Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6101203_HISTORICAL FILE_20110228
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW W�/� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE() a�( YYYYMMDD i ®-EG ELOPMEN II ENGNE F' r o f e s s i o n a/ E n g i n e e r i n g _Z G, AC. . o n s u/ t o n t s OPERATIONS & MAINTENANCE MANUAL for Bioretention Pond and Associated Structures Bojangles Restaurant Holt Oil Convenience Store r' ca--FPO & FEB 2 8 2011 Going Postal Store DVQ Dated: 01-12-11 ` tzsso��' i Prepared by: David H. Blevins, P.E. Development Engineering, Inc. 244 W. Millbrook Road Raleigh, NC 27609 (919) 847-8300 david@d-e-inc.com Permit Number: (to be provided by DWQ) Drainage Area Number: Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). — Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. — Heavy equipment will NEVER be driven over the bioretention cell. — Special care will be taken to prevent sediment from entering the bioretention cell. — Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblems: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. , The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW401-Bioretention O&M-Rev.3 Page 1 of 4 BMP element: Potentialproblems: How I will remediate theproblem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which six months after planting. can kill the tree if not removed). The bioretention cell: soils and mulch Mulch is breaking down or has Floated away. Spot mulch if there are only random void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as PH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of property and replaced with new planting media. Form SW401-Bioretention O&M-Rev.3 Page 2 of 4 BMP element: Potentialproblems: How i will remediate theproblem: The underdrain system Clogging has occurred. Wash out the underdrain system. if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Bioretention O&M-Rev.3 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Boianales and Holt Oil C-Store BMP drainage area number: Print name: Tri-Arc Food Systems Inc. - Tommy L. Haddock Title: President Address: 901 Jones Franklin Road Suite 100 Raleigh NC 27606 Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. I, 1Ql )AQf 1V . K Clef Y.— , a Notary Public for the State of 'kA0,0k1 aroltylo. , County of wakes do hereby certify that —&Y\r n4% )3A A A oc—k personally appeared before me this I3yM day of and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, I%; COU1`�`,,�� SEAL My commission expires 1\ 1 O tO I %Q 1 Z Form SW40 I -Bioretention IRM-Rev. 2 Page 4 of 4 ®EMELOPMI _:NT-ENGN-EJER�NGD 0NC. Pro f e s s i o n o/ En gin coring C o n s u/ t a n i s Stormwater Report for C-STORE & RESTAURANT NC Hwy 24-87 Cameron, NC (Harnett County) Date: 09-22-10 Revised: 11-19-10 Revised: 01-19-11 Prepared By: Development Engineering, Inc. 244 W. Millbrook Rd. Raleigh, NC 27609 (919)847-8300 www.d-e-inc.com 1 244 W Millbrook Road, Raleigh, NC 27609 Phone: 919-847-8300 P. O. Box 17705, Raleigh, NC 27619 FAX 919-847-2130 Abstract: The site is located on the south side of NC Hwy 24-87 approximately 1 mile south of the intersection of NC Hwy 24 and NC Hwy 87. The site is vacant. The development will consist of 3 separate lots with a total area of 6.48 acres. Lots 2 and 3 will be developed with this submittal. The entire area of lot 2 will be calculated at 80% impervious to allow for future expansion. One half (1.09 ac) of lot 1 will be captured in the BMP. We are using 80% maximum impervious for the portion of lot 1 that will drain to the BMP. The post development for lots 1 (portion), 2 and 3 combined is 67.1 % impervious. The site slopes from north to south. The existing property drains to two different areas. These areas are indicated as drainage area 1 and drainage area 2. Stormwater Management will be required for water quantity and water quality. Stormwater detention will be required to restrict the post - development stormwater discharge to the pre -development rate for the 1-year storm. The detention will be provided within the bioretention pond facility with a restrictor opening in the outlet structure. Note that a separate stormwater BMP will have to be provided for the future use of the post -development 2 area property. The stormwater discharge from the imperious surfaces are being captured and routed through the bioretention pond. There is a small portion of the landscaped area that will bypass the BMP. The bioretention pond will provide for the 85% TSS removal requirement. Findings Pre Development 1-Year Storm Runoff - Area 1 - 4.70 Acres Q, = CIA C = composite C 0.22 (4.61) 4.70 C = 0.22 (Grass) = 4.70 ac C = 0.95 (Impervious) = 0.0 ac Q, = 4.77 cfs Camp = 0.22 I, = 4.61 in/hr A = 4.70 ac Post Development 1-Year Storm Runoff - Area 1 - 5.39 Acres Q, = CIA C = composite C 0.71 (4.61) 5.39 C = 0.22 (Grass) = 1.77 ac C = 0.95 (Impervious) = 3.62 ac Q, = 17.64 cfs CwmP = 0.71 I, = 4.61 in/hr A = 5.39 ac Stormwater Detention is required to reduce the peak stormwater discharge to the Pre Development for the 1-vear storm for drainage area 1. Post Development 1-Year Runoff - Area 1 Detained - 4.81 Acres Q, = CIA C = composite C 0.77 (4.61) 4.81 C = 0.22 (Grass) = 1.19 ac C = 0.95 (Impervious) = 3.62 ac Q, = 17.08 cfs CWmP = 0.77 I, = 4.61 in/hr A = 4.81 ac a Outlet Structure The proposed storm structure will have three 19" wide x 2.76" height opening at elevation 363.25 post development to restrict the discharge of the 1-year storm. Q, = CdA 2gh 0.6 (0.36) 64.4(0.5) Q, = 1.23 cfs Post Development 1-Year Runoff - Detained = 1.23 cfs X 3 openings = 3.69 cfs Post Development 1-Year Runoff - Area 1 Un-Detained - 0.58 Acres Q, = CIA C = composite C = 0.22 (4.62) 0.58 C = 0.22 (Grass) = 0.58 ac C = 0.95 (Impervious) = 0.0 ac Q, = 0.59 cfs CwMp = 0.22 I, = 4.61 in/hr A = 0.58 ac Total Post Development 1-Year Runoff = 3.69 cfs + 0.59 cfs = 4.28 cfs The Post Development 1-Year Peak Discharge Runoff (4.28 cfs) is less than the Pre Development 1-Year Peak Discharge (4.77 cfs). Required Storage to Reduce Runoff to 4.77 cfs S = (Qpost - Qpre) x 5 min x 60 sec/min _ (17.64 - 4.77) x 5 x 60 S = 3,861 cf Required Storage Provided Pond Storage 1451 x 117'W x 0.23' D Pond S = 3,902 cf Pre Development 1-Year Storm Runoff - Area 2 -1.78 Acres Q, = CIA C = composite C 0.22 (4.61) 1.78 C = 0.22 (Grass) = 1.78 ac C = 0.95 (Impervious) = 0.0 ac Q, = 1.81 cfs Ccomp - 0.22 I, = 4.61 in/hr A = 1.78 ac Post Development 1-Year Storm Runoff — Area 2 —1.09 Acres Q, = CIA C = composite C 0.22 (4.61) 1.09 C = 0.22 (Grass) = 1.09 ac C = 0.95 (Impervious) = 0.00 ac Q, = 1.11 cfs CWMP = 0.22 11 = 4.61 in/hr A = 1.09 ac The Bio-Retention Pond is sized for the following volumes of stormwater runoff. Runoff volume from the first inch of rain for entire drainage area: 4.81 ac = 12,746 cf 1 Year Storm for the entire drainage area being captured 4.81 ac = 3,902 cf Bio-Retention Sizing "Simple Method" per NCDWQ 2007 BMP Manual Rv=0.05+0.9xIA Rv = 0.05 + (0.9 x 0.75) = 0.73 V = 3,630 x RD x Rv x A V = 3,630 x 1 " x 0. 73 x 4.81 ac=12,746CF 12,746 CF x 9" Depth = 16,995 SF Bio-Retention Pond Provided = 147' L x +/-115' W = 17,000 SF Bio-Retention Pond Storage = 17,000 SF x 9" Depth = 12,750 CF Bio-Retention Underdrain Calculations The underdrain system for the pond will consist of 10 sections of 4" Schedule 40 PVC pipe with the required perforations per the BMP manual. There will be a total of 17 cleanouts for the 4" PVC underdrains. The 4" PVC underdrains will be connected to a 6" solid PVC trunk line that will be connected to the riser structure. The following calculation is per section 5.7 of the BMP manual. The follow rate through the soil media is 2" per hour and the safety factor is 10. Q=2"X10=20 D=16(Qxn S 0.5 D=16(20x0.011)=7.04 0.5 Per Table 5-1 of the BMP Manual a minimum of 5 — 4" pipes are required for the bioretention underdrain system. Bio-Retention Draw Down Time Calculations The depth of the water being treated in the bioretention pond is 9". The drainage rate for the soil media is 2" per hour. 9" / 2" = 4.5 hours Bio-Retention Pretreatment This bioretention pond will have 5 different points where the stormwater enters the pond. The stormwater enters the pond via storm pipes with flared end sections. The end of each flared end section will rip rapped with a calculated amount of stone based on the volume and velocity of the stormwater. Once the storm water velocity is dissipated on the rip rap it run onto the grassed portion of bioretention pond. Conclusions The site meets NC DENR Division of Water Quality requirements for peak discharge and 85% TSS reduction. Pro f e s s i o n o/ Engineering C o n s u/ t o o t s January 20, 2011 Brian Lowther NCDENR — DWQ Stormwater Permitting Unit 512 N. Salisbury St. Raleigh, NC 27604 RE: Response to Stormwater 1st review comments Bojangles / Convenience Store — INC 24.87 Barbeque/Anderson Creek, INC - Harnett County Brian, The plans have been revised to address the 1st review comments dated 1-13-11. 