July 8, 2022
Donald Greeley, PE, PLS, Director of Water Management
City of Durham
101 City Hall Plaza
Durham, NC 27701-3329
Subject: Compliance Evaluation Inspection
City of Durham Wastewater Collection System
Permit Number WQCS00005
Durham County
Dear Mr. Greeley:
Mitch Hayes of the Division of Water Resources conducted the subject inspection on June 23,
2022. The assistance of Junior Mobley and other City of Durham staff with this inspection was
greatly appreciated. Please find attached to this letter, the BIMS checklist summarizing the
inspection. Below is a list of findings developed from the inspection:
1. The permit was reissued and became effective August 16, 2018 and will expire July 31,
2026. The collection system has a permitted flow of 40 MGD and is classified as a Class -
4 collection system. Junior Mobley is listed as the Operator in Responsible Charge with
multiple back-up ORC's.
2. The Capital Improvement Plan (CIP) covers a five-year period. The Department of Water
Management prepares an annual CIP every year. The CIP identifies the highest -priority
projects listed for CIP funding and incorporates those projects into a 5-year prioritized CIP
based on target funding levels.
3. Tyrone Battle is responsible for the Sewer Use Ordinance and Fats, Oil, and Grease (FOG)
program. Food establishments are inspected once a year. Records are kept on paper and
computer. There have been no enforcement actions sent out for past year. Educational
materials on proper disposal of grease are in the annual report and in the local newspapers.
Bill stuffers are also used.
4. Records review indicated the following:
a. 196 miles out of 350 total miles of right of ways were maintained for FY22.
Records are maintained
b. For FY22, Collection System Maintenance work group has cleaned 113 out of
target 115 miles of gravity sewer. Records are maintained.
DE 4*
North Carolina Department of Environmental Quality I Division of Water Resources
Raleigh Regional Office I 3800 Barrett Dnve I Raleigh, North Carolina 27609
919 791 4200
c. 594 High priority lines are inspected once per every 6 months. Records are
maintained.
d. 144 air release valves are inspected annual. Records are maintained.
e. Customer complaints are maintained on computer.
f. All 63 pump stations have weekly, monthly, biannual, and annual inspections.
Records are maintained.
g. According to BIMS records, there have been 125 SSOs reported since July 26,
2018, the last CET inspection. There were 80 NOVs issued and with 47
enforcements. Records of all SSOs are maintained.
5. There are 63 pump stations in the collection system. All have secured access, contact
information signage, audible / visual alarms except for Snow Hill, on -site generators,
except for Herndon Park pump station, and SCADA. Pump stations inspected were
Stagecoach, 751 Primary, Fayetteville Road, Parkwood, and Snow Hill. All audible / visual
alarms except for the Snow Hill pump station functioned when the high-water float was
lifted. The pump station had not been fitted for an audible / visual alarm. SCADA called
in a high wet well alarm. All generators started and operated under load when the power
was cut off. SCADA phone in a power out status.
6. A high -priority line along Scott King Road was inspected. The line is a 16" DI encasement
running on top of the ground. There are no creek crossings. The line appeared free of
damage and straight. A manhole was inspected and found to be free of grease, sand, and
debris.
