Loading...
HomeMy WebLinkAbout20190900 Ver 3_Modification Request_20220705Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID# * 20190900 Version* 3 Is this project a public transportation project?* Yes No Reviewer List: * Sue Homewood:eads\slhomewood Select Reviewing Office: * Winston-Salem Regional Office - (336) 776-9800 Does this project require a request for payment to be sent?* Yes No How much is owed?* $240.00 $570.00 Project Submittal Form Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * For the Record Only (Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre -Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Pre -Filing Meeting Date Request was submitted on: 6/6/2022 Project Contact Information Name: Jackson Garvey Who is submitting the information? Email Address: jackson.garvey@hdrinc.com Project Information Existing ID #: Existing Version: 20190900 3 20170001 (no dashes) 1 Project Name: City of Greensboro Proposed Southeast Feeder Main and Liberty Road Sewer Force Main Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown County (ies) Guilford Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document Greensboro Loop Modification 6.71MB Request_6_17_2022_Combined. pdf Permit_Mod_6_17_2022_Other_Features_Pics.pdf 1.59MB Only pdf or kmz files are accepted. Describe the attachments or comments: Please find attached the permit modification request for the City of Greensboro Proposed Southeast Feeder Main and Liberty Road Sewer Force Main. The modification is a response to Notice of Violation (NOV-2022- PC-0142) received on April 26, 2022. Corrections for these issues resulted in the additional impacts discussed in the mod letter. Some areas noted in the NOV are not discussed in the mod letter due to no increase in impacts. They are discussed below. W-B-181-2: Rip rap installed for blow off was determined to be outside of wetland boundary. Confirmed by GPS. A picture of this wetland has been attached. S-A-181-3: The portion of stream impacted was incorrectly left on the jurisdictional map. The channel on the west side of Liberty Rd is a grass swale/ditch. Pictures have been attached to illustrate this. S-A-181-4: Corrections were made with no additional impacts. S-B-181-1: Sediment in the stream is due to a leaking water pipe joint. The contractor will return to this area to correct the problem. S-A-180-2: Corrections were made with no additional impacts. Also covered in this mod are changes requested in the design along NC 62. These changes are a result of having to avoid a newly installed utility line and other obstacles. Sign and Submit ......................................................................................................................................................................................................................................................................................................................................... By checking the box and signing box below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form. Signature: cFa Submittal Date: Is filled in automatically. F�2 June 17, 2022 Mrs. Jean Gibby / Mr. Andrew Williams U.S. Army Corps of Engineers Raleigh Regulatory Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Ms. Sue Homewood N.0 Division of Water Resources 401 & Buffer Permitting Unit 512 North Salisbury Street Raleigh, NC 27604 Subject: Request for Modification to Nationwide Permit Nos. 13 and 58 (SAW- 20019-01356) / General Water Quality Certification Nos. 4245 and 4276 (DWR # 20190900) City of Greensboro Proposed Southeast Feeder Main and Liberty Road Sewer Force Main Guilford County, North Carolina To Whom It May Concern: HDR, on behalf of the City of Greensboro (City), requests modification to the existing Section 404 Nationwide Permit Numbers 58 and 13 and Section 401 Water Quality Certification Numbers 4245 and 4276 for construction activities associated with the Proposed Southeast Feeder Main and Liberty Road Sewer Force Main project (Project) in Guilford County. The original Section 404 Permit (Action ID SAW-2019-01356) is dated September 19, 2019 and the Section 401 Water Quality Certification (Number 20190900) is dated September 16, 2019. There was one previous modification to these permits issued in September 2021. This project is nearing completion of construction. Explanation of Permit Impact Site Modifications Being Requested This modification request is due to increased impacts created when the contractor had to open cut stream channels rather than horizontally drill across the streams due to the hardness of the rock encountered. The change in construction method was described in the previous modification. During construction the contractor determined additional bank stabilization was needed at S-A-180-1 and S-B-130-3. 