Loading...
HomeMy WebLinkAboutNCS000606_Inspection Report_20220630Compliance Inspection Report Permit: NCS000606 Effective SOC: Effective County: Wake Region: Raleigh Contact Person: Kim Maza Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Expiration: Owner : Duke Energy Progress LLC Expiration: Facility: Shearon Harris Nuclear Power Plant 5413 Shearon Harris Rd Title: Inspection Date: 06/30/2022 Entry Time 09:OOAM Primary Inspector: Thaddeus W Valentine Secondary Inspector(s): Lauren Garcia Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: ❑ Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Certification: New Hill NC 27562 Phone: 984-229-2502 Phone: Exit Time: 12:30PM Phone: Inspection Type: Technical Assistance Page 1 of 3 Permit: NCS000606 Owner - Facility: Duke Energy Progress LLC Inspection Date: 06/30/2022 Inspection Type : Technical Assistance Reason for Visit: Routine Inspection Summary: Inspection was inresponse to the seperation of stormwater from the NPDES wastewater permit. A very detailed summary of each drainage area was provided in the facility SWPPP. All industrial activities observed onsite correlated with the descriptions in the SWPPP. Materials, waste, chemical storage, etc. descriptions were provided in the application. The areas observed during the inspection appeared to correlate with these summaries as well. Currently the facility does not perform analytical monitoring of the stormwater outfalls. The facility has had representative outfall status under the combined permit. Only two outfalls, Outfalls 3 and 6, have been sampled in the past. Composite sampling equipment is set up at both of the outfalls. The majority of the exterior of the site was observed during the inspection. All accesible stormwater outfalls were viewed as well. In drainage areas 8 and 9 there is a laydown and storage area. Metal piping, sand and gravel, pallets, crushed stone and a few empty tanks were observed in this area. The tanks were reported to be cleaned out by Shamrock Environmental. An old generator is stored in this area and was reported to be removed from the site soon. A second laydown area was observed in drainage areas 1 ad 2. Other materials in the laydown included metal replacement parts and other pieces. There was a small wash bay located in this area. An old container labeled as "Klaraid CPPI 301" has been re -purposed and is used to hold water for the wash bay. Dumpsters with household waste and one paint can were observed in this area. Other dumpsters contained metal materials as well. This area is also used to store equipment. A chemical storage building was observed as well. The firing range was inspected for potential contamination to stormwater. The firing range is birmed on three sides and runnoff is expected to drain internally. The firing range facility has an underground domestic treatment area that handles bathroom and kitchen wastes. The area also houses a single mineral oil transformer. The area is not expected to cause significant stormwater contamination. Stormwater sheetflows from the parking area towards a canal that is an inlet to the site. Water flowing from the canal is treated in the facilities onsite wastewater treatment plant A few good housekeeping practices in the laydown, chemical and equipment storage areas were discussed onsite. Overall, no serious issues were identified during the inspection. Page 2 of 3 Permit: NCS000606 Owner - Facility: Duke Energy Progress LLC Inspection Date: 06/30/2022 Inspection Type : Technical Assistance Reason for Visit: Routine Page 3 of 3