Loading...
HomeMy WebLinkAboutI-5111_I-4739 Individual Modification Wake_Johnston July 6 2022 M STA1,d O� '� '^xaam^ 0000 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER J.ERIC BOYETTE GOVERNOR SECRETARY July 6, 2022 U.S. Army Corps of Engineers N.C. Division of Water Resources Raleigh Regulatory Field Office 1617 Mail Service Center 3331 Heritage Trade Drive, Suite 105 Raleigh,NC 27699 Wake Forest,NC 27587 Attn: Mr.Andrew Williams Mr. Rob Ridings NCDOT Coordinator NCDOT Coordinator Subject: Revised Modification Request for Section 404 Individual Permit, Section 401 Water Quality Certification and Neuse Riparian Buffer Authorization for Interstate 40 Widening and Improvements from I-440/US 64 (Exit 301) to just north of SR 1525 (Cornwallis Road), including improvements to NC 42 and SR 1010 (Cleveland Road) in Wake and Johnston Counties, Federal Aid Project No. IMNHF-040-4(139)301; TIP Numbers I-5111 and I-4739, Division 5. Debit$570 from WBS Element 42346.3.1. Dear Sirs: As you are aware, the North Carolina Department of Transportation (NCDOT) applied for permits for the subject project on May 7,2019,and modifications on December 20,2019,May 28,2020,August 31, 2020, January 21, 2022, and June 21, 2022. The Corps of Engineers issued the Section 404 permit for the project on September 6,2019,and modifications on February 11,June 11,October 1,2020,and March 22, 2022, respectively. The North Carolina Division of Water Resources issued the 401 Water Quality Certification for the project on July 10, 2019 (NCDWR Project No. 20190593) and modifications on January 22, June 3, September 16, 2020, and January 26, 2022, respectively. This correspondence is to request modification to Sites 14A, 14B, and 55 and replaces the request for modification submitted on June 21,2022. Site 14A: The pipe was installed at this site on June 22nd, and field conditions dictated that additional bank stabilization is needed.NCDOT asked that rip rap be placed upstream of the pipe outlet,in addition to the bank stabilization that was originally permitted. This change will result in the following changes in impacts: • 15 linear feet increase in permanent stream impacts(bank stabilization) • 400 square feet increase in mitigable buffer zone 1 impacts • 186 square feet increase in mitigable buffer zone 2 impacts MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION TELEPHONE: 919-707-6000 LOCATION: ENVIRONMENTAL ANALYSIS UNIT FAX: 919-212-5785 CENTURY CENTER,BUILDING A 1598 MAIL SERVICE CENTER 1000 BIRCH RIDGE DRIVE RALEIGH NC 27699-1598 WEBSITE:NCDOT GOV RALEIGH NC,27610-4328 Site 14B: Similar to site 14A, the pipe installation at this site requires additional bank stabilization upstream of the new pipe. This is in addition to the originally permitted bank stabilization below the new pipe. This change will result in the following changes in impacts: • 12 linear feet increase in permanent stream impacts(bank stabilization) • 12 linear feet decrease in temporary stream impacts(bank stabilization) • No changes in buffer impacts. Site 55: Due to repeating erosion events and the general instability of the channel below the outlet of Site 55,the Design Build Team proposes rip rap be added to the flow line to match the length of the previously permitted bank stabilization. This will result in the following changes: • 40 linear feet decrease in bank stabilization impacts • 40 linear feet increase in permanent stream impacts • No changes in buffer impacts Attached are the following revised permit drawings depicting the affected area, all of which have a revision date of either June 1,2022 or June 27,2022: • Permit Drawing 7: Ditch detail sheet • Permit Drawing 31: plan sheet 17 without contours • Permit Drawing 32: plan sheet 17 with contours • Permit Drawing 111: plan sheet 49 without contours • Permit Drawing 112: plan sheet 49 with contours • Permit Drawing 122: summary table • Permit Drawing 125: summary table • Buffer Drawing 15: buffer plan sheet 17 • Buffer Drawing 41: buffer plan sheet 49 • Buffer Drawing 47: buffer summary table • Buffer Drawing 51: buffer summary table Compensatory Mitigation Compensatory mitigation for the additional jurisdictional stream impacts has been debited from the Marks Creek Mitigation Site. The revised debit ledger is included with this modification request.. REGULATORY APPROVALS Section 404: NCDOT requests modification to the USACE Individual 404 Permit for the project as required for the above-described activities. Section 401: We are also requesting modification of the Section 401 Individual Water Quality Certification and Neuse River Buffer Authorization from NCDWR. We are providing this request to NCDWR, for their approval. Authorization to debit the$570.00 Permit Application Fee from TIP No. I- 5111/I-4739/WBS 42346.3.1 is hereby given. A copy of the permit modification request and its distribution list will be posted at https://xfer.services.ncdot.goy/pdea/PerinApps/. If you have any questions or need additional information, please contact Chris Rivenbark at civenbark@ncdot.gov or 919-707-6152. Sincerely, EDocuSigned by: C. P14 III AAAD1248B309416... for Philip S. Harris,III,P.E., C.P.M. Environment Analysis Unit Head