555 Fayetteville Street Suite 900 Raleigh, NC 27601-3034 (919) 232-6600 June 16, 2022 Page 2 S-A-180-1 (Big Alamance Creek) had permanent impacts increased 22 linear feet due to additional bank stabilization required. A tributary of Big Alamance Creek, S-B-180-3, confluences within this additional stabilized area. This resulted in 26 linear feet of permanent impact to S-B-180-3. These impacts occur on plan sheet 03X-19. An additional design change is being requested along NC 62. Installation of a new utility line (fiber) along with landowner installation of a new driveway and landscaping prevents the previous alignment on the north side of the road from being feasible. Switching to the south side of the road creates permanent and temporary impacts to W-C-181-1 (WS8.3), W-C-181-2 (WS8.4), and P-A-181-3 (PS8.5). Site WS8.2 within the previous alignment is no longer impacted due to this design change. The modification results in 48 linear feet of additional permanent impact to streams due to bank stabilization, 0.02 acres of additional wetland impacts due to fill, 0.02 acres of additional open water impact due to fill, and a reduction of 0.01 acres of temporary wetland impact. Permanent stream crossings are not required at these locations due to access being available along NC Highway 62 and Liberty Road. Please see the enclosed revised permit drawings and updated impact summary sheets which reflect the changes in impacts as well as the following table which describes the impacts. Additional Permit Impacts The following table illustrates the additional impacts beyond those that were previously provided in the electronic PCN and Modification Request. Stream impact number- Permanent (P) or Temporary (T) Type of Impact Stream Name Perennial or Intermittent Type of Jurisdiction Average Stream Width (feet) Impact Length (linear feet) S-A-180-1 (Sheet 03X-19) P Open Cut Trenching (coffer dam, deatering, excavation,wpipe installation, backfilling)/ Bank Stabilization Big Alamance Creek Perennial USACE & DWR 16 62 S-B-180-3 (Sheet P3X 19) Bank Stabilization UT to Big Alamance Intermittent USACE & DWR 2.5 26 June 16, 2022 Page 3 Wetland/Pond Impact Number Type of Impact Wetland/Pond Name Permanent (acre) Temporary (acre) WS8.2 (Sheet 03X-08) Impact Eliminated W-D-181-1 0.00 0.00 WS8.3 (Sheet 03X-08) Clearing W-C-181-1 0.01 0.00 WS8.4 (Sheet 03X-08) Clearing W-C-181-2 0.01 0.00 PS8.5 (Sheet 03X-08) Clearing P-A-181-3 0.02 0.00 Thank you for your assistance with this project. If you have any questions or need additional information, please contact me at (919) 232-6613 orjackson.gavrey@hdrinc.com. Respectfully, HDR Engineering, Inc. of the Carolinas Jackson Garvey Sr. Project Manager Attachments: Revised Wetland and Stream Impact Sheets cc: Jan Stewart - Engineering Manager, City of Greensboro Brian Boyd — Project Manager, City of Greensboro Matt Watt, PE - H D R 03X-06 03X-07 03X-08 03X-09 03X-10 03X-11 03X-12 03X-13 NC W� 62 0 5, 000' 10,000' SCALE: 1" = 5,000' 03X-20 03X19 03X-18 %03NIVX17 03X-14 03X-15 03X-16 F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31 /2018 03X-00 N.C.B.E.L.S. License Number: F-0116 Wetland Impacts Impact Number Sheet Number Wetland ID Lat. (decimal degrees) Long. (decimal degrees) Type of Impact Type of Wetland (Cowardin) Area of Permanent Impact (acres) Area of Temporary Impact (acres) WS6.1 6 W-C-180-1 35.920404 -79.802879 CLEARING PEM 0.00 0.01 WS8.1 8 W-C-180-2 35.918013 -79.781425 CLEARING PEM 0.00 0.01 WS8.2 8 W-D-181-1 35.917793 -79.777446 NONE PFO 0.00 0.00 WS8.3 8 W-C-181-1 35.917541 -79.776958 CLEARING PEM 0.01 0.00 WS8.4 8 W-C-181-2 35.917499 -79.776175 CLEARING PSS 0.01 0.00 0 8 W-D-181-2 35.917442 -79.773543 NONE PSS 0.00 0.00 PS8.5 8 P-A-181-3 35.917525 -79.776394 CLEARING Open Water/Pond 0.02 0.00 WS12.1 12 W-C-182-1 35.913574 -79.738270 CLEARING PEM/PSS 0.00 0.02 0 12 W-A-182-1 35.913791 -79.738301 NONE PFO/PEM 0.00 0.00 0 12 W-D-182-1 35.912686 -79.730837 NONE PFO 0.00 0.00 0 15 W-B-190-1 35.913483 -79.689968 NONE PFO 0.00 0.00 WS15.1 15 W-A-181-3 35.913251 -79.689828 CLEARING PEM 0.00 0.01 WS16.1 16 W-B-181-5 35.931007 -79.675826 CLEARING PFO 0.04 0.04 WS17.1 17 W-B-181-2 35.943931 -79.680043 CLEARING PFO 0.00 0.01 WS17.2 17 W-B-180-1 35.945854 -79.681158 CLEARING PSS 0.00 0.06 0 17 W-A-181-1 35.944035 -79.679691 NONE PFO/PSS 0.00 0.00 0 18 W-A-180-3 35.953595 -79.688709 NONE PFO 0.00 0.00 0 18 W-B-181-1 35.952439 -79.687505 NONE PFO/PSS 0.00 0.00 0 20 W-A-180-1 35.966862 -79.698641 NONE PEM 0.00 0.00 0 20 W-A-180-2 35.966345 -79.697721 NONE PEM 0.00 0.00 Total 0.08 0.16 F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31/2018 03X-01 N.C.B.E.L.S. License Number: F-0116 Stream Impacts Impact Number Sheet Number Stream ID Lat. (decimal degrees) Long. (decimal degrees) Type of Impact Perennial (P) or Intermittent (I) Average Stream Width (feet) Permanent Impact Length (linear feet) Temporary Impact Length (linear feet) Impact Area (square feet) SS5.1 5 S3-BNF 35.924927 -79.827382 TEMPORARY CROSSING, BANK STABILIZATION I 6 22 132 SS5.2 5 SB-2 35.923720 -79.824087 TEMPORARY CROSSING, PERMANENT CROSSING P 8 10 25 280 0 5 S-C-180-1 35.922488 -79.827359 NONE I 12 0 0 0 SS6.1 6 S-C-180-2 35.919669 -79.798393 TEMPORARY CROSSING, BANK STABILIZATION I 8 29 0 232 SS6.2 6 S-C-180-2 35.919535 -79.797672 TEMPORARY CROSSING, BANK STABIILIZATION I 10 33 0 330 SS6.3 6 S-C-180-3 35.919465 -79.796278 TEMPORARY CROSSING, BANK STABIILIZATION P 32 25 0 800 SS7.1 7 S-C-180-4 35.918625 -79.787849 TEMPORARY CROSSING, BANK STABILIZATION P 8 40 0 320 SS8.1 8 S-C-181-2 35.917186 -79.773397 TEMPORARY CROSSING, BANK STABILIZATION P 10 32 0 320 SS9.1 9 S2-BNF 35.916918 -79.771183 TEMPORARY CROSSING, BANK STABILIZATION I 6 25 0 150 0 9 S-C-181-2 35.916409 -79.767131 NONE I 6 0 0 0 0 9 S-D-181-3 35.916707 -79.767055 NONE I 6 0 0 0 0 10 S-D-181-4 35.915121 -79.760345 NONE I 11 0 0 0 0 10 S-C-181-3 35.914945 -79.760406 NONE I 11 0 0 0 0 10 S-C-181-4 35.914626 -79.757771 NONE P 14 0 0 0 SS11.1 11 S-C-181-6 35.914717 -79.749107 TEMPORARY CROSSING, BANK STABILIZATION P 7 25 0 175 SS12.1 12 S-D-182-6 35.913573 -79.738196 TEMPORARY CROSSING, BANK STABILIZATION P 4 14 0 56 SS12.2 12 S-A-182-4 35.912789 -79.730814 TEMPORARY CROSSING, BANK STABILIZATION I 3 16 0 48 SS13.1 13 S1-BNF 35.912648 -79.728323 TEMPORARY CROSSING, BANK STABILIZATION I 6 29 0 174 0 13 S-A-182-2 35.912742 -79.718908 NONE I 6 0 0 0 SS14.1 14 S-A-181-9 35.913056 -79.701679 TEMPORARY CROSSING, BANK STABILIZATION P 7 25 0 175 0 14 S-A-181-8 35.913026 -79.701612 NONE I 3.5 0 0 0 0 14 S-B-190-1 35.913280 -79.701675 NONE P 7 0 0 0 SS15.1 15 S-A-181-7 35.913258 -79.689815 TEMP INLET PROTECTION I 3 0 3 9 SS16.1 16 S-A-181-4 35.931438 -79.675943 TEMPORARY CROSSING, BANK STABILIZATION P 12 40 0 480 0 16 S-A-181-6 35.931085 -79.675565 NONE I 3 0 0 0 0 16 S-A-181-3 35.935000 -79.676084 NONE I 3 0 0 0 SS17.1 17 S-B-181-1 35.943869 -79.679982 TEMPORARY CROSSING, BANK STABILIZATION I 4 26 0 104 SS18.1 18 S-A-180-2 35.952599 -79.687974 TEMPORARY CROSSING, BANK STABILIZATION P 10 37 0 370 SS19.1 19 S-B-180-3 35.959380 -79.692211 TEMPORARY CROSSING, BANK STABILIZATION I 2.5 26 0 65 SS19.2 19 S-A-180-1 35.959316 -79.692152 TEMPORARY CROSSING, BANK STABILIZATION P 16 62 0 992 0 20 S-B-180-1 35.966390 -79.698612 NONE P 4.5 0 0 0 SS20.1 20 S-B-180-2 35.966096 -79.697923 TEMPORARY CROSSING, BANK STABILIZATION I 3 24 0 72 Total 540 28 5,284 F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31/2018 03X-02 N.C.B.E.L.S. License Number: F-0116 N 5 O STREAM FLOW NATURAL c— GROUND TOP OF BANK EX. INV. CREEK CROSSING PIPE 20 ' PERM. EASMENT (MIN.) 10' PLAN DRAINAGE DITCH OR SMALL STREAM TOP OF BANk RIP -RAP TYPICAL SYNTHETIC FILTER FABRIC RIP RAP SHALL NOT EXTEND ABOVE NORMAL HIGH WATER MARK SYNTHETIC FILTER FABRIC (AS PER NCDOT SPEC 01055. TYPE-2) CROSSING PIPE 18" CLASS I RIP -RAP SECTION A -A NOTES: 1) PERMANENT CROSSING FOR VEHICLE MAINTENANCE EQUIPMENT. 2) CLASS I RIP -RAP TO BE LAID MIN. 18 INCHES THICK OVER ENTIRE AREA OF DISTURBANCE (AS DIRECTED BY ENGINEER). 3) CLASS II RIP -RAP USED IN LARGER STREAMS (AS DIRECTED BY ENGINEER) . 4) AS PROJECT IS STABIL 12E0 PLACE SYNTHETIC FILTER FABRIC & SPREAD ALL EXISTING EROSION STONE INTO PERMANENT LINER AS SHOWN. ADD STONE AS NEEDED. 