I would like to thank everyone involved with this inspection. If you have any questions concerning
this letter or the inspection, please contact Mitch Hayes at 919.791.4261 or at
mitch.hayes:a:;ncdenr.gov
cc: permit files, Laserfiche
Vanessa E. Manuel, Assistant Regional Supervisor
Water Quality Regional Operations Section
Raleigh Regional Office
Division of Water Resources, NC DEQ
North Carolina Department of Environmental Quality 1 Division of Water Resources
512 North Salisbury Street 11611 Mail Service Center 1 Raleigh, North Carolina 27699.1611
919 707 9000
Compliance Inspection Report
Permit: WQCS00005
SOC:
County: Durham
Region: Raleigh
Effective: 08/16/18 Expiration: 07/31/26 Owner : City of Durham
Effective: Expiration: Facility: Durham Collection System
101 City Hall Plz
Contact Person: Donald F Greeley
Directions to Facility:
System Classifications: CS4,
Primary ORC: Gurvis Glenn Mobley
Secondary ORC(s):
On -Site Representative(s):
24 hour contact name
On -site representative
Related Permits:
NC0026051
NC0047597
NC0023841
Title:
Certification: 990240
Kenneth Wayne Willard
Kenneth Wayne Willard
Durham County - Triangle WWTP
City of Durham - South Durham WRF
City of Durham - North Durham WRF
Inspection Date: 06/23/2022 Entry Time 10:00AM
Primary Inspector: Mitchell S Hayes
Secondary Inspector(s):
Exit Time: 01:45PM
Phone: 919-560-4381
Phone: 910-560-4344
336-373-2033
336-373-2033
Phone: 919-791-4200
Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling
Permit Inspection Type: Collection system management and operation
Facility Status: • Compliant
Question Areas:
▪ Miscellaneous Questions
• Capital Improvement Plan
▪ Inspections
▪ Lines
0 Not Compliant
(See attachment summary)
▪ General
▪ Map
in Spill Response Plan
▪ Manholes
▪ Sewer & FOG Ordinances
• Reporting Requirements
I. Spills
▪ Pump Stations
Page 1 of 7
Permit: WOCS00005 Owner - Facility: City of Durham
Inspection Date: 06/23/2022 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
Inspection Summary:
The permit was reissued and became effective August 16, 2018 and will expire July 31, 2026. The 40 MGD is listed as a
Class -4 collection system. Junior Mobley is listed as the Operator in Responsible Charge with multiple back-up ORC's.
The Capital Improvement Plan (CIP) covers a five-year period. The Department of Water Management prepares an annual
CIP every year. The CIP identifies the highest -priority projects listed for CIP funding and incorporates those projects into a
5-year prioritized CIP based on target funding levels.
Tyrone Battle is responsible for the Sewer Use Ordinance and Fats, Oil, and Grease (FOG) program. Food establishments
are inspected once a year. Records are kept on paper and computer. There have been no enforcement actions sent out for
past year. Educational materials on proper disposal of grease are in the annual report and in the local newspapers. Bill
stuffers are also used.
Records review indicated the following:
a. 196 miles out of 350 total miles of right of ways were maintained for FY22. Records are maintained
b. For FY22, Collection System Maintenance work group has cleaned 113 out of target 115 miles of gravity sewer.
Records are maintained.
c. 594 High priority lines are inspected once per every 6 months. Records are maintained.
d. 144 air release valves are inspected annual. Records are maintained.
e. Customer complaints are maintained on computer.
f. All 63 pump stations have weekly, monthly, biannual, and annual inspections. Records are maintained.
g. According to BIMS records, there have been 125 SSOs reported since July 26, 2018, the last CEI inspection.
There were 80 NOVs issued and with 47 enforcements. Records of all SSOs are maintained.
There are 63 pump stations in the collection system. All have secured access, contact information signage, audible / visual
alarms except for Snow Hill, on -site generators, except for Herndon Park pump station, and SCADA. Pump stations
inspected were Stagecoach, 751 Primary, Fayetteville Road, Parkwood, and Snow Hill. All audible / visual alarms except for
the Snow Hill pump station functioned when the high-water float was lifted. The pump station had not been fitted for an
audible I visual alarm. SCADA called in a high wet well alarm. All generators started and operated under load when the
power was cut off. SCADA phone in a power out status.
A high -priority line along Scott King Road was inspected. The line is a 16" DI encasement running on top of the ground.
There are no creek crossings. The line appeared free of damage and straight. A manhole was inspected and found to be free
of grease, sand, and debris.
Page 2 of 7
Permit: WQCS00005 Owner - Facility: City of Durham
Inspection Date: 06/23/2022
Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
General
Is there a properly designated primary ORC and at least one back-up of proper grade?
Are Togs being reviewed by the system management or owner on a regular basis?
# What is that frequency?
# Are there any issues being addressed currently or any in the planning stages?
Is there a specific pump failure plan available for all pump stations?
Does plan indicate if pump parts/new pumps are in spare parts/equipment inventory?
Are new/significantly upgraded pump stations equipped with anti -corrosion materials?
Does the permittee have a copy of their permit?
# Is permit expiring within the next 6 months?
If Yes, has the Permittee applied for renewal?
Comment:
Sewer and FOG Ordinances
Is Sewer Use Ordinance (SUO) or other Legal Authority available?
Does it appear that the Sewer Use Ordinance is enforced?
Is there a Grease Control Program that legally requires grease control devices?
What is the standard grease trap cleaning requirement in the FOG ordinance?