1. See attached completed BMP checklist for the bioretention pond on this site. 2. See enclosed revised Stormwater Report for the bioretention pond underdrain calculations. 3. See enclosed revised Stormwater Report for the bioretention pond drawdown time calculations. 4. See enclosed revised Stormwater Report for information concerning the provided pretreatment. Also see sheet 4 of the plans for the pretreatment provided for the stormwater entering the bioretention pond. 5. See the landscape plan, sheet 5 for the area of the centipede sod in the bioretention pond. 6. See the erosion control plan, sheet 7 for the construction sequence indicating when the bioretention pond is to be installed. Please let us know if you have any questions. Sincerely, T�� Tom Harrell Development Engineering, Inc. 244 W. Millbrook Road, Raleigh, NC 27609 Phone: 919-847-8300 P. 0. Box 17705, Raleigh, NC 27619 FAX 919-847-2130 DEVELOPMENT �NGINERNGo INCe P. O. Box 17705 Raleigh, NC 27619-7705 244 W. Millbrook Rd. Raleigh, NC 27609 Phone: 919-847-8300 Fax: 919-847-2130 TO: NC DENR / DWQ Attn: Brian C. Lowther, Stormwater Permitting 512 N. Salisbury Street, 91h floor Raleigh, NC 27699 LETTER OF TRANSMITTAL DATE: 01-21-11 JOB NO.: 10-127 1 ATTENTION: Brian C. Lowther RE: Bojangles & Holt Oil C-Store Site Plan Stormwater Management Permit Applicaiton Response to review comments WE ARE SENDING YOU ® Attached ❑ Under separate cover via delivery the following items: ❑ Shop Drawings ❑ Prints ® Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Change Order ® listed below COPIES DATE NO. DESCRIPTION 1 01/20/2011 Reponse to Stormwater 1st Review Comments 1 BMP checklist for bioretention pond (Deed Restrictions & Soils Report included) 1 01/20/11 Bioretention Cell Supplement 1 01/12/11 Operations & Maintenance Manual 1 01/19/11 Revised - Stormwater Report 2 01/21 /11 Sets of full size plans - Sheets 1 through 16 THESE ARE TRANSMITTED as checked below: ® For approval ❑ For your use ® As requested ❑ For review and comment ❑ FORBIDS DUE_ REMARKS COPY TO: RECEIVED BY: ❑ Approved as submitted ❑ Resubmit copies for approval ❑ Approved as noted ❑ Submit _ copies for distribution ❑ Returned for corrections ❑ Return_ corrected prints ❑ — ❑ PRINTS RETURNED AFTER LOAN TO US FROM: Kim Ardizzone (kim@d-e-inc.com) If enclosures are nor as noted, kindly notify us at once. Prepared I Dunn, NC EXCISE TAX: Parcel 11) No. jq1111111111 23951 FOR RE :WTI YIT R0C OF OEEDb 2W DEC 281t'58:07 AM VIM PG:02-1t6 FEE0,00 N543,00 IM 1 200ON GENERAL. WARRANTY DEED H. Jones, JONES AND JONES, P.L.L.C. PO Box 397, THIS DEED, made t a f CAGLE and wife, LIIdDA iL GMGLE., HAYES; CATHY C. CALL CAGLE and wife, PATSY MARKS; AND JOHN TIMOTHY 28326, hereinafter called GRANTORS, and Cameron, NC 28326, hereinafter called GIB. The designation Grantor and Gran successors, and assigns, and shall include context. by and between, MICHAEL � C. �HAJVFS and husband, WILLIAM E. JOSEPH J. CALLAHAN, III; JEFFREY k C S and husband SANDY M. miied, 30 5 NC Hwy 87 South, Cameron, NC S KM$, INC., 3035 NC Hwy 87 South, That the Grantor, for a valuable consideration paid is hereby acknowledged, has and by these presents does gt Grantees in fee simple, all that certain lot or parcel of land Harnett County, North Carolina and more particularly des include said parties, their heirs, ine or femnune as required by BEING all of Lot Nos. 116, 117, 118, 119, 120 and 121 Qf t Subdivision as per plat recorded in Map Book 8, Page 17 t Register of Deeds of Harnett County to which plat reference greater certainty of description. See deeds recorded in Deed and Deed Book 493, Page 402, Harnett County Registry. the receipt of which and convey unto the due Township, The property herein above described was acquired by Grantor by instrument recorded in 213, Page 406, Harnett County Registry. HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and ws thereto belonging to the Grantees in fee simple. Grantor covenants with the Grantees, that Grantor is seized of the premises in fee to onvey the same in fee simple, that title is marketable and free and clear nces.ApMat Grantor will warrant and defend the title against the lawful claims Iko wergxcept for the exceptions hereinafter stated. above described is subject to the following exceptions: easements for phone and power purposes. flights -of -way of record and those visible by inspection of the study on the subject property by an environmental IN WITNESS VAMMOF, t Grantor has hereunto set her hand and seal the day and year fast above written. Z [� I, hereby certify tha C me this day and ac o therein expressed. Witness my hand S{ iAtlV C • n&4_W (SEAL) C IIA� r 1J— C. MARKS ` d• M (SEAL) SANDY M. MARKS I I a Notary Public of aforesaid County and State, do d wife, LINDA R. CAGLE personally appeared before ie a execution of the foregoing instrument for the purposes 1, is the. 13 d ay of PeGetub t r , 2004. My Cammission Expires: J) eC e,6t} y4bioscl NORTH CAROLINA ' Ka, N N e't7 COUNTY /Ik ca`/� e jy a No hereby certify LA' lA C—HAKES and hus an ' appeared before me this day and acknowledged the ue the purposes therein expressed. Witness my hand and notarial seal, this the My Commission Expires: b,260 NO T_ �t H CAROLINA 11106 Ne TCOUNTY �'�1"Ilind�x r�••� b r11) µ`C aforesaid County and State, W M E. HAYES personally the foregoing instrument for I, R L b /1�� // ¢ � 1 , a Notary Public of aforesaid ( hereby cerfi tha CA 1� C. CAL N and husband, JOSEPH I. CAI personally appeared before me this day and acknowledged the due execution instrument for the purposes therein expressed. 2004. Witness my hand and notarial seal, this the 13*I- day of D eGt4aiel , 2004. f, me this day therein exnt Deer-„6-et q�Itb0' I2�, a Notary Public of aforesaid County and State, do rLE and wife, PATSY H. CAGLE personapy appeared before due execution of the foregoing instrument for the purposes iaL s 1, this the day of D e e t ». 6 -e S- , 2004. My Commission Expires: y o 9 P? # s• `•;dY`f laa: C NORTH CAROLINA .}�j _IWc�r N eT-' COUNTY t I e of ub] c of aforesaid County and State, do hereby cemfy tha A C. d h an DY M. MARKS personally appeared before me this day and acknowl ed a ex ution of the foregoing instrument for the purposes therein expressed. Witness my hand and notarial seal thi of P e-C a ,, b -e, 1- 2Q(�4'' d My Commission Expires: ii e C es, NORTH CAROLINA a� b N '0 _Ha i- Nit-r— COUNTY ' Nbry ublr:' I, Rt+b 4 i3. ?fiat! QY a Notary Public o res ' un and State, do hereby certify tha OHN TIMOTH CAGLE personally appeared o �=e da and acknowledged the due execution of the foregoing instrumer t for the p o' ressed. Witness my hand and notarial seal, this the L,g _ day of 20ie:._,. sR / aA ° .. ad 5 Notary Pu ; ',� 9 n d : _ My Commission Expires: pet a, 1, ¢ 1, y � O D � r • � s�a:�C �o It is part of recorded Filed For Registration: Document No.: NS: Recorder. 