5) ANY REQUIRED ARMORING ABOVE NORMAL HIGH WA TER MARK SHALL CONSIST OF MATTING OR APPROVED VEGETATIVE COVER. CITY OF GREENSBORO STANDARD PERMANENT CREEK STABILIZATION WITH MAINTENANCE CROSSING STD. NO. REV. 214 01-91 05-05 03-97 F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31/2018 03X-03 N.C.B.E.L.S. License Number: F-0116 PUMP I FP PROPOSED EARTH BERM (TYP.) NOTES: -10 04. TEMP. CONSTRUCTION 10 ' '"CLASS " STREAM CROSSING 1 "I" MIN. 1) EROSION STONE TO BE I RIP -RAP UNLESS DESIGNATED DIFFERENTLY ON LL CLASS 10'X10' LL CONSTRUCTION PLAN. ._ FLOW -� RIP RAP ' SEDIMENT TRAP - N. , / V 2.- 1 SIDE st +7PF OR SILT BAG. U ; 2) PIPE SIZE AND AMOUNT NEEDED TO BE DETERMINED BY ENGINEER ON CONSTRUCTION PLAN, «liftt 3 12 ' MIN. 5 ' 1111011111s, v / / { �:y,. 3) TEMPORARY STREAM CROSSING TO BE CONVERTED TO COG #214 UPON PROJECT CONSTRUCTION COMPLETION IF CALLED FOR ON THE CONSTRUCTION PLANS. o_ ti %i°.irofa•l9 • •• .r�r f e�p�• s•rr8lp ., 4) PUMP AND LINE SIZE TO BE DETERMINED BY THE CONTRACTOR USING THE BASE FLOW •p• eov� p*:�� o�a a'M��• /� *.i•`1O p..tttola g 9°r° p+voile ,, s •al.�"Y.1a •LO ee� .�°�,,e*sa'f °•�K,°•6�, f:9 4 6 a, A SHOWN ON THE CONSTRUCTION PLANS. 5) WIDTH OF CONSTRUCTION EASEMENT SHALL BE MINIMIZED BASED UPON FIELD GDNDITIONS. ANY DISTURBANCEISI EXCEEDING AO ' MAY REQUIRE ADDITIONAL WA TEA QUALITY PERMITTIN OR MITIGATION. STREAM ,`{} °�•�99 r i. *A4b ile- CONSTRUCTION SEQUENCE FOR STREAM CROSSING FLOW • MIA. {�ra IIM° weifikPuke I s.'ar.ppaw •4,i°ea a°'• ° °a .� aT r 1) INSTALL PUMP AND LINE TO PUMP FLOW FROM AREA UPSTREAM OF TEMPORARY STREAM p/ +9. �u�i rW:�' Owe �O.. p° • ° 0+e106 CROSSING TO AREA DOWNSTREAM OF CONSTRUCTION AREA. BEGIN PUMPING AND TEMP. 5 "glt e:>: ;,;.::.a CONTINUING PUMPING WHILE WORKING WITHIN THE STREAM. 24" TO 42" CMP CLASS "I' RIP RAP CROSSING �J PIPE MIN.L 2' EROSION STONE CLASS "A" CONTROL WEIR 1- _ { } — ` / \ / 10• x 10' DEWATERING BASIN 3 2' 1 SIDE SLOPE 2) INSTALL UPSTREAM DAM" FILTER FABRIC, AND TEMPORARY CMP. COVER PIPE INLET WITH FABRIC AND SAND BAGS AS SHOWN IN INSET "A" WHILE WORKING IN THE STREAM. ALLOW STREAM FLOW THROUGH CMP AS SHOWN IN INSET "8" WHEN NOT WORKING WITHIN THE STREAM. ' 10 - OR SIC T BAG. 3) INSTALL DOWNSTREAM TEMPORARY STONE DAM AND FILTER FABRIC TO PREVENT PROPOSED EARTH BERM 20 MIN. 1 BACK FLOW INTO CONSTRUCTION AREA. (TYP.I 50' CONSTRUCTION EASEMENT (SEE NOTE 5) PROPOSED EARTH BERM PLAN (TYP.) 4) INSTALL PROPOSED EARTH BERMS ALONG TOP OF BANK ON EACH SIDE OF THE CONSTRUCTION AREA. 5) INSTALL DEWA TERING BASIN OR SILT BAG AT TOP OF BANK. DEWA TER CONSTRUCTION AREA BETWEEN TEMPORARY DAM USING THIS BASIN. POLYETHYLENE FABRIC ON FACE (B ML. THICK) TO M N_ TOP OF FROM ~ PUMP 6J INSTALL THE 10 X 90 ' SEDIMENT TRAP OR SILT BAG. 7) UPON CONSTRUCTION COMPLETION. REMOVE TEMPORARY DAMS, FILTER FABRIC. AND TOP \Exchangal5tannartls\XDRk!N FILES\UPDATES SEAT 2445\CO%2$3.Drq PUMP S1:04 BANK TEMPORARY CMP. OEPRESS TEMPORARY DAM BOTTOMS INTO STREAM BED UNTIL OF RIP RAP IS LEVEL WITH STREAM BOTTOM. CONVERT TO COG STANDARD *214 IF CALLED FOR IN THE CONSTRUCTION PLANS. ., . _ py� STREAM "• �_ FLOW 11 TEMP. 24" TO 8) UPON STABILIZATION OF CLEARED AREAS, REMOVE TEMPORARY EARTH BERM, SEDIMENT TRAP, AND DEWATERING BASIN. A 1 - 42" CMP •aA� NT)ilo I °; trey v b¢as°°` EX. INV.."' CREEK / N / 1 I �yy 18"' 9r.s parer* Y°i MIN. .test eet e0 ' TEMPORARY STONE DAM POL YETHYLENE FABRIC ON FACE (8 ML . THICK) CROSSING PIPE B A INSTALL SANDBAGS IN PIPE INVERT 6 FABRIC WHILE PUMPING _ — AROUND DURING CONSTRUCTION IN STREAM. POLYETHYLENE FABRIC ON FACE 18 ML. THICK) B REMOVE SANDBAGS & FABRIC TO ALLOW FLOW THROUGH — PIPE WHEN NOT PUMPING AROUND. SECTION A —A C I T Y OF GREEIVSBORO CITY OF GREENSBORO STANDARD TEMPORARY CREEK STD. NO. REV. STANDARD TEMPORARY CREEK STD. NO. REV. CROSSING DURING CONSTRUCTION 213 01-91 06-05 03-97 09-05 03-05 CROSSING DURING CONSTRUCTION 213 01-91 06-05 03-97 09-05 03-05 F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31/2018 03X-04 N.C.B.E.L.S. License Number: F-0116 \\‘ • o d o� N \\ ��\\\\k2 (�l L \ \\\ s � �5/<`\ \- \ INTERMITTENT STREAM S3-BNF PERENNIAL STREAM S-C-180-1 -- i / / / ctnvx / „.