bragg, North Carolina. Existing improvements A portion of the site along Surveyor Street is currently being used as a parking lot. The remainder of the site is undeveloped. The parking lot portion of the site is covered with asphalt pavement. Current ground cover The remainder of the site is covered with brush, kudzu, and undergrowth. Based on the provided site plan, the elevations range from Existing topography approximately 177 to 169 feet msl across the planned construction area. The site slopes down toward the wooded and wetland areas located to the north and west. Responsive o Resourceful ■ Reliable Geotechnical Engineering Report l�erracon C-130 Flight Simulator Facility a Fort Bragg, North Carolina August 22, 2012 a Terracon Project No. 70125113 3.0 SUBSURFACE CONDITIONS 3.1 Site Geology Based on the 1985 Geologic Map of North Carolina, the project site is located within the Coastal Plain physiographic province. The Coastal Plain soils consist mainly of marine sediments that were deposited during successive periods of fluctuating sea level and moving shoreline. The soils include sands, silts, and clays with irregular deposits of shells, which are typical of those lain down in a shallow sloping sea bottom. Recent alluvial sands, silts, and clays are typically present near rivers and creeks. More specifically the site is mapped as being underlain by the Middendorf Formation. The Middendorf Formation is described as gray to pale gray sand, sandstone, and mucistone with clay and iron -cemented concretions. The formation is also described as having laterally discontinuous bedding with cross -bedding being common. 3.2 Typical Subsurface Profile Based on the results of the borings, subsurface conditions on the project site can be generalized as follows: Description Approximate Depth to Material Encountered Consistency/Density Bottom of Stratum (feet) Surface 0.5 to 1 Asphalt and Crushed N/A (where encountered) Stone Base Stratum 1 2.5 to 5.5 Fill Consisting of Silty / Loose to Dense (where encountered) Clayey Sand z Very Loose to Dense To boring termination depth Sands with varying Sand (Sand) Stratum 2 of approximately 30 amounts of Silt and Clay Medium Stiff to Stiff and Fat Clay (Clay) 1. Encountered in borings B-1, B-2, B-2, and B-4. 2. Encountered in borings B-2, B-3, B-4, B-5, and B-6. Conditions encountered at the boring locations are indicated on the boring logs. Stratification boundaries on the boring logs represent the approximate location of changes in soil types; in -situ, the transition between materials may be gradual. Variations in the subsurface conditions can also occur between borings. Further details of the borings can be found on the boring logs in Appendix A of this report. Responsive o Resourceful o Reliable 3 Geotechnical Engineering Report l��rracon C-130 Flight Simulator Facility a Fort Bragg, North Carolina August 22, 2012 a Terracon Project No. 70125113 3.3 Groundwater Groundwater levels were observed during drilling and sampling in borings B-3, B-4, B-5, and B-6 at depths ranging from 18.5 to 23.5 feet below existing site grades. Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff and other factors not evident at the time the borings were performed. 3.4 Geophysical Methods 3.4.1 Shear Wave Velocity Testing Terracon utilized multichannel analysis of surface waves (MASW) to develop shear wave velocity profiles at the site for use in determining the seismic site class and developing dynamic soil properties. This method utilizes a computer controlled Geometrics Geode seismograph to record active source (10 and 20 pound sledge hammer) and passive source (ambient noise) surface wave dispersion. We utilized two lines of twenty-four 4.5-Hertz geophones set along straight-line arrays with 5-foot and 8-foot receiver intervals. Our active records consisted of 4 to 6 stacked shots depending on the noise at the site. The shot points were symmetrically located at each end of the array at distances equal to approximately 20 and 40 percent of the array length. Additionally, we collected 10 second and 32 second passive records utilizing the linear arrays. The collected data was processed using the computer software Seislmager/SWTm by Geometrics with the results plotted as a conventional shear wave versus depth profile (Exhibit A-3). The shear wave velocity measurements for this site indicate a stiff soil profile as outlined by the building code. The weighted average shear wave velocity (Vs -bar) measured for the upper 100 feet of the subsurface profile was 1,162 feet per second (ft/s). 3.4.2 Field Electrical Resistivity Testing An electrical resistivity survey was performed at the site using the Wenner Four Pin method and a Model 4500 Digital Ground Resistance Tester manufactured by AEML Instruments. The area of investigation included two resistivity traverses (A -A' and B-B') which were located as shown on the attached Boring Location Diagram. The electrodes were inserted approximately 10 inches into the ground. One measurement was recorded at each pin spacing interval. The resistivity survey was performed after a period of dry weather. Soil conditions were moist and the soil was not frozen. The results of the electrical resistivity survey are tabulated below. Responsive a Resourceful a Reliable Geotechnical Engineering Report l��rracon C-130 Flight Simulator Facility a Fort Bragg, North Carolina August 22, 2012 a Terracon Project No. 70125113 Field Electrical Resistivity Results Electrode Spacing 5 10 20 30 40 (ft) Traverse A - A' Measured Resistance 12.2 9.1 7.0 6.5 7.2 (0) Traverse A - A' Calculated Resistance 11,681 17,426 26,810 37,342 55,152 (f2 - cm) Traverse B - B' Measured Resistance 17.9 12.7 12.6 9.6 9.1 P) Traverse B - B' Calculated Resistance 17,139 24,320 48,258 55,152 69,706 (a - cm) 3.5 Seismic Considerations Code Used Site Classification 2009 North Carolina Building Code (2006International Building Code (IBC), D with North Carolina Amendments)' Mapped Acceleration Parameters, Ss and S, Ss = 0.29 and S, = 0.10 Site Coefficients Fa and Fv (Site Class D) Fa = 1.6 and Fv = 2.4 Design Spectral Response Acceleration Sos = 0.46 and So, = 0.24 Parameters Sos and In general accordance with Table 1613.5.2 of the 2009 NCBC. 2. The spectral response parameters provided are based on a site classification of D and assume that the planned buildings will have a period of less than 0.5 seconds. The subsurface materials are not considered subject to liquefaction under the magnitude of seismic events predicted for the area. Responsive o Resourceful a Reliable 5 Geotechnical Engineering Report l��rracon C-130 Flight Simulator Facility n Fort Bragg, North Carolina August 22, 2012 c Terracon Project No. 70125113 4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION 4.1 Geotechnical Considerations In our opinion, the soils at the site are generally stiff enough to allow the proposed structures to be supported on shallow spread footings or mat foundations. We recommend close examination of the foundation bearing materials be performed during footing construction to confirm suitable bearing conditions. A representative of the geotechnical engineer should use a combination of hand auger borings and dynamic cone penetrometer (DCP) testing to determine the suitability of the bearing materials for the design bearing pressure. Soft, wet, or otherwise unsuitable soils, if encountered, can be addressed through localized overexcavation (undercutting) and replacement with suitable materials. Existing soil fill, apparently associated with construction of the existing parking lot on the site, was encountered in our borings B-2, B-3, B-4, B-5, and B-6. The support of footings, floor slabs, and pavements on existing fill soils is discussed in this report. However, even with the recommended remedial work and construction testing activities, the owner still carries an inherent risk that unsuitable material may be discovered beneath