'MBERLY S. HARGROVE $TER OF DEEDS, HARNETT CORNELIUS HARNETT BLVD SUITE 200 L)LLINGTON, NC 27546 $25.00 TRUDI C SMrrH LLOW TRAILER PAGE be submitted with original for re-recording RM11lMlMMR!!tRllll,MlNIMIN!!NIlHRRlM�IN.lNRRRNNRNRRRMNRM N�NNIMINIrJ11M1lNMNiMN State of North Car ,County of Harnett \�J/Jl The fo n certificate of RUBY B. NALLEY ary Is certified to a rre L his 28TH of December 2004 KI ERLY S. ARGROVE , REGI ER OF DE 5 By: DeputylAssisi eeda *2004023951* 2004023951 North Carolina Secretary of State i Page I of I North Carolina Elaine F- Marshall DEPARTMENT OF THE Secretary SECRETARY OF STATE PO Box 29622 Raleigh, NC 2762"622 1919)807-2000 Date: 11/17/2010 Click here to: View Document Filings I Sign Up for E-Notifications IPrint apre-populated Annual Report Form I Annual Report Count I File an Annual Report � Corporation Names Name Name Type AC TRI-ARC FOOD LEGAL SYSTEMS, INC. Business Corporation Information SOSID: 0150171 Status: Current -Active Effective Date: 6/8/1979 Dissolution Date: Annual Report Due Date: Citizenship: DOMESTIC State of Inc.: NC Duration: PERPETUAL Registered Agent Agent Name: RAPER JR, JOHN E Office Address: 901 JONES FRANKLIN RD RALEIGH NC 27606 Mailing Address: PO BOX 87009 FAYETTEVILLE NC 28304 Principal Office Office Address: 901 JONES FRANKLIN RD RALEIGH NC 27606 Mailing Address: 901 JONES FRANKLIN RD RALEIGH NC 27606 Officers Title: ASSISTANT SECRETARY Name: DONNAHADDOCK Business Address: 901 JONES FRANKLIN ROAD RALEIGH NC 27606 Title: PRESIDENT Name: TOMMY HADDOCK Business Address: 901 JONES FRANKLIN ROAD RALEIGH NC 27606 Stock Class Shares No Par Value Par Value COMMON 30000 0.1 This website is provided to the public as a part of the Secretary of State Knowledge Base (SOSKB) system. Version: 2411 http://www.secretary.state.nc.us/corporations/Corp.aspx?Pitem Id=484081 1 11 / 17/2010 _i CD-479 J(410-2e Business Corporation North Carolina This report may be filed online at the Secretary of State website: wwt Date Filed: 4/512010 12:11:00 PM Elaine F. Marshall North Carolina Secretary of State CA201011202608 Name of Business Corporation: TRI-ARC FOOD SYSTEMS, INC. Fiscal Year Ending: 12 31 09 State of Incorporation: NORTH CAROLINA Month l Day r Year Secretary of State ID Number: 0150171 ❑1 hereby certify that the informatlon requested below (required by NCGS 55-16-22) has not changed since the most recently filed annual report and is therefore complete. Nature Of Business: RESTAURANTS Registered Agent: JOHN E RAPER, JR. Registered Office Mailing Address: P.O. BOX 87009 County: City: FAYETTEVILLE State: NC Zip Code:28304 Registered Office Street Address: 901 JONES FRANKLIN ROAD County: WAKE City:RALEIGH State: NC Zip Code:27606 Signature of New Registered Agent: (Signature nmstautea consent to me appdntnva) Principal Office Telephone Number: 919-859-1131 Principal Office Mailing Address: 901 JONES FRANKLIN ROAD City: RALEIGH State: NC Zip Code:27606 Principal Office Street Address: 901 JONES FRANKLIN ROAD City RALEIGH Name, i sue, ano ousmess rtuuress ui rnnuipm vnluers State: NC ZIp COde:27606 Name: TOMMY HADDOCK Title: PRESIDENT Address: 901 JONES FRANKLIN ROAD city: RALEIGH State: NC Zip: 27606 Name: DONNA HADDOCK Title: ASST. SEC Address: 901 JONES FRANKLIN ROAD city: RALEIGH State: NC Name: Tide: Address: city. State: CerOflcatlon of annual report (must be COmpieteO by all ousmess corporations). r - Y Signature (Form muet be aglow by an omerot oorpmtm) ry 0 OD39351.= Type or Print Name 27606 Zip: Date ASSISTANT SECRET Title 6539714 700T o LLIVIA ©UADRANGLE. NORTH CAROO LINA IUSGSI W) U11111 NOWIT991FAMRIES TIMMUM RMA-Miff IMUM11FAM PROPOSED HOLY OIL C STOO RE (LOOT 2) . QOJANGLES' RESTAURANT (LOT-3) He>fYNf TT C�1l1NTA NCSRAT, ( Ill:(k�l IN,I TERRATECH E N G I N E E R S- I N C • GeutechnicaL Engineering _ Environmental Covulciny Canstructlon bjatedaLs Testing Report of Subsurface Investigation and Geotechnical Engineering Evaluation C-Store and Restaurant Cameron, North Carolina prepared for Bunn -Brantley Enterprises Inc. Prepared by TerraTech Engineers, Inc. NC Engineering Corporation C-1356 4905 Professional Court Raleigh, NC 27609 919-876-9799 4905 Professional Court • Raleigh, North Carolina 27609 • (919) 876-9799 • Fax: (919) 876-8291 311 Judges Road, Suite 3-A • Wilmington, North Carolina 28405 • (910) 392-4425 • Fax: (910) 392-6376 r TERMECH E N G I N E E R S- I N C C,eatechnical Engineering Environmental C"n tting April 14, 2010 cunstru<ticn Materials Testing Bunn -Brantley Enterprises, Inc. 389 Instrument Drive — Rocky Mount, NC 27804 ATTENTION: Mr. Bob Brantley Report of Subsurface Investigation and Engineering Evaluation C-Store and Restaurant Cameron, North Carolina Our Project Number 121-10-61480 Gentlemen: TerraTech Engineers, Inc. has completed the authorized subsurface investigation and engineering evaluation for the planned construction of the Convenience Store and Restaurant in Cameron, North Carolina. The enclosed report describes our investigative procedures and presents the results of our testing and evaluation along with design and construction recommendations for this project. We appreciate the opportunity to work with you on this subsurface investigation and engineering evaluation, and are prepared to follow up with the recommended construction materials testing services. If you have any questions concerning this report, please contact us. Sincerely, CSP/sk Erwin T. Williams III, P.E. Principal Geotechnical Engineer 4905 Professional Court • Raleigh, North Carolina 27609 • (919) 876-9799 • Fax: (919) 876-9291 311 Judges Road. Suite 3-A • Wilmington, North Carolina 28405 • (910) 392-4425 • Fax: (910) 392-6376 Page 1 T9104TECH ENGINEERS• I N C C�eatechnical Enyineeriny Envirommental Consulting Constmc9on MAE,HAS Teetiny SCOPE OF SERVICES The scope of our services was outlined in our proposal number 4556-N dated March 29, 2010. The primary objectives of this investigation were to evaluate the subsurface conditions within the area of proposed construction and to make recommendations regarding foundation design. More specifically, this investigation included the following objectives: (1) To evaluate the existing subsurface soil and ground water conditions within the area of proposed development. (2) To recommend foundation types which can safely and economically support the proposed construction, along with a discussion of Seismic Site Classification. (3) To evaluate the allowable bearing pressure of the foundation subsoils encountered within the proposed building areas for support of shallow foundations. (4) To make recommendations concerning site preparation and site grading, including a discussion of the excavation characteristics of the materials encountered. (5) To make recommendations concerning concrete slab -on -grade construction. (6) To provide recommendations for thickness and material types for a bituminous concrete pavement system in the planned driveways and parking areas. (7) To make recommendations for achieving high density structural fill capable of satisfactorily supporting the proposed construction. (8) To make pertinent recommendations concerning quality control measures during construction. Page 2 INVESTIGATIVE PROCEDURES Field Investieation UPPATECH E N G I N E E R 5- I N C C�eatechnicat Cngineenng Ewi,,wentat Consulting Constmction Natenets Tesfng The subsurface investigation consisted of nine soil test borings in the proposed construction areas. The test borings were performed in the planned building and pavement areas to depths of 10 to 20 feet below the ground surface. The locations are approximately shown on the Test Boring Plan (Figure 1) included in the Appendix. The test borings were located in the field by our representative by measuring distances and angles from existing site reference points. Ground surface elevations were not known at the time of this report. In general, the locations of the test borings should be considered approximate. Standard penetration testing, as provided for in ASTM D-1586, was performed at selected intervals in the soil test borings. The standard penetration resistance, in conjunction with soil classifications, provides some indication of a soil's engineering characteristics. Detailed descriptions of the soils encountered in the test borings are provided in the Test Boring Records included in the Appendix. Ground water conditions, standard penetration resistances, and other pertinent information are also included. Laboratory Investieation The laboratory investigation consisted of a physical examination and classification of all samples obtained from the drilling operation. Classification of the soil samples was performed in general accordance with ASTM D-2488 (Visual -Manual Procedure for Description of Soils). Soil classifications include the use of the Unified Soil Classification System described in ASTM D-2487 (Classification of Soils for Engineering Purposes). Page 3 GENERAL SITE AND SUBSURFACE CONDITIONS Site Location and Description TRRROTECH ENGINEERS- INC Geatechnical Engineering ErrviranmentaL ConsuLticg CanstmcEan A�atenals 7es:my The subject site is an approximately 6.49 acre tract located southeast of the intersection of NC Highway 24/87 and Plantation Drive in Cameron„ North Carolina