Loading...
HomeMy WebLinkAbout20140514 Ver 1_More Info Received_20140707 (3)CLEAN AND M CUL NOTES: 1) DATA BASED ON TOTAL STATION SURVEYS APRIL 28, 2010 AND MAY 26, 2010. 2) DRAWING FOR CONCEPTUAL PURPOSES ONLY; PRECISE CHANNEL AND STRUCTURE LOCATIONS TO BE DETERMINED DURING CONSTRUCTION BY FIELD ENGINEER 3) REPLACE (2) 30" CMP WITH SAME; SET UPPER INVERT AT EXISTING ELEVATION; INSTALL AT 4% SLOPE UNDER ROAD. 4) REPLACE (2) 60" CMP WITH SINGLE BOTTOMLESS ARCH CULVERT; MAINTAIN DESIGN CHANNEL CROSS- SECTION THROUGH CULVERT. 5) CLEAN AND MAINTAIN EXISTING (2) 48" CMP. RIFFLE BANKFULL BENCH O LOG VANE BOULDER CROSS VANE DOUBLE -DROP BOULDER CROSS VANE RELOCATE EXISTING FOOTS DC,E RELOCATE EXISTING TRA I ELEVATED SEWER LINE REMOVE RIPRAP FILL REPLACE CULVERTS (SEE NOTES) REMOVE FENCE EXISTING THALWEG DESIGN THALWEG EXISTING TOP OF BANK DESIGN TOP OF BANK o EXISTING TREE 0 EXISTING CULVERT EXTENT OF BACKWATER FROM HIWASSEE RIVER (MAY 26, 2010) SCALE 1" = 80' 40 0 40 80 Z z U U o U � •*y asJ�� �W Q° U O O m Li U L� 0 U LC Z I- O C/� � I �QLj I L- ZLJ n < w �� z wQ� Qi 0 V' D � DATE 09/23/2010 PROJECT NO. FILENAME MURPHY.DWG SHEET NO. PL - 2 DRANNG NO. RIFFLE PAVED ROAD BANKFULL BENCH O LOG VANE BOULDER CROSS VANE INSTALL BOULDER CROSS VANE DOUBLE -DROP PER ATTACHED DETAIL BOULDER CROSS VANE REMOVE EXISTING TREES CLEAN AND MAINTAIN EXISTING CULVERTS ESTABLISH NEW TOP OF BANK TO CREATE 40 -FOOT WIDE CORRIDOR GRADE FROM NEW TOP OF BANK TEL BANKFULL ELEVATION AT 2:1 SLOPE N INSTALL NAG125BN OR SIMILAR ON ALL SLOPES �\7 REMOVE EXISTING TREES W NOTES: 1) DATA BASED ON TOTAL STATION SURVEYS APRIL 28, 2010 AND MAY 26, 2010. 2) DRAWING FOR CONCEPTUAL PURPOSES ONLY; PRECISE CHANNEL AND STRUCTURE LOCATIONS TO BE DETERMINED DURING CONSTRUCTION BY FIELD ENGINEER 3) REPLACE (2) 30" CMP WITH SAME; SET UPPER INVERT AT EXISTING ELEVATION; INSTALL AT 4% SLOPE UNDER ROAD. 4) REPLACE (2) 60" CMP WITH SINGLE BOTTOMLESS ARCH CULVERT; MAINTAIN DESIGN CHANNEL CROSS- SECTION THROUGH CULVERT. 5) CLEAN AND MAINTAIN EXISTING (2) 48" CMP. INSTALL LOG VANES PER ATTACHED DETAIL TRIBUTARY o SEE DESIGN CROSS- SECTION FOR CHANNEL DIMENSIONS E. REMOVE EXISTING TREES EXISTING THALWEG DESIGN THALWEG EXISTING TOP OF BANK DESIGN TOP OF BANK o EXISTING TREE EXISTING CULVERT REMOVE EXISTING FOOTBRIDGE REPLACE CULVERTS (SEE NOTES) , i O O INSTALL BOULDER CROSS VANE PER ATTACHED DETAIL O SCALE 1" = 40' 20 0 20 40 z U U o U � �•.yr�yy— asJ�� U p, O m w U L� L� O U Z F- O C� oQ� L- ZLJ n < w �� z w Q� Qi �V) D DATE 09/23/2010 PROJECT NO. FILENAME MURPHY.DWG SHEET NO. PL — b DRA'MNG NO. 0 E w INSTALL DOUBLE -DROP BOULDER CROSS VANES (5) PER ATTACHED DETAIL \ REPLACE CULVERTS \ (SEE NOTES) NOTES: 1) DATA BASED ON TOTAL STATION SURVEYS APRIL 28, 2010 AND MAY 26, 2010. 