or within the fill. This risk of unforeseen conditions cannot be eliminated without completely removing and replacing the existing fill. However, based on the available boring information, this risk appears to be relatively low. High plasticity clay was encountered within 5 feet of the surface in borings B-3 and B-5. High plasticity clay creates the potential for shrink/swell behavior and should be addressed during construction. Where highly plastic clays are encountered at planned subgrades we recommend reducing the potential for shrink/swell behavior by creating a 2-foot thick protective zone of low to moderate plasticity soil between the existing soils and the design subgrade elevation. This protective zone is intended to reduce moisture fluctuations in the underlying soil. The protective zone can be created by over -excavation and replacement of existing soils, if required. The clayey and silty soils on site are moisture sensitive. If exposed subgrades are not protected from the weather, subgrade soil conditions will deteriorate. Remedial measures of the near surface soils will depend upon the moisture condition and stability of the soils at the time of construction. The remedial measures will potentially include over -excavation and replacement or the use of subgrade stabilization fabric in conjunction with a clayey sand fill or crushed stone. We expect that less remedial work will be necessary if work is performed during summer and early fall months. We recommend leaving the existing pavements in -place during the construction phase, even if new pavements are planned, to help protect the subgrade around the building from weather. A geotechnical engineer should be retained during the construction phase of the project to observe earthwork and to perform necessary tests and observations during subgrade Responsive o Resourceful o Reliable 6 Geotechnical Engineering Report lferracon C-130 Flight Simulator Facility a Fort Bragg, North Carolina August 22, 2012 a Terracon Project No. 70125113 preparation; proofrolling; placement and compaction of controlled compacted fills; backfilling of excavations into the completed subgrade, and foundation excavation. A more complete discussion of these points and additional information is included in the following sections. 4.2 Earthwork Several monitoring wells are indicated on the site plan. If the monitoring wells are anticipated to be impacted by the proposed site development, then the impacted wells should be abandoned in accordance with NCDENR guidelines. The near surface clayey and silty soils at the site are moisture sensitive and will lose strength and stiffness with increased moisture content. Earthwork should be performed during summer and early fall due to the improved drying conditions and shorter time periods of rainfall associated with these seasons. This does not preclude earthwork during other periods of the year. Rather, performing site earthwork during late fall, winter and spring increases the potential for needing to perform remedial subgrade work. Highly plastic clay was encountered in borings B-3 and B-5 within 5 feet of the existing ground surface. These soils are not desirable at or near subgrades because of their potential to shrink and swell due to changes in moisture content. These soils should not be used within 2 feet of the design subgrade elevations. Low to moderate plasticity soils obtained from approved sources should be used within 2 feet of the design subgrade elevation to create a separation zone. The separation zone and control of surface drainage is intended to reduce moisture fluctuation in the highly plastic clays. Site preparation should begin by stripping the existing surface vegetation, topsoil, and tree stumps from construction areas. Based on our field observations, we anticipate a topsoil stripping depth of about 4 to 6 inches will be required in some areas; however, stripping depths could vary and actual stripping depths should be evaluated by a Terracon representative. Deeper stripping depths should be anticipated with the removal of the root -mat associated with the trees. The existing asphalt pavement in the building area should be demolished and removed prior to beginning earthwork operations. The existing asphalt pavement outside the building area may remain in place until the parking lot areas of the site are being developed to help protect the subgrade. The stone under the existing asphalt may stay in -place if found stable during a proofroll. The kudzu at the site should be stripped to allow an evaluation of the condition of the existing slopes at the site. At the time of our investigation the existing slopes were covered in kudzu and their condition could not be evaluated. We recommend a geotechnical engineer observe the slopes prior to placing fill at the site. Responsive a Resourceful a Reliable 7 Geotechnical Engineering Report l�orracon C-130 Flight Simulator Facility u Fort Bragg, North Carolina August 22, 2012 o Terracon Project No. 70125113 After stripping and demolition are completed, we recommend proof -rolling the exposed soils in areas to receive fill and at subgrade in the cut areas. Additionally, a representative of the geotechnical engineer should evaluate and take samples of the exposed subgrade to help identify the presence of highly plastic clays. Where these soils are identified we recommend undercutting and replacement as necessary to create the specified 2-foot separation zone. Proofrolling should also be performed after "rough grading" in areas where existing highly plastic clay is excavated to create the 2-foot thick separation zone. Proofrolling should be performed with a loaded, tandem -axle dump truck or similar rubber -tired construction equipment. The proofrolling operations should be observed by a representative of the geotechnical engineer and should be performed after a suitable period of dry weather to avoid degrading an otherwise acceptable subgrade and to reduce the amount of additional undercutting required. If the exposed soil surface exhibits excessive deflection, pumping or rutting under the Proof - rolling operation we recommend overexcavation of the unstable soil and replacement with low to moderate plasticity approved soil fill or crushed stone base course. Engineered fill should meet the following material property requirements: Fill Type' USCS Classification Acceptable Location for Placement Low- to Medium- CUCH, MUMH, SC or Plasticity Soil SM (Soil having at least and All locations and elevations 18% fines) (LL < 60 & PI < 30) High Plasticity CH / MH > 2 feet below footings, floor slabs, and pavement Fat Clay (LL > 60 & PI > 30) subgrades 1. Washed, crushed stone (NCDOT No. 57) beneath floor slabs. 2. NCDOT CABC (crushed aggregate base course) beneath pavements or as a replacement material in Sand / Gravel with over -excavated areas. less than 10% fines GW/GP, SW/SP 3. "Clean" sand (less than 10% silt and clay) should not (silt and clay) be used as general site fill in building and pavement areas to reduce risk of perched water developing in the surface fill as water infiltrating the surface zone becomes trapped above the less permeable clayey and silty sands and clay soils at the site. Responsive o Resourceful a Reliable 8 Geotechnical Engineering Report C-130 Flight Simulator Facility a Fort Bragg, North Carolina August 22, 2012 a Terracon Project No. 70125113 lrerracon Fill Type' USCS Classification Acceptable Location for Placement On -site soils generally appear suitable for use as engineered fill at all locations and elevations with the On -site soils CH, SM, SC, SP exception of the high plasticity fat clay. However, the on -site soils should be evaluated for conformance, with the above criteria and placed accordingly. 1. Controlled, compacted fill should consist of approved materials that are free of organic matter and debris. A sample of each material type should be submitted to the geotechnical engineer for evaluation. 