The subject parcel is currently undeveloped and partially wooded. Site topography generally slopes away from the center of the site with a slight gradual slope to the southeast. Maximum relief across the site is about 5 to 7 feet. ReEional Geoloev The site is located in the Coastal Plain Geologic Province, just east of the Piedmont Geologic Province. The soils in this area generally consist of marine sediments deposited during successive periods of Fluctuating shoreline. The formations tend to dip slightly seaward, and several are exposed at the surface in bands paralleling the coast. Many beds exist only as fragmented, erosional remnants with more continuous strata located above and below. The soils typically classify as sands, silts, and clays, with irregular deposits of shells. Some of the existing formations contain predominantly plastic clays interbedded with strata of sands and poorly consolidated limestones. Others contain predominantly sands with localized deposits of highly plastic clays. Because the site is located close to the fall line between the Coastal Plain and the Piedmont, the Coastal Plain soils in this area are typically shallow: in the tens of feet. Beneath the Coastal Plain soils, Piedmont soils which are weathered from the underlying rock (residual soils) are typically encountered. The Piedmont soils typically consist of clays and silts in the upper 10 to 30 feet. The soils become coarser grained with depth, and begin to take on the characteristics of the underlying parent rock. When the residual materials have a standard penetration resistance of 100 blows per foot or greater, they are referred to as partially weathered rock. The transition from soil to partially weathered rock is usually a gradual one, and may occur at a wide range of depths. Lenses or layers of partially weathered rock are not unusual in the soil profile. Partially weathered rock represents the zone of transition between the soil and the underlying rocks from which the soils are derived. The thickness of the zone of partially weathered rock and the depth to the rock surface have both been found to vary considerably over relatively short distances. The depth to the rock surface in the area has generally been found to range from about 10 to 60 feet below the ground surface. General Subsurface Conditions A surficial layer of topsoil was encountered in test boring B-4 to an approximate depth of 1 inch. The thickness of topsoil can be quite variable and could be significantly different at other locations on the site. The reported topsoil thicknesses should not, therefore, be used for detailed quantity estimates. Beneath the topsoil in test boring B-4 and from the ground surface in the remaining borings, soils _ typical of the Coastal Plain were encountered. These soils typically consisted of sands, slightly clayey sands, slightly silty sands, and clayey sands. Standard penetration resistances in these soils generally ranged from 2 to 18 blows per foot. TRRRaTECH E N G I N E E R 5- I N C C,eakecnnicaL 6nyineenng Emmironmen A C,n5U'Ung Page 4 Cooetmction MateriaLs Testing Ground water was not encountered in the test boring at the time of our drilling operations. The test borings were backfilled upon completion to avoid hazard to pedestrian traffic. It should be noted that ground water levels will fluctuate depending on seasonal variations of precipitation and other factors, and may occur at different elevations at some time in the future. For more detailed descriptions of subsurface soil and ground water conditions, please refer to the Test Boring Records included in the Appendix. Page 5 PROPOSED CONSTRUCTION TFRPOTECH E N G I N E E 3 S- I N C C,eotechnlcal Cngineenng E.nw,n,,ntaL Consulting Conatmction Materiate Tniing Our understanding of the proposed construction is based on our e-mail correspondence with Mr. Bob Brantley. We understand that the planned construction will consist of two single story buildings with metal stud and wood frame construction and a concrete slab -on -grade floor system. The Bojangles' building will most likely have a brick veneer. In front of the convenience store will be an overhead canopy for the gas pump islands and a subsurface tank farm. A bio-retention pond is planned on the south side of the site. Asphalt and Portland cement concrete driveways and parking areas are planned around each of the buildings. Structural loading conditions are not currently known. However, based on our experience with similar construction we have estimated a maximum wall load of 3 kips per lineal foot. The canopy footings are expected to be designed with uplift loads governing their size. Site grading plans are expected to include cut and fill placement of approximately 3 to 5 feet. Pavements are expected to be bituminous concrete or Portland cement concrete. Based on the parking lot size and planned building use, we have estimated traffic volumes of 1000 cars per day, 5 tractor -trailer trucks per day including fuel delivery trucks, 10 delivery trucks per week, and one dumpster truck per week. If actual traffic volumes are greater than these assumed maximums, please contact us and we will review our recommendations for applicability to the actual traffic volumes. TRRP4TECH E N G I N E E R S- I N C CeotechrucaL Lngineering CMtrmmentaL Consultiny Page 6 Cons<ructian MatenaLs Testing EVALUATIONS AND RECOMMENDATIONS The following recommendations are based on the information available on the proposed structures, the data obtained from our soil test borings, and our experience with soils and subsurface conditions similar to those encountered at this site. Because the test borings represent a very small statistical sampling of subsurface conditions, it is possible that conditions may be encountered during construction that are substantially different from those indicated by the test borings. In these instances, adjustments to the design and construction may be necessary depending on actual conditions. General Site Development Considerations Based on the results of our test borings, very loose to loose sands were encountered in all of our test boring locations. Remedial measures during building and pavement construction should be expected. Based on the results of our analysis, the planned construction can be supported on shallow foundations designed using an allowable bearing pressure of 1,500 pounds per square foot. Based on our assumed loading conditions, the estimated post -construction foundation settlement related to the application of building loads is expected to be approximately 0.50 inch to 0.75 inch, if the recommended foundation bearing pressure is used. General Site Preparation All underbrush, topsoil, roots, and other deleterious materials should be removed from the proposed construction area. Special attention should be given to the removal of tree stumps within the proposed construction area. Site clearing, grubbing, and stripping should be performed only during dry weather conditions. Operation of heavy equipment on the site during wet conditions could result in excessive mixing of topsoil, and organic debris with clean underlying soils. The majority of our test borings encountered very loose to loose sands near the ground surface. After removal of the topsoil, we (recommend that these soils be compacted to a minimum of 95% of their standard Proctor maximum dry density utilizing large vibratory compaction equipment. Adequate density tests should be performed to verify that the recommended level of compaction is achieved. Some moisture conditioning of the near surface soils will likely be required to facilitate compaction. The intent of the compaction operations recommended for the surficial soils is two -fold. One is to provide a stable base for operation of construction equipment and construction of the planned buildings. The second is to reduce the potential for settlement of the foundations and Floor slabs. While the compaction of the near surface soils from the ground surface will reduce the long-term settlement potential, our test borings revealed that the depth of the loose sands is at least 20 feet below the existing ground surface. The recommended compaction operations at the ground surface will not densify the soils to this depth. After the near surface sands have been adequately compacted, we recommend that proofrolling operations be performed.. We