2) DRAWING FOR CONCEPTUAL PURPOSES ONLY; PRECISE CHANNEL AND STRUCTURE LOCATIONS TO BE DETERMINED DURING CONSTRUCTION BY FIELD ENGINEER 3) REPLACE (2) 30" CMP WITH SAME; SET UPPER INVERT AT EXISTING ELEVATION; INSTALL AT 4% SLOPE UNDER ROAD. 4) REPLACE (2) 60" CMP WITH SINGLE BOTTOMLESS ARCH CULVERT; MAINTAIN DESIGN CHANNEL CROSS- SECTION THROUGH CULVERT. 5) CLEAN AND MAINTAIN EXISTING (2) 48" CMP. RIFFLE BANKFULL BENCH O LOG VANE BOULDER CROSS VANE DOUBLE -DROP BOULDER CROSS VANE EXISTING THALWEG DESIGN THALWEG EXISTING TOP OF BANK DESIGN TOP OF BANK 0 EXISTING TREE EXISTING CULVERT SCALE 1" = 40' 20 0 20 40 z U U o U� •1�1 asJ�� U p, 0 m Li U L� Li O U I- F- Z O C/� � I �QLj I L- ZLJ n <�� w z w Q� �Qi o U' D � DATE 09/23/2010 PROJECT NO. FILENAME MURPHY.DWG SHEET NO. PL- 4 DRA'MNG NO. - RIFFLE - BANKFULL BENCH D LOG VANE BOULDER CROSS VANE DOUBLE -DROP BOULDER CROSS VANE EXISTING THALWEG DESIGN THALWEG EXISTING TOP OF BAN DESIGN TOP OF BANK O EXISTING TREE CZ:::3 EXISTING CULVERT NOTES: 1) DATA BASED ON TOTAL STATION SURVEYS APRIL 28, 2010 AND MAY 26, 2010, 2) DRAWING FOR CONCEPTUAL PURPOSES ONLY; PRECISE CHANNEL AND STRUCTURE LOCATIONS TO BE DETERMINED DURING CONSTRUCTION BY FIELD ENGINEER 3) REPLACE (2) 30" CMP WITH SAME; SET UPPER INVERT AT EXISTING ELEVATION; INSTALL AT 4% SLOPE UNDER ROAD. 4) REPLACE (2) 60" CMP WITH SINGLE BOTTOMLESS ARCH CULVERT; MAINTAIN DESIGN CHANNEL CROSS- SECTION THROUGH CULVERT. 5) CLEAN AND MAINTAIN EXISTING (2) 48" CMP. TRIB\UT/�! r RELOCATE EXISTING FOOTBRIDGE RELOCATE EXISTING TRAIT_ ESTABLISH NEW TOP OF BANK APPROX. 20 -FEET FROM EXISTING TOP OF BANK GRADE FROM NEW TOP OF BANK TO BANKFULL ELEVATION AT 2:1 SLOPE ELEVATED SEWER LINE INSTALL NAG125BN OR SIMILAR ON ALL SLOPES O O REMOVE EXISTING TREE TRIBUTARY 01, REMOVE FENCE EXTENT OF BACKWATER FROM HIWASSEE RIVER (MAY 26, 2010) MAINTAIN EXISTING THALWEG AND CHANNEL LOCATIONS DOWNSTREAM OF CULVERTS z U U o •py- asJ�� U p, 0 0 m Li U O U I— F- Z O � � I c:�QLj L— ZLJ n <�� w z w Q� �Qi o U' DATE SCALE 1" = 40' 0e/23 /2010 PROJECT NO. 20 0 20 40 FILENAME MURPH Y.DWG SHEET N0. PL- 5 DRA'MNG NO. BAC SEL FILTE FOOTER LOG SELECT MATERIAL/ FILTER FABRIC N❑TES� PLAN VIEW ______ _ ______ BANKFULL ELEVATION _____________ HEADER LOG / __ _�___1/2 B_ANKEULL_ - ELEVATION FOOTER LOG STREAMBED ELEVATION SECTI ❑N A -A 1. FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE 1/4 DIAMETER FROM THE TOP OF THE LOG. THE NAILS SHALL BE ON 12 INCH CENTERS FILTER FABRIC SHALL BE BURIED IN THE BOTTOM OF THE CHANNEL AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE 2 A TRENCH SHALL BE DUG IN SUCH A MANNER THAT THE FOOTER BOULDERS AND LOGS A MINIMUM OF 2/3 OF THE HEADER BOULDER IS BURIED BENEATH THE BED SURFACE ELEVATION LOG VANE SCALE: NTS BANKFULL ELEVATION ----------------------------------------------------------------------------------- ////////// HEADER LGG 1/2 BANKFULL ELEVATION --------------------------------------------------------- STREAMBED ELEVATION T FOOTER LEGS WILL BXISTIN C U I SB THE E G TRATE AND SHALL BE A MINIMUM OF THE 13" DIAMETER 3. LOG IS HARDWOOD AND A MINIMUM DIAMETER OF 24 THE LOG SHALL BE BURIED A MINIMUM OF 5 FT IN THE BANKS, 4. FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE VANE STRUCTURE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS, FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE, SECTI ❑N B -B Z �N g � N � Z 0 m J Q W LJ Q Z Q Q Q LD F7 Z J Q H- DATE 09/29/201 PROJECT NO. FILENAME MURPHY.DWG SHEET N0 DRAWING NO FILTER 20 - 3 BACKFILL W: SELECT MATE BANKF i F`HW i FLOW i ROCK CROSS VANE 1/3 OF PROPOSED 1/3 O� PROPOSED 1/3 OF PRUPUSED SCALE: N T S BANKFULL WIDTH BANKFUL_ WIDTH BANKFULL WIDTH NOTES: i 1/3 OF PROPOSED 1/3 OF PROPOSED 1/3 OF PROPOSED BANKFULL WIDTH BANKFULL WIDTH BANKFULL WIDTH NO GAPS BANKFULL BETWEEN ELEVATION FBOULDERS TOP OF CENTER 1/3 STONES SET AT ELEVATION SHOWN � JON LONGITUDINAL PROFILE -OUT STREAMBED — ELEV. FOOTER BOULDERS - WILL BE PLACED INTO THE EXISTING SUBSTRATE C R❑ S S S E C T I O N A MINIMUM OF THE ROCK DIAMETER 1. ALL STONES ARE TO BE STRUCTURE STONE. 2. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER, PLUGGING WITH STRUCTURE STONE CLASS A AND SELECT MATERIAL OR CHINKING STONE APPROVED BY DESIGN ENGINEER, AND LINING WITH FILTER FABRIC. 3. DIMENSIONS AND SLOPES MAYBE ADJUSTED TO FIT BY THE DESIGN ENGINEER. 4. CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TIGHTLY. 5, FOOTER BOULDERS AND VANE BOULDERS SHALL BE NATIVE STONE OR SHOT ROCK, CUBICAL OR RECTANGULAR IN NATURE, 6, SLOPE OF VANE FROM CENTERLINE TO THE TOP OF THE VANE ARM SHALL BE 2 -57.. 7. ELEVATION CHANGE SHALL BE SPLIT EVENLY OVER TWO DROPS, VANE SEOpE FOOTER BOULDERS WILL BE PLACED INTO THE EXISTING SUBTRATE A MINIMUM OF THE BOULDER DIAMETER STREAMBED ELEVATION 8, THERE SHALL BE NO DROP GREATER' THAN 6 INCHES. 