4.2.1 Compaction Requirements Item Description Fill Lift Thickness 9-inches or less in loose thickness (4-inch to 6-inch lifts when hand -operated equipment is used) Beneath structures and building slabs to 5 feet beyond the limits of the structure, beneath streets and paved areas Compaction Requirements' except the top 12 inches of paved areas, trenches: 92% (Represented as minimum percent of Top 12 inches beneath streets and paved areas: 95% the material's modified Proctor Beneath shoulders: 90% maximum dry density, ASTM D 1557) Beneath sidewalks and bike paths, grassed areas: 85% Base course under paved areas: 100% Within the range of -3% to +3% of optimum moisture content Moisture Content as determined by the standard Proctor test at the time of placement and compaction 1. Engineered fill should be tested for moisture content and compaction during placement. If in -place density tests indicate the specified moisture or compaction limits have not been met, the area represented by the tests should be reworked and retested as required until the specified moisture and compaction requirements are achieved. 4.2.2 Grading and Drainage During construction, grades should be sloped to promote runoff away from the construction areas. Based on the provided RFP, final grades in non -paved areas should be sloped away from structures on all sides with a minimum slope of 5 percent for the first 10 feet around the structure. Outside of the first 10 feet around the structure the grades should slope a minimum of 2 percent. If gutters / downspouts do not discharge directly onto pavement they should not discharge into landscaped areas adjacent to the buildings. This can be accomplished through the use of splash -blocks, downspout extensions, and flexible pipes that are designed to attach to the end of the downspout if necessary. Flexible pipe should only be used if it is daylighted in such a manner that it gravity -drains collected water. Splash -blocks should also be considered below hose bibs and water spigots. Responsive o Resourceful o Reliable 9 Geotechnical Engineering Report l��rracon C-130 Flight Simulator Facility o Fort Bragg, North Carolina August 22, 2012 o Terracon Project No. 70125113 With the presence of the moisture sensitive soils on site, control of water is important. Highly plastic clays have the potential to shrink/swell when exposed to varying moisture conditions. Landscaped areas with irrigation systems near the building perimeter are frequently a source of foundation problems. If a landscape irrigation system is planned, a drainage system should be installed to divert the irrigation water away for the building's foundations. This can be done by providing a moisture barrier and then piping the collected irrigation water away. 4.2.3 Excavations The soils at the site may be excavated with conventional construction equipment, such as bulldozers, backhoes, and trackhoes. Temporary excavations may be required during grading operations and/or for installation of utilities. As a minimum, all temporary excavations should be sloped or braced as required by Occupational Safety and Health Administration (OSHA) regulations to provide stability and safe working conditions. The grading contractor, by his contract, is usually responsible for designing and constructing stable, temporary excavations and should shore, slope or bench the sides of the excavations as required, to maintain stability of both the excavation sides and bottom. All excavations should comply with applicable local, state and federal safety regulations, including the current OSHA Excavation and Trench Safety Standards. Since exposure to weather can significantly weaken the sidewalls of a trench, a competent person should evaluate the excavations for stability prior to each entry by personnel. 4.2.4 Slopes We recommend that the existing slopes at the site be observed by the geotechnical engineer after site stripping is complete. The slopes were covered with kudzu during our site visits and the condition of the existing slopes could not be determined. For permanent slopes in unreinforced compacted fill areas, recommended maximum configurations for on -site materials are as follows: Material Maximum Slope Horizontal:Vertical Cohesive soils (on-site/imported clays and silts) .................................................... 3:1 Cohesionless soils (on-site/imported granular soils, greater than 18% fines) .... 2-1/2:1 If steeper slopes are required for site development, stability analyses should be completed to design the grading plan. The face of all slopes should be compacted to the minimum specification for fill embankments. Alternately, fill slopes can be overbuilt and trimmed to compacted material. Responsive o Resourceful a Reliable 10 Geotechnical Engineering Report l��rracon C-130 Flight Simulator Facility a Fort Bragg, North Carolina August 22, 2012 c Terracon Project No. 70125113 If fill is placed in areas of the site where existing slopes are steeper than 5:1 (horizontal:vertical), the area should be benched to reduce the potential for slippage between existing slopes and fills. Benches should be wide enough to accommodate compaction and earth moving equipment and to allow placement of horizontal lifts of fill. 4.2.5 Construction Considerations The clayey and silty soils at the site are moisture -sensitive and will lose strength and rut or deflect excessively under construction traffic when they become wet. Performing earthwork operations during warmer, drier periods of the year (May through October) will reduce the potential for problems associated with unstable subgrades. The moisture sensitivity of the on -site soils does not preclude performing earthwork at other times of the year, but does lead to an increased potential for having to perform overexcavation and replacement or some other form of remedial work. Protecting the exposed subgrade soils from infiltration of surface water by keeping the site grades sloped to promote runoff and by "sealing" disturbed clay soil surfaces with rubber -tired equipment in advance of rain events will also reduce the potential for needing to perform remedial work on wet subgrades. Placing additional crushed stone base course as a protective layer and working surface in exposed subgrade areas could also be considered to protect the subgrade soils. Should unstable subgrade conditions develop, stabilization measures should be employed. The site should also be graded to prevent ponding of surface water on the prepared subgrades or in excavations. If the subgrade should become frozen, desiccated, saturated, or disturbed, the affected material should be removed or these materials should be scarified, moisture conditioned, and recompacted. A geotechnical engineer should be retained during the construction phase of the project to observe earthwork and to perform necessary tests and observations during subgrade preparation; proofrolling; placement and compaction of controlled compacted fills; backfilling of excavations to the completed subgrade, and prior to placing reinforcing steel in the footing excavations. 