cc: NCDOT Permit Application Standard Distribution List Marks Creek Mitigation Site ONEID 092-011 The Marks Creek Mitigation Site is located in Wake County within the USGS hydrologic unit 03020201 of the Neuse River. NCDOT acquired the 66 acre site to mitigate for unavoidable, jurisdictional impacts associated with TIP R-2547. Monitoring requirements were performed from 2004 to 2008 and the site was closed out in 2009. Table 1 shows the final mitigation quantities approved for the site. The site has been placed on the NCDOT On-site Debit Ledger for use within HUC 03 02020 1. Tables 2-5 indicate all mitigation debits that have occurred per regulatory agency approval. To offset unavoidable stream impacts associated with T.I.P. I-5111, the Marks Creek Mitigation Site will be debited 80 linear feet of credit to offset 40 linear feet of stream impacts and 1479 square feet of buffer mitigation to offset 400 square feet of impacts in zone 1 at a 2:1 ratio and 186 square feet of impacts in zone 2 at a 1.5:1. This debit is reflected in the debit ledger below. Table 1. Mitigation Quantities Approved HUC Mitigation Type Starting Amount Additional Notes 3020201 Stream Preservation 3247(Ln.Ft.) 3020201 Riparian Wetland Restoration 3.33 (Ac.) 3020201 Riparian Wetland Preservation 11 (Ac.) No Debit as of 8/18/2014 3FO202011 Riparian Wetland Enhancement 1 13 (Ac) 3020201 F Buffer Restoration 324700 (Sq.Ft.) Table 2. Mitigation Debits—Stream Restoration Mitigation Type Debit Amount Status Site TIP Action ID# NOTES (Ln.Ft.) Stream Restoration 2873 Close Out R-2814A&B Mod 2008-01316 Modification (Sep 21, 2010) decreased impacts by 268 If. Stream Restoration 80 Close Out 1-5338 (Areas 1, 2A, Permit By Impacts were 40 and 2b) Default �Iin. Ft. @ 2:1 ratio Stream Restoration 25 Closeout 1-5338 NW18 being permitted separately for stream impacts Stream Restoration 80 Close Out I-5111 F_rffli om2: ratio Table 3. Mitigation Debits—Riparian Wetland Enhancement pr Mitigation Type 11 Debit Amount(A( Status Site TIP Action ID# NOTES Riparian Wetland Enhancement 10.9 Close Out R-2000F&G 199920387 Unable to confirm in permits. From old DOT ledger Riparian Wetland Enhancement 0.98 Close Out I R-3825A 201101695 I 0.49 @2:1 Riparian Wetland Enhancement 1.08 Close Out U-5748 0.36 acres of impacts at 3:1 ratio Table 4. Mitigation Debits Buffer Restoration -IF Mitigation Type Debit Amount Status Site TIP Action ID# NOTES MI (Sq.Ft.) Buffer Restoration 114659 Close Out I U-3804 200421647 Buffer Restoration 114 Close Out I R-2814-B Mod 2008-01316 Buffer Restoration 75581 Close Out B-3528 2008-00153 Buffer Restoration 1655 Close Out I B-4944 2009-00207 Buffer Restoration 34683 Close Out 1-5338 (Areas Permit By �6,915 sq ft of 1, 2A, and 2b) Default impacts for zone land 9292 sq ft of zone 2 totaling 34,683 sq ft with 3:1 ratio for zone land I1.5:1 for zone 2 Buffer Restoration 12,914 Close Out B-4659 INCDOT was required to use a 3:1 ratio for zone land a1.5:1 ratio for zone 2. Mitigation Type Debit Amount Status Site TIP ] Action ID# NOTES (Sq.Ft.) Buffer Restoration 4,947 Close Out B-5121 NCDOT was required to use a 3:1 ratio for zone land a1.5:1 ratio for zone 2. Buffer Restoration 5322 Close Out B-5656 Impacts of 1699 sq ft zone 1 @3:1 and 150 sq ft zone 2 @ 1.5:1 Buffer Restoration 54,672 Close 1-5700 zone 1 (14,723 Out @3:1 =44,169) zone 2 (7,002 @ 1.5:1 = 10,503) Buffer Restoration 1479 Close OUt 1-5111 Zone 1:440 sq ft@ 3:1 Zone 2: 186 sq ft @1.5:1 Table 5. Mitigation Debits Riparian Wetland Restoration Mitigation Type Debit Amount Status Site TIP Action ID# NOTES (Ln.Ft.) Riparian Wetland 3.33 Close Out R-2547/R-2641 200220819 The permit states Restoration that R-2547 will debit 4.4 ac of wetland restoration from Mark's Creek. The remaining 1.07 acres was debited from Wiggins Mill at 2:1 PROJECT REFERENCE NO. SHEET NO. 1-5111/1-4739 2D-6 ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER DETAIL BX DETAIL AR DETAIL AS DETAIL AT BERM STANDARD BASE DITCH SPECIAL LATERAL'V'DITCH STANDARD BASE DITCH (Not to Scale) (Not to Scale) (Not to Scale) (Not to Scale) Natural Natural Ground ?• Ground Natural Natural Nah,ml D '. c Ground ?, 1 Natural Ground D �•' H d Natuml 3, °< Fill y D �'' C° 2y Min.D=2.25 Ft. Ground p7'y or D F\o'6a Slope v Geotextile g °Hem Min.D= SEE BELOW Min.D= 1.0 Ft. Max,d=2.25 Ft. b= 1.0 Ft. When B is<6_0' B=5.0 Ft. B= SEE BELOW Std.No.876.01 Min.D= 1.0 Ft. -L-STA.429+48 RT,L=250',S=0.3% DOCUMENT NOT CONSIDERED FINAL -Y1RPA-STA.17+50 RT,L=35' Type of Line- CL I Rip-Rap BEG.EL=273.50',END EL=272.80' UNLESS ALL SIGNATURES COMPLETED -L-STA.447+93 RT,L=34,S=2.1% -L-STA.454+50 TO STA.455+77 RT D=2.5',B=3.0' BEG.EL=257.30';END EL=256.60' -Y5LPB-STA.13+82.47 TO STA.17+50 RT PERMIT DRAWING SHEET 7 OF 125 REVISED 08/11/2020 DETAIL AU DETAIL AV DETAIL AW DETAIL AX DETAIL AZ REVISED 07/13/2021 SPECIAL CUT BASE SWALE LATERAL BASE DITCH BERM BASE DITCH LATERAL BASE DITCH LATERAL'V' DITCH REVISED 11/19/2 021 (Not to Scale) (Not to Scale) (Not to Scale) (Not to Scale) (Not to Scale) REVISED 6/1/2 0 2 2 b 3,7 b b Natural `3-) o< Front Natural Natural 1 RDWY Natural jC<gOR O P ♦- Ground °� A'� et pitch Ground ) 1„fit Fill y 9' Ground FR '� lit Fill Fill F N 3 3'� Sloe Ground 3. D E Natural yoye D F\a Slope d D p d d D F\� Slope Ground 3y D .j•� 1"iT-t. Slope 4.B Min.D=1.0 Ft. GEOTEXTILE g Min.D=1.0 Ft. B GEOTEXTILE GEOTEXTILE�� B in.D=SEE BELOW Min.D= 1.0 Ft. Max.d=1.0 Ft. Min.D= 2.25 Ft. b=5.0 k. B=4.0 Ft. Max.d= 1.0 Ft. Max,d= 2.25 Ft. 