9, THE ELEVATION OF EACH GRADE CONTROL STRUCTURE SHOULD BE EQUAL TO OR GREATER THAN THE ELEVATION OF THE TOP OF THE FOOTER ROCKS DIRECTLY UPSTREAM, SECTIEN BB 10. FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS, FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE J_ Q J Q Q Q Q Z Q H-- L7 W Z Q L7 L7 0 U U 0 ry DATE 09/9/201 PROJECT NO. FILENAME MURPHY.DWG SHEET NO. DRA`MNG NO. SLOPE OF VANE FROM CENTERLINE z FILTER TOP BANKFULL SHALL BE 2 -57, zN FABRIC z i w > FLOW o � Jao HEADER STONE __ -- - - - -- PO OL _ •� DDB& R % / / /� ° STONE STREAMBEDw o ELEV. o�z 0 SECTION A— A m STREAMBANK BANKFULL ELEVATION STREAMBED — ELEV. FOOTER BOULDERS - WILL BE PLACED INTO THE EXISTING SUBSTRATE C R❑ S S S E C T I O N A MINIMUM OF THE ROCK DIAMETER 1. ALL STONES ARE TO BE STRUCTURE STONE. 2. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER, PLUGGING WITH STRUCTURE STONE CLASS A AND SELECT MATERIAL OR CHINKING STONE APPROVED BY DESIGN ENGINEER, AND LINING WITH FILTER FABRIC. 3. DIMENSIONS AND SLOPES MAYBE ADJUSTED TO FIT BY THE DESIGN ENGINEER. 4. CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TIGHTLY. 5, FOOTER BOULDERS AND VANE BOULDERS SHALL BE NATIVE STONE OR SHOT ROCK, CUBICAL OR RECTANGULAR IN NATURE, 6, SLOPE OF VANE FROM CENTERLINE TO THE TOP OF THE VANE ARM SHALL BE 2 -57.. 7. ELEVATION CHANGE SHALL BE SPLIT EVENLY OVER TWO DROPS, VANE SEOpE FOOTER BOULDERS WILL BE PLACED INTO THE EXISTING SUBTRATE A MINIMUM OF THE BOULDER DIAMETER STREAMBED ELEVATION 8, THERE SHALL BE NO DROP GREATER' THAN 6 INCHES. 9, THE ELEVATION OF EACH GRADE CONTROL STRUCTURE SHOULD BE EQUAL TO OR GREATER THAN THE ELEVATION OF THE TOP OF THE FOOTER ROCKS DIRECTLY UPSTREAM, SECTIEN BB 10. FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS, FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE J_ Q J Q Q Q Q Z Q H-- L7 W Z Q L7 L7 0 U U 0 ry DATE 09/9/201 PROJECT NO. FILENAME MURPHY.DWG SHEET NO. DRA`MNG NO. DOUBLE DROP ROCK CROSS VANE SCALE: NTS 1/3 OF PROPOSED BANKFULL WIDTH a I w A FILTER FABRIC I I — BANKFULL 20 - 30 deg / BACKFILL WITH I SELECT MATERIAL° 01 i Sl EP \\ I PC OL \ \ ° I SEE NOTE 7 \ ,j h - Z N I B SCO A 1/3 OF PROPOSED 1/3 OF PROPOSED 1/3 OF PROPOSED BANKFULL WIDTH BANKFULL WIDTH BANKFULL WIDTH NO GAPS BANKFULL BETWEEN ELEVATION BOULDERS \ TOP OF CENTER 1/3 STONES SET AT ELEVATION SHOWN \\ ON LONGITUDINAL PROFILE / STREAMBED ELEV. — //7 CROSS - SECTION NOTES: 1. ALL STONES ARE TO BE STRUCTURE STONE. 2. GAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING BOULDERS TOGETHER AND PLUGGING WITH STRUCTURE STONE CLASS A AND SELECT MATERIAL OR CHINKING STONE APPROVED BY DESIGN ENGINEER, AND LINING WITH FILTER FABRIC. 