recommend that areas to receive structural fill be proofrolled prior to placement of structural fill. Areas of proposed excavation should be proofrolled after rough finished subgrade is achieved. Proofrolling should be performed using a loaded dump truck weighing at least 15 tons. Proofrolling should be accomplished by performing at least 3 passes in each of two perpendicular directions within entire construction areas, and 10 feet beyond. Any unsuitable materials Page 7 TRRpaTECH E N G I N E E R S- I N C C,eatechnicaL Engineering LnvironmentaL Consulting Construction MatenaLs Tesfing that may be present, and any low consistency soils that are encountered which cannot be adequately densified in place, should be removed and replaced with well compacted fill material placed in accordance with the Structural Fill section of this report. Proofrolling should be observed by our representative to determine if remedial measures are necessary. Proofrolling should facilitate the identification of soft surficial soils, but should not be expected to reveal soft conditions more than 2 feet below the ground surface at the time of proofrolling. Footing examinations will be required to evaluate the presence of deeper soft soils, which could adversely affect foundation support. Footing examinations will be discussed later in this report. We understand that a bio-retention pond will be constructed at the south side of the site. The encountered soils at the site have a high rate of infiltration and a high permeability. If the pond is planned to hold water, it would be necessary to line the pond with a low permeability material. Based on our experience on similar sites, there may also be buried foundations, bum pits or trash pits. On sites located near developed areas this is not an unusual occurrence. All too frequently such buried material occurs in isolated areas which are not detected by the soil test borings. Any buried waste construction debris or trash which is found during the construction operation should be thoroughly excavated, and the waste material should be removed from the site prior to placement of fill soils or building construction. Earth Slopes Temporary construction slopes should be designed in strict compliance with the most recent OSHA regulations. The test borings indicate that most soils at the site are either Type B or Type C as defined _ in the OSHA regulations. This dictates that temporary construction slopes be no steeper than 1.5 horizontal to 1 vertical (Type C soils) for excavation depths of up to 20 feet. Flatter slopes may be needed depending upon conditions at the time of construction. The use of well points and the sandy nature of the soils at the site will affect the stability of deeper excavations. A "competent person", as defined by OSHA regulations, should be present on site during excavation. Depending upon conditions encountered, some excavations may require shoring. Temporary construction slopes should be closely observed for signs of mass movement: tension cracks near the crest, bulging at the toe of the slope, etc. If potential stability problems are observed, the geotechnical engineer should be immediately contacted. The responsibility for excavation safety and stability of construction slopes should lie solely with the contractor. We recommend that permanent cut or fill slopes be no steeper than 3.0 (H) to 1.0 (V) to maintain long term stability. Slopes constructed steeper than 3.0 (H) to 1.0 (V) could be highly susceptible to erosion, will be difficult to maintain, and could experience large scale slope failure in some instances. Flatter slopes may be necessary, depending upon the type of erosion control selected. We recommend that buildings be located at least 15 feet from the crest of adjacent slopes. Pavement areas should be located at least 5 feet away from the crest of adjacent slopes. Page 8 Groundwater Control UPPATECH E N G I N E E R 5- I N C <,eote6,w.L C.ngmering' [mironmenbL Con utting Canst,u,twn Mi teri.b Tasting _ Based on the conditions encountered in our borings, the depth to groundwater generally exceeds our boring depths. Therefore, we do not anticipate that excavation at the site will encounter groundwater. If ground water is encountered, the most suitable method of controlling this water will likely be pumping directly from the excavation. Pumping from excavations should be done with care to prevent loss of soil fines, boils, or instability of slopes. If pumping proves to be ineffective, then the use of well points or other methods may be required. We must emphasize that the need for ground water control and the most appropriate method will be based on the conditions encountered during construction. The contractor should use the most effective dewatering method based on the conditions at that time. Foundation Design _ After site preparation and site grading are complete, it is our opinion that the proposed structures may be supported on conventional shallow foundations. We recommend that footings for the building be designed for an allowable bearing pressure of 1,500 pounds per square foot (psf). In addition, we recommend a minimum width of 18 inches for continuous wall footings and 24 inches for isolated column footings to prevent localized shear failure. Footings should bear at a minimum depth of 18 inches below the prevailing exterior ground surface elevation to avoid potential problems due to frost heave. The footings for the fuel canopies will likely bear at an elevation of 5 to 8 feet below the ground surface to resist uplift loads. Based on the results of our test borings in the area of the planned fuel canopies, the foundation bearing materials at these depths are expected to consist of sands and slightly clayey sands generally capable of supporting a design bearing pressure of 1,500 pounds per square foot. Although our test borings did not encounter any ground water, if ground water is encountered during footing excavations, the footing size may be required to be increased due to additional uplift forces caused by ground water. Detailed footing examinations should be performed in each footing excavation prior to placement of reinforcing steel. These examinations should be performed by our representative to confirm that the design allowable soil bearing pressure is available. The footing examinations should be performed using a combination of visual observation, hand rod probing, and dynamic cone penetrometer testing. Dynamic cone penetrometer testing, as described in ASTM STP-399, should be performed in each column footing location and at no greater than 20 foot intervals in continuous wall footings. If the soil is found to have an unsatisfactory bearing capacity, our inspector will review the problem with our project Geotechnical Engineer. Recommendations will be developed to be immediately implemented in order to minimize construction delays. Very loose to loose sands were encountered near the ground surface in the majority of our test borings. Depending on the final design bearing elevations of the foundations, remedial measures may be required to achieve the design foundation bearing pressure. The most feasible remedial measure in most cases is stone replacement, where any encountered soft, wet soils are removed from the footing excavations and replaced with washed 457 stone. The washed #57 stone should be placed in maximum lifts of 12 to 18 inches, and each lift should be consolidated with a vibratory plate tamp or similar seq apeu8gns aql leg! Aduan of sisal Cusuap play pup 'suotleNasgo Sutpadoad 'suo!letiasgo lens!n do uoileu!gwoo a opnlout A= uo!punlpna slgl -uotlowlsuoo gels uoog o1 ioud Alate!pawwi an!leluosaldoa ino Aq polenlena aq spos apei8gns oq) Ipgl puawwooau am ajoiantil opel8gns opei8-uo gels pajedaud agldo uolleuoualap asnea ualdo 1n0wn011Ana agl of amsodxa pup satltn!Ioe uogonJlsuo:) •asinoo aseq ale8au88e paloedwoo do ssoujatgl gout y wnw!utw a ,Cq uteliapun aq uo!lanjlsuoo apiIA-uo-gels pe leg! puawwoaai am ',Q!n!lae uo!lonilsuoo lod aseq algels a apinoud of uapio ul •sagau! ZI Iaddn aql u! f4!suop ,Cap wnwlxpw (869-4 WISV) iolooad pjepuels u!atp do luawad 86 do wnwtutw a of paloedwoa aq p!m silos py pup silos apeAgns aql 1pgl sawnsse amen papuawwooN s!qd• •apw8-uo-sgels alaiouoo and pasn aq Qod) gout o!gno jad spunod 001 do amen (1) uolloew 3pei8gns do snlnpow u8tsop e legi puawwooaj