„„gifjpr\ (..,-;•\((//,, 1001 Perennial Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS5.2 SB-2 TEMPORARY CROSSING, PERMANENT CROSSING 10 25 0 S-C-180-1 NONE 0 0 Total 10 25 Intermittent Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS5.1 S3-BNF TEMPORARY CROSSING, BANK STABILIZATION 22 0 Total 22 0 SCALE: 1" = 200' PERENNIAL STREAM SB-2 SS5.2 (, LEGEND w EXISTING WETLAND EXISTING POND • — EXISTING PERENNIAL STREAM — — — — — — EXISTING INTERMITTENT STREAM TEMPORARY WETLAND IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM IMPACT (COG STD. 214 - SEE 03X-03) FM FM \ ��\\`\\\\\"` TEMPORARY STREAM IMPACT (COG STD. 213 - SEE 03X-04) PROPOSED SEWER MAIN PROPOSED WATER MAIN 4.1 F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31/2018 03X-05 N.C.B.E.L.S. License Number: F-0116 Wetland Impacts KEYMAP I I i I I I Impact Site Feature ID from PJD Impact Type Permanent Impact Area (AC) Temporary Impact Area (AC) WS6.1 W-C-180-1 CLEARING 0.00 0.01 Total 0.00 0.01 Intermittent Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS6.1 S-C-180-2 TEMPORARY CROSSING, BANK STABILIZATION 29 0 SS6.2 S-C-180-2 TEMPORARY CROSSING, BANK STABIILIZATION 33 0 Total 62 0 Perennial Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS6.3 S-C-180-3 TEMPORARY CROSSING, BANK STABIILIZATION 25 0 Total 0 0 ///// // / / / "77%/ /i///`� /// / / // a 4i// //// y / LEGEND EXISTING WETLAND EXISTING POND • — EXISTING PERENNIAL STREAM — — — — — — EXISTING INTERMITTENT STREAM TEMPORARY WETLAND IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM IMPACT (COG STD. 214 - SEE 03X-03) M \ q \\� / l 1 `� Illy V)1\ 11 SS6.1,r�:7.!_i_______,("(7j/1 �,1 lii\\ \\�_.- INTERMITTENT STREAM S-C-180-2 0 200' 400' SCALE: 1" = 200' -)INTERMITTENT STREAM S-C-180-2 SS6.3 TEMPORARY STREAM IMPACT (COG STD. 213 - SEE 03X-04) PROPOSED SEWER MAIN PROPOSED WATER MAIN -93 ° //- ///// ///, fr z 0 1— Q z 1- z 0 0 0 r- O M O 1- w W W w w z_ J U 1- 2 F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31/2018 03X-06 N.C.B.E.L.S. License Number: F-0116 Perennial Stream Impacts z 0 1=I z z 0 0 0 I u- 8 0 MI O 1- W W W W w z J 0 1- 2 • 'A. NC HWY 62 KEYMAP • gas — ` / )'\"IIINli-'l11�1\11l11\ \ .� 1�I"LJ0///////i'in11 II�11111\111� I � l/I I t'I I I I I I I I 1 I I 1 I I -- I zy Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS7.1 S-C-180-4 TEMPORARY CROSSING, BANK STAB! LIZATI ON 40 0 Total 40 0 PSRENNIA STREA S-C- se-4 200' \\ 400' SCALE: 1" = 200' N 5 I I LEGEND EXISTING WETLAND EXISTING POND • — EXISTING PERENNIAL STREAM — — — — — — EXISTING INTERMITTENT STREAM TEMPORARY WETLAND IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM IMPACT (COG STD. 214 - SEE 03X-03) FM FM i///// // /�/ i i i / i i TEMPORARY STREAM IMPACT (COG STD. 213 - SEE 03X-04) PROPOSED SEWER MAIN PROPOSED WATER MAIN Z-// — \\.\ \ %VI 11111`IIj z 0 IQ I1- z 0 0 0 u- co Ic 0 co /...,..,,,,N) W co I / z I U i— Q 2 F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31 /2018 03X-07 N.C.B.E.L.S. License Number: F-0116 Wetland Impacts z 0 QI z 1— z 0 0 0 u- rI 0 M1 O 1— w w w w z J 2 • EetWale ����F6,�„ NCHWY62 KEYMAP II ' x N 1 / / WS8.1 ) -- WETLAND W-C-180-2 ti" FaLrFp�—FOC —ter 1 0 Impact Site Feature ID from PJD Impact Type Permanent Impact Area (AC) Temporary Impact Area (AC) WS8.1 W-C-180-2 CLEARING 0.00 0.01 WS8.2 W-D-181-1 NONE 0.00 0.00 WS8.3 W-C-181-1 Fill 0.01 0.00 WS8.4 W-C-181-2 Fill 0.01 0.00 0 W-D-181-2 NONE 0.00 0.00 PS8.5 P-A-181-3 Fill 0.02 0.00 Total 0.02 0.01 Pond Total 0.02 0.00 Perennial Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS8.1 S-C-181-2 TEMPORARY CROSSING, gANK STABILIZATION 32 0 Total 32 0 WS8.2 IMPACT ELIMINATED WETLAND W-D-181-1 200' WS8.3 400' SCALE: 1" = 200' WETLA W-C-181-1 _ QyF WS8.4 WS8.5 LEGEND EXISTING WETLAND EXISTING POND • - EXISTING PERENNIAL STREAM - - - - - - EXISTING INTERMITTENT STREAM TEMPORARY WETLAND IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM IMPACT (COG STD. 214 - SEE 03X-03) FM FM TEMPORARY STREAM IMPACT (COG STD. 213 - SEE 03X-04) PROPOSED SEWER MAIN PROPOSED WATER MAIN WWDT181LAD2 I!•. \ \1 I f II'1(SS8.1-/JL \\\\III {I�\\\1 \ \ \\ \\\I\\\\ PERENNIAL STREAM S-C-181-2 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31/2018 03X-08 N.C.B.E.L.S. License Number: F-0116 Intermittent Stream Impacts LEGEND z 0 1=I z 1= z 0 U 0 I u- E 0 MI O 1— W W W W z J 2 0 1— Q 2 .