HomeMy WebLinkAboutNCC201929_NOT Closeout Documents_20220705North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
(336) 776-9800
County: Surry Project: Mt. Airy Airport - Aircraft Storage Hangar MWK River basin: Yadkin-PeeDee
Person financially responsible: Surry County Airport Authority Project #: SURRY-2019-025
Address: PO BOX 1467, Dobson, NC 27017
1. Project Location: Holly Springs Rd., Mt. Airy
Pictures: No
2. Weather and soil conditions: 80's, Clear, Workable
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
Initial inspection: No
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Pat Harrigan
Inspection report: Sent Report
9. Corrective action needed:
Title: Parrish & Partners
Date given/sent: June 28, 2022
Yes
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Kimberly Turney
Date of inspection: June 28, 2022 Time arriving on site: 9:30 AM Time leaving site: 10:30 AM