Loading...
HomeMy WebLinkAbout20140514 Ver 1_More Info Received_20140707 (2)OVERFLOW WIDTH 1/2 "BANKFULL" I_ru <- 1--1\fo1N!V BYF (SEE 7 MIN. 1 1. BYPASS PIPE: MINIMUM DIAMETER: 12" (SUMMER FLOWS) VARIES AS NEEDED 45 DEGREE ELBOWS REQUIRED: 2 (MIN.) 2. BYPASS PIPE UNDER FINISHED: HIGH DENSITY POLYETHYLENE PIPE MEETING REQUIREMENTS OF ELEVATION VIEW STREAMBED SEC. 602 MITER ENDS TO FINISHED FILL SLOPES. PAYMENT ELB SUBSIDIARY TO ITEM 15713. A,' 3. REMOVE ALL DEWATERING FACILITIES WHEN NEED IS GONE. CONTRACTOR'S OPTION TO REMOVE THE DEWATERING PIPE FROM Bp UNDER FILL OR PLUG EACH END WITH CONCRETE AND LEAVE IN PLACE. CLOCAI STREAK IMPERVIOUS MEMBRANE KEY TRENCH AS NEEDED TO CONTROL SEEPAGE UNDER IMPERVIOUS MEMBRANE FILL WITH CLEAN GRAVEL 2' IMPERVIOUS MEMBRANE DOWNSTREAM END SANDBAGS BYPASS PIPE /_ DIAMETER MINIMUM BYPASS PIPE 12" DIAMETER MINIMUM or Q2 FL 6. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE NEW CONSTRUCTION AREA IN AS DRY A CONDITION AS POSSIBLE DURING CONSTRUCTION. DEWATERING DETAILS THIS PLAN IS FOR EXAMPLE ONLY - NOT REQUIRED - CONSIDER AS GUIDANCE BYPASS SCHEMATIC - TYPICAL PLAN VIEW (NOT TO SCALE) r0RE5T5ERVIq U.S. DEPARTMENT OF AGRICULTURE NATIONAL FORESTS IN NORTH CAROLINA 1 U ,S FOREST SERVICE NANTAHALA NATIONAL FOREST - TUSQUITEE RANGER DISTRICT STREAM DIVERSION & DEWATERING DETAILS 9�T�E 0 40 REGION 8 TRIBUTARY TO HIAWASSEE CREEK STREAM RESTORATION STRAW BALES STREAM FLOW STREAMBED IMPERVIOUS MEMBRANE LEAK -PROOF COLLAR GEOTEXTILE UPSTREAM END PRORILE VIEW MIRAFI 140N GRANULAR BACKFILL SANDBAG BYPASS DAM DETAILS OR EQUAL SECTION 703.03(a) (NOT TO SCALE) STREAMBED "BR NOTES SECTION VIEW 1. THIS DEWATERING & SEDIMENT CONTROL PLAN SHOWS THE L 0 GRANULAR BACKFILL MINIMUM ACCEPTABLE CRITERIA, AND MAY REQUIRE ADDITIONAL �- -i SECTION 703.03(a) REMOVE SEDIMENT /Tl MEASURES. THE CONTRACTOR WILL SUBMIT A DESIGN /PLAN U) u- I BEFORE ALLOWING ` TO THE C.O.R. FOR APPROVAL THAT MEETS OR EXCEEDS THE STANDARDS 11 TO RE -ENTER STF SHOWN HEREON. j/ GEOTEXTILE 2. MAINTAINING WATER TURBIDITY DOWNSTREAM (NOT EXCEEDING MIRAFI 140N THE TURBIDITY OF THE UPSTREAM WATER) IS THE RESPONSIBILITY OF THE OR EQUAL CONTRACTOR THROUGHOUT THE DURATION OF THE PROJECT. GEOTEXTILE -WRAF 3. PUMPS CAPABLE OF PUMPING STREAM FLOW SHALL BE ON -SITE BANKFULL STRAW BALES STRAW BALE SEDIP UNTIL STREAM IS FLOWING ON APPROVED FINISHED STREAMBED. CONTROL WEIR REMOVE SEDIMEN' 4. OVERNIGHT PUMPING IS NOT PERMITTED, OPERATE "BROWN- WATER" SUMP PLAN VIEW 1/2 HEIGHT OF THE AT END OF WORK DAY UNTIL SUMP WATER IS CLEAR. GEOTEXTILE - WRAPPED STRAW BALE SEDIMENT CONTROL WEIR STRAW BALES 5. MATERIAL HANDLING BAGS MAY BE USED, INSTEAD OF SANDBAGS, (NOT TO SCALE) WHERE THEY ARE MORE EFFECTIVE. 6. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE NEW CONSTRUCTION AREA IN AS DRY A CONDITION AS POSSIBLE DURING CONSTRUCTION. DEWATERING DETAILS THIS PLAN IS FOR EXAMPLE ONLY - NOT REQUIRED - CONSIDER AS GUIDANCE BYPASS SCHEMATIC - TYPICAL PLAN VIEW (NOT TO SCALE) r0RE5T5ERVIq U.S. DEPARTMENT OF AGRICULTURE NATIONAL FORESTS IN NORTH CAROLINA 1 U ,S FOREST SERVICE NANTAHALA NATIONAL FOREST - TUSQUITEE RANGER DISTRICT STREAM DIVERSION & DEWATERING DETAILS 9�T�E 0 40 REGION 8 TRIBUTARY TO HIAWASSEE CREEK STREAM RESTORATION