'When B is< 6.0' B= 4.0 Ft. B=4.0 Ft. *When B is< 6.0' B= 4.0 Ft. -L-STA.237+00 TO STA.241+50 LT b= 5.0 Ft. Type o Ft. b= 5.0 Ft. -Y5RPBSPUR-STA.13+73 TO STA.17+20 RT Type of Liner= SEE BELOW Type of Liner= CL B Rip Rap Type of Liner= SEE BELOW -Y2-STA.55+75 TO STA- .18+ LT,D=1.0' -Y2LPD-STA.16+20 TO STA.18+81 RT,D=1.0' -L-STA.229+50 TO STA.231+50 LT,CL B -L-STA.122+50 TO STA.126+50 LT -L-STA.231+00 TO STA.231+75 RT,CL I -Y2RPD-STA.24+43 TO STA.25+27 LT,D=2.25' -L-STA-231+75 TO STA.233+00 RT,CL I -L-STA.234+50 TO STA.238+00 RT -L-STA.233+00 TO STA.234+00 RT,CL B -SRI-STA.10+70 TO STA.12+50 LT,D=1.0' -L-STA.234+00 TO STA.235+00 RT,CL B -LCDWB-STA.99+23.62 TO STA.103+26.82 LT,CL I -YI-TEMP-STA.19+50 TO STA.21+39 RT,D=1.0' -L-STA.235+50 TO STA.237+00 LT,CL B -Y2RPA-STA.22+75 TO STA.23+40 LT,CL I -L-STA.243+00 TO STA.245+50 LT,CL B -L-STA.263+00 TO STA.268+88 LT,CL B DETAIL BE -L-STA.263+50 TO STA.265+00 RT,CL B -L-STA.274+50 TO STA.275+00 RT,CL B CB HIINDEWAILLH PROP.NOISE WALL DETAIL BA DETAIL BB DETAIL BC DETAIL BD VARIES 0-5'«** RIP RAP AT EMBANKMENT PIPE OUTLET CHANNEL STABILIZATION PIPE OUTLET CHANNEL STABILIZATION STANDARD BASE DITCH = 4, 2, VARIES** (Not to Scale) (Not to Scale) (Not to Scale) Natural Be (Not to Scale) U d t- 10'min. Natural Natural Elevation � z, atural Natuml Ground 3y nu:\ Ground O Ditch F"'+' ��0� Gr000 Ground D Grad 1.0'min. r T=15" (CL I) "Na o n ,.'t T-15"((CL q d y ,A.� ?,Y D=SEE BELOW T lY (IS B) t _ erTr� T=12"(CL el O T=15"(CL I) Geotexrile GEOTEXTILE T 1 GeoteztiCL le B Min.D=1.0 Ft. a racai.wrom�x vn�Esoens ooa'X1o'E D.Lounon nr nu or rnNI' CHANNEL BED Max.d=1.0 Ft. (Va ble) Channel Bed *when B is< 6.0' B=4.0 Ft. Type of Liner= SEE BELOW Length= SEE BELOW Length= SEE BELOW (Variable) DETAIL AT NOISE WALL Type of U.- CL I or B Rip-Rap-Keyed4n(SEE BELOW) Typa of Liner- CL or B Rip-Rap-Keyed-In(SEE BELOW) Type of Liner= CL B Rip-Rap -L-STA.257+25 RT,CL I RIPRAP 'Rip-R°p in Ch°nneltied•no gear xiile -L-STA.245+56 RT,L=20',CL I RIPRAP -Yl-STA.30+05 LT,L=50',S=1.6% -L-STA.259+50 TO STA.271+00 RT,D=0.5' -L-STA.272+82 RT,CL B RIPRAP -L-STA.169+12 LT,L=5',CL B RIPRAP -L-STA.290+70 LT,L=35',CL I RIPRAP BEG.EL=315.80,END EL=315.00 -L-STA.276+00 TO STA.280+25 RT,D=0.5' -L-STA.272+87 RT,CL B RIPRAP -L-STA.172+65 LT,L=8',CL B RIPRAP -L-STA.121+50 RT,L=20',CL B RIPRAP -Y1RPD-STA.23+00 TO STA.23+31 LT,S=7.2% -L-STA.355+00 TO STA.366+50 RT,D=0.5' -L-STA.273+27 RT,CL B RIPRAP -L-STA.176+20 LT,L=361,CL I RIPRAP -L-STA.124+36 RT,L=30',CL I RIPRAP BEG.EL= 302.27,END ELEV=300.0 -L-STA.250+00 TO STA.251+00 RT,D=0.5' p -L-STA.274+95 LT,CL B RIPRAP -L-STA.284+50 LT,L=5',CL I RIPRAP -L-STA.126+90 RT,L=30',CL I RIPRAP -Y1RPD-STA.23+31 TO STA.23+96 LT,S=9.2% -L-STA.256+50 TO STA.258+50 RT,D=0.5' s -L-STA.322+48 LT,CL B RIPRAP -L-STA.396+41 LT,L=45',CL I RIPRAP -L-STA.275+43 LT,L=25',CL I RIPRAP BEG.ELEV=300.00,END ELEV=305.96 -L-STA.258+50 TO STA.262+00 RT,D=1.0' -L-STA.322+88 LT,CL B RIPRAP -L-STA.369+00 LT,L=5',CL B RIPRAP -L-STA.323+13 RT,CL I RIPRAP 9 -L-STA.386+30 RT,CL I RIPRAP -L-STA.381+90 RT,=1 CL B RIPRAP 41 -L-STA.395+82 RT,CL I RIPRAP -L-STA.416+93 LT,L=10',CL B RIPRAAP -L-STA.447+84 LT,L=64',CL I RIPRAP m -L-STA.405+84 RT,CL I RIPRAP -L-STA.461+38 RT,L=301,CL I RIPRAP DETAIL BJ DETAIL BU 3I -L-STA.406+05 RT,CL B RIPRAP -L-STA.111+82 LT,L=35',CL I RIPRAP* -o -L-STA.447+72 LT,CL I RIPRAP -L-STA.144+04 LT,L=40',CL I RIPRAP TOE PROTECTION BANK STABILIZATION -L-STA.447+93 LT,CL I RIPRAP Notto Scale (Not to Scale) =i -L-STA.174+80 RT,CL B RIPRAP -L-STA.1 +4 LT,L=4 ',CL I RIPRAP* I I -L-STA.171 +49 LT,L=55',CL I RIPRAP 1.5:1 or Flatter m -L-STA.210+62 RT,CL I RIPRAP -L-STA.205+30 RT,L=55',CL I RIPRAP RETAINING -L-STA.215+34 LT,CL I RIPRAP Natu -L-STA.215+52 LT,CL I RIPRAP -L-STA.233+34 LT,L=45',CL I RIPRAP WALL v -L-STA.234+09 LT,L=40',CL I RIPRAP* °oond b Gr°°° �2' -L-STA.247+67 LT,CL I RIPRAP -L-STA.247+67 LT,L=50',CL I RIPRAP _ -L-STA.270+63 LT,CL I RIPRAP -L-STA.270+61 LT,L=33%CL I RIPRAP CLASS II RIPRAP d=2.0 Ft. GEOTEXTILE LCl b=2.0 Ft. Geotextile U Type of Liner= CL II Rip-Rap i -L-STA.105+80 TO STA.Ill+00 LT -L-STA.103+95,Length=225' -L-STA.104+40,Length=250' DETAIL BF = ; DETAIL BG DETAIL BH 3 FALSE SUMP �F FALSE SUMP FALSE SUMP t (Nono scale) in (NOT TO Scale) (Not To Scale) DETAIL BW CD Median Ditch Outside Ditch DETAIL BV SPECIAL LATERAL'V'DITCH Traffic Flow 1p•� 2 HAZARDOUS SPILL BASIN (Notto Scale) Outside Dllch � �z.o'� 9' ►2' l Traffic Fo TOTAL CAPACITY REQUIRED:Cl N GI (See Chart Below) 20' GI TOTAL CAPACITY FREEBOARD EBOARDIDED:C2 o< E �-$ eta �-S F3' 0j, �'\°°c Slope GI Natural 1 Fill etc. t S- etc. MIN EL2 Groans 7 8 o -Y8RPA-STA.23+00 RT �orye D F L S=Ditch Sloe fE Proposed Ditch S=Ditch Slope fL Proposed Ditch p p ,S. C1=17780cf P S=Ditch Sloe Pro osed Ditch u'. Dl '. > Ditch Grade L Ditch Grade L C2=18036cf C 0.0% To 2.0% 20' Over 4.0% To 6.0% 40' EL1=251.0' Min.D= 1.0 Ft. LLi Over 2.0% To 4.0% 30' Over 6.0% 50' EL2=255.0' n