Is Grease Control Program enforced via periodic inspections/records review?
Is action taken against violators?
# Have satellite systems adopted an equivalent or more stringent ordinance?
Is grease/sewer education program documented with req'd customer distribution?
# Are other types of education tools used like websites, booths, special meetings, etc?
If Yes, what are they? (This can reduce mailing to annual.)
"Grease kits" are handed out to customers, advertise on tv stations, bill stuffers.
Comment: There have been no enforcements within the past 12 months.
Capital Improvement Plan
Has a Capital (CIP) or System Improvement Plan been developed and adopted?
Is it designated for wastewater only or does it have a dedicated section?
Does CIP cover three to five year period of earmarked improvements?
Does CIP include description of project area?
Does CIP include description of existing facilities?
Does CIP include known deficiencies?
Does CIP include forecasted future needs?
Comment:
Mau
Yes No NA NE
• ❑ ❑ ❑
• ❑❑❑
once a week
• ❑ ❑ ❑
• ❑❑❑
▪ ❑ ❑ ❑
• ❑ ❑ ❑
IIIF300
❑ ❑ •❑
❑ ❑•❑
Yes No NA NE
• ❑ ❑ ❑
• ❑❑❑
• 000
once per month
• ❑❑❑
• ❑❑❑
❑ ❑•❑
▪ ❑❑❑
• ❑❑❑
Yes No NA NE
• ❑❑❑
■ ❑❑❑
• ❑ ❑❑
• ❑ ❑❑
• ❑❑❑
• ❑❑❑
• ❑ ❑❑
Yes No NA NE
Page 3 of 7
Permit: WQCS00005 Owner - Facility: City of Durham
Inspection Date: 06/23/2022 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
Is there a overall sewer system map?
Does the map include:
Pipe Type (GS/FM)
Pipe sizes
Pipe materials (PVC, DIP, etc)
Pipe location
Flow direction
Approximate pipe age
Pump station ID, location and capacity
# Force main air release valve location & type
# Location of satellite connections
Is the map being updated for changes/additions within 1 year of activation?
Comment:
Reporting Reauirements
# Have there been any sewer spills in the past 3 years?
If Yes, were they reported to the Division if meeting the reportable criteria?
If applicable, is there documentation of press releases and public notices issued?
Is an Annual Wastewater Performance Report being filed with the Division, if required?
Is the report being made available to all its sewer customers?
# How is it being made available?
Comment:
Inspections
Are adequate maintenance records maintained?
Are pump stations being inspected at the required frequency?
# Is at least one complete functionality test conducted weekly per pump station?
Is there a system or plan in place to observe the entire system annually?
Is the annual inspection documented?
# Does the system have any high -priority lines/locations?
Are inspections of HPL documented at least every 6 months?
Are new lines being added to the HPL list when found or created?
Comment* There are 594 HPL in the system.
Sill Response Action Plan
Is a Spill Response Action Plan available?
Is a Spill Response Action Plan available for all personnel?
Does the plan include:
▪ ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑❑❑
• ❑ ❑❑
• ❑ ❑❑
• ❑❑❑
• ❑❑❑
• ❑❑❑
• ❑❑❑
▪ ❑❑❑
• ❑❑❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑❑❑
• ❑ ❑ ❑
• ❑ ❑ ❑
webpage
Yes No NA NE
• ❑ ❑ ❑
■ ❑❑❑
• ❑ ❑❑
• ❑❑❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑❑
Yes No NA NE
• ❑❑❑
• ❑❑❑
Page 4 of 7
Permit: WQCS00005 Owner - Facility:City of Durham
Inspection Date: 06/23/2022
Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
24-hour contact numbers
Response time
Equipment list and spare parts inventory
Access to cleaning equipment
Access to construction crews, contractors, and/or engineers
Source of emergency funds
Site sanitation and cleanup materials
Post-overflow/spill assessment
Does the Permittee appear to respond within 2 hours of first knowledge of a spill?
Comment:
Spills
Is system free of known points of bypass?
If No, describe type of bypass and location
Are all spills or sewer related issues/complaints documented?
# Are there repeated overflows/problems (2 or more in 12 months) at same location?
# If Yes, is there a corrective action plan?
Comment: No repeated overflows at the same location.
Lines/Right-of-Ways/Aerial Lines
Please list the Lines/Right of Ways/Aerial Lines Inspected:
Scott King Road exposed above ground line.
