HomeMy WebLinkAboutNC0024244_SOC changes_20220622Strickland, Bev
From: Adam Kiker <adam@lkcengineering.com>
Sent: Wednesday, June 22, 2022 3:53 PM
To: Chen, Siying; Voyles, Jay
Cc: Sara Mirek; Ferris, Michael; Hinson, Bryan L; Basinger, Corey; Scheller, Roberto; Rob
McIntyre
Subject: RE: [External] RE: SOC WQ S19-007 Ad I - City of Albemarle Long Creek WWTP
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good afternoon Siying—
We received notice this morning that the Albemarle city manager has signed the revised SOC. We will get the original
from them later this week, and we'll send it to you (email and hard copies).
So everyone is aware now, on the second page of the revised SOC, under Item 2.a, the date for "Begin Construction and
execute construction contract for Phase 3" is indicated as August 31, 2022.
We are fairly certain at this time that the City will not meet this date. The DWI reviewer, Adrian Eaton, has been taking
4-6 weeks to respond to relatively minor edits requested to the construction drawings. Note this is not Adrian's fault, he
and the other DWI staff have a lot on their plates currently. However, it has resulted in the construction document
review period taking roughly 2 months longer than we thought it would take when we submitted the revised SOC
application on March 31', 2022.
Is this something you would like to address now? Or later?
With multiple projects, at multiple stages, and the SOC modifications, it is impossible to track everything together with
certainty. DWI's review timeframes are not in the City's control. We check with Adrian on a regular basis for updates,
and he politely responds letting us know he will get to it when his workload allows.
Best,
Adam
ADAM P. KIKER, P.E.
LKC Engineering, PLLC
140 Aqua Shed Court
Aberdeen, NC 28315
Ph: (910) 420-1437
Fax: (910) 637-0096
Cell: (910) 639-2132
Follow us on Instagram! @Ikc_engineering
From: Chen, Siying <siying.chen@ncdenr.gov>
Sent: Tuesday, June 21, 2022 1:38 PM
To: Adam Kiker <adam@lkcengineering.com>; Voyles, Jay <jvoyles@ci.albemarle.nc.us>
Cc: Sara Mirek <Sara@lkcengineering.com>; Ferris, Michael <mferris@ci.albemarle.nc.us>; Hinson, Bryan L
<blhinson@ci.albemarle.nc.us>; Basinger, Corey <corey.basinger@ncdenr.gov>; Scheller, Roberto
1
<roberto.scheller@ncdenr.gov>
Subject: RE: [External] RE: SOC WQ S19-007 Ad I - City of Albemarle Long Creek WWTP
Hi Adam,
Thanks for the update! Please see attached for an updated draft of the SOC and contact information. The Director's
name for Division of Water Resources has been updated in the draft SOC, so please use this updated version for
signature. The central office contact information has also been updated in the transmittal letter we sent you.
Please sign and return two (2) copies of the SOC to:
NCDEQ/DWR/WQ Permitting Section
Attention: Siying Chen
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Thank you and please let me know if you have any other questions!
Siying (Sylvia) Chen (She/Her/Hers)
Environmental Specialist
Compliance and Expedited Permitting Unit
Division of Water Resources
North Carolina Department of Environmental Quality
Email: siying.chen@ncdenr.gov
Phone: 919-707-3619 (Office)
NQRTii CAf�0; �
n•p+ran.nc a ErwirDimucial NIAIYy
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: Adam Kiker <adam@lkcengineering.com>
Sent: Tuesday, June 21, 2022 1:23 PM
To: Voyles, Jay <jvoyles@ci.albemarle.nc.us>; Chen, Siying <siying.chen@ncdenr.gov>
Cc: Sara Mirek <Sara@lkcengineering.com>; Ferris, Michael <mferris@ci.albemarle.nc.us>; Hinson, Bryan L
<blhinson@ci.albemarle.nc.us>
Subject: [External] RE: SOC WQ S19-007 Ad I - City of Albemarle Long Creek WWTP
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Thanks Jay.
Siying—we have received the draft SOC and recently forwarded it to Jay and Michael (city manager). We asked if they
would prefer the City Council to review and approve the document before signature. If that is the case, the next Council
meeting is July 11th, and we requested their consideration of the draft SOC as an agenda item.
We will keep you updated on Michael's and Jay's preferences regarding signature and Council's consideration.
2
Best,
Adam
ADAM P. KIKER, P.E.
LKC Engineering, PLLC
140 Aqua Shed Court
Aberdeen, NC 28315
Ph: (910) 420-1437
Fax: (910) 637-0096
Cell: (910) 639-2132
Follow us on Instagram! @Ikc_engineering
From: Voyles, Jay <jvoyles@ci.albemarle.nc.us>
Sent: Tuesday, June 21, 2022 1:17 PM
To: Chen, Siying <siying.chen@ncdenr.gov>
Cc: Sara Mirek <Sara@lkcengineering.com>; Adam Kiker <adam@lkcengineering.com>; Ferris, Michael
<mferris@ci.albemarle.nc.us>; Hinson, Bryan L <blhinson@ci.albemarle.nc.us>
Subject: RE: SOC WQ S19-007 Ad I - City of Albemarle Long Creek WWTP
Good afternoon Ms. Chen:
Thanks for reaching out. I have added Michael & Bryan to this email and have removed Dan since he is no longer with us.
Can we please update the primary points of contact to reflect what I have below?
City Manager: Michael Ferris mferris@albemarlenc.gov
Water/Wastewater Resources Manager: Bryan Hinson blhinson@albemarlenc.gov
Assistant Utilities Director: Jay Voyles jvoyles@albemarlenc.gov
Consulting Engineer: LKC Engineering sara@lkcengineering.com & adam@lkcengineering.com
Michael and/or Bryan:
Please see Ms. Chen's message below. Have we received a draft SOC from the state?
Thank you,
Jay Voyles
Assistant Utilities Director
Phone: 704-984-9609
Mobile: 704-438-3178
Web: www.albemarlenc.gov
P.O. Box 190, Albemarle, NC 28002
From: Chen, Siying <siying.chen@ncdenr.gov>
Sent: Tuesday, June 21, 2022 1:10 PM
To: Worl, Dan <dworl@ci.albemarle.nc.us>
Cc: sara@LKCengineering.com; adam@LKCengineering.com
Subject: SOC WQ S19-007 Ad I - City of Albemarle Long Creek WWTP
CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking
links, especially from unknown senders.
3
Hi Mr. Ferris,
My name is Siying Chen and I'll be your Central Office contact for your SOC modification application for City of Albemarle
Long Creek WWTP. I want to check with you and see if you have received any draft SOC from us, and if so, have you
signed and returned it to us? If not, please let me know and I'll send you a copy, we will need them signed for the public
notice.
Thank you!
Siying (Sylvia) Chen (She/Her/Hers)
Environmental Specialist
Compliance and Expedited Permitting Unit
Division of Water Resources
North Carolina Department of Environmental Quality
Email: siying.chen@ncdenr.gov
Phone: 919-707-3619 (Office)
F1-1E C15
r,
Dc iitmen{ al Fmnroarnaiiel 041,411y
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
4