3. DIMENSIONS AND SLOPES MAY BE ADJUSTED TO FIT BY THE DESIGN ENGINEER. / FOOTER BOULDERS WILL BE PLACED INTO THE EXISTING SUBSTRATE A MINIMUM OF THE ROCK DIAMETER FILTER FABRIC HEADER STONE FOOTER STONE SLOPE OF VANE FROM CENTERLINE TOP BANKFULL SHALL BE 2 -5% FLOW 0-- T POOL 7/ ' IC SECTION A -P- MAX OF 0.5'— �TREAMBED ELEV. STEP ROCKS — /_ STREAMBANK T\\r 0 VANE SLOpF FOOTER BOULDERS WILL BE PLACED INTO THE EXISTING SUBTRATE A MINIMUM OF THE BOULDER DIAMETER STREAMBED ELEVATION BANKFULL ELEVATION SECTION B -B �•'T��jli asJ�� U o 0 J LEI Q Z Q LEI O Q Q� Q � LEI p Q J ry q Pal U Z � Q O Y Q U V O ry 4. CONTRACTOR WILL BE REQUIRED TO FIT BOULDERS TIGHTLY. 5. FOOTER BOULDERS AND VANE BOULDERS SHALL BE NATIVE STONE OR SHOT ROCK, CUBICAL OR RECTANGULAR IN NATURE. 6. SLOPE OF VANE FROM CENTERLINE TO THE TOP OF THE VANE ARM SHALL BE 2 -5% 7. ELEVATION CHANGE SHALL BE SPLIT EVENLY OVER TWO DROPS. 8. THERE SHALL BE NO DROP GREATER THAN 6 INCHES. 9. THE ELEVATION OF EACH GRADE CONTROL STRUCTURE SHOULD BE EQUAL TO OR GREATER THAN THE ELEVATION OF THE TOP OF THE FOOTER ROCKS DIRECTLY UPSTREAM. 10. FILTER FABRIC SHALL BE PLACED ON THE UPSTREAM SIDE OF THE STRUCTURE TO PREVENT WASHOUT OF SEDIMENT THROUGH BOULDER GAPS. FILTER FABRIC SHALL EXTEND FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH OF THE STRUCTURE. DATE 09/29/201 PROJECT NO. FILENAME MURPHY.DWO SHEET NO. DRAWING NO. USFS Tusquitee Ranger District Office, Murphy, NC Longitudinal Profile - Mainstem Design 100 95 90 0 W 85 Existing Thalweg — Existing Culvert Proposed Thalweg • Proposed Structure 80 Proposed Bankfull 75 0 200 400 600 800 1000 1200 Station (feet) USFS Tusquitee Ranger District Office, Murphy, NC Longitudinal Profile - Tributary Design �i ■ ■ X x ■ x ■ ■ x X2 ■x ■ x — *—Existing Thalweg — Existing Culvert ■ Left Top of Bank x Right Top of Bank .`���� Proposed Thalweg • Proposed Structure USFS Tusquitee Ranger District Office, Murphy, NC Cross - sections Design Design riffle cross - section (lower reach) 90.0 89.0 88.0 w 87.0 0 86.0 y 85.0 v w 84.0 83.0 Design cross- section Existing cross - sect on 1 82.0 0 10 20 30 40 50 60 70 80 Distance (feet) Area = 8.3 sq ft Width = 9.1 ft Mean depth = 0.9 ft Max depth = 1.3 ft W/D ratio = 10.1 Design riffle cross - section (upper reach) 97.0 96.0 95.0 94.0 0 93.0 v 92.0 w 91.0 �� Design cross - section 90.0 Existing cross- section ] 89.0 0 10 20 30 40 50 60 70 80 Distance (feet) Area = 5.0 sq ft Width = 7.2 ft Mean depth = 0.7 ft Max depth = 0.9 ft W/D ratio = 10.5