4.3 Foundation Recommendations The proposed building structure can be supported by shallow, spread footing foundation systems or thickened portions of monolithic slabs. Based on conversation with KCI, we understand the simulator will be supported on an independent concrete mat/block isolated from the surrounding floor slab for the building. Design recommendations for foundations for the proposed structures and other structural elements are presented in the following table and paragraphs. Responsive a Resourceful o Reliable 11 Geotechnical Engineering Report ��C�fr7COr1 C-130 Flight Simulator Facility o Fort Bragg, North Carolina August 22, 2012 c Terracon Project No. 70125113 Description Column Wall Net allowable bearing pressure' 2,000 psf 2,000 psf Minimum dimensions 24 inches 16 inches Minimum embedment below finished grade for frost protection 18 inches 18 inches Approximate total settlements <1 inch <1 inch Estimated differential settlements <1/2 inch between <1/2 inch over 40 feet columns Modulus of subgrade reaction (k) for mat foundation 8 pounds per square inch per inch (psi/in) 1. The recommended net allowable bearing pressure is the pressure in excess of the minimum surrounding overburden pressure at the footing base elevation. Assumes any unsuitable fill or soft soils, if encountered, will be undercut and replaced with engineered fill. 2. The foundation settlement will depend upon the variations within the subsurface soil profile, the structural loading conditions, the embedment depth of the footings, the thickness of compacted fill, and the quality of the earthwork operations. Finished grade is defined as the lowest adjacent grade within five feet horizontally of the foundation for perimeter (or exterior) footings and finished floor level for interior footings. The allowable foundation bearing pressures apply to dead loads plus design live load conditions. The design bearing pressure may be increased by one-third when considering total loads that include wind or seismic conditions. The weight of the foundation concrete below grade may be neglected in dead load computations. The dead weight of the foundation and the soil directly over the plan area of the footing should be used in calculating uplift resistance. For this calculation, we recommend a soil unit weight of 110 pounds per cubic foot and a safety factor of at least 1.5. Lateral resistance may be calculated by using a coefficient of friction of 0.3 between the bottom of a footing and the underlying soil with a factor of safety of 2. The base of all foundation excavations should be free of water and loose soil prior to placing concrete. Concrete should be placed as soon as practical after excavating to reduce bearing soil disturbance. Should the soils at bearing level become excessively disturbed or saturated, the affected soil should be removed prior to placing concrete. It is recommended that the geotechnical engineer be retained to observe and test the soil foundation bearing materials. The foundation bearing materials should be evaluated at the time of the foundation excavation. A representative of the geotechnical engineer should use a combination of hand auger borings and dynamic cone penetrometer (DCP) testing to determine the suitability of the bearing materials for the design bearing pressure. Excessively soft, wet, or otherwise unsuitable bearing soils should be overexcavated to a depth recommended by the geotechnical engineer. The Responsive a Resourceful o Reliable 12 Geotechnical Engineering Report l��rracon C-130 Flight Simulator Facility a Fort Bragg, North Carolina August 22, 2012 a Terracon Project No. 70125113 footings could then bear directly on these exposed soils at the lower level or the excavated soils could be replaced with compacted soil fill, lean concrete, or crushed stone base course. However, clean, washed stone (No. 57) should not be used for foundation support beneath structures subject to dynamic loadings such as oscillating equipment, due to the potential for subsidence of, this material under dynamic loading. 4.4 Dynamic Soil Properties Dynamic behavior should be considered in the design of foundations subjected to rotating or eccentric equipment loads such as the proposed flight simulator. The dynamic analysis should incorporate the natural frequencies and dynamic responses of the foundation. To account for soil and structure interaction, we recommend the dynamic design parameters listed below be used to determine the soil/structure interaction of vibrating foundations. Dynamic Soil Properties Angle of Internal Friction, 0 300 Mass Density, p 3.42 lbs-sect/ft" Poisson's Ratio, p 0.35 Dynamic Modulus of Elasticity, Ed 4,850 ksf Dynamic Shear Modulus, G 1,800 ksf Damping (Internal), % 5 The recommended elastic constants are based upon geophysical tests and propagation of seismic waves through soil at very low strain levels (less than 10-6). The shear modulus of the material will need to be reduced in accordance with relationships given by Seed et al. (1984) and as outlined in ACI 351.3R for higher strains. A preliminary damping ratio of 0.05 is suggested to account for internal damping of the soils. Actual design values will be dependent upon the shape and depth of the foundation and the mass of the system supported by the foundation. A soil density of 110 pcf is recommended for use in final calculation of the damping ratio. 4.5 Retaining Wall Considerations We understand the retaining wall planned for the northwest corner of the site will be constructed as a modular block faced-geogrid reinforced backfill system. These walls are typically subcontracted as design -build structures, since design details are often manufacturer specific. Established design methods for modular block walls address local and internal stability, but do not specifically address the global stability of the wall system. Therefore, we recommend that Responsive o Resourceful o Reliable 13 Geotechnical Engineering Report l��rracon C-130 Flight Simulator Facility a Fort Bragg, North Carolina August 22, 2012 c Terracon Project No. 70125113 the following general and specific considerations be included in the project specifications for the wall design. Internal stability analyses should conform to the latest design methodology accepted for use by either the Federal Highway Administration (FHWA), AASHTO, or the National Concrete Masonry Association (NCMA). Since these analysis procedures are based on the use of drained strength parameters, the backfill used for the geogrid reinforced backfill section should be drainable, granular material to conform with the assumptions of the analysis. Cohesive soil or granular material containing high amounts of fines (silts and clays) are not considered drainable and should not be allowed in the geogrid reinforced backfill zone unless provisions are made to provide backslope and surface drainage that would prevent water from entering the backfill. The designer should state in the construction specifications the backfill material description and design strength parameters so that unsuitable materials are not allowed in the backfill zone during construction. Global stability of the wall system should be analyzed using both drained and undrained strength parameters. The wall contractor/designer should be required to provide the global stability analyses based on the planned final cross section, including the topography above and below the wall, using the generalized subsurface stratigraphy discussed in this report. Terracon should be provided the opportunity to review and comment on the wall system design and analysis prior to construction. Testing and monitoring during construction by qualified geotechnical personnel is strongly recommended. 4.6 Slabs on Grade Approved site soils and/or approved, properly placed, engineered fill soils are suitable for support of the proposed floor slabs for the project. Design recommendations are discussed in the following paragraphs. ITEM DESCRIPTION Floor slab support Approved/prepared site soils or new engineered fill Modulus of subgrade reaction 100 pounds per square inch per inch (psiln) for point loading conditions Capillary Break 6 inches of crushed, washed stone (NCDOT No. 57 or NCDOT No. 67) Vapor Barrier Lapped polyethylene sheeting having a minimum thickness of 10 mils placed directly beneath the slab We recommend floor subgrades be maintained in a relatively moist, yet stable, condition until floor slabs are constructed. If the subgrade should become excessively desiccated or wet prior to construction of floor slabs and pavements, the affected material should be removed or the Responsive 13 Resourceful o Reliable 14 Geotechnical Engineering Report l��rracon C-130 Flight Simulator Facility a Fort Bragg, North Carolina August 22, 2012 a Terracon Project No. 70125113 materials scarified, moisture conditioned, and recompacted. Saw -cut control joints should be placed in the slab to help control the location and extent of cracking. For additional recommendations refer to the ACI Design Manual. 