Loading...
HomeMy WebLinkAbout20140684 Ver 1_Site Plan_20140730TYPICAL SECTIONS 1V:2H 4% 1 V: 2 H 1V:1H 4% 6" Aggregate Base Grading C or D 14 ' Travel way PGL S lop e v a r i e s Roadway excavation Limits of clearing and grubbing, and turf establishment B2 1 8 " ( t y p ) 2% min (Sta 10+60 to 11+80) SITE 1 SLIDE SECTION CL_SG CL SHLD_SG CP_SG SHLD_SG CP_SG See Detail E629-01A Rolled erosion control product, Type 5.A 15' minimum length (typ) 4' 1V:1.3H Select granular backfill (57 stone) 1 4 ' w a l l h e i g h t and Detail E255-B Facing support, see note 7 13' minimum length (typ) Existing ground 1' 1' Section A-A 4-Inch drain pipe Select granular backfill (57 stone) where drain pipes are not used. 3. Provide 6 inches of select granular backfill (57 stone) below the wall 2. Establish turf according to Section 625 on all slopes. 1. Grade roadside ditches to drain (0.5 percent minimum slope). NOTES: 8. Construct GRS wall in accordance with Section 255. 7. Provide wire basket with support struts according to Detail E255-B. 6. Key new fill into temporary slopes during backfilling. 5. Adequately stabilize temporary slopes during excavation and backfilling. 4,000 lb/ft. 4. Provide biaxial geogrid with minimum long-term design strength (LTDS) of of Subsection 706.08(d). Furnish perforated outlet pipe and fittings to meet the requirements 10. 11. 12. 13. 9. subsection 703.03(a) . Furnish select granular backfill (57 stone) meeting the requirements of suitable marker. Mark the outlet of the underdrain with a delineator post or other A A 4" Perforated drain pipe Geogrid reinforcement (typ) spacing. Place 4-inch perforated drain pipes at maximum 10 feet center to center as approved by the CO. 605.03. Hold the screen securely in place with standard coupling bands or Cover the end of the outlet drain pipe with screen according to subsection U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION STERLING, VIRGINIA REG STATE PROJECT SHEET NO. NC8 NC ERFO FSR 2013-1(1) NANTAHALA NATIONAL FOREST TYPICAL SECTIONS 4%4% 6" Aggregate Base Grading C or DPGL 14 ' Travel way 1V:2H Varies 1V:1H 1 V: 2 H 2% min Roadway excavation Limits of clearing and grubbing, and turf establishment 1 6 ' w a l l h e i g h t B3 1 8 " ( t y p ) CL (Sta 21+50 to 23+00) SITE 2 SLIDE SECTION Rock dowel (typ) See Detail E629-01A Rolled erosion control product, Type 5.A Sl o p e v arie s - 2. 4 V: 1 H m a x 14' minimum length (typ) 16' minimum length (typ) S l o p e v a r i e s - 7 V : 1 H m a x 4' Select granular backfill (57 stone) 20' (typ) Slo pe varies and Detail E255-B Facing support, see note 7 Existing ground 1' 1' Section A-A 4-Inch drain pipe Select granular backfill (57 stone) of Subsection 706.08(d). Furnish perforated outlet pipe and fittings to meet the requirements 14. 11. 12. 13. subsection 703.03(a) . Furnish select granular backfill (57 stone) meeting the requirements of suitable marker. Mark the outlet of the underdrain with a delineator post or other 6. Key new fill into temporary slopes during backfilling. backfilling. 5. Adequately stabilize temporary slopes during excavation and strength (LTDS) of 4,000 lb/ft. 4. Provide biaxial geogrid with minimum long-term design the wall where drain pipes are not used. 3. Provide 6 inches of select granular backfill (57 stone) below 2. Establish turf according to Section 625 on all slopes. 1. Grade roadside ditches to drain (0.5 percent minimum slope). NOTES: on Sheet C2. full height to start/end limits according to wall schedule Use 1 row of rock dowels where wall transitions from horizontal) in two rows starting at 6 feet below grade. 