HomeMy WebLinkAboutNCC202554_NOT Closeout Documents_20220630North Carolina Department of Environmental Quality
Land Resources: 2090 US Highway 70, Swannanoa, NC 28778 (828) 296-4500
County: Cherokee Project: Murphy Oil - Murphy, NC River basin: Hiwassee
Person financially responsible: Murphy Oil USA Inc. -John A Moore, Sr. VP and Project #: CHERO-2020-005
General Council
Address: 200 Peach Street, El Dorado, AR 71730
1. Project Location: US 19, Murphy
Pictures: Yes - Digital
2. Weather and soil conditions: Heavy Rain Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: September 01, 2021
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -inspection or monitoring is required and the project is released under the SPCA. If this
project has a Certificate of Coverage (COC) under NCGO1 permit, then complete the
electronic Notice of Intent (eNOT) form at degnc.gov/NCGOI.
Reported by: Larry Ammons Others present:
Date of inspection: August 31, 2021 Time arriving on site: 12:20 PM Time leaving site: 12:50 PM
cc: