Loading...
HomeMy WebLinkAbout20190049 Ver 1_Mitigation Evaluation_20220707From: Davis. Erin B To: Baker. Caroline D Subject: FW: [External] Notice of Initial Credit Release/ NCDMS Carpenter Bottom Mitigation Site/ SAW-2018-02062/ Gaston County Date: Thursday, July 7, 2022 4:26:45 PM Attachments: Carpenter Bottom 100090 CT 02 STR RW Initial Release KB.pdf Laserfiche Upload: Email & Attachment DWR#: 20190049 v.1 Doc Type: Mitigation Evaluation From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Thursday, July 7, 2022 4:07 PM To: Wiesner, Paul <paul.wiesner@ncdenr.gov> Cc: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Bowers, Todd <bowers.todd@epa.gov>; Youngman, Holland J <hollandyouungman@fws.gov>; Merritt, Katie <katie.merritt@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer, Olivia <olivia.munzer@ncwildlife.org>; Reid, Matthew <matthew.reid@ncdenr.gov>; Eric Neuhaus <eneuhaus@wildlandseng.com>; Shawn Wilkerson <swilkerson@wildlandseng.com>; Fennel, Tommy E CIV USARMY CESAW (USA) <Tommy.E.Fennel@usace.army.mil>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil>; Stanfill, Jim <jim.stanfill@ncdenr.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; Allen, Melonie <melonie.allen@ncdenr.gov> Subject: [External] Notice of Initial Credit Release/ NCDMS Carpenter Bottom Mitigation Site/ SAW- 2018-02062/ Gaston County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon Paul, The 15-Day As-Built/MYO review for the Carpenter Bottom Mitigation Site (SAW-2018-02062) ended June 29, 2022. This review was done in accordance with Section 332.8(o)(9) of the 2008 Mitigation Rule. All comments received from the NCIRT are incorporated in the email below. Please address IRT concerns in the MY1 Report. There were no objections to issuing the initial (30% ) credit release of 920.349 warm SMUs and 2.503 Riparian WMUs. Please find attached the current signed ledger. The IRT is not requesting a site visit at this time, but would like to put it on the list for late in MY2. USACE Comments, Kim Isenhour: 1. How deep are the floodplain pools where the relic channel meander features were located? On recent site visits, we've noted several instances of floodplain pools being left as open water in areas where the mitigation plans calls for planted buffers. The majority of these pools have been deep enough that they will not dry seasonally and allow for herbaceous or woody vegetation establishment. 2. In future monitoring years, please capture some of the wetland rehabilitation areas with mobile veg plots. 3. Thank you for including the soil profile descriptions at each groundwater gauge. It would have been helpful to include a table with the pre -construction gauge data. 4. Pebble counts were included in the data. Do you plan to keep this as a performance standard through monitoring? 5. Photo Point 12, outside the easement, appears to be a source of offsite sediment/nutrients. NCDWR Comments, Erin Davis: 1. DWR would like to reiterate DMS' comments/questions on the high riffles and gauge bentonite seals. WEI's responses were fine, but please closely observe these areas during MY1 and address as needed. 2. What are the max. depths of the floodplain pools? (may include response in MY1 report) 3. DWR appreciated that invasives were inventoried and treated pre -construction. And we were glad to see woody debris was added to the floodplain pools. DWR is ok with the proposed credit release. No site visit requested. USEPA Comments, Todd Bowers: * All 13 vegetation plots met the interim success criteria and are on track to meet the final * success criteria required for MY7, and no species dominance per plot was greater than 50%. * Morphological surveys conducted throughout the Site show all streams as stable and functioning as designed. * Eleven groundwater wells were established at baseline conditions to monitor wetland hydrology within both wetland re-establishment and rehabilitation areas. Wetland hydrologic data will be collected and reported during MY1. * No adaptive management plan needed at this time. * No issues of conservation easement encroachment. * Table 2a: I recommend adding a visual confirmation that the objective of excluding livestock from the conservation easement is being met. Visual confirmation can include no sign of hoof shear or cattle excrement within the project boundaries. Trampled streams and vegetation, broken fence, destroyed banks from hooves and excrement would be positive indications of that objective not meeting standards. * Overall, I am very satisfied with the report and the work that Wildlands has completed at the site. Having not been able to visit this location, I really appreciated the detailed ground -level stream and veg plot photos to illustrate the amount of work implemented. I recommend the appropriate credit release (Milestone 2) for warm stream and riparian wetland mitigation units for this monitoring milestone. I have no other substantial comments at this time. Please let me know if you have any questions. Respectfully, Kim Kim (Browning) Isenhour Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 1 919.946.5107 Mitigation Project Name DMS ID River Basin Cataloging Unit County Carpenter Bottom 100090 Catawba 03050102 Gaston USACE Action ID DWR Permit Date Project Instituted Date Prepared Stream/Wet. Service Area 2nd Stream/Wet. Service Area Signature of Official Approving Credit Release 2018-02062 2019-0049 10/9/2018 6/1/2022 Catawba 03050102 CT 03 ESA 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases °/u Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 920.349 920.349 0.000 920.349 2022 6/1/2022 3 - Year 1 Monitoring 10.00% 306.786 2023 4 - Year 2 Monitoring 10.00% 306.786 2024 5 - Year 3 Monitoring 10.00% 306.786 2025 6 - Year 4 Monitoring 5.00% 153.392 2026 7 - Year 5 Monitoring 10.00% 306.786 2027 8 - Year 6 Monitoring 5.00% 153.392 2028 9 - Year 7 Monitoring 10.00% 306.786 2029 Stream Bankfull Standard 10.00% 306.786 2026 Totals 920.349 Total Gross Credits 3,067.849 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 920.349 Total Percentage Released 30.00% Remaining Unreleased Credits 2,147.500 Credit Release Milestone Riparian Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 2.503 2.503 0.000 2.503 2022 6/1/2022 3 - Year 1 Monitoring 10.00% 0.834 2023 4 - Year 2 Monitoring 10.00% 0.834 2024 5 - Year 3 Monitoring 15.00% 1.252 2025 6 - Year 4 Monitoring 5.00% 0.418 2026 7 - Year 5 Monitoring 15.00% 1.252 2027 8 - Year 6 Monitoring 5.00% 1 0.418 2028 9 - Year 7 Monitoring 10.00% 0.834 2029 Totals 2.503 Total Gross Credits 8.345 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 2.503 Total Percentage Released 29.99% Remaining Unreleased Credits 5.842 Carpenter Bottom Catawba 03050102 / Catawba 03 ESA Page 1 of 2 Mitigation Project Name DMS ID River Basin Cataloging Unit County Notes Contingencies (if any) Project Quantities Carpenter Bottom 100090 Catawba 03050102 Gaston USACE Action ID DWR Permit Date Project Instituted Date Prepared Stream/Wet. Service Area 2nd Stream/Wet. Service Area Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 3,023.714 Warm Stream Enhancement II 353.080 Riparian Restoration 9.661 2018-02062 2019-0049 10/9/2018 6/1/2022 Catawba 03050102 CT 03 ESA Debits Warm Stream Restoration Credits Riparian Restoration Credits Beginning Balance (mitigation credits) 3,067.849 8.345 Released Credits 920.349 2.503 Unrealized Credits 0.000 0.000 Converted Credits 0.000 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 920.349 2.503 Remaining Balance (Unreleased credits) 2,147.500 5.842 Total Remaining Balance (Released and Unreleased credits) 3,067.849 8.345 Carpenter Bottom Page 2 of 2 Catawba 03050102 / Catawba 03 ESA