4.7 Pavements When prepared as outlined in section 4.2 Earthwork, the subsurface materials appear to be suitable for support of the planned pavement sections. Prior to parking lot construction, the pavement subgrade should be proofrolled as outlined in section 4.2 Earthwork of this report. Soft, wet, or otherwise unsuitable soils delineated by the proofrolling operation should be undercut and backfilled as recommended by the geotechnical engineer. Remediation options may include placement of additional crushed aggregate base course in conjunction with stabilization fabric. Pavement thickness design is dependent upon: o the anticipated traffic conditions during the life of the pavement; o subgrade and paving material characteristics; and o climatic conditions of the region. The following were assumed pavement design parameters: o Traffic loading information was not provided. Traffic is assumed to be pneumatic tired passenger vehicles and occasional truck traffic. No tracked vehicles anticipated. n A California Bearing Ratio (CBR) value of 20 based on laboratory testing. o Pavement structure designed in general accordance with UFC 3-250-01 FA Pavement Design for Roads, Streets, Walks, and Open Storage Areas. o In addition, we should be contacted to confirm the traffic assumptions outlined above. If the actual traffic varies from the assumptions outlined above, modification of the pavement section thickness will be required. Recommended pavement sections are listed in the table below. For areas subject ,to concentrated and repetitive loading conditions, i.e. dumpster pads and ingress/egress aprons, or in areas where vehicles will turn at low speeds, we recommend using a Portland cement concrete pavement with a thickness of at least 7 inches underlain by at least 6 inches of crushed stone. For dumpster pads, the concrete pavement area should be large enough to support the container and tipping axle of the refuse truck. Responsive o Resourceful o Reliable 15 Geotechnical Engineering Report C-130 Flight Simulator Facility o Fort Bragg, North Carolina August 22, 2012 a Terracon Project No. 70125113 Recommended Pavement Sections Pavement Type I Material Rigid (4,000 psi) Crushed Aggregate Base Course (NCDOT CABC Type 1 or Type 2) Asphalt Surface Flexible Asphalt Binder (Superpave) (NCDOT I-19.0B) Crushed Aggregate Base Course (NCDOTCABC Type 1 or Type 2) lrerracon Layer Thickness (inches) 7 4 1 3 8 The placement of a partial pavement thickness for use during construction is not suggested without a detailed pavement analysis incorporating construction traffic. Recommendations for pavement construction presented depend upon compliance with recommended material specifications. To assess compliance, observation and testing should be performed under the direction of the geotechnical engineer. Asphalt concrete aggregates and base course materials should conform to the North Carolina Department of Transportation (NCDOT) "Standard Specifications for Roads and Structures." Concrete pavement should be air -entrained and have a minimum compressive strength of 4,000 psi after 28 days of laboratory curing per ASTM C-31. The performance of all pavements can be enhanced by minimizing excess moisture which can reach the subgrade soils. The following recommendations should be considered a minimum: o site grading at a minimum 2 percent grade away from the pavements; o subgrade and pavement surface with a minimum 1/4 inch per foot slope to promote proper surface drainage; and n installation of joint sealant to seal cracks immediately. Prevention of infiltration of water into the subgrade is essential for the successful performance of any pavement. Both the subgrade and the pavement surface should be sloped to promote surface drainage away from the pavement structure. Preventative maintenance should be planned and provided for through an ongoing pavement management program to enhance future pavement performance. Preventative maintenance activities are intended to slow the rate of pavement deterioration and to preserve the pavement investment. Preventative maintenance, which consists of both localized maintenance (e.g. crack Responsive o Resourceful o Reliable 16 Geotechnical Engineering Report l��rra�on C-130 Flight Simulator Facility u Fort Bragg, North Carolina August 22, 2012 n Terracon Project No. 70125113 and joint sealing and patching) and global maintenance (e.g. surface sealing), is usually the first priority when implementing a planned pavement maintenance program and provides the highest return on investment for pavements. 4.8 Underground Utilities (Corrosion Considerations) In addition to the field resistivity performed at the site by the 4-pin Wenner method, laboratory electrical resistivity was performed on portions of the bulk samples collected from borings B-1 and B-2. The laboratory test results indicate that the on -site soils in,borings B-1 and B-2 have a minimum electrical resistivity value of 33,000 and 46,000 ohm -centimeters, respectively. The bulk sample soils were also tested for pH and soluble sulfate content. The pH value for the bulk samples collected in borings B-1 and B-2 were 4.3 and 4.6, respectively. Results of soluble sulfate testing indicate negligible values (less than 100 ppm) for both bulk samples. These values should be used to determine potential corrosive characteristics of the on -site soils with respect to contact with the various underground materials that will be used for project construction. 5.0 GENERAL COMMENTS Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications. Terracon also should be retained to provide observation and testing services during grading, excavation, foundation construction and other earth -related construction phases of the project. The analysis and recommendations presented in this report are based upon the data obtained from the borings performed at the indicated locations and from other information discussed in this report. This report does not reflect variations that may occur across the site, or due to the modifying effects of weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided. The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either express or implied, are intended or made. Site Responsive o Resourceful o Reliable 17 Geotechnical Engineering Report l��rr�con C-130 Flight Simulator Facility a Fort Bragg, North Carolina August 22, 2012 a Terracon Project No. 70125113 safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing. Responsive o Resourceful o Reliable 18 N Po Arm Approximate G' "Airfield`. Site LocationWWnW.�Ater Rd t t xr y Pope Army Airfield Q { U.N by: LOCATION ONLY, AND IS NOT App.ve b/ 'TRUCTIONPURPOSES Vvp it 24 1 z�r P. p No31�Yc%%t0d Fort Bragg lrerrac®n Consulting Engines A&icnti,ts ".)m-zo flo ° RN�°B'NDM SITE VICINITY DIAGRAM EXHIBIT C-130 FLIGHT SIMULATOR FACILITY SURVEYOR STREET AND TITAN STREET FORT BRAGG, NORTH CAROLINA A— F.,uI )M-9555 819�0b-12R FA%. (B1B�B)Y9555 -I (o <\I A -A, NJ 1 3� 1 --- y �TQ'] LEGEND: -�- Approximate boring location Pmiectm.."' pmiepw. Approximate MASW array location AAN omwR Ry: 0125113 sole: Irerracon Approximate resistivity traverse Ch."d by: MJA Flle Name: N.T.S. Consulting Engincers R kicnlists location RLD 70125113BD WGRAI IS FOR GENERAL LOCATION ONLY, AND IS NOT RppmweIl by: Oale: 52e0Cweena Wa RosE RWl ,N CwoFa: INTENDED FOR CONSTRUCTION PURPOSES RLD AUGUST 2012 PN, 19191 873-2211 FM. I9181 87a ---- MASW ARRAY \111k1 YARD MECH B-4 r r 11rr m — C R'1 i T / S 1 ( B-2+ \` ---1/ /I BORING LOCATION DIAGRAM EXHIBIT C-130 FLIGHT SIMULATOR FACILITY SURVEYOR STREET AND TITAN STREET -2 FORT BRAGG, NORTH CAROLINA S-wave Velocity (ft/s) 503 5: 1000 1.50 150E inn, 21300 _-V I 20 25 30 35 t0. u so W1 65 70 75 a' 65 90 95. 