10. Space rock dowels at 7 feet center to center (vertical and or flatter. by the CO. Rock dowels are not needed on slopes at 1:1 9. Install rock dowels for back slope stabilization as required 8. Construct GRS wall in accordance with Section 255. Detail E255-B. 7. Provide wire basket with support struts according to 15. A A 4" Perforated drain pipe as approved by the CO. 605.03. Hold the screen securely in place with standard coupling bands or Cover the end of the outlet drain pipe with screen according to subsection spacing. Place 4-inch perforated drain pipes at maximum 10 feet center to center Geogrid reinforcement (typ) U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION STERLING, VIRGINIA REG STATE PROJECT SHEET NO. NC8 NC ERFO FSR 2013-1(1) NANTAHALA NATIONAL FOREST TYPICAL SECTIONS 1 V: 2 H 4% 1V:2H1V:1H 4% 6" Aggregate Base Grading C or D 14 ' Travel way PGL Slope varies Roadway excavation Limits of clearing and grubbing, and turf establishment B4 (Sta 26+75 to 27+95) SITE 3 SLIDE SECTION CL_SG CL SHLD_SG SHLD_SG Varies - 1 V:1 H max 1 8 " ( t y p ) Select granular backfill (57 stone) 4' 14' minimum length (typ) 11' minimum length (typ) 1 2 ' w a l l h e i g h t See Detail E629-01A Rolled erosion control product, Type 5.A 2% min and Detail E255-B Facing support, see note 7 Existing ground 1' 1' Section A-A 4-Inch drain pipe where drain pipes are not used. 3. Provide 6 inches of select granular backfill (57 stone) below the wall 2. Establish turf according to Section 625 on all slopes. 1. Grade roadside ditches to drain (0.5 percent minimum slope). NOTES: 8. Construct GRS wall in accordance with Section 255. 7. Provide wire basket with support struts according to Detail E255-B. 6. Key new fill into temporary slopes during backfilling. 5. Adequately stabilize temporary slopes during excavation and backfilling. 4,000 lb/ft. 4. Provide biaxial geogrid with minimum long-term design strength (LTDS) of Select granular backfill (57 stone) Mark the outlet of the underdrain with a delineator post or other suitable marker. of Subsection 706.08(d). Furnish perforated outlet pipe and fittings to meet the requirements 10. 11. 12.Furnish select granular backfill (57 stone) meeting the requirements of subsection 703.03(a) . 13. 9. A A 4" Perforated drain pipe Place 4-inch perforated drain pipes at maximum 10 feet center to center spacing. Geogrid reinforcement (typ) Hold the screen securely in place with standard coupling bands or as approved by the CO. Cover the end of the outlet drain pipe with screen according to Subsection 605.03. U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION STERLING, VIRGINIA REG STATE PROJECT SHEET NO. NC8 NC ERFO FSR 2013-1(1) NANTAHALA NATIONAL FOREST TBAR 4202 TBAR 30603070 3070 3080 308 0 30 8 0 3090 3090 3090 3100 3100 3100 3100 3110 3110 3110 312 0 3120 3120 3 13 0 3130 3130 3130 3 140 3140 3140 3140 4203 3 150 3150 3150 3150 3 16 0 3160 3160 3 1 6 0 3170 3170 317 0 318 0 3180 3180 3190 3190 3190 320 0 3200 32103210 3220 P C 2 0 + 5 8 .5 0 2 1 + 0 0 P T 2 1 + 0 0 . 2 7 P C 2 1 + 1 9 . 8 4 P T 2 1 + 5 8 . 6 7 2 2 + 0 0 P C 2 2 + 0 6 . 8 4 2 3 + 0 0 P T 2 3 + 2 9 . 