HomeMy WebLinkAboutNCS000156_DMR June_20220706b
BAKELITE
July 05, 2022
Stormwater Permitting Unit
Division of Water Quality
1617 Mail Service Center
Raleigh, NC 27699-1617
Re: Discharge Monitoring Report
Stormwater Analytical Sampling
June 2022 Sample
Bakelite Synthetics — Acme Facility.
NPDES Permit No. NCS000156
To Whom It May Concern:
Bakelite Synthetics operates under NPDES Permit No. NCS000156. Asa partof this
permit, Bakelite is required to submit Discharge Monitoring Reports (DMRs) for periodic
stormwater analytical sampling. Currently, the facility is in Tier Three status, as outlined
in Part II, Section B of the permit, which requires monthly sampling.
Please find enclosed the completed DMR Form for the June 2022 sampling event, which
includes analytical sampling results. Note there was no measurable monthly discharge for
the month of June.
If you have any questions or require any additional information, please contact our
Regional Environmental Leader, Emily Thompson at (502) 381-5513
(Emily.Thompson@bakelite.com) or me at ronald.bazinet@bakelite.com.
Sincerely,
�, J� � 5%ram
Ronald Bazinet
Site Leader
Bakelite Synthetic — Acme Facility
333 Neils Eddy Rd.
Riegelwood, NC
28456
RECEIVED
JUL 06 20v
OEMIR-Stormwater Program
Bakelite Synthetics — Acme Facility
Certificate of Coverage No. NCS000156
333 Neils Eddy Road, Riegelwood, NC 28456
Personnel Collecting Samples: Lab technicians
Certified Laboratories: Environmental Chemists (Lab ID: 94)
Environmental Testing Solutions, Inc. (Lab ID: 37)
NA
Date of Sampling Event*
ANALYTICAL RESULTS
00530
00310
00340
00610
00625
00630
00665
77885
50060
71880
01042
01092
01051
00556
00400
TSS
BOD
COD
NH3
TKN
NO3+NO2
Total
Methanol
TRC
Hexamine
HCHO
Total
Total
Total
Non-
Polar
pH
Outfall
mg/I
mg/I
mg/I
mg/I
mg/I
mg/1
Phosphorous
mg/I
mg/1
mg/I
mg/I
Zinc
Lead
0&O
s.0
milCopper
mg/I
mg/I
Mg/1
mg/1
003
004
006
009
ACUTE TOXICITY
RESULTS (TGA3B)
Outfall003 Outfall004 Outfall006 Outfall009
NA NA NA NA
STORM EVENT CHARACTERISTICS
Total Event Precipitation:
NA inches*
Sampling Period: June 2022
CERTIFICATION STATEMENT
By this signature, I certify this report is accurate and complete to the best of my knowledge.
/&ahyatt - V I ZZ
Sigdature of Permitte or Designee Date
Ronald Bazinet, Site Leader
Print Name and Title
* N/A indicates no qualifying rain event for monthly period