am 'suollwado 8utpui8 ails paledlopue oql pup 'sllnsai 8uuoq 1sa1 ino uo poseg apei0-uo-squiS ala•taOZ) •sn loeluoo aseald 'pamsap si spues uadaap osogl /C !suap o1 spoglaw do uotssnostp a dt jo 'pautsap si jugualod asagl do uo!ssnostp popupp ajow a dl •luawaluas gels jooy pup uopupunod ut llnsai pinoo spues jadaap aql do uotleoylsuaQ •speol o!wstas 8utpnlout 'uollulq!n wad uolleoytsuap 01 alq!ldaosns an silos osogl •olls slgl le Iaad OZ !seal III do gldop a of luosoid spues asool on ajagl 'palou , jsno!naud sV •apo:) 8wppng leuollewalul 900Z oql do l' l •S l91 algel tl$m aoueplooae u! 4 ad (1 se paylsselo oq pinogs ops aql 'ssuuoq ino jo sllnsw aql pue 'malnaa ino uo paspg •uo!leuoldxa do gldap aql molaq sa!ltadad pos alew!Isa 01 ma!naJ amleialy snolnaid wad uo!Ieuuodui pun sails Xgmau uo pauuodiad s8waog aadaap word pau!elgo elep papnloui suo!lenlena'0gl aql m pasn gldap load 001 aq) jo a8eluaoiad dews a papualxa Xjuo s8uuoq !sal ino Onog11V 'apoD 8ulppng leuopuwalul OOOZ aql quM aouepi000e ut uotleoytsselo olwslas ol!s a au!twalop of sdew leot8oloa8 luouniod pup sllnsaa 8uuoq Isa1 aql pama!naJ aneq oM uolleaylsseJJ al!s olwslas -alalouoodo luawaoeld of joud pan011101 oq pinogs silos ldos agl'amsodxa of onp paua}los saw000g aoedlns 8uueaq uo!lepunod aqI dl 'aw!l do spouad papualxa lod pasodxo aie Catp d! 'aoedjns 8uueaq uo!lppunod oql le sllos aql uquam Aiw plaweoJIAua oql of aunsodxg luawaluas uopupunod an!ssaaxa ut Ilnsw pinoo fj!suap ,Cap wnw!xew 10130td pJepuels oql do a8piva3lad papuawwooai oql uegl ssal sotl!suap ltos polopdwoD -sleualpw jig uo uo!poedwoo do !anal papuawwoaai aq1 8ulna!goe uo ,(128ael puadop p!m 'leuawtu lly Iunlonils Xq pauoddns on gotgm 'suo!lepunod 8utpllnq do aoueuuoduad •IIy IpnAawls do luawaaeld oql 8uunp 8ullsal lonuoo fo!lunb;o ooupyodw! aq1 ortsegduta Isnw am'uoseau slgl tog •lpualew IIy lemlonuls mau uo aeaq Xvw loafold s!ql iod sSu!lood agldo awos •uotlon.11suon do owll oql le paaalunooua suotllpuoa apw8gns lenloe oql uo 8ulpuadop samseaw le!pawal algm!ns Isow oql 1sa88ns upo an!leluosaudai ino 'paiolunooua an, silos asool to gos d! 'Janamo}{ -luawdwba bui}sal s}eua}ew uoi}>v�}suo' 5uq�nsro7 le}vawvonpu3 5uuaan5vj }emuy>a}oaj J N I S N 3 3 N 1 'J N 3 HNIOdlil1 6 a8ed Page 10 TFRRoTECH E N 0 1 N E E F 5- I N C C�eotecnri cal C.ngineering Environmental Consulting Can�tmcban Matenals Testing been properly prepared. If soft areas are encountered, recommendations for remedial measures should be provided by our project geotechnical engineer. Pavement Desien Recommendations Based on the above described site preparation recommendations, we anticipate that the pavement area subgrade soils will generally consist of sands and slightly clayey sands. These materials may reasonably have a California Bearing Ratio (CBR) ranging from approximately 10 to 20, if compacted to at least 100% of the standard Proctor maximum dry density. For purposes of pavement design, we have used a California Bearing Ratio of 10 for the pavement subgrade soils and the loading condition described previously in this report. Based on the AASHTO design method, a 20 year design life, and our past experience, we suggest the following design pavement section: Parking Areas: 2 inches Bituminous Concrete Surface Course 6 inches Aggregate Base Course Driveways: 3 inches Bituminous Concrete Surface Course 8 inches Aggregate Base Course Preparing, grading, shaping, and compaction of subgrade soils should be performed in accordance with Division 5, section 501 of the NCDOT Standard Specifications for Roads and Structures (2006). Preparing, grading, shaping, and compaction of aggregate base course (ABC) stone should be _ performed in accordance with Division 5, section 520 of the NCDOT Standard Specifications for Roads and Structures (2006). Placement and compaction of the bituminous concrete surface course (Type SF9.5A) should be performed in accordance with Division 6, section 600 of the NCDOT Standard Specifications for Roads and Structures (2006). Proper subgrade compaction, adherence to the NCDOT specifications, and compliance with project plans and specifications are critical to the performance of the constructed pavement. The recommended pavement section is designed to support the traffic volumes expected after completion of the planned construction. If construction traffic is allowed to use the recommended pavement section, some damage requiring repair should be expected. Based on our past experience, we recommend that a Portland cement concrete pavement be used in dumpster areas, in areas where fuel delivery tracks will operate, and in other areas where heavy trucks are turning while traveling at slow speeds. We suggest the use of a 6 inch thick section ofNCDOT type AA Portland cement concrete having a 28 day design compressive strength of 4,500 psi above a 6 inch thick section of compacted ABC stone. The concrete pavement may be designed as a "plain concrete pavement" with no reinforcing steel, or reinforcing steel may be used at joints. Construction joints and _ other design details should be in accordance with guidelines provided by the Portland Cement Association and the American Concrete Institute. The rigid pavement system should be constructed in accordance with section 700 of the NCDOT Standard Specifications. TFRR.aTECH E N G I N E E R S- I N C C�eotechnicaL Enyineeriny 6nvironmentaL ConslAtlny Page 11 C,nA,mctwa MlateriaLs Testmy Suitability of Excavated Material for Re -use as Structural Fill Based on the results of our soil test borings, the sandy soils at the project site generally appear to be suitable for re -use as structural fill material. Routine adjustment of moisture content will be necessary to allow compaction in accordance with project specifications. Structural Fill In order to achieve high density structural fill, the following recommendations are offered: (1) Materials selected for use as structural fill should be free of vegetable matter, waste construction debris, and other deleterious materials. The material should not contain rocks having a diameter over 3 inches. It is our opinion that the following soils represented by their USCS group symbols will typically be suitable for use as structural fill: (SP), (SW), (SP-SC), (SP-SM), (ML), (CL), (SM), and (SC). The following soil types are considered unsuitable: (MH), (CH), (OL), (OH), and (Pt). (2) Laboratory Proctor compaction tests and classification tests should be performed on representative samples obtained from the proposed borrow material to provide data necessary to determine acceptability and for quality control. The moisture content of suitable borrow soils should generally not be more than 3 percentage points above or more than 3 percentage points below optimum at the time of compaction. Tighter moisture limits may be necessary with certain soils. (3) Suitable fill material should be placed in thin lifts (lift thickness depends on type of compaction equipment, but in general, lifts of 8 inches loose measurement are recommended). The soil should be compacted by mechanical means such as sheepsfoot rollers or vibratory drum. Proofrolling with rubber tired, heavily loaded vehicles may be desirable at approximately every third lift to bind the lifts together and to seal the surface of the compacted area thus reducing potential for absorption of surface water following a rain. This sealing operation is particularly important at the end of the work day and at the end of the week. (4) We recommend that structural fill be compacted to a minimum of 95% of the standard Proctor maximum dry density (ASTM Specification D-698). Additionally, the in -place maximum dry density of structural fill should be no less than 90 pcf. The upper 12 inches of floor slab subgrades should be compacted to at least 98% of the standard Proctor maximum dry density (ASTM D-698). Fill placement in pavement areas should be performed in accordance with the NCDOT Standard Specifications. (5) . An experienced soil engineering technician should take adequate density tests throughout the fill placement operation to verify that the specified compaction is achieved. It is particularly important that this be accomplished during the initial stages of the compaction operation to enable adjustments to the compaction operation, if necessary. TRRR4TECH k N G I N E E R S- I N C C,eatechnical. Cnyinee,mq Env,,,. neataL Co..Utiny