100 105 110 Average shear wave velocity for upper 100 feet of strata is 1162 feet per second. I R "°I"`"° SHEAR WAVE VELOCITY PROFILE EXHIBIT D,25"' 1�erracon sUie.N.T.S. C-130 FLIGHT SIMULATOR FACILITY File Name: Consulting 6lgincerSd Slll`I1lI5lSSURVEYOR STREET AND TITAN STREET A-3 ]at 111 MDale: • AUGUST2012 .an�a,venzv Peee ,e,.�,,,ms FORT BRAGG, NORTH CAROLINA Geotechnical Engineering Report l��rr�con C-130 Flight Simulator Facility o Fort Bragg, North Carolina August 22, 2012 a Terracon Project No. 70125113 Field Exploration Description The boring locations were determined using a handheld GPS and by measuring distances from existing landmarks at the site. Ground surface elevations were surveyed and provided to us by KCI Associates of North Carolina, PA. State plane coordinates indicated on the boring locations are in NAD 83 (Georgia West State Plane Coordinates) and the datum used for the elevations indicated on the boring logs was NGVD 29. The borings were drilled with a Diedrich D-50T rotary drill rig mounted on a rubber tracked Marooka carrier. The borings were advanced by hollow auger drilling methods. Samples of the soil encountered in the machine -advanced borings were obtained using the split barrel sampling procedures. A representative bulk sample of the auger cuttings in borings B-1 and B-2 were collected for the purpose of performing modified Proctor and CBR testing. In the split -barrel sampling procedure, the number of blows required to advance a standard 2-inch O.D. split -barrel sampler the last 12 inches of the typical total 24-inch penetration by means of a 140-pound hammer with a free fall of 30 inches, is the standard penetration resistance value (SPT-N). This value is used to estimate the in -situ relative density of cohesionless soils and consistency of cohesive soils. An automatic SPT hammer was used to advance the split -barrel sampler in the borings performed on this site. A significantly greater efficiency is achieved with the automatic hammer compared to the conventional safety hammer operated with a cathead and rope. This higher efficiency has an appreciable effect on the SPT-N value. The effect of the automatic hammer's efficiency has been considered in the interpretation and analysis of the subsurface information for this report. A field log of each boring was prepared by the drill crew. These logs included visual classifications of the materials encountered during drilling as well as the driller's interpretation of the subsurface conditions between samples. Final boring logs included with this report represent the engineer's interpretation of the field logs and include modifications based on laboratory observation and tests of the samples. Laboratory Testing Descriptive classifications of the soils indicated on the boring logs are in accordance with the enclosed General Notes and the Unified Soil Classification System. Also shown are estimated Unified Soil Classification Symbols. A brief description of this classification system is attached to this report. Classification was by visual manual procedures. Selected samples were further classified using the results of Atterberg limit testing. Corrosivity testing consisting of water soluble sulfate content and pH was performed on selected samples. A selected sample of the representative pavement subgrade materials were collected for modified Proctor testing and California Bearing Ratio. Laboratory test results are attached. LOG OF BORING NO. B-1 Page 1 of 1 CLIENT NORTHING EASTING KCI Associates of North Carolina, PA 518369 ft 1993258 ft SITE Surveyor Street and Titan Street PROJECT Fort Bragg, North Carolina C-130 Flight Simulator Facility SAMPLES TESTS C7 DESCRIPTION JO °' c > e -c > u V > W W Z wF Z m o a F y m w a p ?� <O aoi m (9 Approx. Surface Elev.: 188.0 ft w o uVi D z w m a� m m U a:_ O n co0 u v a m Approx. 6" ASPHALT and CRUSHED CL 1 SS 5 5 STONE BASE 2-2-3 3 SANDY LEAN CLAY 185 Light gray, medium stiff SP 2 SS 8 8 2-4-4 POORLY GRADED SAND Tan, fine-grained, loose to medium dense 5 SP 3 SS 8 23 4-10-13 4-10-11 SP 4 SS 9 21 .' . 10 178 10 BORING TERMINATED The stratification lines represent the approximate boundary lines ' SPT performed with automatic hammer between soil and rock types: in -situ, the transition may be gradual. Advanced 3-114 inch hollow augers to 8.5 feet. WATER LEVEL OBSERVATIONS, ft Irerracon BORING STARTED 7-30-12 WL ¢ IT BORING COMPLETED 7-30-12 WL _V__ _V_ RIG Diedrich D-50 FOREMAN WTD WL DCI @ 4 feet APPROVED MJA JOB # 70125113 LOG OF BORING NO. B-2 Page 1 of 1 CLIENT NORTHING EASTING KCI Associates of North Carolina, PA 518518 ft 1993397 ft SITE Surveyor Street and Titan Street PROJECT Fort Bragg, North Carolina C-130 Flight Simulator Facility SAMPLES TESTS O DESCRIPTION O m ` > r S U m W _ Z� Z Z m$ o o- qa o rn O w a p U O WH ¢O O warn In Approx. Surface Elev.: 167.39 It o z ¢ Q. m 3 U o a cow o a 0 Approx. 5" ASPHALT and CRUSHED SM 1 SS 9 10 STONE BASE 8-5-5 FILL - SILTY SAND Tan and gray, fine-grained, loose to SM 2 SS 9 4 medium dense 3-2-2 5.5 182 5 1-2-2 SILTY SAND SM 3 SS 7 4 Tan, fine-grained, loose 2-2-2 SM 4 SS 7 4 to ...12 175.5 CLAYEY SAND Gray, fine-grained, loose SC 5 SS 4 7 3-3-4 15 172.5 15 i I , i I i i BORING TERMINATED i The stratification lines represent the approximate boundary lines ' SPT performed with automatic hammer i between soil and rock types: in -situ, the transition may be gradual. Advanced 3-114 inch hollow augers to 8.5 feet. WATER LEVEL OBSERVATIONS, It Irerracon BORING STARTED 7-30-12 ' WL Q L BORING COMPLETED 7-30-12 WL V Y RIG Diedrich D-50 FOREMAN WTD WL s I DCI @ 7.5 feet APPROVED MJA JOB # 70125113 LOG OF BORING NO. B-3 Page 1 of 1 CLIENT NORTHING EASTING KCI Associates of North Carolina, PA 518567 ft 1993333 ft SITE Surveyor Street and Titan Street PROJECT Fort Bragg, North Carolina C-130 Flight Simulator Facility SAMPLES TESTS DESCRIPTION J m > m� 2 ° U U a s = 2 m W r z F> r a�i o W o o ° Approx. Surface Elev.: 188.48 ft o nz W to mm �U 0 6 _ °~om ' 1.1 Approx. 13" ASPHALT and CRUSHED 187.5 STONE BASE SC 1 SS 9 35 16-15-20 13-12-12 5-3-6 2.5 FILL -CLAYEY SAND 186 q Brown, fine-grained, dense 184 5 SM 2 SS 9 24 FILL - SILTY SAND CH 3 SS 11 9 s.s an, fine-grained, medium dense 183 5 SM 4 SS 9 18 10-13-5 FAT CLAY Light gray, stiff 3-4-5 SM 5 SS 9 9 3-1-2 8.5 SILTYan, fineSAND-grained, medium dense to loose 180 T SC 6 SS 7 3 0 SC 7 SS 9 3 1-1-2 CLAYEY SAND 11.5 Tan, fine-grained, very loose 177 SP 8 SS 8 9 3-5-4 POORLY GRADED SAND Tan, light orange, fine- to medium -grained, 7-9-10 SP 9 SS 8 19 loose to medium dense SP 10 SS 7 17 15 4-6-11 74-4 SP 11 SS 10 18 7-6-7 SP 12 SS 10 13 1s lsss 1-1-1 SILTY SAND SM 13 SS 6 2 Gray to tan, very loose to medium dense 20 4-10-10 SM 14 SS 10 20 25 27 161.5 POORLY GRADED SAND Tan, fine- to medium -grained, dense SP 15 SS 10 j 30 10-13-17 30 158.5 30 BORING TERMINATED The stratification lines represent the approximate boundary lines ' SPT performed with automatic hammer between soil and rock types: in -situ, the transition may be gradual. Advanced 3-1/4 inch hollow augers to 28.5 feet. WATER LEVEL OBSERVATIONS, ft Irerracon BORING STARTED 7-30-12 WL V 185 WS N. BORING COMPLETED 7-30-12 WL T -L RIG Diedrich D-50 FOREMAN WTD WL I DCI @ 16 feet APPROVED MJA JOB # 70125113 LOG OF BORING NO. B-4 Page 1 of 1 CLIENT NORTHING EASTING KCI Associates of North Carolina, PA 518503 ft 1993275 ft SITE Surveyor Street and Titan Street PROJECT Fort Bragg, North Carolina C-130 Flight Simulator Facility SAMPLES TESTS (7 DESCRIPTION p 2 F rr 5 a > CO) U t > V) K W of W > — Z V! Z W W ~ Z c wt , m— 3 o d F N m W O 3 W H ¢p o n p o c m Approx. Surface Elev.: 188.89 ft o z w W G_� m m U �6 o a i'o = D U W a W Approx. 