D1=3.0' -Y1RPB TEMP-STA.12+50 TO STA.13+28.76 RT H • s L1=96.0' ELI L2=120.0' W SLUICE GATE B2 HDWL g1=48.0' vr Bl _ Q SZ 0 30� R�X� P:(919)878-9560 H- L1 -� 8601 Six Forks Road,Forum 1,Suite 700 N Raleigh,North Carolina 27615-3960 L L2 NC License No.F-0112 N-may Engineers I Construction Managers I Planners I Scientists L M=� www.rkk.com LnU_00 Responsive People I Creative Solutions RAW VON PROJECT REFERENCE NO. SHEET NO. 25 0 215 50 PERMIT DRAWING REVISED 6/27/2022 1-511111-4739 17 00 — SHEET 31 OF 125 NAD 83 R'W SHEET NO. SCALE FOR INSET DENOTES IMPACTS IN ---,NNWI � ROADWAY DESIGN HYDRAULICS SURFACE WATER ENGINEER ENGINEER 50 25 0 50 100 ;;;= dNC®NgPLE rE PLANS SCALE DENOTES TEMPORARY DO NOT USE FOR /W ACOUISITION IMPACTS IN SURFACE WATER Tg MARTIN MARIETTA MATERIAL INC. 15 R _ _-_ MAPPED PER WAKE CO.G.I.S. TB P O7 4 DOCUMENT NOT CONSIDERED FINAL 14 � UNLESS ALL SIGNATURES COMPLETED / SITE 1413 ------ - SITE 14A - - MOVE DI u SRM W/14NSY GEB RIP OT,.LLEPI N S ET C SITE 14C ON BANKS ONLY 2 TONS CL B RIP RAP ----------------- LENGTH=8' 7 SY GEOTEXTILE BZ 2 8Z 2 (SEE DETAIL BB) 62 ON BANKS ONLY 161 S 50 TONS CL I RIP RAP ? LENGTH=5' ------ W/98 SY GEOTEXTILE SEE INSET A (SEE DETAIL BB) g1� BZ 1 BZ) BZ 2 ON BANK LENGTHS ONLY B2, B2 2 BZ 2 SEE INSET B (SEE DETAIL BB) SEE INSET C = t8� TB_�TB� B TB eZwluoN BZ R/W MON TB TB "-�5 TB Bz t T '�O�TB� -TB T6 TB TB—TB le SPECIAL CUT SWALE �iB _TB t6 "fL —TB_TB SEE DETAIL G L~ --- —TB TB �� TB d BC8 BZ 1 SPECIAL CUT SWALE BZ 1 �.:-- TB \ l9 W �._ ASP �ff� SEE DETAIL E \ TB OFF 2 TB TB------ i5 - _ - 79 O �sF - TB TB - - r Z iB / --. \ N BZ 1 RCP-111 LL DI.o --_- _--�/ \ ___� COLLAR\� c�i ! A T W -BZT -Br FS 2GI8-WSS - _ ---_---____—�Z--T----- - FS -- — °'49 BZ 2TL T 10'L27NC 2____ EOT �o'CONc Z y MOVE DI ^'n 02 O c m0 S= I-40 WBL 35'CONC (n r roF o'ON TF —————— -- --- ————— --ms -- y Lor' 42" -III O REMOVED` .p 165+00 /70+00 r 175+00 _ cl-T- --- _ -- — — -- — — B 2 ST GIB- — — — —  — — RCP-III J FBI REMOVE DI r x 74" - - 24"RCP-III R OVE DI 15"RCP-III TB 2GIB-ST 2 I_ 15" REMOVE DI _ Q 6. 18"RCP-III _ EOP O VI ——— _ _ — — — _ ------ --_ _--- ---- O A F 9! O A J E07 Z !-40 EBL 35'CONC B�F FOJ` EOT __ rn W ------ 10 co'c ____ _ ______ ----- Z — --------- ------ 3 FS COLLAR AND REMOVE DI MTL ONC N s /�ii.0 III FS EXTEND pI ,-�', COLLAR W a J LL \ 18"RCP / _ y T ,3 mQ •• P_I I 2GIB- S _ _ _ _ __ _ FS N ----- / SPECIAL CUT DITCH rn 0 y� -2GIB -- -- - _ -- - - BERM V DITCH ,,, GIBrn 3 V OO WSS ---_--- -_-_-_---_ �\ .. W/CL B RIP RAP $ mm WSS W/HINGE ____C 10'WIDE BERM HW C —I U yT 15"CSP \ SEE DETAIL C REMOVE —= r / SEE DETAIL \ i N\ SPECIAL CUT DITCH W/HINGE / T ELEV. 349.5' 2 ELBOWS \_—— _ \ SEE DETAIL D // SEE DETAIL J 00 .. .. .. .. BE V DITCH BERM V DITCH BDO < - I� SEE DETAIL A SEE DETAIL A 42"RCP-III v �C` SPECIAL CUT DITCH El e Riw Mary Exisnrvc R R/W MOM - R/W MON BERM V DITCH W/HINGE 2 TONS CL B RIP RAP SEE DETAIL A Riw MON -L- SC Sto.176+23A0 SEE DETAIL D 7 SY GEOTEXTILE C O N a -L- TS Sta.173+23.00 N C 0 k U m MARTIN MARIETTA MATERIAL INC. GARNER ECONOMIC DEVELOPMENT CORP. U i MAPPED PER WAKE CO.G.I.S. O1 14 o � TB V E 3 TB0 w w INSET A INS T B RKX P'.(919)878-9560 8601 Six Forks Road,Forum i,Suite 700 p Raleigh,North Carolina 1227615396D NC Li ense No Engineers I Construction Managers I Planners Sciamsts NS w.vW.rkk.com FOR -L- PROFILE SEE SHT.85 Rearxn,..People l creative SOlutrone R W VON PROJECT REFERENCE NO. SHEET NO. 25 0 21s 5o REVISED 6/17r1022 ^ PERMIT DRAWING ma 1-511111-4739 17 SHEET 32 OF 125 - W SHEET NO. SCALE FOR INSET DENOTES IMPACTS IN — - ROADWAY DESIGN HYDRAULICS SURFACE WATER - -- ENGINEER ENGINEER 50 25 0 50 100 iji i.."j INCOMPLE rE PLANS SCALE DENOTES TEMPORARY Se \ DO NOT USE MR /W ACQUISITION IMPACTS IN SURFACE WATER ism 3em `` __-37m - 3q� A ERIA I Jr se PER WA /` DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 350 36 36m SITE 14B SITE 14A 5m MOVE DI 3� 3m0 0 SRM 5 SITE 14C m_ _-- g 330 330 3� TH= 7 S GE LE 3e B SEE DETAI 1 TO S CL IP \ ON EN KS_ONLY 91 Z 98 S CEO XTILE (SEE DETAIL B) N BA KS LY 01 BZ 2 ENG =35' BZ BZ 40 (5 DEf TB BZ l B MON ' � � � 32 q0 BTe B Tg I+ r —TB le SPECIAL T SWALE W/HI LU TB _ W LU —— I 15"RCP- mzc T LLJ — 2GI8-WSS W BZ 2 -- --- ---- --- 2 -- -- --- BZ --- — DOVE D1 �n 1 Ln EOr la CONC — -- r O WBL 35'CON ? m N rnON Tr- / - -- — — --- — � LOP � �p 5+00 33m 00 \ r 0 =GI -T- —R - - 42" VE J -- — — — -- — — — -- — — 82 GIB- — — — — — — — — — — CP_III r 2 I 15n R Q10 IJREMOVE DI 7 4" - 4"RCP-III R OVE 15"RCP-III TB 2 REM I _ 6 0 r 18"RCP-III p O C J A m'E07 Z 1-40 EBL 'GONG Id EOr CONC m _ rn 0 -- ° W —_racoNc -- --- MIL 3FSCOLLAR A EMOVE DI ism N s ---� EXTEND 18"RCP �, .. - .- P-I _ en -- UT DITCH m a V .. .. se msE — W/RING HW 'C 'I d G L WS all _ SEE W 0 2 B GH V CH p < 42" P-1 _ ^ a SEE All A - SEE ETAIL SPECIAL CUT DITCH v xE- SSTING IP RAP w Mory - Piw BE V DITCH Riw our, -L Sc Sto. +23A0 W/HINGE D 5Y EE DETAIL A n i 09F C N � OEE a -L- TS Sto./ +23.00 N 0LE C 0 k [) E£ 4) 0� GA IN E 0 MIC D ELO T CORP. IETTA MATERIA C. i MAPPED PE WAKE CO.G.I.S. or >E 320 14 I 3 N O ti V e C ' N E 0 se N w y IN$ RiC'4r'fC P'.