Page 12 Conetruction MAHAe Teeting ADDITIONAL'SERVICES RECOMMENDED Additional foundation engineering, testing, and consulting services recommended for this project are summarized below: (1) Proofrolline Observation: Proofrolling should be observed by a representative of the Geotechnical Engineer to determine if remedial measures are necessary in certain instances. (2) Quality Control of Fill Placement and Compaction: We recommend that an experienced engineering technician witness all required filling operations and take sufficient in -place density tests to verify that the specified degree of compaction has been achieved. Soil engineering judgments will be involved and should be made by our project geotechnical engineer with information provided by our engineering technician. (3) Footing and Slab Evaluations: Footing and slab areas for this project should be evaluated by our representative. The purpose of these evaluations will be to verify that the design soil bearing pressure is available and that subgrade areas are properly prepared. (4) Pavement Components Testing and Inspection: Pavement components should be tested and inspected during and following construction to verify compliance with project plans and specifications. The attached Appendix completes this report. Sincerely, Christophe . Pilz, Senior Geotechnical CSP/sk Enclosure lir Erwin T. Williams III, P.E. Principal Geotechnical Engineer Not to Scale Legend: TERR.ATKH s� N Figure 1. Test Location Plan Project: C-Store and Restaurant Cameron, North Carolina Our Project Number 121-10-61480 Symbols and Nomenclature Undisturbed Sample (UD) • Standard penetration resistance (ASTM D-1586) 100/2- Number of blows (100) to drive the spoon a number of inches (2) W-O-H, R Weight of Hammer, Weight of Rods Ax, Bx, r4x Core barrel sizes for rock cores 65% Percentage of rock core recovered ROD Rock quality designation - % of core 4 or more inches long S Water table at least 24 hours after drilling S Water table one hour or less after drilling A Loss of drilling water A Atterberg Limits test performed c Consolidation test performed Gs Grain size test performed T Triaxial shear test performed a Proctor compaction test performed 18 Natural moisture content (percent) Penetration Resistance Results Sands Sills and Clays Number of Blows, N 0-4 5-10 11-20 21-30 31-50 over 50 Number of Blows, N 0-1 2-4 5-8 9-15 16-30 31-50 over 50 Drilling Procedures Relative Density very loose loose firm very firm dense very dense Approx. Consistency very soft soft firm stiff very stiff hard very hard TERRATECH Soil sampling and standard penetration testing performed in accordance with ASTM D-1586. The standard penetration resistance is the number of blows of a 140 pound hammer falling 30 inches to drive a 2 inch O.D., 1.4 inch I.D. split spoon sampler one foot. Core drilling performed in accordance with ASTM D-2113. Undisturbed sampling performed in accordance with ASTM D-1587. TEST BORING RECORD TERR.ATECH Depth Description Elev. Water Level Blow Counts Standard Penetration Test blows/ft 20 40 60 80 1 i 2 Loose tan orange slightly clayey fine to medium 6-4-4 • 3 sand (SP-SC) 4 5 2-3-3 • ! . -5.5 Loose orange tan clayey fine to medium sand 6 (SC) 3.4-5 • 8 8 9 tan slightly silty fine to medium sand I() —Firm (SP-SM) 5-6-6 • 11 -12 12 13 Loose tan and white fine to coarse sand (SP) 14 -15 IS 3-4-3 • . BORING TERMINATED 16 17 18 19 20 21 2.2 23 24 25 Water Level 24 hr.: Boring Backlilled! Upon l'omplemm TerraTeah Engineers, Inc. Boring Number: 11-1 4905 Professional Court pro-ect Number: 121-10-61480 N'dter Level I hr.: Nu1 Lnnw°tCfeJ Raleigh, NC 27609 1 Daft Drilled: 4/N/10 Sheet: I of 1 TEST BORING RECORD TERRATECH E N G I N E E N S- I N C Depth Description Elev. Water Level Blow Counts Standard Penetration Tesl blows/ft 20 40 60 80 I Loose tan fine to medium sand (SP) 2 2-3-3 • 3 3 5 4-4-4 • 6—Loose tan orange slightly clayey fine to medium sand (SP-SC) 7- 3-5-3 • n el 10 -10 3-4-4 • Il BORING TERMINATED 12 13 14 IS 16 17 I8 19 20 21 22 23 2,1 25 N*ter level tJ hr.: Boring Bncklilled Ilpem Cmnplclion TerraTech Engineers, Inc. Ilorine Numher: B-_' 4905 Professional Court Project Nu.,her: 1_'L10-b1480 u'xar Level I hr.: Not lincomnered Raleigh, NC 27609 1 Uxte Drillyd: 4/rillo Sheet: 1 of 1 TEST BORING RECORD TERRATECH Water Blow Standard Penetration Test Depth Description Elev. Level Counts blows/ft 20 40 60 80 I 2 i Very loose tan and brown fine to medium sand 2-1-2 • 3 (SP) ) S 2 I 1 -S.5 b Loose tan and orange fine to medium sand (SP) 7 5-4-4 • _8 n r) I0 Firm brown orange slightly clayey line to 5-G-5 • medium sand (SP-SC) II 12 l .2 13 Loose tan fine to medium sand (SP) 14 IS 15 3-3-5 • BORING TERMINA'1'EI) I6 17 IS I () 20 21 22 23 24 25 WmerI.eel 24 hr.: Boxing Rack filled Upont-unq,lei „n TerraTeeh Englneem, Inc. Raring Number: 81-3 4905 Professional Court Project Number: 121.10-61480 P'xtrr Ler el I hr.: Not I:ncaumLfOd Raleigh, NC 27609 Dole Drilled: 4/9/I0 sheet 1 of I TEST BORING RECORD TERR.ATECH E N G 1 N E E R 5- I N C Depth Description Elev. Water Blow Standard Penetration Test Level Counts blows/R 20 40 60 80 t To soil (Approximately 1 inch 2 2 2-2 • 3 4 Very loose and loose tan orange slightly clayey 5 fine to medium sand ISP SC) 2-3-5 • 6- 7- 3-3-2 • 8 9 10 -10 2-2-2 • BORING TERMINATED II 12 13 la 1s 16 I 17 18 19 20 21 22 23 24 25 Moler Lod 24 hr.: Boring lWaA1111ed I poul•unipleomi TervaTech Engineers, Inc. Boring Number: ll-1 4905 Professional Court Pro erl Numhm Cl-lu-nlJNu 1\'atrr Lerrl I hr.: Not kinanmered Raleigh, NC 27609 1 note Drilled: 4/N/III Sheet: I of 1 a TEST BORING RECORD TERR.ATECH Depth Description Elev. Water Level Blow Counts Standard Penetration Tesi blows/ft 20 40 60 80 1 i 2 -_.. Very loose tan and dark brown fine to medium 3-2-1 • ;3 sand (SP( . 4- 5- WOH-1-1 It -5.5 6- 7- Firm tan orange slightly clayey fine to medium 5-6-6 • - 8 sand (SP-SC( 9 10 .10 5-6-7 • II BORING TERMINATED _ 12 13 14 IS 16 17 I8 19 20 21 22 23 24 25 N nice Lod 24 hr.: Boring 9n<klilled Ulnm Completion TemTeeh Engineers, Inc. lioring Number: 11-5 4905 Professional Court Project Number: 121-10-614HO \\'�Irr Leed 1 hr.: Not I'neauntered Raleigh, NC 27609 3 W1e Drilled: 4/9/10 Sheet: 1 of I c TEST BORING RECORD TERRATECH E N G I N E E R 5- I N C Urpth Description Elev. Water Blow Standard Penetration Test Level Counts blows/ft 20 40 60 80 1 Very loose tan and dark brown fine to medium sand (SP( '.. 2 3 2-2-2 • 3 Firm tan orange slightly clayey fine to medium 4 sand (SP-SC) 5 2-8-10 • -S.5 6- 7- 4-2-3 • 8 10 3-3-4 • I 1 Loose tan and orange fine to medium sand (SP( 12 .. 13 i 14 15 3-4-5 • 16 1 7 17 Is - Loose tan and pink slightly clayey fine to medium sand (SP-SC( 19 2U -20 3-3-3 • . . BORING TERMINATED 21 22 23 24 25 _ ... . I Puler Le,0 24 hr.: Boring Backfilled Upon Completion TerraTech Engineers, Inc. N'rtcr Lod 1 hr.: Not Encountered Raleigh, Professional Court Raleigh, NC 27609 Boring Number: B-6 Project Number: 121-10-61480 Date Drilled: 4/8110 sheet: t or 1 TEST BORING RECORD TERRATECH I h'plh Description Elev. Water Blow Standard Penetration Test Level Counts blows/ft 20 40 60 80 l Loose tan fine to medium sand (SPI 2 3 2-3-2 • 3 4 5dr-7 • G 7 Firm to loose tan orange slightly clayey fine to medium sand (SP-SC) 7-8-9 . • 8 9 10 4-4-5 • 1l 12 -12 13 14 Very loose tan and brown fine to medium sand (SP) IS 3 2-2 • I6 17 -17 18 Firm tan and brown fine to medium sand (SP) 19 20 -20 3.4.7 • BORING TERMINATED 21 22 23 21 25 Water Level I! hr.: Ibuing Bncklillvd Illwn Cwnplrnun TerraTeeh Engineers, Inc. Horin4 Nunther. 14-7 %\'Ater Level I hr.: Not Hio, icred 4905 Professional Court 1'rojrrt Numha: 121-10-61480 Raleigh, NC 27609 Ilxte Willyd: 41HIM Sheri: 1 of 1 TEST BORING RECORD TERRATECH Depth Description Elev. Water Blow Standard Penetration Test Level Counts blows/ft 20 40 60 80 Firm tan and brown slightly clayey fine to medium sand (SP-SC) 2 -3 8-8-7 • 3 4- 5- 4-4-4 • 6 I Loose tan and brown line to medium sand (SP) ! 