10" ASPHALT and CRUSHED SM 1 SS 4 10 STONE BASE 10-6-4 3 FILL - SILTY SAND 186 Dark brown, fine-grained, medium dense 11-10-7 SM 2 SS 9 17 SILTY SAND 5 Tan to light orange, fine- to SM 3 SS 9 19 medium -grained, loose to medium dense 10-9-10 3-3-4 SM 4 SS 12 7 10 6-7-8 SM 5 SS 9 15 t5 10-13-10 SM 6 1 SS 11 1 23 20 22 167 CLAYEY SAND Tan, fine-grained, loose 4 SC 7 SS 11 6 5-1-5 25 27 162 POORLY GRADED SAND Tan, fine- to medium -grained, medium SP 8 SS 11 23 dense 5-11-14 30 5s 30 i i BORING TERMINATED i i i S i i The stratification lines represent the approximate boundary lines ' SPT performed with automatic hammer between soil and rock types: in -situ, the transition may be gradual. Advanced 3-1/4 inch hollow augers to 28.5 feet. WATER LEVEL OBSERVATIONS, ft Irerracon BORING STARTED 7-31-12 WL 23.5 WS 1-Y BORING 7 -31-12 WL Y V RIG Diedrich D-50EDFOREMAN WTD WL I DCI @ 14 feet APPROVED MJA JOB # 70125113 3 LOG OF BORING NO. B-5 Page 1 of 1 CLIENT NORTHING EASTING KCI Associates of North Carolina, PA 518601 It 1993268 It SITE Surveyor Street and Titan Street PROJECT Fort Bragg, North Carolina C-130 Flight Simulator Facility SAMPLES TESTS V, DESCRIPTION J 2 > a > �, 0 2 Y K w z ~ c yr t 3 a F N m w 0 ?� ww 7 am m w W D o. w o.o. � < 0 X c o a Approx. Surface Elev.: 188.23 ft o n z it X W m 3 0 o a o u W FILL - SILTY FINE SAND Gray, medium dense 3-4-5 SM 1 SS 8 9 3 185 7-3-4Light FAT CLAY gray, medium stiff CH 2 SS 6 7 5.5 182.5 5 SILTY SAND SM 3 SS 10 12 Gray, fine-grained, medium dense 4-6-6 8 180 1-1-2 CLAYEY SAND SC 4 SS 12 3 Gray, fine-grained, very loose 10 2 176 POORLY GRADED SAND Tan, fine-grained, medium dense SM 5 SS 10 18 6-8-10 15 17 171 FAT CLAY Gray, medium stiff Q CH 6 SS 6 5 2-1-4 20 22 166 ' POORLY GRADED SAND Tan, fine- to medium -grained, medium SP 7 SS 6 17 dense 10-9-8 25 4-4-12 SP 8 SS 10 16 30 Ise 30 BORING TERMINATED The stratification lines represent the approximate boundary lines ' SPT performed with automatic hammer between soil and rock types: in -situ, the transition may be gradual. Advanced 3-1/4 inch hollow augers to 28.5 feet. WATER LEVEL OBSERVATIONS, ft Irerracon BORING STARTED 7-31-12 WL Q 18.5 WS -V BORING COMPLETED 7-31-12 WL 1 RIG Diedrich D-50 FOREMAN WTD WL DCI @ 17 feet APPROVED MJA I JOB # 70125113 LOG OF BORING NO. B-6 Page 1 of 1 CLIENT NORTHING EASTING KCI Associates of North Carolina, PA 518576 ft 1993223 ft SITE Surveyor Street and Titan Street PROJECT Fort Bragg, North Carolina C-130 Flight Simulator Facility SAMPLES TESTS DESCRIPTION O m > e a > y 12 C o > in 12.5 m N W m p rr1 , 3 =Wzwt- w�oZ w a w a w ¢ Zp c oApprox. Surface Elev.: 187.80 ft o z mm 3 U OFILL - CLAYEYSAND SC 1 SS 6 8 6-4-4Gray, fine-grained, loose lass 1-2-3 1-1-6 CL 2 SS 8 5 LEAN CLAY CL 3 SS 11 7 4.5 Light gray, medium stiff 183.5 5 4-3-6 SILTY SAND SM 4 SS 11 9 6 Gray, fine-grained, loose 182 3-34 CH 5 SS 6 7 7.5 FAT CLAY 180.5 Light gray, medium stiff 5-6-14 SM 6 SS 10 20 . SILTY SAND 10.5 Light gray, medium dense 177.5 10 SM 7 SS 10 28 8-14-14 7-6-8 POORLY GRADED SAND SP 8 SS 10 14 Tan, fine-grained, medium dense 44-7 SP 9 SS 10 11 10-10-14 SP 10 SS 10 24 15 SP 11 SS 10 25 10-11-14 6.5 171.s 3-2-3 SILTY SAND SM 12 SS 10 5 Gray and tan, loose 3-3-6 SM 13 SS 10 9 20 1-3-4 SM 14 SS 10 7 22 166 POORLY GRADED SAND Tan, fine- to medium -grained, medium 9__ SP 15 SS 14 18 dense 5-8-10 zs 7-8-12 SP 16 SS 10 20 30 158 30 i i i BORING TERMINATED I i I i I The stratification lines represent the approximate boundary lines ' SPT performed with automatic hammer between soil and rock types: in -situ, the transition may be gradual. Advanced 3-1/4 inch hollow augers to 28.5 feet. j WATER LEVEL OBSERVATIONS, ft Irerracon BORING STARTED 7-31-12 WL � 23.5 WD � BORING COMPLETED 7-31-12 WL Y Y RIG Diedrich D-50 FOREMAN WTD t WL s DCI @ 16 feet APPROVED MJA JOB # 70125113 60 CL CH 50 P L S 40 T I C T 30 Y N 20 D E X — 10 CL-ML ML MH 0 0 20 40 60 80 100 LIQUID LIMIT Specimen Identification LL PL PI %Fines Classification • _B-1 1.0ft 40 17 23 53 SANDY LEAN CLAY(CL) B-5 3.5ft 63 27 36 90 FAT CLAY(CH) Irerracon ATTERBERG LIMITS RESULTS Project: Flight Simulator Facility Site: Surveyor Street and Titan Street Fort Bragg, North Carolina Job #: 70125113 U.S. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS 1 HYDROMETER I "11■1■Illm■®IIII11�i .;11 ,11■■IIIIIII■■Illlln■!�►�II111■■IIIIIII■■Illlln■ :11■■IIIIIII■■IIIIIII■■11►1111■■IIIIIII■■IIIIIII■ �' iii■iiinii■®IIIIIII■■iri �i■■°IIIII■■IIIIIII■ 11■■IIIIIII■■IIIIIII■■IIIII►\■■IIIIIII■■IIIIIII■ �Ism1■■IIII ■■III!!I��'i■IIIIIII■■IIIIIII■ 1111 NNE III ■■IIIII111111■IIIIIII■■IIIIIII■ Ism 111111■■IIII1■■IIIIIIII■■IIIII■IIIIIII■■IIIIIII■ �I■■u1111■■IIII 11■■ulll 1 '■IIIIIII■■IIIIIII■ 11■■IIIIiII■■IIII 11■ IIII11■■IIIIIII■ IIII`i111111■■IIIIlismillillismillillinEll I■■IIIIIII■■IIIIIII■■III 11 �.���,�I IIIII■■IIIIIII. ,11■■IIIIIII■■IIIIIII■■III�11�■.11�1111■■IIIIIII. 11■■IIIIIII■■IIIIII■■II1IIIH■IIIIII■■IIIIIII■ ►■■IIIIIII■■IIIIII ■■II IIII■IIIIIII■■IIII�1�■ ' 1■■IIIIIII■■IIIIIII■■IIIIIII I■IIIII�1■■IIII 1 1■■Illlln■■IIIIIII■■IIIIIII '■IIIII I■■IIIIIII ' 1■■Illlln■■IIII�1■■IIIIIII■■IIIIIII■■IIIIIII■ Iln■■u11 1■■Iu1111■�M11■■IIIIIII■ GRAIN SIZE IN MILLIMETERS COBBLES GRAVEL SAND SILT OR CLAY I coarse fine coarse medium fine Specimen Identification Classification LL PL I PI I Cc Cu • B-3 17.5ft POORLY GRADED SAND(SP) 0.99 2.99 z B-3 19.Oft SILTY SAND(SM) NP NP NP • B-4 10.Oft SILTY SAND(SM) NP NP NP o * B-6 17.5ft SILTY SAND(SM) NP NP NP 0 p Specimen Identification D100 D60 D30 D10 %Gravel %Sand %Silt %Clay w • B 3 17.5ft 9.5 0.533 0.307 0.178 2 w a z u B-3 19.0ft 4.75 0.307 0.084 28 a • B-4 10.0ft 9.5 0.24 0.082 28 u * B-6 17.5ft 9.5 0.314 0.083 29 0 GRAIN SIZE DISTRIBUTION N Project: C-130 Flight Simulator Facility Irerracon Site: Surveyor Street and Titan Street Fort Bragg, North Carolina Job #: 70125113 Date: 8-16-12 135 130 125 120 115 110 a x 3 105 100 95 90 Source of Material B-1 1-5' Description of Material Cla eey Sand (SC) Test Method ASTM D1557 Method A TEST RESULTS Maximum (optimum) Dry Unit Weight 128.5 PCF Optimum Water Content 9.4 % � � _ ATTERBERG LIMITS LL PL PI 31 14 17 Curves of 100% Saturation for Specific Gravity Equal to: 2.80 2.60 85 80 ` TJ 75 0 5 10 15 20 25 30 35 40 45 WATER CONTENT, % Irerracon MOISTURE -DENSITY RELATIONSHIP Project: C-130 Flight Simulator Facility Site: Surveyor Street and Titan Street Fort Bragg, North Carolina Job #: 70125113 Date: 8-21-12 REPORT FOR CALIFORNIA BEARING RATIO 1 ��rracon Report Number: 70125113.0001 Service Date: 08/17/12 5240 Green's Dairy Road Report Date: 08/22/12 Raleigh, NC 27616 919-873-2211 Client Project KCI Associates of NC PA Inc. Pope Air Field - C-130 Flight Simulator Building 4601 Six Forks Road, Suite 220 NWC of Surveyor Street and Titan Street Landmark Center II Fort Bragg, North Carolina Raleigh, North Carolina 27609-5210 Project No. 70125113 SAMPLE INFORMATION Sample Number: Bulk Sample Proctor Method: ASTM D1557 - Method A Boring Number: B-1 Maximum Dry Density (pcf): 128.5 Sample Location: N/A Optimum Moisture: 9.4 Depth: 1-5' Liquid Limit: 31 Material Description: Light Gray Clayey Sand Plasticity Index: 17 CBR TEST DATA CBR Value at 0.100 inch 19.7 CBR Value at 0.200 inch 27.5 Surcharge Weight (lbs) 10 Soaking Condition Soaked Length of Soaking (hours) 96 Swell (%) 0.3 DENSITY DATA Dry Density Before Soaking (pcf) 126.4 Compaction of Proctor (%) 98.4 MOISTURE DATA Before Compaction (%) 9.9 After Compaction (%) 10.1 Top V After Soaking (%) 10.8 Average After Soaking (%) 10.9 Comments: • r r • C e =_ eee poll, Gee C=— _gees=ee __ —== e-_ _= C ,• r eeeoMm�LMoe o0 -- -- -�e e6S5ee eB MMM �—_=�E � rrr E. _15 — 101101 rrr -_----- -- ---_ _--_-- HE rr r to r rr r rr r rr rrr r rr Services: Obtain soil sample and test for California Bearing Ratio Terracon Rep: Stephanie Hardison Reported To: Matthew Alexander Contractor: Report Distribution Reviewed by: Matthew Alexander Geotechnical Staff Professional Test Methods:. ASTM D 1883 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page t of t 135 130 125 120 115 110 U d _ w 3 105 o 100 