8 3 2 4 + 0 0 21+00 3120 3122 3124 3126 3128 3130 3132 3134 3136 3120 3122 3124 3126 3128 3130 3132 3134 3136 22+00 23+005050 3136 3138 3140 3142 3144 3146 3136 3138 3140 3142 3144 3146 50 NANTAHALA NATIONAL FOREST D2 Centerline Proposed edge of road Existing edge of road Proposed profile Existing ground Existing ground Match to existing 21+00 Route 423 Begin aggregate overlay NC ERFO FSR 2013-1(1)8 NC D PI 20+79.42 Curve = SITE2&3-1 R = 300.00' T = 20.92' L = 41.78' PI 21+39.50 D Curve = SITE2&3-2 R = 100.00' T = 19.66' L = 38.83' D R = 300.00' PI 22+69.21 Curve = SITE2&3-3 T = 62.37' L = 122.99' E 562,412.10 N 578,299.07 23+50 Route 423 End aggregate overlay Proposed profile 23+50 Route 423 End aggregate overlay 31483148 3150 3150 Remove existing 24" CMP 1 4 ' t y p . N 1 4 ' t y p Match to existing Match to existing Install 1 ton riprap class 3 Install inlet type 4B Install 24" x 21' CMP 21+00 Install 1 ton riprap class 3 Install inlet type 4B Install 24" x 20' CMP 24+00 Remove existing inlet. Remove existing 24" culvert. 12 - J u n - 2 0 1 4 0 9 :10 A M9 :10 :0 2 A M M :\ P R O J E C T S \ _ F S \ N C \ 2 0 1 3 - 1( 1) \ P r o j _ D e v \ C A D D \ D 2 & 3 - n c e r f o _ 2 0 1 3 - 1( 1) _ p & p .d g n U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION STERLING, VIRGINIA PLAN & PROFILE TATHAM GAP ROAD SITE 2 REG STATE PROJECT SHEET NO. Construction limits CL El. 3128.10 Install 24" x 21' CMP 21+00 CL El. 31248.76 Install 24" x 20' CMP 24+00 1290 cuyd excavation SCALE IN FEET 0 20 40 E 562,429.31 N 578,052.52 21+00 Route 423 Begin aggregate overlay Begin Site 2 N.C. E 562,419.29 N 578,348.36 24+00 Route 423 End Site 2 +5.978% V P I 2 1 + 7 5 E L 3 , 1 3 8 . 4 1 30' VC K = 12 SSD = 451' V P I 2 2 + 5 5 E L 3 , 1 4 1 . 2 1 +3.502% +7.995% 117' VC K = 26 +7.995% 2470 2470 2470 2 4 7 0 4504 TBAR 2480 2 4 8 0 2480 2 4 8 0 ALLOWEDDUMPINGNO 4503 TBAR 500NAIL 24 90 2490 2 4 9 0 2490 2500 2500 2 5 0 0 2510 2510 25 20 2520 2530 2530 2540 2540 2550 P O T 6 0 + 0 0.0 0 6 0 + 0 0 6 1 + 0 0 P C 6 1 + 1 5.0 4 6 2 + 0 0 6 3 + 0 0 P T 6 3 + 8 9 .1 2 6 4 + 0 0 60+00 61+00 62+005050 50 2472 2474 2476 2478 2480 2482 2484 2486 NANTAHALA NATIONAL FOREST D5 Curve = SITE5-1 D R = 300.00' PI 62+62.48 T = 147.44' L = 274.08' E L 2 , 4 8 5 . 3 3 V P I 6 1 + 0 0 E L 2 , 4 7 5 . 5 6 V P I 6 2 + 1 0 2 , 4 8 6 . 7 9 NC ERFO FSR 2013-1(1)8 NC N Centerline Existing edge of road Proposed edge of road Existing ground Proposed profile 60+00 Route 423 Begin aggregate overlay 62+50 Route 423 End aggregate overlay 2472 2474 2476 2478 2480 2482 2484 2486 Construction limits E 561,680.56 N 589,094.80 62+50 Route 423 End aggregate overlay 1 4' t y p 63+00 2472 2474 2476 2478 2480 2482 2468 2470 2468 2470 2472 2474 2476 2478 2480 2482 Remove existing culvert 12 - J u n - 2 0 1 4 0 9 :18 A M9 :18 :3 9 A M M :\ P R O J E C T S \ _ F S \ N C \ 2 0 1 3 - 1( 1) \ P r o j _ D e v \ C A D D \ D 5 - n c e r f o _ 2 0 1 3 - 1( 1) _ p & p .d g n U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION STERLING, VIRGINIA PLAN & PROFILE TATHAM GAP ROAD SITE 5 REG STATE PROJECT SHEET NO. Install inlet type 4B. Install 24" x 20' CMP. Remove existing inlet. Remove existing culvert. 62+80.92 CL El. 2468.752 Install 24" x 20' CMP 62+80.92 66 cuyd excavation, 82 cuyd embankment SCALE IN FEET 0 20 40 CL El. 2479.714' with 1.25' embedment Install 26' of 7' x 4' RCB Remove existing double 20" x 30' CMP 60+68 E 561767.49 N 588,863.28 60+00 Route 423 Begin aggregate overlay Begin Site 5 N.C. Construct headwalls, skew 5° Install 26' of 7' span x 4' rise RCB Remove existing double barrel CMPs 60+68 E 561,675.25 N 589,127.26 62+82 Route 423 End Site 5 -1 .456% -8.88 7 % 75' VC K = 10 SSD = 183'-8.88 7 % - 4. 332 % 80' VC K = 18 2 , 4 7 3 . 8 2 - 4. 332 % 2 , 4 7 3 . 8 2