7 3-5-5 i • 8 9 10 -10 3-3-3 • BORING TERMINATED II 1'2 13 14 15 Ili 17 18 19 20 21 22 23 24 25 Water Level 24 hr.: Boring Backtilled Ilixwn Completion TerratTech Engineers, Inc. KorinR Number: D % Water Lerel 1 hr.: Not lincounlered 4905 Professional Court proj Raleigh, NC 27609 ect Number: 121-10-(,N%tl Date Drilled: 4/8/I0 Sheet: 1 of 1 TEST BORING RECORD TERRATECH E N 0 1 N E E R S- I N C Depth Description Elev. Water Level Blow Counts Standard Penetration Test blows/ft 20 40 60 80 1 � 2 5-6-6 • 3 Firm to loose tan orange slightly clayey fine to 4 medium sand (SP-SC) 5 4-4-4 • 6 i 7 4-5-5 • 8 -8 i 9 10 4-3-4 • It— Loose to firm tan and purple slightly clayey fine to medium sand (SP-SC) 12 13 14 -15 - IS 566 • BORING TERMINATED 16 17 IS 19 20 21 22 23 24 i 25 Water Level 24 hr.: Boring Bucktilled Upon Completion TerreTech Engineers, Inc. Boring Number: I)-9 Water Level 1 hr.: Nol F.Ixuunle,ed 4905 Professional Court Pmjeel Number: 121-14W490 Raleigh, NC 27609 Date Drilled: 4)8110 Sitter: 1 of 1 DEVELOPMENT �NGSNEERSNGo S�Co P. O. Box 17705 Raleigh, NC 27619-7705 244 W Millbrook Rd. Raleigh, NC 27609 Phone: 919-847-8300 Fax: 919-847-2130 TO: NC DENR Attn: Division of Water Quality (Stormwater) 3800 Barrett Drive Raleigh, NC LETTER OF TRANSMITTAL DATE: 12-10-10 JOB NO.: 10-127 ATTENTION: RE: Bojangles/C-Store Commercial Development Stormwater Management Permit Applicaiton WE ARE SENDING YOU ® Attached ❑ Under separate cover via US Mail the following items: ❑ Shop Drawings ❑ Prints ® Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Change Order ® listed below COPIES DATE NO. DESCRIPTION 2 Ztormwater Management Permit Application Form (original & 1 copy) 2 eed Restrictions & Protective Conenants Form (original & 1 copy) 1 09/21/10 Operations & Maintenance Manual (original) 1 12/09/10 007093 Permit Processing fee: Check in the amount of $505.00 1 ea ✓ Detailed Narrative (10/12/10) & USGS Map identifying site 1 09/22/10 J Calculations - Stormwater Report (original) 2 11/22/10 ✓ Sets of 11 x 14 plans - Sheets 1 - 15 1 04/14/10 Soils Report - Report of Subsurface Investiation & Geotechnical Eng. Evaluation THESE ARE TRANSMITTED as checked below: ® Forapproval ❑ For your use ❑ As requested ❑ For review and comment ❑ FORBIDS DUE_ ❑ Approved as submitted ❑ Resubmit_ copies for approval ❑ Approved as noted ❑ Submit _ copies for distribution ❑ Returned for corrections ❑ Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US i REMARKS 1 - Current Deed: Deed Book 1025, Page 112 1 - NC Secretary of State supporting documents of titles and positions held p pr l:IIl1: 1 . COPY TO: FROM: David Blevins EC 1 0 2010 Nip om Raleigh Regional Office RECEIVED BY: If enclosures are not as noted, kindly notify us at once. DEVELOPMENT EMG1NEER1NG9INC- P. O. Box 17705 Raleigh, NC 27619-7705 244 W Millbrook Rd. Raleigh, NC 27609 Phone: 919-847-8300 Fax: 919-847-2130 TO: NC DENR / DWO Attn: Bill Diuguid, Stormwater Permitting 512 N. Salisbury Street, 9t" floor Raleigh, NC 27699 LETTER OF TRANSMITTAL DATE: 01-06-11 JOB NO.: 10-127 ATTENTION: RE: Bojangles & Hold Oil C-Store Site Plan Stormwater Management Permit Applicaiton FULL SIZE SETS OF PLANS WE ARE SENDING YOU ® Attached ❑ Under separate cover via delivery the following items: ❑ Shop Drawings ❑ Prints ® Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Change Order ® listed below COPIES DATE NO. DESCRIPTION 2 11/2/10 Sets of full size plans - Sheets 1 - 15 THESE ARE TRANSMITTED as checked below: ® For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit _ copies for distribution ® As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FORBIDS DUE _ ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS Par ran uoct to nnvirf Rloui nc in A -mail rintori n1 inF;li i COPY TO: RECEIVED BY: FROM: Kim Ardizzone (kim@d-e-inc.com) d enclosures are not as noted, kindly notify us at once. t t.: _`il �� 1 �1� �T .0 4 �i N!J � r Ct�' 7�_ G{e � (.._��_. _ 1: 1 � _ �$.�'� �` �`�:✓ f: Kim Ardizzone From: David Blevins [david@d-e-inc.com] Sent: Wednesday, January 05, 2011 4:24 PM To: 'Kim Ardizzone' Subject: FW: Bojangles and Holt Oil C-Store site plan David H. Blevins, P.E. Development Engineering, Inc. 244 W. Millbrook Rd. Raleigh, NC 27609 919-847-8300 www.d-e-inc.com From: Diuguid, Bill [mailto:bill.diuguid( ncdenr.govl Sent: Wednesday, January 05, 2011 2:48 PM To: david(c d-e-inc.com Subject: Bojangles and Holt Oil C-Store site plan David Blevins: We need 2 sets of full size site plans for this project. You may have been confused by the instructions that say, plans, folded to 8.5 x 11. If you can have those dropped by our office on the 9th floor, Archdale Bldg., Stormwater Permitting Then I won't have to mail your package back to you. Bill D. Bill Diuguid, AICP Staff Planner, Stormwater Permitting Wetlands and Stormwater Branch Division of Water Quality I NCDENR 1617 Mail Service Center (Mail) 512 N. Salisbury St, Raleigh, NC 27604 1 9th Floor (Location & Parcels) Raleigh North Carolina 27699-1617 Phone:919-807-6369 Website: htto://l)ortal.ncdenr.ora/web/we/ws/su E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. M DEVELOPMENT ENGINEERING, INC P. O. Box 17705 Raleigh, NC 27619-7705 244 W Millbrook Rd. Raleigh, NC 27609 Phone: 919-847-8300 Fax: 919-847-2130 TO: NC DENR Attn: Division of Water Quality (Stormwater) 3800 Barrett Drive Raleigh, NC LETTER OF TRANSMITTAL DATE: 12-10-10 JOB NO.: 10-127 ATTENTION: RE: Bojangles/C-Store Commercial Development Stormwater Management Permit Applicaiton WE ARE SENDING YOU ® Attached [] Under separate cover via US Mail the following items: ❑ Shop Drawings ❑ Prints ® Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Change Order ® listed below COPIES DATE NO, DESCRIPTION 2 tormwater Management Permit Application Form (original & 1 copy) 2 Deed Restrictions & Protective Conenants Form (original & 1 copy) 1 09/21/10 Operations & Maintenance Manual (original) 1 12/09/10 007093v Permit Processing fee: Check in the amount of $505.00 1 ea ✓ I Detailed Narrative (10/12/10) & USGS Map identifying site 1 09/22/10 v Calculations - Stormwater Report (original) 2 11/22/10 ✓ Sets of 11 x 14 plans - Sheets 1 - 15 1 04/14/10 Soils Report - Report of Subsurface Investiation & Geotechnical Eng. Evaluation THESE ARE TRANSMITTED as checked below: ® For approval ❑ Foryouruse ❑ As requested ❑ For review and comment ❑ FOR BIDS DUE ❑ Approved as submitted ❑ Resubmit _ copies for approval ❑ Approved as noted ❑ Submit copies for distribution ❑ Returned for corrections ❑ Return _ corrected prints ^ n _o o El PRINTS RETURNED AFTER LOAN TO US n� REMARKS 1 - Current Deed: Deed Book 1025, Page 112 1 - NC Secretary of State supporting documents of titles and positions held �— COPY TO: :'_i .1 j .l rilil FROM: David Blevins RECEIVED BY: If enclosures are nor as noted, kindly notify us at once. ®-EV FLOP ENT -F=NG� N-E-E R� NG, NC. Pro f e s s i o n o/ E n g i n e e r i n g C o n s u/ t O n t s October 12, 2010 NC Dept of Environment & Natural Resources Division of Water Quality 512 N Salisbury Street Raleigh, NC RE: Narrative describing the stormwater treatment and management for the project Bojangles I Convenience Store — NC 24.87 Cameron, NC - Harnett County To Whom It May Concern: This is a 6.48 acre commercial project on the west side of NC 24-87 just north of the intersection of Plantation Drive (SR 2411). The project consists of three (3) separate lots that front on NC 24-87. A 17,000 SF bioretention pond is being utilized the treat the stormwater runoff from the 3 lots. The bioretention pond is providing for the 85% removal of the Total Suspended Solids. Each individual lot has an allocated amount of impervious area. Lot 1 is a split drainage site. It drains to two different drainage basins. 50% of the property area of lot 1 will drain to the bioretention pond, a maximum 80% impervious has been assumed for the portion of lot 1 that drains to the bioretention pond. All of lots 2 and 3 drain to the bioretention pond. Drainage easements are provided across the each property for the collection and routing of the stormwater to the bioretention pond. A storm drainage yard inlet within the bioretention structure will serve as the storm drainage outlet structure. There will be a stormwater management agreement in place for the ongoing maintenance of the bioretention pond. The bioretention pond will also provide detention for the peak post development discharge for the 1-year storm. A 19" wide x 2 5/8" height restrictor opening will be provided on all four (4) sides of the storm drainage yard inlet to restrict the stormwater discharge to the post development rate. Sincerely, Tom Harrell Development Engineering, Inc. 244 W Millbrook Road, Raleigh, NC 27609 Phone: 919-847-8300 P. 0. Box 17705, Raleigh, NC 27619 FAX: 919-847-21JO