HomeMy WebLinkAboutNCG140507_COC (Signed)_20220707STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE No. NCG140507
STORMWATER & WASTEWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provisions of North Carolina General Statute 143-215.1, other
lawful standards and regulations promulgated and adopted by the North Carolina
Environmental Management Commission, and the Federal Water Pollution Control Act, as
amended,
MacLeod Construction, Inc.
is hereby authorized to operate wastewater treatment system(s) and discharge
stormwater and wastewater from a facility located at
MacLeod Construction, Inc. - Hickory Concrete Batch Plant
2880 Main Avenue SE
Hickory
Catawba County
to receiving waters designated as Miller Branch, class C, waters in the Catawba River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions
set forth in General Permit No. NCG140000 which can be downloaded by entering
"deq.nc.gov/SW-industrial" in a browser window and navigating to the "NPDES
Stormwater General Permits" web page.
This Certificate of Coverage shall become effective July 5, 2022.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 5u day of July 2022.
for Brian Wrenn
Director, Division of Energy, Mineral and Land Resources
By the Authority of the Environmental Management Commission