Loading...
HomeMy WebLinkAbout20190922 Ver 1_Mitigation Evaluation_20220707From: Davis, Erin B To: Baker, Caroline D Subject: FW: [External] Wildlands Yadkin Valley UMB, Critcher Brothers Mitigation Site (SAW-2017-01913) Year 1 Annual Monitoring Credit Release Approval Date: Thursday, July 7, 2022 4:33:30 PM Attachments: 2017-01913 Wildlands Critcher MY1 Credit Release.odf Laserfiche Upload: Email & Attachment DW R#: 20190922 v.1 Doc Type: Mitigation Evaluation From: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil> Sent: Wednesday, July 6, 2022 11:37 AM To: Andrea Eckardt <aeckardt@wildlandseng.com> Cc: Shawn Wilkerson <swilkerson@wildlandseng.com>; Emily Reinicker <ereinicker@wildlandseng.com>; Steve Kichefski <Steven.I.kichefski@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Haywood, Casey M CIV MVP <Casey.M.Haywood@usace.army.mil>; Bowers, Todd <bowers.todd@epa.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Wilson, Travis W. <travis.wilson@ncwildlife.org> Subject: [External] Wildlands Yadkin Valley UMB, Critcher Brothers Mitigation Site (SAW-2017- 01913) Year 1 Annual Monitoring Credit Release Approval CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Andrea, Attached is the MY 1 Credit Release for the Yadkin Valley Umbrella Bank, Critcher Brothers site. Please review and let me know if you have any questions. We have updated RIBITS to reflect the release. Thank you, Todd TugwelI Mitigation Project Manager Wilmington District, US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 (919) 210-6265 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service- survey Thank you for taking the time to visit this site and complete the survey. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 July 6, 2022 Regulatory Division Action ID No. SAW-2017-01913 Re: Year 1 Monitoring Report Review and Credit Release associated with Wildlands Yadkin Valley Umbrella Mitigation Bank, Critcher Brothers Mitigation Site Ms. Andrea Eckardt Wildlands Engineering, Inc. 1430 South Mint Street, Suite 104 Charlotte, NC 28203 Dear Ms. Eckardt: This correspondence is in reference to the Wildlands Yadkin Valley Umbrella Mitigation Bank, Critcher Brothers Mitigation Site. The site includes unnamed tributaries in the Yadkin River Basin, Cataloging Unit (03040101), and is located in Wilkes County, North Carolina. The purpose of this letter is to transmit comments provided by the NC Interagency Review Team (NCIRT) during the review of the annual monitoring report (see attached) and to confirm the Year 1 credit release for this mitigation site. Pursuant to the site's Umbrella Mitigation Banking Instrument and the site -specific Mitigation Plan, the following mitigation credits shall be available for sale provided the annual monitoring report demonstrates interim performance standards are being met: • 10% of the total enhancement and/or restoration Stream Mitigation Units (SMUs) associated with year 1 annual monitoring (2,009.54 Cool Water SMUs) Based on a review of the data provided for the stream restoration and enhancement on the site, we confirm that you have satisfied the above requirements, and 2,009.54 Cool Water SMUs are now available for sale. To date, 40% of the total restoration and enhancement SMUs and 100% of the preservation SMUs (8,530.45 SMUs) have been released for sale. Please note that this release includes an adjustment of credit totals resulting from the conversion of 100 linear feet of preservation to enhancement II, including necessary adjustments to previous releases and the new as -built total of 20,591.73 SMUs. Please review the comments provided by the NCIRT during their review of the monitoring report. While it is not necessary to provide a response to specific comments at this time, please be sure to address the issues raised in future monitoring report submittals. Thank you for your interest in restoring and protecting waters of the United States. If you have questions regarding this letter, please contact Mr. Steve Kichefski at steven.I.kichefski(o)usace.army. miI or telephone (828) 271-7980 X 4234. Sincerely, Todd Tugwell Mitigation Project Manager Regulatory Division Electronic Copies Furnished: NCIRT Distribution List DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 CESAW-RG/Tugwell MEMORANDUM FOR RECORD July 6, 2022 SUBJECT: Action ID # SAW-2017-01913, NCIRT Review Comments on the Wildlands Yadkin Valley Umbrella Mitigation Bank, Critcher Brothers Year 1 Monitoring Report Erin Davis, NCDWR: 1. No site visit requested. DWR is ok with the proposed credit release. 2. Glad to read the culverts were retrofitted, stream repairs were completed, invasives were treated, and encroachments were resolved. DWR appreciates the early close attention to the easement boundary. 3. The bare and low stem density areas, while small, are a bit concerning. DWR recommends re-evaluating supplemental planting after the MY2 veg survey and visual site assessment. 4. All of the cross-section graphs/tables that drew yellow flags for me were discussed in the stream assessment section, which helped put the data in context and provide more info. Definitely please keep tracking these areas along with the identified SPAs for any further changes. 5. The lack of bankfull events was a bit surprising. How often is data collected? Would an onsite rain gauge help? 6. In addition to reporting the max. total days consecutive flow, it could be helpful to include a column for overall total days flow (particularly for SG2). 7. DWR is ok with the discussed preservation to enhancement credit change on Magnolia Trib. 8. Good photos. Todd Tugwell, USACE: 1. Thank you for providing the info regarding the resolution to the easement encroachments. Please continue to watch for further encroachments and provide updated in future monitoring reports. 2. The bank scour noted on WFFC R4 in the area of concern photos is concerning and may require action if it does not stabilize. Please continue to watch this area closely. 3. Several of the cross -sections show some aggradation, which is not necessarily concerning for MY1, but there is incision evident on cross-section 17 of more than a foot. Additionally, cross-section 12 also shows notable lateral migration. Please ensure these areas are watched and noted in future reports. 4. 1 appreciate the information/photos showing the removal of the culverts and conversion to a ford crossing. -z- 5. 1 concur with the adjustment of credit due to the additional work on Magnolia Tributary, but in future a more thorough description of the associated activities would be appreciated to help justify the change to a 2.5.1 Ell ratio. Todd Tugwell Mitigation Project Manager Regulatory Division