//%l% 7i•e4 VA NC HWY 62 //// j///� //// / / / %//////My / ( l t /////7 I - \ \ < --_9 -� III\\\\\�- %/- \ \\\\\ ; _ % - '/ KEYMAP INTERMITTENT STREAM S2-BNF SS9.1 i1 i\\, , ink , I1 Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS9.1 S2-BNF TEMPORARY CROSSING, BANK STAB I LI ZA11 ON 25 0 0 S-C-181-2 NONE 0 0 0 S-D-181-3 NONE 0 0 Total 25 0 INTERMITTENT STREAM ) I `N.S-D-181-3 \�' \• �✓�//i/////7/ , NCHWY62'• ' ///� // /mar 0 INTERMITTENT STREAM S-C-181-2 ) I I I I lI�J1/�/i / ) 1l1i1{Illh6((I (/\\) \ 200' N 40 ' SCALE: 1" = 200' N EXISTING WETLAND EXISTING POND • — EXISTING PERENNIAL STREAM — — — — — — EXISTING INTERMITTENT STREAM TEMPORARY WETLAND IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM IMPACT (COG STD. 214 - SEE 03X-03) TEMPORARY STREAM IMPACT (COG STD. 213 - SEE 03X-04) PROPOSED SEWER MAIN PROPOSED WATER MAIN z 0 IQ D II Z 0 0 Ct 0 u- 0 M 0 I— W W CO W W CO Iz ` I 1.((1( 1 U (1i 1- Q 2 F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31/2018 03X-09 N.C.B.E.L.S. License Number: F-0116 Perennial Stream Impacts LEGEND MATCHLINE - SEE SHEET 03X-08 FOR CONTINUATION l l I l lJ i ti, // //f J ((,/ /- --_-� • 0/ NC HWY 62 KEYMAP INTERMITTENT STREAM S—D-181-4 1 �/. S—C-1 —3 `\) 0 _sue 1 w _ q 0 Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) 0 S-C-181-4 NONE 0 0 Total 0 0 Intermittent Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) 0 S-D-181-4 NONE 0 0 0 S-C-181-3 NONE 0 0 Total 0 0 JACK AND BORE °J��llrl� PERENNIAL11 S RI�III STREAM �\� ' S—C-181-4 200' °//7 rc(�//`/ N 400' SCALE: 1" = 200' F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 EXISTING WETLAND EXISTING POND • - EXISTING PERENNIAL STREAM - - - - - - EXISTING INTERMITTENT STREAM TEMPORARY WETLAND IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM IMPACT (COG STD. 214 - SEE 03X-03) FM FM TEMPORARY STREAM IMPACT (COG STD. 213 - SEE 03X-04) PROPOSED SEWER MAIN PROPOSED WATER MAIN PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31/2018 03X-10 Q 2 N.C.B.E.L.S. License Number: F-0116 LEGEND • NC HWY 62 KEYMAP In �✓ri'//// //( yL-T/- —�j`��� �-- 111 J��)111( V • SS11.1 Perennial Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS11.1 S-C-181-6 TEMPORARY CROSSING, BANK STABILIZATION 25 0 Total 25 0 N� i.ais //// l i of / ////7 % ✓1 /Il��l// ( (// //////- 200' 400' SCALE: 1" = 200' o 0 0 EXISTING WETLAND EXISTING POND • — EXISTING PERENNIAL STREAM — — — — — — EXISTING INTERMITTENT STREAM M M \ \\\\\`� TEMPORARY WETLAND IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM IMPACT (COG STD. 214 - SEE 03X-03) TEMPORARY STREAM IMPACT (COG STD. 213 - SEE 03X-04) PROPOSED SEWER MAIN PROPOSED WATER MAIN ////(_ �J�i I1/ -_ -�///. F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31/2018 03X-11 N.C.B.E.L.S. License Number: F-0116 Wetland Impacts z 0 QI z I- z 0 0 0 u_ I • /.,.i"il %!/%�' ov NC HWY 62 KEYMAP j 1 WETLAND /��` \ I n \ W—D-182— ` n\\ `szs.. WS12.1 SS12.1 WETLAND W—C-182-1 • PERENNIAL STREAM S—D-182 6 \�\ \IA \ \1 0 Impact Site Feature ID from PJD Impact Type Permanent Impact Area (AC) Temporary Impact Area (AC) WS12.1 W-C-182-1 CLEARING 0.00 0.02 0 W-A-182-1 NONE 0.00 0.00 0 W-D-182-1 NONE 0.00 0.00 Total 0.00 0.02 Perennial Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS12.1 S-D-182-6 TEMPORARY CROSSING, BANK STABILIZATION 14 0 Total 14 0 Intermittent Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS12.2 S-A-182-4 TEMPORARY CROSSING, BANK STABILIZATION 16 0 Total 16 0 200' yteu 400' SCALE: 1" = 200' 4/ /// /(-1 r1�� III0411\ �\ 11 1101 P 1 1 b LEGEND EXISTING WETLAND EXISTING POND • — EXISTING PERENNIAL STREAM — — — — — — EXISTING INTERMITTENT STREAM FM FM TEMPORARY WETLAND IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM IMPACT (COG STD. 214 - SEE 03X-03) TEMPORARY STREAM IMPACT (COG STD. 213 - SEE 03X-04) PROPOSED SEWER MAIN PROPOSED WATER MAIN ll\1��1\t�� I(�` �\\\I ')/I 1(1�" 1<<J1I`\� \ \I\I�\ l /II\ 1 I 1 1\ \\ ���\ \ �� WET - W—A- INTERMITTENT STREAM S—A-182-4 F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31 /2018 03X-12 N.C.B.E.L.S. License Number: F-0116 INTERMITTENT STREAM Si-BNF y' `"�^'�G NC HWY 62 /It'4 ' gig. SS13.1 KEYMAP 1 ( r p�+ ��/i_ — 7 / ° I / . i (ti /.. _ -- - Intermittent Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS13.1 S1-BNF TEMPORARY CROSSING, BANK STABILIZATION 29 0 0 S-A-182-2 NONE 0 0 Total 29 0 t 71 / mem E. i 0 200' °/°; 1 r 1 `` \\�. LEGEND EXISTING WETLAND EXISTING POND • — EXISTING PERENNIAL STREAM — — — — — — EXISTING INTERMITTENT STREAM TEMPORARY WETLAND IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM IMPACT (COG STD. 214 - SEE 03X-03) Or - FM FM TEMPORARY STREAM IMPACT (COG STD. 213 - SEE 03X-04) PROPOSED SEWER MAIN PROPOSED WATER MAIN 4/010014, \\L ^ \\ It \\ \�� ���°�`�� ok� \\ \\\�\\ ikimp y' v1 ie.' kg - I l� T.d,� / / / I N 400' SCALE: 1" = 200' 1 I I ( / )III J INTERMITTENT STREAM S-A-182-2 F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31/2018 03X-13 N.C.B.E.L.S. License Number: F-0116 L 'A. Mi�. :,W ..iil %'.i ?q i NC HWY 62 SOF KEYMAP 77// —0-0 //// / / ill/ �J/I/Ni i 11 %/ i%� �ti� / / 111► 1111 I I I Ii SS14.1 Perennial Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS14.1 S-A-181-9 TEMPORARY CROSSING, BANK STABILIZATION 25 0 0 S-A-181-8 NONE 0 0 0 S-B-190-1 NONE 0 0 Total 25 0 /= PERENNIAL STREAM S—A-1B1-9 0 IMPACTS ON THIS SHEET ARE WITHIN THE HAW RIVER SUBASIN (CAPE FEAR 02) PERENNIAL STREAM S—B-190-1 �. \\\ \I 7) \ \\ ( \8 \ PERENNIAL STREAM S—A-181-8 LEGEND EXISTING WETLAND EXISTING POND • — EXISTING PERENNIAL STREAM — — — — — — EXISTING INTERMITTENT STREAM TEMPORARY WETLAND IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM IMPACT (COG STD. 214 - SEE 03X-03) FM FM 1 \\*\ • 200' SCALE: 1" = 200' N 400' 4$ TEMPORARY STREAM IMPACT (COG STD. 213 - SEE 03X-04) PROPOSED SEWER MAIN PROPOSED WATER MAIN 5/)/)+//I/I ll / // / J//l / =1�s' F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31 /2018 03X-14 N.C.B.E.L.S. License Number: F-0116 Wetland Impacts LEGEND • i//s....iil k ?q i NC HWY 62 KEYMAP \o to Impact Site Feature ID from PJD Impact Type Permanent Impact Area (AC) Temporary Impact Area (AC) 0 W-B-190-1 NONE 0.00 0.00 WS15.1 W-A-181-3 CLEARING 0.00 0.01 Total 0.00 0.00 Intermittent Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS15.1 S-A-181-7 TEMP INLET PROTECTION 0 3 Total 0 3 IMPACTS ON THIS SHEET ARE WITHIN THE HAW RIVER SUBASIN (CAPE FEAR 02) EXISTING WETLAND EXISTING POND • — EXISTING PERENNIAL STREAM — — — — — — EXISTING INTERMITTENT STREAM TEMPORARY WETLAND IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM IMPACT (COG STD. 214 - SEE 03X-03) FM FM TEMPORARY STREAM IMPACT (COG STD. 213 - SEE 03X-04) PROPOSED SEWER MAIN WATER ER MAIN y` \\1 � 21. W•-4\\ c>0 �\\\\\\WETLAND / \ O 1 1 W �e-.ma�� NCHWY62 w w w e�=ram-- j ��__� / WETLAND w ( r f E3 \ W-A-181-3 INTERMITTENT N. I ( // / e i �Fr 4 f ��� STREAM b� \ 1—rrj i a S-A-181-7 a I� ` 1 L SS15.1WS151 Q 0 200' 400' SCALE: 1" = 200' F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31 /2018 03X-15 N.C.B.E.L.S. License Number: F-0116 Wetland Impacts IY NC HWY 62 KEYMAP IMPACTS ON THIS SHEET ARE WITHIN THE HAW RIVER SUBASIN (CAPE FEAR 02) -.-o o - INTERMITTENT N\I G STREAM rr r !. FS B F696-J FM FM NN W � �\\�\\\\\\\ IC\�\ \ .1..\11 / - J- 9.1 ri( I 1 I 1 I'j i i I I 1 Impact Site Feature ID from PJD Impact Type Permanent Impact Area (AC) Temporary Impact Area (AC) WS16.1 W-B-181-5 CLEARING 0.04 0.04 Total 0.04 0.04 Perennial Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS16.1 S-A-181-4 TEMPORARY CROSSING, BANK STABILIZATION 40 0 Total 40 0 Intermittent Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) 0 S-A-181-6 NONE 0 0 0 S-A-181-3 NONE 0 0 Total 0 0 FM _\ 1,..,7 --__,--:-.- r - i.1 ;I e 0 200' 400' SCALE: 1" = 200' 0 o p\ �� � 1� PERENNIAL �:�. STREAM `1, —/ r S-A-1B1-4 \\ 1' - FM FM &i. il\4i l \\\ SS16.1 WS16.1 LEGEND EXISTING WETLAND EXISTING POND • — EXISTING PERENNIAL STREAM — — — — — — EXISTING INTERMITTENT STREAM TEMPORARY WETLAND IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM IMPACT (COG STD. 214 - SEE 03X-03) i FM FM TEMPORARY STREAM IMPACT (COG STD. 213 - SEE 03X-04) PROPOSED SEWER MAIN PROPOSED WATER MAIN A INTERMITTENT STREAM S-A-181-6 •� %err/ I) %/ 1 J//(1 1r FM FM FM wWBT181�5!� ./ Alb +\ \ \tea 17:2 I 1 1\ tj 1 a F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31/2018 03X-16 N.C.B.E.L.S. License Number: F-0116 Wetland Impacts LEGEND %1 ZI 0 z 1— z 0 UI I O u_ co X c) 0 1- w w (I)I WI w w z J 0 <• ////V I I' °'%"ice.