(919)878-9560 Rala Six Forks Road,Forum i,1111 700 o i0 msE -- NC Li ens,NoCF-00111227615-396D Engineers I CmnsWdimn Managers I Planners I ScienLsts S � vmnv.rkk.wm �i 3s FOR -L- PROFILE SEE SHT.85 Reapo..r.Peeple l C..N.Sdutfone d��� Project Submittal Interim Form NORTH CARO.INA Envlmnm¢ntrtl Qvofiry Updated September2020 Please note:fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type:* For the Record Only(Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre-Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Pre-Filing Meeting Date Request was submitted on: 5/7/2019 Project Contact Information ................................ Name: Chris Rivenbark Who is submitting the information? Email Address:* crivenbark@ncdot.gov Project Information ....................................................................................................................................... Existing ID#:* Existing Version:* 20190593 6 20170001(no dashes) 1 Project Name:* Interstate 40 Widening&Improvements(1-4739 1-5111) Is this a public transportation project?* Yes No Is this a DOT project?* Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)?* Yes No Unknown TIP#: WBS#: 1-4739 1-5111 42346.3.1 (Applies to DOT projects only) County(ies)* Johnston Wake Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document 1-5111 1-4739 Individual Modification Wake Johnston 6.14MB July 6 2022.pdf Only pdf or kmz files are accepted. Describe the attachments or add comments: Revised:cover letter,debit ledger, permit drawings,and buffer drawings which replaces our 6/21/22 submittal. * By checking the box and signing box below, I certify that: • 1,the project proponent, hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief. • 1,the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the online form. Signature:* h C 111 Submittal Date: 7/6/2022 Is filled in automatically once submitted. 25 0 25 50 P DENOTES FILL IN PROJECT REFERENCE 9 SHEET NO. \ PERMIT DRAWING WETLAND INSET A INSET B —5/////-4739 49 ° SHEET 111 OF 125 � RW SHEET NO. SCALE FOR INSET DENOTES IMPACTS IN ROADWAY DESIGN HYDRAULICS SURFACE WATER Pp 3 ENGINEER ENGINEER 50 25 0 50 �0 DENOTES TEMPORARY m IMPACTS IN SURFACE WATER QO �PQ ][NC®Ng1�LE �' YyII.ANS SCALE ` DO NOT USE FOR f W ACQUISITION 65 TONS CL I RIP RAP W/125 Sy GEOTEXTILE LENGTH=40' (SEE DETAIL BB) \ / F � DOCUMENT NOT CONSIDERED FINAL 83 TONS CL I RIP RAP BARBARA PENNY \A/I UNLESS ALL SIGNATURES COMPLETED W/155 SY GE IL ��/J Q10-16.0 cfs ON BANKS ONLY V10=1.97 il4 LENGTH=45' y p L1 REVISED 64'2022 (SEE DETAIL BB) JB W/M H i 82A SITE 55 y ---- F `A�Ibprje� '��H SJ Vl'0=190 flh 5�9 ti0 ml SEE DETAIL AV m m�SITE 54 �� SK 5 TONS CL B RI RAP I D JERALD L.PETERSON 85A = &� LATERAL 4'BASE W/14$Y GEOT XTILE LATERAL 4'BASE DITCH LP LUZMILA PE TERSON LATERAL 4'BASE SWALE JS ,@ SWALE SEE W/CL 8 RIPRAP �/ "�,' DETAIL AM R p 0%SEE DETAIL AV _-- 9+99. L IN SEE SEE DETAIL AM a >e D � 0 40% ATTIN 85 INSET A e°� t �E P 2 x- 82A g/ / \ X�X X SPECIAL CUT 4'BASE SWALE s //� 4"RCP II \ X SEE DETAIL AU BARBARA PENNY 9N—� E R,w X 0 OPB 6 KN El ASEM P \ 1 LU X C P _ 3 CS REMOVE LLI WI ti uy SEE 2EL O \ / MCbPW — %� —_ 21ELBOWS F Z 2 ELBOWS \ / EL80W5� R,w MON x �� m INSET B \ F X ,5"CSP / IB-W' \/ 2GIBs-WSF * — JB vrMH u 2 (� y_ 2-2GIBs W JB wSlob Lid 15"RCP-III REMOVE r W II - - .- - .. .. - -. -. - a 41_ N IIlOI MTL MT L MTL MOVE_-- OVE NJ PLUG & FILL ,`.' PLUG & FILL FILL ---- -- --- -----_— £--_ -- __ _ FILL O --- � FILL -------=11---==---�4.rJ'f u _ ------ z --------------- -- —�{ N INTERSTATE 40 WBL 24'CONC v+ ----- — N N v------- — 235+00 -- — -- ------ — ---____-Z —�B 2 rrnCK — --�— — re 2 CM —U— --0 —0--tea TB 201 ST lr — — 1r' P-4V S RQPN —� 9-- — --�—�—� _15"RCP=1V —_--- Ull TB 2GI6 —_ — N 32°53'407"W REMOVE 8'RCP REt� l TB 2GIB-ST --15"RCP ---__ ---------- REMOVE ——————————— ————————————— ——————————————— ——_—————— Q ^ •+ILL F 00 — TB 2GIB ST7CEFfOVE----- _—_ TB 2GIB-W _--------- O N ---— — -- a �WARIF ———— -------- ------ Z RSTATE 40 EBL 2a CONC _ FILL ------ ———- N INTE I ---- ----- — ----- ------- ------- — -- -- -- ---------= MTL rn 2� m LLI REMOVE .. .. .. .. -. _ .. .. _y Z _ ---- i^ 8.0' — TOE PROTECT— EaTT—m �� \\\ CON `� ---� " W/CL IRIPRAP m m J / \---- ---1 �— ► 2 LBO SEE DETAIL T 4 W L V2 9 a,w MON SPECIAL CUT DITCH // C p� ,^ Y r R/W MON / R/W MON 0 m � EL SEE DETAIL L B =�� Q U _ ——— - -- ——— LATERAL 4'BASE SWALE 40TC SEE DETAIL AM HW C > 0"RCP—III -a — —— s LATERAL 4'BASE BERM V DI H —L— Sc Sta.241+24.63 Gs� 84C 0" DITCH W/CL B LATERAL 4'BASE DITCH SEE DETAIL K M RIPRAP SEE W/CL B RIPRAP Z LATERAL 4'BASE DITCH I �'^ `1 a DETAIL AX SEE DETAIL AV s W/CL I RIPRAP ❑ � 0.30% 0.39% ��� SEE DETAIL AV BERM 4'BASE DITCH 9 W/CL B RIPRAP �� ZO SEE DETAIL AW m —L3— STA.240+01.36 RT CONTRACTOR TO FIELD ADJUST THOMAS C.III BUCKLEY m (WITH RIPRAPI JESSICA BUCKLEY 3 ALL LOCATIONS OF / CONCENTRATED FLOW KATHRYN HOLLAND CAVENAUGH DANIEL ALTON HOLLAND ch TRAVELING ONSITE L INTO PROPOSED DITCHES 83 —L— TS St 238+64.63 84B � 84A O BARBARA PENNY — rn RHONDA HOLLAND TOPPINGS ° 82 m / V C E C 0 C W E W / RiC�fC P'.