Loading...
HomeMy WebLinkAboutNC0024244_SOC changes_20220622Strickland, Bev From: Adam Kiker <adam@lkcengineering.com> Sent: Wednesday, June 22, 2022 3:53 PM To: Chen, Siying; Voyles, Jay Cc: Sara Mirek; Ferris, Michael; Hinson, Bryan L; Basinger, Corey; Scheller, Roberto; Rob McIntyre Subject: RE: [External] RE: SOC WQ S19-007 Ad I - City of Albemarle Long Creek WWTP CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon Siying— We received notice this morning that the Albemarle city manager has signed the revised SOC. We will get the original from them later this week, and we'll send it to you (email and hard copies). So everyone is aware now, on the second page of the revised SOC, under Item 2.a, the date for "Begin Construction and execute construction contract for Phase 3" is indicated as August 31, 2022. We are fairly certain at this time that the City will not meet this date. The DWI reviewer, Adrian Eaton, has been taking 4-6 weeks to respond to relatively minor edits requested to the construction drawings. Note this is not Adrian's fault, he and the other DWI staff have a lot on their plates currently. However, it has resulted in the construction document review period taking roughly 2 months longer than we thought it would take when we submitted the revised SOC application on March 31', 2022. Is this something you would like to address now? Or later? With multiple projects, at multiple stages, and the SOC modifications, it is impossible to track everything together with certainty. DWI's review timeframes are not in the City's control. We check with Adrian on a regular basis for updates, and he politely responds letting us know he will get to it when his workload allows. Best, Adam ADAM P. KIKER, P.E. LKC Engineering, PLLC 140 Aqua Shed Court Aberdeen, NC 28315 Ph: (910) 420-1437 Fax: (910) 637-0096 Cell: (910) 639-2132 Follow us on Instagram! @Ikc_engineering From: Chen, Siying <siying.chen@ncdenr.gov> Sent: Tuesday, June 21, 2022 1:38 PM To: Adam Kiker <adam@lkcengineering.com>; Voyles, Jay <jvoyles@ci.albemarle.nc.us> Cc: Sara Mirek <Sara@lkcengineering.com>; Ferris, Michael <mferris@ci.albemarle.nc.us>; Hinson, Bryan L <blhinson@ci.albemarle.nc.us>; Basinger, Corey <corey.basinger@ncdenr.gov>; Scheller, Roberto 1 <roberto.scheller@ncdenr.gov> Subject: RE: [External] RE: SOC WQ S19-007 Ad I - City of Albemarle Long Creek WWTP Hi Adam, Thanks for the update! Please see attached for an updated draft of the SOC and contact information. The Director's name for Division of Water Resources has been updated in the draft SOC, so please use this updated version for signature. The central office contact information has also been updated in the transmittal letter we sent you. Please sign and return two (2) copies of the SOC to: NCDEQ/DWR/WQ Permitting Section Attention: Siying Chen 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Thank you and please let me know if you have any other questions! Siying (Sylvia) Chen (She/Her/Hers) Environmental Specialist Compliance and Expedited Permitting Unit Division of Water Resources North Carolina Department of Environmental Quality Email: siying.chen@ncdenr.gov Phone: 919-707-3619 (Office) NQRTii CAf�0; � n•p+ran.nc a ErwirDimucial NIAIYy Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Adam Kiker <adam@lkcengineering.com> Sent: Tuesday, June 21, 2022 1:23 PM To: Voyles, Jay <jvoyles@ci.albemarle.nc.us>; Chen, Siying <siying.chen@ncdenr.gov> Cc: Sara Mirek <Sara@lkcengineering.com>; Ferris, Michael <mferris@ci.albemarle.nc.us>; Hinson, Bryan L <blhinson@ci.albemarle.nc.us> Subject: [External] RE: SOC WQ S19-007 Ad I - City of Albemarle Long Creek WWTP CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Thanks Jay. Siying—we have received the draft SOC and recently forwarded it to Jay and Michael (city manager). We asked if they would prefer the City Council to review and approve the document before signature. If that is the case, the next Council meeting is July 11th, and we requested their consideration of the draft SOC as an agenda item. We will keep you updated on Michael's and Jay's preferences regarding signature and Council's consideration. 2 Best, Adam ADAM P. KIKER, P.E. LKC Engineering, PLLC 140 Aqua Shed Court Aberdeen, NC 28315 Ph: (910) 420-1437 Fax: (910) 637-0096 Cell: (910) 639-2132 Follow us on Instagram! @Ikc_engineering From: Voyles, Jay <jvoyles@ci.albemarle.nc.us> Sent: Tuesday, June 21, 2022 1:17 PM To: Chen, Siying <siying.chen@ncdenr.gov> Cc: Sara Mirek <Sara@lkcengineering.com>; Adam Kiker <adam@lkcengineering.com>; Ferris, Michael <mferris@ci.albemarle.nc.us>; Hinson, Bryan L <blhinson@ci.albemarle.nc.us> Subject: RE: SOC WQ S19-007 Ad I - City of Albemarle Long Creek WWTP Good afternoon Ms. Chen: Thanks for reaching out. I have added Michael & Bryan to this email and have removed Dan since he is no longer with us. Can we please update the primary points of contact to reflect what I have below? City Manager: Michael Ferris mferris@albemarlenc.gov Water/Wastewater Resources Manager: Bryan Hinson blhinson@albemarlenc.gov Assistant Utilities Director: Jay Voyles jvoyles@albemarlenc.gov Consulting Engineer: LKC Engineering sara@lkcengineering.com & adam@lkcengineering.com Michael and/or Bryan: Please see Ms. Chen's message below. Have we received a draft SOC from the state? Thank you, Jay Voyles Assistant Utilities Director Phone: 704-984-9609 Mobile: 704-438-3178 Web: www.albemarlenc.gov P.O. Box 190, Albemarle, NC 28002 From: Chen, Siying <siying.chen@ncdenr.gov> Sent: Tuesday, June 21, 2022 1:10 PM To: Worl, Dan <dworl@ci.albemarle.nc.us> Cc: sara@LKCengineering.com; adam@LKCengineering.com Subject: SOC WQ S19-007 Ad I - City of Albemarle Long Creek WWTP CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking links, especially from unknown senders. 3 Hi Mr. Ferris, My name is Siying Chen and I'll be your Central Office contact for your SOC modification application for City of Albemarle Long Creek WWTP. I want to check with you and see if you have received any draft SOC from us, and if so, have you signed and returned it to us? If not, please let me know and I'll send you a copy, we will need them signed for the public notice. Thank you! Siying (Sylvia) Chen (She/Her/Hers) Environmental Specialist Compliance and Expedited Permitting Unit Division of Water Resources North Carolina Department of Environmental Quality Email: siying.chen@ncdenr.gov Phone: 919-707-3619 (Office) F1-1E C15 r, Dc iitmen{ al Fmnroarnaiiel 041,411y Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties 4