•. �/...ii/ % i 7i� i NC HWY 62 KEYMAP /// //j //) I OAP 4% - — �� • ��° ( \�l\►I ��1\%rl fir` J \\\ .2 0 I mpact Site Feature ID from PJD Impact Type Permanent Impact Area (AC) Temporary I mpact Area (AC) WS17.1 W-B-181-2 CLEARING 0.00 0.01 WS17.2 W-B-180-1 CLEARING 0.00 0.06 0 W-A-181-1 NONE 0.00 0.00 Total 0.00 0.07 Intermittent Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS17.1 S-B-181-1 TEMPORARY CROSSING, BANK STABILIZATION 26 0 Total 26 0 200' IMPACTS ON THIS SHEET ARE WITHIN THE HAW RIVER SUBASIN (CAPE FEAR 02) o WS17.2 k� — / / WETLAND ,/, / //// / / W-B-180-1 400' SCALE: 1" = 200' N� FM • FM�FM FM- ( W- FMB w EXISTING WETLAND EXISTING POND • — EXISTING PERENNIAL STREAM — — — — — — EXISTING INTERMITTENT STREAM ■ TEMPORARY WETLAND IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM IMPACT (COG STD. 214 - SEE 03X-03) FAA FM riNI TEMPORARY STREAM IMPACT (COG STD. 213 - SEE 03X-04) PROPOSED SEWER MAIN PROPOSED WATER MAIN / WETLAND r— // W-A-1B1-1 fI / fit( /��//, _ ///-B-1B1- W-B-181-2 INTERMITTENT STREAM S-B-181-1 -2j SS17.1,%//�%�� ��( WS17.1 F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31/2018 03X-17 N.C.B.E.L.S. License Number: F-0116 Wetland Impacts LEGEND z 0 DI z 1- z 0 U 0 rnl MI CD 1- W W 2 U W W �I zl� r J�FM U �FM� Q —`... u l 042 -o 4.7 '����� , ..//s.,, 31- %� NC HWY 62 KEYMAP 1R{ N ‘ \ 44 Impact Site Feature ID from PJD Impact Type Permanent Impact Area (AC) Temporary Impact Area (AC) 0 W-A-180-3 NONE 0.00 0.00 0 W-B-181-1 NONE 0.00 0.00 Total 0.00 0.00 Perennial Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS18.1 S-A-180-2 TEMPORARY CROSSING, BANK STABILIZATION 37 0 Total 37 0 IMPACTS ON THIS SHEET ARE WITHIN THE HAW RIVER SUBASIN (CAPE FEAR 02) `I1 k II( ( . , -_ � � J LIBERTY RD % -�M WETLAND W-B-181-1 0 -FM SS18.1- r PERENNIAL STREAM S-A-180-2 WETLAND_ W-A-180-3" 200' 400' SCALE: 1" = 200' w EXISTING WETLAND EXISTING POND • — EXISTING PERENNIAL STREAM — — — — — — EXISTING INTERMITTENT STREAM TEMPORARY WETLAND IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM IMPACT (COG STD. 214 - SEE 03X-03) FM FM TEMPORARY STREAM IMPACT (COG STD. 213 - SEE 03X-04) PROPOSED SEWER MAIN PROPOSED WATER MAIN F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31 /2018 03X-18 N.C.B.E.L.S. License Number: F-0116 Perennial Stream Impacts LEGEND ZI 0 QI z 1- z 0 0 0 �I N MI 0 H 40 �o EetW:I ,NC HWY 62 KEYMAP n// ),//1,1/.),1 lit / ..%W.11141N1111111ras. tom rr Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS19.2 S-A-180-1 TEMPORARY CROSSING, BANK STABILIZATION 62 0 Total 62 0 Intermittent Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS19.1 S-B-180-3 TEMPORARY CROSSING, BANK STABILIZATION 26 0 Total 26 0 IMPACTS ON THIS SHEET ARE WITHIN THE HAW RIVER SUBASIN (CAPE FEAR 02) E 1111 e,l LIBERTY (SR 3549) 0 111'1 200' 114 400' SCALE: 1" = 200' \\�����,�� �yy ( INTERMITTENT STREAM S-B-180-3 SS19.1 SS19.2 EXISTING WETLAND EXISTING POND • — EXISTING PERENNIAL STREAM FM EXISTING INTERMITTENT STREAM TEMPORARY WETLAND IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM IMPACT (COG STD. 214 - SEE 03X-03) TEMPORARY STREAM IMPACT (COG STD. 213 - SEE 03X-04) PROPOSED SEWER MAIN PROPOSED WATER MAIN / 2 F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31/2018 03X-19 N.C.B.E.L.S. License Number: F-0116 Wetland Impacts %�� ////i;%i i NC HWY62 KEYMAP cot Impact Site Feature ID from PJD Impact Type Permanent Impact Area (AC) Tem porary Impact Area (AC) 0 W-A-180-1 NONE 0.00 0.00 0 W-A-180-2 NONE 0.00 0.00 Total 0.00 0.00 Perennial Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) 0 S-B-180-1 NONE 0 0 Total 0 0 Intermittent Stream Impacts Impact Site Feature ID from PJD Impact Type Permanent Impact Length (LF) Temporary Impact Length (LF) SS20.1 S-B-180-2 TEMPORARY CROSSING, BANK STABILIZATION 24 0 Total 24 0 `� ` \ rms (11 , PERENNIAL \ STREAM S—B-180-1 INTERMITTENT ' STREAM ti� S—B-180-2 04 IMPACTS ON THIS SHEET ARE WITHIN THE HAW RIVER SUBASIN (CAPE FEAR 02) WETLAND \ \ w—A-180-2 rr$ER •�„„���'____l I\ 1 (SR 3549) 0 200' 400' SCALE: 1" = 200' (r11 x7, LEGEND w EXISTING WETLAND EXISTING POND • — EXISTING PERENNIAL STREAM — — — — — — EXISTING INTERMITTENT STREAM TEMPORARY WETLAND IMPACT PERMANENT WETLAND IMPACT PERMANENT STREAM IMPACT (COG STD. 214 - SEE 03X-03) FM FM '1' co co O)cb TEMPORARY STREAM IMPACT (COG STD. 213 - SEE 03X-04) PROPOSED SEWER MAIN PROPOSED WATER MAIN F)1 HDR Engineering Inc. of the Carolinas 555 Fayetteville Street, Suite 900 Raleigh, NC 27601 919.232.6600 PROPOSED SOUTHEAST FEEDER MAIN AND LIBERTY ROAD SEWER FORCE MAIN JURISDICTIONAL IMPACTS DATE SHEET 05/31 /2018 03X-20 N.C.B.E.L.S. License Number: F-0116 S-A-181-3 Non -JD section S-A-181-3 Non -JD section W-B-181-2