95 Source of Material B-2 1-5' Description of Material Silty Sand ISM) Test Method ASTM D1557 Method A TEST RESULTS Maximum (optimum) Dry Unit Weight 121.5 PCF Optimum Water Content 8.9 % \ ATTERBERG LIMITS LL PL PI NP NP NP Curves of 100% Saturation for Specific Gravity Equal to: 2.80 ----- 2.70 2.60 � 85 80 75 0 5 10 15 20 25 30 35 40 45 WATER CONTENT, % 1rerracon ISTURE-DENSITY RELATIONSHIP FlightSimulatorFacility Street and Titan Street Fort Bragg, North Carolina 13 ffe2 REPORT FOR CALIFORNIA BEARING RATIO l��rr�con Report Number: 70125113.0002 Service Date: 08/17/12 5240 Green's Dairy Road Report Date: 08/22/12 Raleigh, NC 27616 919-873-2211 Client Project KCI Associates of NC PA Inc. Pope Air Field - C-130 Flight Simulator Building 4601 Six Forks Road, Suite 220 N WC of Surveyor Street and Titan Street Landmark Center I I Fort Bragg, North Carolina Raleigh, North Carolina 27609-5210 Sample Number: Boring Number: Sample Location: Depth: Material Description: Bulk Sample B-2 N/A 1-5' Dark Gray Silty Sand CBR TEST DATA CBR Value at 0.100 inch 52.5 CBR Value at 0.200 inch 67.0 Surcharge Weight(lbs) 10 Soaking Condition Soaked Length of Soaking (hours) 96 Swell (%) 0.0 DENSITY DATA Dry Density Before Soaking (pcf) 118.2 Compaction of Proctor (%) 97.3 MOISTURE DATA Before Compaction (%) 8.7 After Compaction (%) 9.0 Top I" After Soaking (%) 9.3 Average After Soaking (%) 10.5 _ Comments: Project No. 70125113 SAMPLE INFORMATION Proctor Method: ASTM Di 557 - Method A Maximum Dry Density (pcf): 121.5 Optimum Moisture: - 8.9 Liquid Limit: NP Plasticity Index: NP r r r mmmmmm �IIIIIIIl111111�C== �mm CC HMOmm MM •rr MMM r Cis C pp CC��CCC�� imm 100 mmC� r r rrr r rr r rr r rr r rr r rr Services: Obtain soil sample and test for California Bearing Ratio Terracon Rep: Stephanie Hardison Reported To: Matthew Alexander Contractor: Report Distribution Reviewed by: Matthew Alexander Geotechnical Staff Professional Test Methods: ASTM D1883 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Tenacon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 GENERAL NOTES DRILLING & SAMPLING SYMBOLS: SS: Split Spoon — 1-3/8" I.D., 2" O.D., unless otherwise noted HS: Hollow Stem Auger ST: Thin -Walled Tube - 2" O.D., unless otherwise noted PA: Power Auger RS: Ring Sampler- 2.42" I.D., 3" O.D., unless otherwise noted HA: Hand Auger DB: Diamond Bit Coring -4", N, B RB: Rock Bit BS: Bulk Sample or Auger Sample WB: Wash Boring or Mud Rotary The number of blows required to advance a standard 2-inch O.D. split -spoon sampler (SS) the last 12 inches of the total 18-inch penetration with a 140-pound hammer falling 30 inches is considered the "Standard Penetration' or "N-value". WATER LEVEL MEASUREMENT SYMBOLS WL: Water Level WS: While Sampling N/E: Not Encountered WCI: Wet Cave in WD: While Drilling DCI: Dry Cave in BCR: Before Casing Removal AB: After Boring ACR: After Casing Removal Water levels indicated on the boring logs are the levels measured in the borings at the times indicated. Groundwater levels at other times and other locations across the site could vary. In pervious soils, the indicated levels may reflect the location of groundwater. In low permeability soils, the accurate determination of groundwater levels may not be possible with only short-term observations. DESCRIPTIVE SOIL CLASSIFICATION: Soil classification is based on the Unified Classification System, Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non -plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse -grained soils are defined on the basis of their in -place relative density and fine-grained soils on the basis of their consistency. CONSISTENCY OF FINE-GRAINED SOILS RELATIVE DENSITY OF COARSE -GRAINED SOILS Unconfined Standard Penetration Standard Penetration Ring Sampler IRS) Compressive or N-value (SS) Consistency or N-value (SS) Blows/FL Relative Density Strength, Ou, Ps f Blows/Ft. Blows/Ft. < 500 <2 Very Soft 0-3 0-6 Very Loose 500 — 1,000 2-3 Soft 4-9 7-18 Loose 1,001 —2,000 4-6 Medium Stiff 10-29 19-58 Medium Dense 2,001 —4,000 7-12 Stiff 30-49 59-98 Dense 4,001 — 8,000 13-26 Very Stiff 50+ 99+ Very Dense 8,000+ 26+ Hard RELATIVE PROPORTIONS OF SAND AND GRAVEL GRAIN SIZE TERMINOLOGY Descriptive Term(s) of other Percent of Maior Component Particle Size Constituents Dry Weight of Sample Trace < 15 Boulders Over 12 in. (300mm) With 15 — 29 Cobbles 12 in. to 3 in. (300mm to 75 mm) Modifier > 30 Gravel 3 in. to #4 sieve (75mm to 4.75 mm) Sand #4 to #200 sieve (4.75mm to 0.075mm) Silt or Clay Passing #200 Sieve (0.075mm) RELATIVE PROPORTIONS OF FINES PLASTICITY DESCRIPTION Descriptive Terms) of other Percent of Term Plasticity Constituents Dry Weight Index Trace < 5 Non -plastic 0 With 5-12 Low 1-10 Modifiers > 12 Medium 11-30 High 30+ UNIFIED SOIL CLASSIFICATION SYSTEM Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests" Soil Classification Group Symbol croup Names Coarse Grained Soils: More than 50% retained Gravels: More than 50% of Coarse fraction retained on No 4 sieve Clean Gravels: Less than 5% fines Cu 2 4 and 1 s Cc s 3 GW Well -graded gravel' Cu < 4 and/or 1 > Cc> 3 E GP Poorly graded gravel Gravels with Fines: More than 12% fines` Fines classify as ML or MH GM Silty gravel '`'" Fines classify as CL or CH fY GC Clayey ravel �" Y Y 9 on No. 200 sieve Sands: 50% or more of coarse fraction passes No.4 sieve Clean Sands: Less than 5 % fines Cu 2 6 and 1 < Cc s 3 s SW Well -graded sand Cu < 6 and/or 1 > Cc> 3 E SP Poorly graded sand' Sands with Fines: More than 12%fines ° Fines classify as ML or MH SM Silty santl c"' Fines Classify as CL or CH SC Clayey sand Fine -Grained Soils: 50% or more the Silts and Clays: Liquid limit less than 50 Inorganic: PI > 7 and plots on or above "A" line' CL Lean clay K.LM PI <4 or plots below "A" line ML Siltl.L.M Organic: Liquid limit - oven dried <0.75 OL Organic clay KLKN Liquid limit - not dried Organic silt L,Mo passes No. 200 sieve Silts and Clays: Liquid limit 50 or more Inorganic: PI plots on or above "A" line CH Fat day KL.M PI plots below "A" line MH Elastic Silt KLA Organic: Liquid limit -oven dried <0.75 OH Organic clay KL M ° Liquid limit -not dried Organic silt LM° Highly organic soils: Primarily organic matter, dark in Color, and omanic odor PT Peal A Based on the material passing the 3-in. (75-mm) sieve s If field sample Contained cobbles or boulders, or both, add "with Cobbles or boulders, or both" to group name. ` Gravels with 5 to 12% fines require dual symbols: GW-GM well -graded gravel with silt, GW-GC well -graded gravel with clay, GP -GM poorly graded gravel with silt, GP -GC poorly graded gravel with clay. ° Sands with 5 to 12% fines require dual symbols: SW-SM well -graded sand with silt, SW -SC well -graded sand with day, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay s Cu=Dea/Dio Cc= Duo x Den F If soil Contains 2 15% sand, add "with sand" to group name. ° If fines classifv as CL-ML, use dual svmbol GC -GM. or SC-SM. afl 50 d W 40 O Z > 30 H U 5 20 a 10 7 4 0 0 " If fines are organic, add With organic fines" to group name. ' If soil Contains 2 15% gravel, add with gravel" to group name. ' If Atterberg limits plot in shaded area, soil is a CL-ML, silty day. " If soil contains 15 to 29% plus No. 200, add Wth sand" or "with gravel," whichever is predominant. L If soil contains 2 30% plus No. 200 predominantly sand, add "sandy" to group name. M If soil contains 2 30% plus No. 200, predominantly gravel, add "gravelly" to group name. " PI 2 4 and plots on or above "A" line. ° PI < 4 or plots below "A" line. ° PI plots on or above "A" line. ° PI plots below "A" line. For classification of fine-grained soils and fine-grained fraction of coarse -grained soils Equation of - line \ce +Vice Horizontal att PIto LL=25.5. then PI=0.73 (LL-20) (L — Equation of "Ll" - line ,' Vertical at LL=16 to PI=7, ' G`Z`o� then PI=0.9 IvO� MH or OH ML or OL 10 16 20 30 40 50 60 70 60 90 100 110 LIQUID LIMIT (LL) Exhibit B-2