(919)878-9560 6601 Six Forks Road,Forum 1,Suite 700 Raleigh,North Carolina 27615-3960 N O INC License No.F-0112 0� Engineers I Construction Managers I Planners Scien fists �S —.rkk.com �� Responsive People I Creative Solutions O % PROJECT REFERENCE NO. SHEET NO. 25 0 26 b0 PERMIT DRAWING F 1-511111-4739 49 DENOTES FILL IN J WETLAND SHEET 112 OF 12S I [� 0y� \ W SHEET NO. SCALE FOR INSET DENOTES IMPACTS IN ROADWAY DESIGN HYDRAULICS 1117 SURFACE WATER ENGINEER ENGINEER 50 25 0 50 100 i DENOTES TEMPORARY IMPACTS IN SURFACE WATER �r INCOMPLE L' PLANS SCALE V DO NOT USE FOR /W ACQUISITION 5 T N C IP P/ 2 EO E LE E G = Y f i E D B C r \ DOCUMENT NOT CONSIDERED FINAL 83 T NS IT RAP B RI RA P N \A/� \ UNLESS ALL SIGNATURES COMPLETED W/1 SY EOT XTILE �Y Q10=16.0 cfs LENG KS O LY V10=1.97 il4 z REVISED 6✓1/2022 SEE AI BB) $ SITE 55 �'--- — kU LP. Bl�.SE DIZ H SJQ10=15.0 cfs / W/C9 AIPRAP VIO=1.90 fVs T' ti 11 SEE DETAIL AV �� m S K O SITE 54 5 T NS CL B RAP JERALI L ETERSO SSA LAT RAL 4'B W/4 SY GEO XTILE LATERAL 4' E DITCH LUZMILA ETERSO LATERAL 'BASE WA 15�� S ALE SEE W/CL PIZ ___ 9+99 6 L gp SE DETAI AM ETAIL AM R S AIL AV 0% 0% NTTIN 85 SEE INSET A ( c 9 F i�i X__X X SPECIAL CUT 4'BA SWALE m i SEE DETAIL A AR ARA PE U B B �a 'RCP II, R/W i E V 0 � 'oaaiNaRas P °Y ti0 1B/w/MHLU � iT h 5"CSP E __ Z W ti t' 24„ x wu Pw � � < <�' A,w�__ 2�ELBOW F • 16 Z EL OWS / E R/w On x — � — —— — — T N ,B-W; / 2-2GIB F 2GI _ .- LU LU 15" — ---- —�_ PLUG & FILL /`.' - ------------- PLUG & FILL ---- PLUG &AFI ---- _-- ----- f----- 11I�L�__ _ O FILL O --- F -------=11—_—_— --��5f _ _ ------ ---- z = --- -------- — --0 � —{{� 'v INTERSTATE 40 WBL 24'CONC -------fit -- - -- --------- � -- —______ c`) —ice —E — _=T1 T — �tC IV — — - '- B GIB ST 5 _ �— —�— _ 15 RCP=1V -- Ull _r REMOVE 18' CP TB 2GIB-ST %�" TB 2GIB -- .. - —_ -----_------ N ----- REM ----� ———————— —————————— -- ------- a--- ----- --_ _ I- °' --------- TB 2GIB-ST7CEFfOVE — 2GIB�T ------ O �a FILL —--—_ U _--- _ h ----- — LLL Q Z--- - --- ------ ¢ FL(]WARIF ------- O Z INTERSTATE 40 L 24'CONC _ FILL -- ---- _------ ----- -- N ,..y —__-- -------- - --- I �77 --------- m J - rn ` N m C W 7 a 0 CONIC 62 m 6Z > 2 BO S . \ 1 �� C4 i RIP1tAP E DETAIL OT R/w N C a SPECIAL CUT DIT I,q^ � � � \ EIP SEE DET R/W MON V, B Q � _ TERAL 4'B TC O HW C S zza � s LATERAL a' E E I -L- SC S 24If24.63 8 C o; DITCH /CL B TE 4'BASED CH EE D AI K M RIPRAP S E 4'BASE DITCH A I 5 /CL I R DETAI SEE AIL AV s❑ .0/Q 0 6 SEE AIL AV 0. 39 BERM 4' SE DITCH 9 W/ RIPRAP Lz ETAIL AW -L3- T .240 0 .3 w TRACF RTO FIEL ADJU THOM C.III BUCKLEY m IT RIP 1b JE SICA BUCKLEY TNC LTN TOD FLO KA YN L CAVE U DANIEL LT HOLLA o INT PROP SED ITC 8. -L- TS St 8 3 m 84A 413 ARBA PENNY on RHONDA HOLLAND TOPPINGS 82 o` 84 m V C N E C 0 C W !n H 062 RiC�'fC P'.(919)878-9560 6601 Six Forks Road,Forum 1,Suite 700 Raleigh,North Carolina 27615-3960 N N INC License No.F-0112 ONE 00 Engineers I Construction Managers I Planners Scientists ec w.vv-rkkwm �� Responsive People I Creative Solutions Submitted 7/6/2022 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 14A -L- 168+98-169+22 LT BANK STABILIZATION - SRM < 0.01 < 0.01 20 20 14B -L- 172+50-172+75 LT BANK STABILIZATION - SRM < 0.01 < 0.01 20 31 14C -L- 175+91-176+26 LT BANK STABILIZATION - SRM < 0.01 < 0.01 34 10 15 ONLY IN BUFFER SET 16A -Y5RPD- 22+19-22+29 RT EXIST. 24" CMP PLUG - SCF < 0.01 10 16B -Y5RPD-24+79 RT EXIST. 15" CMP PLUG - SCF < 0.01 15 16C -Y5RPC- 53+31 LT 60" RCP - SCF, WQF < 0.01 < 0.01 < 0.01 < 0.01 46 10 17 -Y5RCP- 54+38-54+68 RT 60" RCP - SOE, WQV < 0.01 < 0.01 < 0.01 12 21 -Y5RCP- 54+68-55+37 RT BANK STABILIZATION - SOE < 0.01 84 -L-250+27 LT 60" WSP - SOE 0.01 87 -L- 250+27 LT BANK STABILIZATION - SOE < 0.01 40 -Y5RPA-22+51-22+93 RT 60" WSP - SOE < 0.01 < 0.01 49 5 18 -L- 256+39-257+51 LT & RT DITCH, 66" WSP- SOI < 0.01 < 0.01 < 0.01 62 6 -L- 256+70 LT BANK STABILIZATION - SOI, WSD 0.02 0.02 < 0.01 < 0.01 34 11 19 -L- 272+67-275+51 LT & RT DITCH, 66" WSP - SNF 0.02 < 0.01 134 14 20 -L- 281+93-284+50 LT & RT CHANNEL CHANGE - SNH, WQE 0.01 < 0.01 < 0.01 < 0.01 99 46 -L- 284+50 LT BANK STABILIZATION - SNH < 0.01 < 0.01 5 10 -L-287+00 LT FILL SLOPE -WRX < 0.01 21 -L- 322+40-323+33 LT & RT CHANNEL CHANGE, 72" RCP, SNY 0.02 < 0.01 138 19 22 -L- 323+33-324+31 RT CHANNEL CHANGE - SOC 0.01 < 0.01 108 22 23A -L- 362+54-364+61 LT CHANNEL CHANGE - SLF/SEM 0.01 < 0.01 204 23 23B -L- 368+90-369+15 LT BANK STABILIZATION - SEM < 0.01 < 0.01 5 20 23C -L- 374+40-379+01 LT CHANNEL CHANGE - SEM 0.02 < 0.01 455 10 -L- 379+01-379+22 LT BANK STABILIZATION - SEM < 0.01 < 0.01 12 10 24 -L- 378+63-379+12 LT I BANK STABILIZATION - SLI, WNQ 1 0.02 1 1 1 1 1 < 0.01 < 0.01 1 56 1 15 TOTALS*: 0.02 0.03 0.02 < 0.01 0.15 0.03 1705 327 0 *Rounded totals are sum of actual impacts REVISED 6/27/22 NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS APRIL 2019 WAKE AND JOHNSTON I-5111 I-4739 Revised 2016 09 09 SHEET 122 OF 125 Submitted 7/6/2022 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size /Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) R R R 54 -L- 232+69-233+35 LT 54" WSP - SJ, WI 0.06 < 0.01 82 -L- 233+33-233+44 LT BANK STABILIZATION - SJ < 0.01 < 0.01 45 10 55 -L- 233+94-234+19 LT 48" RCP - SK, WJ < 0.01 < 0.01 < 0.01 118 10 56 -L- 246+22-246+77 RT CHANNEL CHANGE - SEE < 0.01 < 0.01 102 10 57 -L- 246+73-247+65 60" WSP - SDD, WFF 0.01 0.02 < 0.01 238 10 -L- 247+59-247+78 LT BANK STABILIZATION - SDD < 0.01 < 0.01 55 9 58 -L- 