Are right-of-ways/easements maintained for full width for access by staff/equipment?
If No, give details on temporary access:
Is maintenance documented?
Are gravity sewer cleaning records available?
Has at least 10% of lines older than 5 yrs been cleaned annually?
Were all areas/lines inspected free of issues?
Comment:
Manholes
Please list the Manholes Inspected:
Scott King Road
Are manholes accessible?
# Are manhole covers/vents above grade?
Are manholes free of visible signs of overflow?
Are manholes free of sinkholes and depressions?
Are manhole covers present?
# Are manholes properly seated?
• 000
11000
• ❑ ❑ ❑
11000
• ❑ ❑❑
▪ ❑ ❑❑
• ❑ ❑❑
• ❑ ❑❑
• ❑ ❑❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
❑•❑ ❑
❑ ❑•❑
Yes No NA NE
• 000
■ ❑❑❑
• 000
■ ❑❑❑
• 000
Yes No NA NE
• 000
❑ ❑■❑
• ❑❑❑
■ ❑❑❑
▪ ❑❑❑
▪ ❑❑❑
Page 5 of 7
Permit: WQCS00005 Owner - Facility: City of Durham
Inspection Date: 06/23/2022 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
# Are manholes in good condition?
# Are inverts in good condition?
Is flow unrestricted in manholes?
Are manholes free of excessive amounts of grease?
Are manholes free of excessive roots?
Are manholes free of excessive sand?
Are manhole vents screened?
Are vents free of submergence?
Are manholes free of bypass structures or pipes?
Comment:
Pump Stations
Please list the Pump Stations inspected:
Stagecoach, 751 Primary, Fayetteville Road, Parkwood, Snow Hill
# Number of duplex or larger pump stations in system
# Number of vacuum stations in system
# Number of simplex pump stations in system
# Number of simplex pump stations in system serving more than one building
How many pump/vacuum stations have:
# A two-way "auto polling" communication system (SCADA) installed?
# A simple one-way telemetry/communication system (auto -dialer) installed?
For pump stations inspected:
Are they secure with restricted access?
Were they free of by-pass structures/pipes?
Were wet wells free of excessive grease/debris?
# Do they all have telemetry installed?
Is the communication system functional?
Is a 24-hour notification sign posted ?
Does the sign include:
Owner Name?
Pump station identifier?
# Address?
Instructions for notification?
24-hour emergency contact numbers?
Are audio and visual alarms present?
Are audio and visual alarms operable?
# Is there a backup generator or bypass pump connected?
■ ❑❑❑
• ▪ ❑ ❑ ❑
❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑❑❑
❑ ❑N❑
❑ ❑ ❑
• ❑ ❑ ❑
Yes No NA NE
63
0
0
0
63
0
• ❑❑❑
▪ ❑❑❑
• ❑❑❑
• ❑❑❑
• ❑ ❑ ❑
▪ ❑ ❑ ❑
• ❑ ❑ ❑
• ❑❑❑
■ ❑❑❑
■ ❑❑❑
■ ❑❑❑
• ❑ ❑ ❑
• ❑❑❑
111000
Page 6 of 7
Permit: WQCS00005 Owner - Facility:City of Durham
Inspection Date: 06/23/2022
Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
If tested during inspection, did it function properly?
Is the back-up system tested at least bi-annually under normal operating conditions?
# Does it have a dedicated connection for a portable generator?
# Is the owner relying on portable units in the event of a power outage?
# If Yes, is there a distribution plan?
If Yes, what resources (UnitsfStaffNehicles/etc) are included in Plan?
# Does Permittee have the approved percentage of replacement simplex pumps?
Is recordkeeping of pump station inspection and maintenance program adequate?
Do pump station fogs include at a minimum:
Inside and outside cleaning and debris removal?
Inspecting and exercising all valves?
Inspecting and lubricating pumps and other equipment?
Inspecting alarms, telemetry and auxiliary equipment?
Comment: Not relying on portable generators during a Dower outtage.
• ❑ ❑ ❑
• ❑ ❑❑
• ❑ ❑❑
❑ • El El
❑ ❑ � ❑
❑ ❑■❑
■ ❑❑❑
• ❑ ❑ ❑
▪ ❑ ❑❑
• ❑ ❑❑
■ ❑❑❑