Loading...
HomeMy WebLinkAbout20190157 Ver 1_Mitigation Information_20220707From: Davis, Erin B To: Baker, Caroline D Subject: FW: [External] FW: Perry Hill Date: Thursday, July 7, 2022 4:44:25 PM Attachments: Perry Hill MY2 Stream Credit Calculations - To IRT.odf Laserfiche Upload: Email & Attachment DWR#: 20190157 v.I Doc Type: Mitigation Information -----Original Message ----- From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Thursday, June 30, 2022 10:08 AM To: Davis, Erin B <erin.davis(0ncdenr.gov> Cc: Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Merritt, Katie <katie.merritt(0ncdenr.gov> Subject: [External] FW: Perry Hill CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam.<mailto:rel2ort.sl2am(Vnc.gov> Adjusted ledger for the two waterline encroachments. Kim (Browning) Isenhour Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 1 919.946.5107 -----Original Message ----- From: Jason Lorch <jlorch@wildlandseng.com> Sent: Wednesday, June 29, 2022 1:45 PM To: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning(ousace.army.mil> Cc: Dow, Jeremiah J <jeremiah.dow&cdenr.gov> Subject: [URL Verdict: Neutral][Non-DoD Source] Perry Hill Kim, attached is the updated stream credit table for Perry Hill. The total stream credits were reduced by 25.714 based on the two internal crossings being widened to accommodate the water lines. Let me know if you have any questions about the updated stream credits, or if you need anything else from us. Thanks! Jason Lorch, GISP I Senior Environmental Scientist 0: 919.851.9986 x107 M: 919.413.1214 Wildlands Engineering, Inc. <Blockedhttp://www.wildlandseng.com/> 312 West Millbrook Road, Suite 225 Raleigh, NC 27609 Table 1. Mitigation Assets and Components Perry Hill Mitigation Site DMS Project No. 100093 Monitoring Year 2 - 2022 PROJECT• '• Mitigation Mitigation Existing Mitigation Restoration lt Reach ID Plan Priority Level Ratio Project Credits Footage Category Level Footage Comments Footage Footage (X.1) STREAMS Full Channel Restoration, Planted Buffer, Livestock Perry Branch Reach 1 321 Warm R PI 1.0 321.000 323 Exclusion Grade Control Structures, Invasive Control, Planted Perry Branch Reach 2 464- 344* 3.5 384-B9B 98.286* 36� 342* Buffer, Livestock Exclusion N/A N/A N/A N/A Waterline Maintenance Area Internal Crossing N/A "" Culvert Crossing Full Channel Restoration, Planted Buffer, Livestock Perry Branch Reach 3 132 691 Warm Pl 1.0 691.000 694 Exclusion Full Channel Restoration, Planted Buffer, Livestock 592 654 634* Warm Pl 1.0 654-99B 634.000* 66,' 642* Exclusion Waterline Maintenance Area Perry Branch Reach 4 Culvert Crossing Full Channel Restoration, Planted Buffer, Livestock 1,469 1,284 Warm R PI 1.0 1,284.000 1,297 Exclusion Full Channel Restoration, Planted Buffer, Livestock UTl Reach 1 388 285 Warm R PI 1.5 190.000 285 Exclusion Full Channel Restoration, Planted Buffer, Livestock UTl Reach 2 213 291 Warm R PI 1.5 194.000 293 Exclusion Bank Stabilization, Planted Buffer, Livestock UT2 Reach 1 226 221 Warm Ell N/A 2.5 88.400 223 Exclusion Grade Control Structures, Bank Stabilization, UT2 Reach 2 974 947 Warm El N/A 2.5 378.800 941 Planted Buffer, Livestock Exclusion Grade Control Structures, Bank Stabilization, UT3 357 343 Warm Ell N/A 2.5 137.200 319 Planted Buffer, Livestock Exclusion Restoration Level Stream Riparian Wetland Non -Riparian Wetland Coastal Marsh Warm Cool Cold Riverine Non-R iverine Restoration 3,314.000* Enhancement 1 378.800 Enhancement ll 323.886* Preservation Re -Establishment Rehabilitation Enhancement Creation Total 4,016.686* Project assets were updated during MY2 based -widened internal rtream crossings to incorporate waterlines. The total rtream credits were reduced by 25.714.