269+75-270+63 LT 36" WSP - SQ < 0.01 100 -L- 270+58-270+85 LT BANK STABILIZATION - SQ < 0.01 < 0.01 33 27 TOTALS*: 0.09 0.06 < 0.01 773 76 0 PROJECT TOTALS*: 0.78 0.17 0.11 0.17 1.55 0.21 7771 1483 REVISED 08/28/2019, 12/12/19, 4/22/20, 7/2/20, 8/11/20, 7/13/21, 8/27/21, 11/19/21, 12/6/21, 6/1/22 NOTES: 6/27/2022 "Rounded totals are sum of actual impacts NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS DECEMBER 2021 WAKE AND JOHNSTON I-5111 I-4739 SHEET 125 OF 125 BUFFER DRAWING MITIGABLE IMPACTS ZONE 1 PROJECT REFERENCE NO. SHEET NO. SHEET 15 OF 52 -5/l111-4739 /7 MITIGABLE IMPACTS ZONE 2 NAB ROADWAY� SHEET NO. DESIGN HYDRAULICS YDRAULIC GLI dNC®Ng1�LE E Y�LANS DO NOT USE FOR f W ACQUISITION REVISED 6/27/2022 MARTIN MARIETTA MATERIAL INC. MAPPED PER WAKE CO.G.I.S. DOCUMENT NOT CONSIDERED FINAL 14 UNLESS ALL SIGNATURES COMPLETED SITE 14B SITE 14A u SRM TONS CL B RIP W/14SY GEOTEXTILE SITE 14C ON BANKS ONLY 2 TONS CL B RIP RAP ----------------- LENGTH=8' 7 SY GEOTEXTILE 1 BZ 2 BZ 2 (SEE DETAIL BB) ON BANKS ONLY 1 50 TONS CL RIP RAP @2 0 LENGTH-5' __ W/98 SY GEOTEXTILE (SEE DETAIL BB) � BZ 1 BZ 1 ON BANKS ONLY 81 BZ 2 LENGTH=35' Bj BZ 2 (SEE DETAIL BB) 7 ez 2 TB BZ w l BZ 2 -- Mory Riw Mon TB ez 1 T TB� �TB TB TB�TB le SPECIAL CUT SWALE B �iB ��T9^ �_-::--�fL —TB� E HINGE ^ TIE TB t8 ;: _��� BZ 1 TB SEE DETAIL G \ l LLI TB T9 SPECIAL CUT SWALE BZ 1 TB� f i W �TB �sF�-::-�sFr �F 7B�— TO _ �TB TB� - - R --- - 5• r N „ .. TB .. .. .- .. /5 - / / ----- \\ BZ 1 iB RC-III A S 15"RCP-III — DI o ----_ / ---� COLLAR\_ - M W -BZT � _— pg 2GI8-WSS - BZ 2__—_---____- 8Z--T--_—__— L FSm --_—_—Ia CONC c� N 2 — -- -- Eor acoNc— zy Nn 1 — -- ----- � MOVE DI ------ _ r m� ez -- r- O -- --------- ------- --- -- ~Z — a�----------------- o m- -- -- --- Os 1-40 WBL 35'CONC ------- _---_�\\7L,� �, y _ N Eo7 ON — 5=---------- 0 - D + — -------- —_-----_—_--- — _==--------- _ _—�- -- -- -- LOP r 42" -III REMOVE. J .gyp 165+00 /70+00 /75+00 � - r —— —— — — —— — — B 2 ST GIB- — _ _ —BLE — — _ _ _ — RCP-III J Q DI REMOVE DI P 74" - - 24"RCP-III R OVE DI 15"RCP-III TB 2GIB ST REMOVE DI EOP 18"RCP-III °TB 2GIB-S ,off q y /T —_-- O (All --— — -- — -- — ------- -- ---- ---- G -- ---- a'- C --� -- ------ --- Oy -- ————— Eo/ BlF^ p csf --- - - N ---------- Z /-40 EBL 35'CONC ------/ ------ - ----- EOT _ -- rn On W _____ /o'coNc ____ _ ______ -O J --------- —————— ——— —————— -------- ---- Il, Z 3 FS COLLAR AND REMOVE DI ON N FS EXTEND DI -(� j-�\_� COLLAR W m J i�� 'i� \\ 18"RCP -- �_ a T ,y mQ P-I I 2GIB- S _ _ _ _ __ __ FS N ----- / J/ SPECIAL CUT DITCH rn 2GI8 -- -- -- .. BERM V DITCH GIB _ — W/HINGE ——— rn V ,ram 10'WIDE BERM HW �I � JO WSS ----- ---------- �\ W/CL B RIP RAP __ �0° WSS `W / SEE DETAIL C 15"CSP \ REMOVE d LL 4 2 ELBOWS \\_—_ i SPECIAL CUT DITCH W/HINGE // T ELDE=349.5' J SEE DETAIL D / SEE DETAIL J " a; BERM V DITCH BERM V DITCH BDO - c+l SEE DETAIL A SEE DETAIL A 42"RCP-III SPECIAL CUT DITCH Riw Mary 2 TONSSCLoBRRIP RAP ii-Riw Mory - W/HINGE R/W Mon BERM V DITCH Riw Mory -L- SC Sta./76+23A0 7 SY GEOTEXTILE SEE DETAIL A SEE DETAIL D c. k m -L- TS Sta.173+23.00 N C 0 k U m / MARTIN MARIETTA MATERIAL INC. GARNER ECONOMIC DEVELOPMENT CORP. U / MAPPED PER WAKE CO.G.I.S. 1 14 3 N O N V C N C 0 C W Ul H E RiCpmfC P'.(919)878-9560 8601 Six Forks Road,Forum i,Suite 700 p Raleigh,North Carolina 1227615396D NC Li ense No Engineers I Construction Managers I Planners Sciamsts NS —.rkk.com \rw•c Responsive People I Creative Solutions I BUFFER DRAWING ALLOWABLE IMPACTS ZONE 1 N 4g 0g-33°E W PROJECT REFERENCE NO. SHEET NO. I SHEET 41 OF 52 \ 3q.,,. 2.5550 111-4739 49 42°t8'tg° 92. W SHEET NO. ALLOWABLE IMPACTS ZONE 2 Se,se69 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER GLI $� p a s �P dNC®NL1�LE E PLANS�p DO NOT USE FOR f W ACQUISITION �J 28.10' 9 s� g 65 TONS CL I RIP RAP N 37'4'27'E 2 2s_ sS 2 W/125 Sy GEOTEXTILE LENGTH=40' m F' (SEE DETAIL BB) sm ES 9' DOCUMENT NOT CONSIDERED FINAL 83 TONS CIL I RIP RAP BARBARA PENNY FWJI . UNLESS ALL SIGNATURES COMPLETED W/155 SY GEOTEXTILE Q10-16.0 cfs m F m ,� O LENGTHS ONLY VW-1.97 il4 a \� es.9�- REVISED 64/2022 (SEE DETAIL BB) SJ (d,D-,S.D tis 82A V70=1.90 flh 1 ,�0 m1 SEE DETAIL AV m m� SITE 54 /// C ( / V I\ 5 TONS CL B RI RAP LP JERALD L.PETERSON LATERAL 4'BASE W/14 SY GEOT XTILE LATERAL 4'BASE DITCH LUZMILA PETERSON LATERAL 4'BASE SWALE j=/ SWALE SEE W/CL 8 RIPRAP —L3— ST 9+99.56 LT JS DETAIL AM R SEE DETAIL AV goo' o o STEPHANIE KT MATTIN Wm SEE DETAIL AM a >e� 2353,gg° .30/0 0.407o W:N\ z N V E 0 / // / \ %LAX X X SPECIAL CUT 4'BASE SWALE / // II \ X - SEE DETAIL AU BARBARA E Riw t \ X — N rvPB 6 PG ASEM P 1 /// /{-M \ XLU x f— 5"CSP / 3 W X (y 24"CSP \ / x "CbPw <— �__C A,w __ 2�ELBOWS F REMOVE Z 2 ELBOWS \\ F / ELBOWS Riw Mory x k— ---------- rn 15"CSP IB—W'IF \/ 2-2GIBs—WSF X— * — JB vrMH u 2 - (n � 2-2GIBs r W E JB w51ab Lid 15"RCP-III REMOVE W r� II - - � MTL N MTL MTL _- ---- -- ——— ——————— ------ A O PLUG & FILL ' y - PLUG & FILL _—_—_------- O —EL—WBL— FILL + O N INTERSTATE 40 WBL 24'CONC °v_+ ------ -- - N ------- — DI-----T—B 2GI6-ST ---- ------__—_---------------�----�---- oN 235+00 Ci cy) -U- -0 -�-9-a TB 2-- 5—C—P�IV —��--�- 15"RCP-� � DI - f G � ILL - _ — -- z —EL-EBL- � rB 2 -O l IL_____ N Z INTERSTATE 40 EBL 2a CONC Tn FILL N i -- — rn —j -- ti z Qvt Z �i^� 8.OF _ ---- TOE PROTECT- Ii rn �\ COwC ---� " W/CL IRIPRAP rn J ice/ ---- ---� �— > �> 2 LBO SEE DETAILO W V \ 19 Riw MON SPECIAL CUT DITCH / (j1 W a ww Mory / � Riw Mory \ EIP SEE D�AI,L B O _ LATERAL 4 BASE SWALE 40TC _— —— - SEE DETAIL AM 77�7-/YG HW III'__ _ __ C > 0"RCP—III G s E LATERAL 4'BASE E BERM V DI H U, 84C DITCH W/CL B LATERAL 4'BASE DITCH SEE DETAIL K LATERAL 4'BASE DITCH RIPRAP SEE W/CL B RIPRAP I Ra:,� y r DETAIL AX SEE DETAIL AV s v W/CL I RIPRAP ,r o 0 N O� SEE DETAIL AV 0.30/0 0.39/0 BERM 4'BASE DITCH W/CL B RIPRAP �1 SEE DETAIL AW m LP - - mJ —L3— STA.240+01.36 RT CONTRACTOR TO FIELD ADJUST v THOMAS C.III BUCKLEY 'r `j (WITH RIPRAP6 ry JESSICA BUCKLEY ms•a m ALL LOCATIONS nc� / CONCENTRATED FLOW - KATHRYN HOLLAND CAVENAUGH DANIEL ALTON HOLLAND ch TRAVELING ONSITE — INTO PROPOSED DITCHES o 83 84B 0 84A m 265.19' BARBARA PENNY s 2a •� rn RHONDA HOLLAND TOPPINGS N zT to sa G 3 62 N 0 84 m /p9 w E w _ — m 0 Ll '�Lg8�g gN� / p9 RICO P'.(919)878-9560 6601 Six Forks Road,Forum 1,Suite 700 Raleigh,North Carolina 27615-3960 N N INC License No.F-0112 0� Engineers I Construction Managers I Planners Scien fists �S —.rkk.com �� Responsive People I Creative Solutions RIPARIAN BUFFER IMPACTS SUMMARY IMPACTS BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT Site Station Structure ROAD PARALLEL No. (From/To) Size / Type BRIDGE ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 CROSSING IMPACT ( 2) ( 2) ( 2) ( 2) ( 2) ( 2) ( 2) ( 2) ft ft ft ft ft ft ft ft 14A -L- 168+89-169+89 LT BANK STABILIZATION - SRM X 2058 1132 3190 14B -L- 172+50-172+88 LT BANK STABILIZATION - SRM X 1824 1680 3504 14C -L- 175+81-176+98 LT BANK STABILIZATION - SRM X 2795 277 3071 15 -L- 186+18-188+55 LT ROADWAY FILL - SRJ X 0 90 90 16A -Y5RPD- 22+19-22+50 RT EXIST. 24" CMP PLUG X 2032 2231 4263 16B -Y5RPD- 24+79 RT EXIST. 15" CMP PLUG X 613 306 918 16C -Y5RPC- 53+20 LT 60" RCP - SCF, WQF X 1489 0 1489 -Y5RPC- 54+38-55+47 RT, 17 -L- 250+27 LT, BANK STABILIZATION - SOE, WQV X 12732 5068 17800 -Y5RPA- 21+91-23+05 RT 18 -L- 256+39-257+51 LT & RT DITCH, 66" WSP- SOI, WSD X 6922 3626 10548 19 -L- 272+67-275+51 LT & RT DITCH, 66" WSP - SNF X 8722 5049 13771 20 -L- 281+93-284+50 LT & RT CHANNEL CHANGE - SNH, WQE,WRX X 3953 956 4909 21 -L- 322+40-323+33 LT & RT CHANNEL CHANGE, 72" RCP, SNY X 8579 4452 13031 22 -L- 323+52-325+32 RT CHANNEL CHANGE - SOC X 3438 1054 4493 23A -L- 361+15-364+65 LT CHANNEL CHANGE - SLF / SEM X 10192 2082 12274 23B -L- 368+90-369+15 LT BANK STABILIZATION - SEM X 1037 0 1037 23C -L- 374+40-378+99 LT CHANNEL CHANGE - SEM X 11509 228 11738 24 -L- 378+63-379+21 LT BANK STABILIZATION - SLI X 1108 0 1108 25 -L- 373+59-374+08 RT ROADWAY FILL/ DITCH - SNM X 61 775 836 26A -L- 381+90 RT BANK STABILIZATION - SNK X 422 0 422 26B -L- 385+01-385+81 RT ROADWAY FILL - SNK X 1025 0 1025 -L- 385+80-386+06 RT BANK STABILIZATION - SNK X 712 0 712 27 -L- 386+06-386+88 RT BANK STABILIZATION - SNO X 1765 1079 2844 28 -L- 387+14-387+47 LT 60" WSP - SEM X 1 1 1116 0 1116 TOTALS*: 31431 15161 1 46592 52673 14924 67597 0 0 NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS AUGUST 2020 WAKE / JOHNSTON REVISED 12/12/2019 I-5111 / I-4739 8/3/2020 42346.3.1 Revised 2018 Feb 6/27/2022 SHEET 47 OF 52 RIPARIAN BUFFER IMPACTS SUMMARY IMPACTS BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT Site Station Structure ROAD PARALLEL No. (From/To) Size / Type BRIDGE ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 CROSSING IMPACT (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) 39 ONLY IN PERMIT SET 40 -L- 99+00-107+44 LT & RT BRIDGE X 14449 7030 21479 1104 2993 4097 41 ONLY IN PERMIT SET 42 -L- 106+42-107+44 RT ROADWAY FILL - SDN, WEN X 7169 5126 12295 43 -L- 109+63-114+04 RT ROADWAY FILL - SEO X 7471 4557 12028 44 -L- 110+99-115+29 LT & RT 60" RCP- SEQ, WEO(1) X 12849 6826 19675 45 -L- 143+25-145+12 LT 48" CSP - SEU X 11384 6539 17923 46 -L- 164+25-164+78 RT 30" CSP / 36" RCP - SEA, WOE X 10987 7345 18332 47 -Y1 RPA- 16+15-17+72 RT 54" CSP - SLV X 5620 2993 8613 48 ONLY IN PERMIT SET 49 -L- 170+95-175+40 LT & RT 66" WSP / 66" RCP - SLU, WC, WOB X 20163 9924 30087 50 -L- 178+00-184+97 LT&RT 60" CSP, CHANNEL CHANGE - SLS,WOA X 38684 25634 64318 51 -L- 199+51-205+31 ROADWAY FILL, 66" RCP - SLR, WNZ X 17316 9930 27247 52 ONLY IN PERMIT SET 53 -L- 209+51-217+29 LT & RT 54" RCP / 66" RCP - MILL BRANCH X 27804 17778 45582 54 -L- 232+37-234+37 LT 54" WSP - SJ, WI, WJ X 8694 5213 13907 55 ONLY IN PERMIT SET 56 ONLY IN PERMIT SET 57 -L- 246+11-248+25 LT & RT 60" WSP - SDD, WFF X 15680 9394 25074 58 -L- 269+75-270+63 LT 36" WSP - SQ X 10972 7749 18721 TOTALS*: 28762 1 15236 1 43999 1 181583 1 113795 1 295378 1 0 10 PROJECT TOTALS*: 115552 1 55966 1 171518 302860 1 169677 1 472537 0 0 NOTES: 1. SEQ under fill slope RT is a total take, 765sf of Mitigable BZ2 Impacts accounted for in totals but not hatched in plan view due to location outside PDE NC DEPARTMENT OF TRANSPORTATION REVISED 8/28/2019 8/27/2021 DIVISION OF HIGHWAYS 12/12/2019 11/19/2021 JANUARY 2022 7/2/2020 1/6/2022 WAKE / JOHNSTON 8/11/2020 6/27/2022 I-5111 / I-4739 7/13/2021 42346.3.1 Revised 2018 Feb 8/11/2021 SHEET 51 OF 52